Blame
|
1 | # Hold The Horde — Progress |
||||||
| 2 | ||||||||
|
3 | **Updated 2026-09-09 12:16 Jerusalem (UTC+3); current status through558.** The owner resumed all project work and original Claude roles in490. All work remains **design only**. |
||||||
|
4 | |||||||
|
5 | **38 tracked design packages:37 preparation-closed,1 open (38).** Scope and development handoff refresh37 ([Production Scope](/Hold%20The%20Flood/Production%20Scope); [Development And Validation Handoff](/Hold%20The%20Flood/Development%20And%20Validation%20Handoff)) closed550 at12:05:47. [V1 Readiness38](/Hold%20The%20Flood/V1%20Readiness), assigned551–553, gives a stable ID to the already-planned final coherence/readiness work; it adds no game scope. All15 domains have usable first-pass contracts/0 partial; M2/M3 are not yet declared complete and this is not a game-completion percentage. Existing24 modules/40 rooms,12 equipment definitions,10 encounters INCLUDING2 setpieces and13 major mechanisms remain proposed content;13 is not every interactive object. Intake407 and administration add no further packages. |
||||||
|
6 | |||||||
|
7 | “Closed” means the bounded written design/review outcome is complete. It does not mean a feature is implemented, every detail approved or fun validated. This board covers the current design batch; it is not a complete campaign or production backlog, and the closed/total ratio is not an overall game-completion percentage. Stable IDs stay fixed; added/reopened work must be recorded explicitly. |
||||||
| 8 | ||||||||
|
9 | **Readiness inputs delivered:** Lead557 at12:12:42 and Systems555 at12:12:20; both STOPPED. Reviewer554 criteria are complete, and its ONE critique558 is now WORKING. Critique target13:15 (12:45–14:00); reviewed38 remains16:00 (14:30–18:00), Jerusalem today. The four-defect Lead claim and13-record audit require reconciliation; neither closes M2/M3. |
||||||
| 10 | ||||||||
| 11 | **Actual availability and handoffs:** original identities/models/efforts remain unchanged. Lead557 and Systems555 are STOPPED after their38 submissions; Reviewer558 is WORKING on the ONE combined critique after criteria554. Receiving558 and the full contract were verified at12:14:39/44. Receiving/full contracts were verified at12:06:22/27 for Lead,12:06:18/22 for Systems and12:07:16/21 for Reviewer. Lead owns only the new administrative V1 Readiness article; Systems supplies a local factual audit for the same38 outcome; Reviewer saved independent criteria554 and is conducting ONE critique of the stopped submission and audit. All existing game articles and prior parent ownership are STOPPED; no37 follow-up is authorized. PM owns36/Home/Information STOPPED. No additional permanent agent or owner forwarding is needed. |
|||||||
|
12 | |||||||
|
13 | ## Forward forecast — baseline F1 |
||||||
| 14 | ||||||||
|
15 | **Adopted F1.14 forecast — 9 September:** M3 first-pass wiki now targets **14 September (11–18 September), low confidence**. M2 coherent core remains11 September (10–14); M4 detailed campaign remains10 November (20 October–1 December). Earlier published22 September remains in the history below. These are estimates, not deadlines guaranteed by team agreement. |
||||||
|
16 | |||||||
| 17 | All dates are2026; times are Jerusalem. Ranges are cumulative from8 September, not durations to add together. Baseline F1 was set8 September. Dates assume ordinary weekdays, about6–8 productive agent/PM operating hours per working day, functioning local hosts, and most consequential owner choices within a working day. That does **not** mean6–8hours of the owner's time or guaranteed overnight operation. |
|||||||
| 18 | ||||||||
| 19 | |Milestone|Target|Current likely window|Confidence|What will be ready| |
|||||||
| 20 | |---|---|---|---|---| |
|||||||
|
21 | |M0 — current puzzle/rescue decision pack|Achieved8 Sep15:59|Original target16:30; range16:30–17:00|Actual completion|Both written comparisons reviewed and closed; owner choices remain separate| |
||||||
| 22 | |M1 — whole-game outline and scope bands|Achieved8 Sep16:20|Original18:30; revised17:00|Actual completion|Draft369, focused review370, response374 and PM integration378 complete; architecture, scope bands and missing-work inventory prepared| |
|||||||
|
23 | |M2 — coherent core-design baseline|Fri11 Sep|10–14 Sep|Medium-low|One compatible proposed/selected loop: opening, builds, combat, oxygen, death/shift, rescue and home; old conflicting rules replaced and consequential choices dispositioned| |
||||||
|
24 | |M3 — complete first-pass game-design wiki, v1|Mon14 Sep|11–18 Sep|Low|Actual first-pass behavior and finite inventories across every major area, integrated dependencies and a revision-specific proposed development handoff; full scripts/exhaustive states belong to M4| |
||||||
|
25 | |M4 — detailed campaign/content specification|Tue10 Nov|20 Oct–1 Dec|Low|The approved finite inventory of regions, rooms, puzzles, clues, encounters, rewards, cast scenes and endings is specified through its state changes and recovery paths| |
||||||
| 26 | ||||||||
|
27 | **The current first-pass forecast remains14 September (11–18 September), low confidence.** It does not currently promise delivery today. The actual38 readiness result may justify earlier delivery; PM will revise the forecast after that result rather than exclude it in advance. Finite inventories and scope/handoff37 are prepared. M4 still expands the first pass into the detailed authored campaign. Neither milestone establishes fun, balance, performance or30/90/100–200hours of play. |
||||||
|
28 | |||||||
| 29 | For M3, “complete first pass” includes the story's causal chain and ending structure; station layout/shifts/persistence; equipment acquisition and progression; combat/horde/trap families; oxygen/resources; rescue/colony/cast arcs; both language-learning arcs and clue distribution; journal, controls and accessibility; content budget, production constraints and the later validation plan. Numerical tuning can remain explicitly provisional. A major domain marked only “TBD” does not satisfy completion. |
|||||||
| 30 | ||||||||
|
31 | M4 remains a low-confidence forecast: the SMALL inventory is prepared but not an owner-selected final game size, and exhaustive branch/arrangement depth is unproven. Scope37 supplies a current conditional350–590 role-hour M4 roll-up; it does not count uncreated specialists as available capacity. The initial30–60-working-day estimate with two additional specialists, and40–80 with the original team alone, are historical baseline scenarios rather than current staffing prerequisites. The10November target (20October–1December) remains unchanged pending actual evidence. Re-estimate after three representative detailed packages—a mechanism room, a two-language correction and a short rescue/home arc—are written and checked. Final gameplay validation requires a separately authorized phase and has no established endpoint. |
||||||
|
32 | |||||||
| 33 | ## Estimated work timeline |
|||||||
| 34 | ||||||||
| 35 | This is a planning schedule, not historical delivery data. “Buffer” is allowed revision/decision time, not an unassigned promise to polish indefinitely. |
|||||||
| 36 | ||||||||
|
37 | |Workstream|9 Sep|10–11 Sep|12–14 Sep|15–18 Sep|Oct–Nov| |
||||||
| 38 | |---|---|---|---|---|---| |
|||||||
|
39 | |36 campaign interfaces|**Closed11:49:32**, ahead of14:00 target|Use accepted crosswalk in whole-v1 coherence|Core buffer through14Sep||| |
||||||
| 40 | |37 scope and development handoff|**Closed12:05:47**, ahead of15:00 target|Use accepted scope/packet in coherence|Prepared input||| |
|||||||
| 41 | |38 whole-v1 coherence/readiness|Draft13:30 / reviewed16:00|Bounded repairs only if evidenced|**Current M3 target14Sep; revisit after38**|Revision buffer through18Sep|| |
|||||||
|
42 | |Detailed finite campaign|Stable representative preparation|Representative packages|Continue after first-pass interfaces|Detailed authoring|**M4 target10Nov;20Oct–1Dec range**| |
||||||
| 43 | ||||||||
|
44 | The remaining critical sequence is38 readiness assessment + supporting factual audit → ONE critique and at most ONE consolidated response → bounded repairs and separate PM M2/M3 disposition.35,36 and37 are preparation-closed inputs. The14–26 role-hour allowance at response549 included37 response/disposition4–8 plus coherence10–18. With37 closed, only **10–18 role-hours for coherence/repair disposition** remains forward work. M4 **350–590 role-hours** and the future packet **289–490 role-hours /5–8 working weeks** are low-confidence conditional estimating proposals, not logged labor or development authority. No additional agent or development phase is assumed. |
||||||
|
45 | |||||||
|
46 | **Next delivery, Jerusalem:** [V1 Readiness38](/Hold%20The%20Flood/V1%20Readiness) numbers the previously planned whole-v1 coherence work. Draft target **13:30 (12:45–14:30)** and reviewed disposition **16:00 (14:30–18:00)** today9 September, low confidence; earlier completion can support an earlier M2/M3 delivery decision. Systems552 factual support targets **13:00 (12:30–14:00)**; Reviewer553 criteria **12:45 (12:30–13:15)**, then ONE critique roughly30–60 minutes after the stopped full submission. Lead557 and Systems555 are STOPPED after their38 submissions; Reviewer558 is WORKING on the ONE combined critique after criteria554. Receiving558 and the full contract were verified at12:14:39/44. Receiving/full contracts were verified at12:06:22/27 for Lead,12:06:18/22 for Systems and12:07:16/21 for Reviewer. Lead owns only the new administrative V1 Readiness article; Systems supplies a local factual audit for the same38 outcome; Reviewer saved independent criteria554 and is conducting ONE critique of the stopped submission and audit. Scope and development handoff refresh37 ([Production Scope](/Hold%20The%20Flood/Production%20Scope); [Development And Validation Handoff](/Hold%20The%20Flood/Development%20And%20Validation%20Handoff)) closed550 at **12:05:47**, after response549 at11:58:19 and one critique/response: Production68db46ea (21,243 bytes), Handoff59945901 (27,529 bytes), before its15:00 reviewed target. Both parents are Systems STOPPED.35 closed11:35:17 and36 closed11:49:32. The14–26 role-hour allowance at response549 included37 response/disposition4–8 plus coherence10–18. With37 closed, only **10–18 role-hours for coherence/repair disposition** remains forward work. M4 **350–590 role-hours** and the future packet **289–490 role-hours /5–8 working weeks** are low-confidence conditional estimating proposals, not logged labor or development authority. F1.14 milestone dates remain unchanged pending38; five owner choices remain unanswered. The overnight owner pause was authorized downtime;144–247 remains dated8September planning history. |
||||||
|
47 | |||||||
|
48 | **Adopted F1.14 forecast — 9 September:** M3 first-pass wiki now targets **14 September (11–18 September), low confidence**. M2 coherent core remains11 September (10–14); M4 detailed campaign remains10 November (20 October–1 December). The revision follows the remaining-deliverables audit and preparation closeouts25–33, including the actual24-module/40-room and ten-encounter/thirteen-mechanism first passes. It uses current PM, Systems and restored original Lead/Reviewer capacity; additional agents are not prerequisites. It is a scope-based calendar judgment, not a conversion of word counts or elapsed chat minutes into role-hours. A changed joining architecture, expanded first-pass scope, unresolved integration or unavailable capacity can move the estimate. Next scheduled re-estimate:9 September18:00 Jerusalem, or sooner after consequential acceptance, scope or capacity changes. The earlier absent-two-specialists→25Sep scenario is historical and no longer the current schedule. The earlier14Sep conditional calculation in yesterday’s unpublished draft is now explicitly adopted by PM. |
||||||
|
49 | |||||||
|
50 | ## Extra agents — when and why |
||||||
| 51 | ||||||||
|
52 | **No extra agent creation is required today.** Restored original Lead/Reviewer and existing Systems have substantive parallel assignments. Reconsider a technical/production specialist on10 September only if the concrete handoff queue needs independent expertise; campaign evidence integration is optional only for an actual unresolved gap. |
||||||
|
53 | |||||||
| 54 | |Additional role|Planned start|First bounded responsibility|Reason for adding it| |
|||||||
| 55 | |---|---|---|---| |
|||||||
|
56 | |Campaign and puzzle designer|Only if an actual finite integration gap warrants it|Reconcile existing language/story evidence, room hosts and cast knowledge; identify and fill only concrete missing first-pass links|A bounded independent cross-domain artifact may help; another general campaign map or two new chains would duplicate accepted25/29/30/31/32| |
||||||
| 57 | |Technical design and production planner|10 Sep candidate only if a concrete handoff gap needs independent expertise|Check specific Unity/Steam, save/content compatibility and free-asset suitability assumptions; contribute to a revision-specific proposed handoff|No session created or capacity counted; build on Production24/Save23/Handoff22| |
|||||||
|
58 | |||||||
|
59 | These are design roles. No gamecode, prototypes, simulations, tests, purchases or AI art are authorised by this staffing plan. These additional sessions have not been created; setup is optional and capacity is counted only after independent onboarding, connectivity and a bounded assignment. PM will guide any needed setup one step at a time. Existing Systems retains its mechanical work; no new permanent critic is planned. Do not add writers when PM review/integration is the queue. |
||||||
|
60 | |||||||
|
61 | The original staffing proposal preceded accepted regional, language, story, cast, room and encounter inventories. Do not duplicate campaign maps or chains to occupy a role. Specialist absence no longer automatically implies a25 September wiki target; the adopted14 September estimate uses the restored existing team. |
||||||
|
62 | |||||||
| 63 | ## Why these estimates, and when they change |
|||||||
| 64 | ||||||||
|
65 | The revision follows the remaining-deliverables audit and preparation closeouts25–33, including the actual24-module/40-room and ten-encounter/thirteen-mechanism first passes. It uses current PM, Systems and restored original Lead/Reviewer capacity; additional agents are not prerequisites. It is a scope-based calendar judgment, not a conversion of word counts or elapsed chat minutes into role-hours. A changed joining architecture, expanded first-pass scope, unresolved integration or unavailable capacity can move the estimate. Historical early2–4/6–12/8–15/30–60-day allowances remain dated planning hypotheses; no new labor balance is inferred from them. |
||||||
|
66 | |||||||
|
67 | - Every15-minute report includes the next target/range and any movement. Next ordinary forecast review is9 September18:00 Jerusalem; update sooner after the actual38 readiness result, or when owner answers or actual capacity change the assumptions. |
||||||
|
68 | - Keep the original target visible when revising it. Record old estimate, new estimate and the concrete cause; do not silently move dates. |
||||||
| 69 | - A changed core mechanism or late owner story change may add roughly1–3 working days to the core/v1 forecast; quantify the actual affected work when it happens. |
|||||||
| 70 | - A blocked decision moves its dependent work, not every parallel stream. Host outages are reported with elapsed delay. If authors produce a queue waiting over a working day for review/integration, reduce parallel intake before adding more agents. |
|||||||
| 71 | - Forecasts must be useful even when confidence is low. Uncertainty is a reason to widen a range and state assumptions, not to omit an estimate or wait for certainty. |
|||||||
| 72 | ||||||||
| 73 | |Forecast revision|Recorded|Change and reason| |
|||||||
| 74 | |---|---|---| |
|||||||
| 75 | |F1|8 Sep|First forward baseline added at owner's request; prior board had actuals but omitted estimates. M3 target22 Sep; M4 target10 Nov.| |
|||||||
|
76 | |F1.1|8 Sep16:04|M1 reviewed outline moved from18:00–20:00 to16:30–17:30 because the actual draft arrived16:01 and Reviewer had already fetched it. Review/rework still required. Core, full-wiki and detailed-content dates unchanged.| |
||||||
|
77 | |F1.2|8 Sep16:20|M0 actual15:59 and M1 actual16:20 recorded. Both prepared ahead of forecast. M2–M4 dates unchanged: the outline is a scaffold, and scope/unit reconciliation is still required before rolling up its partial111–208 role-hour inventory.| |
||||||
|
78 | |Availability correction|8 Sep17:10|Only Claude paused; PM/GPT work resumed after PM incorrectly stopped broader intake. Equipment Catalogue20 now targets reviewed18:30 today. M2–M4 dates unchanged pending coverage reassessment.| |
||||||
|
79 | |F1.3|8 Sep17:32|Catalogue actual17:29 and coverage actual17:27 recorded ahead of their18:30/17:45 targets. Next reviewed trap/encounter outcome targets18:45(18:15–19:15). M2–M4 unchanged: the coverage audit still identifies eight partial domains and three missing contracts; remaining-work estimates need deduplication.| |
||||||
|
80 | |F1.4|8 Sep17:54|Traps21 and Handoff22 actual17:48 recorded against18:45/18:15 targets. Next Save And Content State23 reviewed target19:00(18:30–19:30). M2–M4 unchanged: full campaign, content inventory and integration still require work.| |
||||||
|
81 | |F1.5|8 Sep18:09:56|State23 actual closeout417 recorded against its19:00 reviewed target. New418 outcomes: Regional Map25 reviewed19:30(19:00–20:00), Production Scope24 reviewed19:40(19:05–20:10). M2–M4 unchanged pending reviewed remaining-scope accounting; a Production draft is not a reviewed forecast.| |
||||||
| 82 | |F1.6|8 Sep18:21|Production24 closed423. Its reviewed response exposes previously unallocated v1 room/mechanism briefs:144–247role-hours replaces draft116–201. M2–M4 dates retained provisionally;9Sep re-estimate must check capacity. If extra streams are unavailable10Sep, current-teamv1 scenario25Sep(22Sep–2Oct). Regional25 reviewing420, target19:30.| |
|||||||
|
83 | |F1.7|8 Sep18:32|Regional25 actual closeout426 recorded against its19:30 reviewed target. New Acquisition26 assignment427 targets draft19:00(18:45–19:20), reviewed19:45(19:15–20:15). M2–M4, the F1.6 planning allowance and current-team scenario remain unchanged; accepting a regional map does not complete its room inventory.| |
||||||
|
84 | |F1.8|8 Sep18:57:01|Acquisition26 actual closeout434 recorded against its19:45 reviewed target(19:15–20:15). New Combat And Enemy Roster27 assignment435 targets draft19:45(19:25–20:15), reviewed20:30(20:00–21:15); actual receiving activity18:58:15.181 verified. Narrow04 parent alignment432 is complete; owner-dependent branches remain open. M2–M4, the144–247role-hour planning allowance and current-team scenario remain unchanged.| |
||||||
|
85 | |F1.9|8 Sep19:47|Combat27 actual closeout443 recorded against its20:30 reviewed target(20:00–21:15). Home And Colony Loop28 assignment444 reached draft446 at19:42:37 before its20:20 target(20:00–20:50); independent review447 active, reviewed21:15(20:45–22:00) remains a medium-low-confidence forecast. Narrow legacy04 integration441–443 is complete; global04 stays open. M2–M4 and the current-team scenario remain unchanged; the dated144–247 allowance needs accepted-scope reconciliation.| |
||||||
|
86 | |F1.10|8 Sep20:07|Home28 actual closeout450 recorded against its21:15 reviewed target(20:45–22:00). Two Language Discovery Map29 assignment451 reached draft454 at20:07:22 before its21:00 target(20:35–21:30); independent review455 active, reviewed22:00(21:15–22:45) remains the medium-low-confidence forecast. Home/colony now has a usable first-pass contract; five cast arcs/15scenes and finite room/encounter/mechanism inventories remain unfinished. Global04, M2–M4 and the current-team scenario remain unchanged; the dated144–247 allowance still requires accepted-scope reconciliation.| |
||||||
|
87 | |F1.11|8 Sep20:28|Language29 actual closeout459 recorded against its22:00 reviewed target(21:15–22:45). Story And Ending Map30 assignment461 reached draft463 at20:30:02 before its21:15 target(20:50–21:45); one focused review underway under462, reviewed22:15(21:30–23:00) remains the medium-low-confidence forecast. Language/discovery now has a usable first-pass contract; story remains partial. Global04, M2–M4, planned9–10Sep staffing and the current-team scenario remain unchanged; the dated144–247 allowance still needs accepted-scope reconciliation.| |
||||||
|
88 | |F1.12|8 Sep20:55|Story30 actual closeout466 at20:42:22 recorded against its22:15 reviewed target(21:30–23:00). Cast And Short Rescue Map31 assignment468 reached draft470 at20:53:50 before its21:30 target(21:10–22:00); one review under469, reviewed22:30(22:00–23:30) remains the medium-low-confidence forecast. Story is now usable first-pass; cast remains partial. Global04, M2–M4, planned9–10Sep staffing, the current-team scenario and dated144–247 allowance caveat remain unchanged.| |
||||||
|
89 | |F1.13|8 Sep21:22|Cast31 actual closeout473 at21:12:44 recorded against its22:30 reviewed target(22:00–23:30); initial draft470 arrived20:53:50. Station Room And Module Inventory32 assigned475, native receiving verified21:13:24.363; draft477 submitted21:22:49 at15bb8454 before23:00 on8Sep(22:15 on8Sep–00:00 on9Sep). Systems STOPPED; one review active under476. Reviewed00:00 on9Sep(23:15 on8Sep–01:15 on9Sep) remains the low-medium-confidence forecast. Cast is now usable first-pass, bringing coverage to13usable/2partial; room/module and full encounter/mechanism inventories remain unfinished. Global04, M2–M4, planned9–10Sep staffing, the current-team scenario and dated144–247 allowance caveat remain unchanged.| |
||||||
|
90 | |F1.14|9 Sep 10:45|Owner resumed all roles490 after authorized overnight downtime. Room32 closed481 on8Sep21:44:18; Encounter33 closed493 on9Sep10:32:09, final5c1a9ad6, after one critique/response and narrow PM integration492.34 information assigned491; global04 assigned494; original Reviewer preauthorized495. Current34 tracked/32 closed/2 open;14 usable/1 partial. PM adopts M3 **14Sep (11–18), low confidence**, from remaining-scope audit and accepted25–33 with the restored team; no extra agents prerequisite.04/34 drafts9Sep12:00 (11:15–12:45), reviewed13:00 (12–14), low-medium. M2/M4 unchanged. Night pause is not a failed deadline. Earlier Sep22 and missing-two-specialists→Sep25 scenarios remain historical. Yesterday’s F1.14 draft was local and unpublished; this row is the new adoption record. Dated144–247 allowance is not current remaining labor.| |
||||||
|
91 | |||||||
|
92 | ## Delivery history and current changes |
||||||
|
93 | |||||||
|
94 | - [Combat And Enemy Roster27](/Hold%20The%20Flood/Combat%20And%20Enemy%20Roster) preparation-closed443 at19:34, finalf1fe0d9a. One focused review/response corrected the new-role triggers and counterplay, staged cues for both regional orders, and Bellback's warning-start cone lock. Six ordinary/three special roles and two setpieces are prepared within ten encounter placements; exact populations, geometry, presentation and tuning remain later work. |
||||||
|
95 | - [Home And Colony Loop28](/Hold%20The%20Flood/Home%20And%20Colony%20Loop) preparation-closed450 at20:01:12, final5bff3436. One focused review/response clarified shared commissioning, first-return actions and each project's participants and lasting facilities. Five project briefs remain two reused/three new with three new fixed ship fixtures; cast choices, full scene scripts/state variants and management economy remain separate; Cast31 first-pass allocation is now prepared473. |
||||||
|
96 | - [Two Language Discovery Map29](/Hold%20The%20Flood/Two%20Language%20Discovery%20Map) preparation-closed459 at20:23:52, finaldf0f48f5. One focused critique/response separated address/body evidence, retained valid captures across lives and supplied the iris variant's local B plate and completion state. Four proposed chains across two languages are prepared; actual clue/string/room variants and comprehension evidence remain unfinished. |
||||||
|
97 | - [Story And Ending Map30](/Hold%20The%20Flood/Story%20And%20Ending%20Map) preparation-closed466 at20:42:22, final03c9cb8e. One focused critique/response separated current diagnostic evidence from historical chronology, specified evidence retained/lost before and after isolation, and used shared mechanical cycle impressions. Four mystery/personal chains and layered choices are prepared proposals; final story, departure rules and full cast/room/scene variants remain open. |
||||||
|
98 | - [Cast And Short Rescue Map31](/Hold%20The%20Flood/Cast%20And%20Short%20Rescue%20Map) preparation-closed473 at21:12:44, final6456406b: five proposed people and fifteen unique first-pass scene briefs, three primary per person. One focused critique/response resolved the initial walked rescue route, actual movement event and first bench operation. D2 retains Dorn participating in the initial demonstrated operation; later commissioned use follows Home28. First-survivor/global mortality and final cast remain unselected. |
||||||
|
99 | - [Station Room And Module Inventory32](/Hold%20The%20Flood/Station%20Room%20And%20Module%20Inventory) preparation-closed481 at21:44:18, finald4ef2497(61009bytes):24modules/40rooms with explicit arrangement and compact-assembly constraints, retained conversion clues and independent core-isolation mechanism13. The13major units are not every interactive object and remain a proposed scope sample. |
||||||
| 100 | - [Encounter And Mechanism Placement Inventory33](/Hold%20The%20Flood/Encounter%20And%20Mechanism%20Placement%20Inventory) preparation-closed493 on9 September10:32:09, final5c1a9ad6. The one response plus narrow PM integration makes later E03 population a later-death-shift selection, preserves self-contained reset thresholds, and corrects Lens heat/cold and single-Cycler conservation. Ten encounters including two setpieces and thirteen major mechanism briefs are prepared; full variants and gameplay validation remain later. |
|||||||
|
101 | - PM verified04's narrow legacy integration under441–443: [Discovery Chain](/Hold%20The%20Flood/Discovery%20Chain)114e9267 and [Expedition Proposal](/Hold%20The%20Flood/Expedition%20Proposal)836ab2ae now use historical post-death routes and world-time capture/full frozen journal inspection. No new access guarantee was added; global04 was still open at that historical narrow closeout and subsequently closed518. |
||||||
| 102 | - PM closed narrow [Coming Home](/Hold%20The%20Flood/Coming%20Home)/[Home Projects](/Hold%20The%20Flood/Home%20Projects) compatibility456 at20:15:57, revisionsacbc945c/996d235a. Current Fork/supply, unloading, historical-route and refill rules align; PM owns both parents STOPPED. This added no package and did not close global04 at that historical point; global04 subsequently closed518. |
|||||||
| 103 | - PM519 classified15 usable first-pass domains/0 partial.35 closed533,36 closed545 and37 closed550. The already-planned final coherence disposition is now numbered38; it alone remains open. M2/M3 await its actual result. Full scripts and exhaustive states/layouts remain M4. |
|||||||
| 104 | - Global04 preparation closed518 at11:07:24 after [Death Shift And Rescue Continuity](/Hold%20The%20Flood/Death%20Shift%20And%20Rescue%20Continuity) candidate577236e7 and all eleven aligned parents were fully checked and independently read back. Those parents are STOPPED under the current ownership recorded after533; Systems retains STOPPED Continuity ownership. Protected retreat and final station behavior remain explicit unselected owner branches; preparation closure is not owner adoption. |
|||||||
|
105 | - [Player Information And Options34](/Hold%20The%20Flood/Player%20Information%20And%20Options) closed509 at61e0be4a:41 main states in9 bands,5 journal sections,4 manifest sections,10 options and4 walkthroughs. PM508 aligned recorded ship readings, essential target/readiness cues and the opening6→7→6 cargo example with4A. |
||||||
|
106 | - [Mechanical Interfaces And Opening Quantities35](/Hold%20The%20Flood/Mechanical%20Interfaces%20And%20Opening%20Quantities) preparation closed533 at11:35:17, final2e604fc2 (44,079 bytes), after one critique/response, twelve independently verified parent revisions and two narrow PM532 collar fixes. Home is now08f8dde6 and Information9ca194c2; the other ten retain530 revisions. Counts/owner branches are unchanged. |
||||||
| 107 | - [Campaign Evidence And State Crosswalk36](/Hold%20The%20Flood/Campaign%20Evidence%20And%20State%20Crosswalk) closed545 at11:49:32, final70e004e9 (28,144 bytes), after one critique/response and PM integration. It maps 8 existing chains,15 scenes and26 evidence INDEX entries—not26 new objects or single captures—with7 host variants,5 personal variants and2 Regional25 orders. Optional parent tags were declined; no handoff remains. Lead stopped36 at closeout; PM36 remains STOPPED. Lead’s current38 administrative assignment is separate. |
|||||||
| 108 | - Scope and development handoff refresh37 ([Production Scope](/Hold%20The%20Flood/Production%20Scope); [Development And Validation Handoff](/Hold%20The%20Flood/Development%20And%20Validation%20Handoff)) closed550 at12:05:47 after response549 at11:58:19, ONE critique547 and independent factual verification. Final Production68db46ea/Handoff59945901,21,243/27,529 bytes; both Systems STOPPED. The14–26 role-hour allowance at response549 included37 response/disposition4–8 plus coherence10–18. With37 closed, only **10–18 role-hours for coherence/repair disposition** remains forward work. M4 **350–590 role-hours** and the future packet **289–490 role-hours /5–8 working weeks** are low-confidence conditional estimating proposals, not logged labor or development authority. |
|||||||
|
109 | - [V1 Readiness38](/Hold%20The%20Flood/V1%20Readiness) assigned551–553 for the existing final coherence/readiness obligation. Lead557 and Systems555 are STOPPED after their38 submissions; Reviewer558 is WORKING on the ONE combined critique after criteria554. Receiving558 and the full contract were verified at12:14:39/44. Receiving/full contracts were verified at12:06:22/27 for Lead,12:06:18/22 for Systems and12:07:16/21 for Reviewer. Lead owns only the new administrative V1 Readiness article; Systems supplies a local factual audit for the same38 outcome; Reviewer saved independent criteria554 and is conducting ONE critique of the stopped submission and audit. Draft13:30 (12:45–14:30), reviewed16:00 (14:30–18:00); no new game content or scope. |
||||||
|
110 | - Five unanswered owner questions and unadopted intake407 remain. All original roles resumed490. M3 now targets14 September (11–18), low confidence; M2/M4 remain unchanged. The144–247 allowance remains dated. Yesterday’s F1.14 drafts were not published. |
||||||
|
111 | |||||||
| 112 | ## Open and closed outcomes |
|||||||
| 113 | ||||||||
| 114 | All milestone times below are Jerusalem time. “Updated” separates later owner-rule integration from the original preparation closeout. |
|||||||
| 115 | ||||||||
| 116 | |ID|Outcome|Preparation status|Decision status|Latest milestone|Next step / remaining scope| |
|||||||
| 117 | |---|---|---|---|---|---| |
|||||||
| 118 | |01|[Reusable equipment combinations](/Hold%20The%20Flood/Build%20Rules)|Closed|Selected direction|Sep7 22:19; updated Sep8 13:45|Catalogue and numerical rules remain proposed| |
|||||||
| 119 | |02|[Oxygen visibility and journal pause](/Hold%20The%20Flood/Oxygen%20and%20Observation)|Closed|Selected direction|Sep7 20:55; updated Sep8 13:45|Exact oxygen amounts remain open| |
|||||||
| 120 | |03|[Carried property returns on death](/Hold%20The%20Flood/Death%20And%20Persistence)|Closed|Selected rule|Sep8 13:45|Shift and survivor ordering tracked separately| |
|||||||
|
121 | |04|[Death Shift And Rescue Continuity](/Hold%20The%20Flood/Death%20Shift%20And%20Rescue%20Continuity)|Closed|Local permanence selected; rescue/finish branches provisional|9Sep11:07:24 closeout518|Accepted577236e7 and eleven parent revisions independently verified. All affected parents and Continuity STOPPED under current533 ownership; owner choices, exhaustive arrangements and whole-v1 integration remain| |
||||||
|
122 | |05|[Ordinary combat and horde encounters](/Hold%20The%20Flood/Combat%20Rules)|Closed|Selected direction|Sep8 10:51; updated13:45|Automatic ordinary fire, manual specials; balance remains open| |
||||||
|
123 | |06|[First-survivor comparison](/Hold%20The%20Flood/First%20Survivor)|Closed|Short rescue selected; person unchosen|Sep8 response364/disposition368|Yeva versus Aster ready; short-route condition and death/refuge timing remain explicit limits| |
||||||
|
124 | |07|[Practical discovery and optional help](/Hold%20The%20Flood/Clues%20and%20Help)|Closed|Selected direction|Sep8 11:23; updated13:45|Current routes cannot be inferred from historical records| |
||||||
| 125 | |08|[Cooperation and useful work aboard](/Hold%20The%20Flood/Home%20Projects)|Closed|Tentative preference|Sep8 12:00; updated13:45|Equipment loans tentative; full colony/cast still open| |
|||||||
| 126 | |09|[Two-language expedition and journal use](/Hold%20The%20Flood/Language%20Expedition)|Closed|Reviewed proposal|Sep8 13:45|Detailed language system unselected;16 is a distinct evidence scene| |
|||||||
| 127 | |10|[How equipment is acquired and improves](/Hold%20The%20Flood/Progression%20Options)|Closed|Reviewed alternatives|Sep8 13:51|Find working components versus observe/fabricate; owner choice later| |
|||||||
| 128 | |11|[Three distinct horde creatures](/Hold%20The%20Flood/Horde%20Creature%20Proposals)|Closed|Reviewed proposals|Sep8 14:07|Roster and origins unselected| |
|||||||
| 129 | |12|[Hospital story and its causal alternatives](/Hold%20The%20Flood/Hospital%20Story%20Directions)|Closed|Reviewed alternatives|Sep8 14:47|Owner hospital/godhood draft leads; exact story/ending remain revisable| |
|||||||
| 130 | |13|[Player resurrection and corruption](/Hold%20The%20Flood/Resurrection%20And%20Corruption)|Closed|Reviewed alternatives|Sep8 14:38|No player decay or death budget adopted| |
|||||||
| 131 | |14|[Opening expedition: reusable machinery](/Hold%20The%20Flood/First%20Expedition%20Options)|Closed|Option A selected|Prepared Sep8 15:14; selected15:30|Preferred direction recorded; exact starting items/rooms remain proposed| |
|||||||
|
132 | |15|[Whole-station mechanism comparison](/Hold%20The%20Flood/Connecting%20The%20Station)|Closed|Goal selected; mechanism conditional|Sep8 15:51 disposition363|Physical connection candidate prepared; owner payoff choice and detailed content remain open| |
||||||
|
133 | |16|[Testable alien-language interaction](/Hold%20The%20Flood/Alien%20Utterance%20Discovery)|Closed|Reviewed proposal|Sep8 15:38|Protocol discovery prepared; does not prove request semantics or a god| |
||||||
|
134 | |17|[Whole-game design outline and scope bands](/Hold%20The%20Flood/Whole%20Game%20Outline)|Closed|Reviewed planning scaffold|Sep8 16:20 disposition378|Use finite bands and dependencies for domain designs; story/ending/count choices and estimate coverage remain open| |
||||||
|
135 | |18|[Player information and accessibility](/Hold%20The%20Flood/Player%20Information)|Closed|Reviewed proposed information contract|Sep8 16:35 disposition387|Full cue/screen structure and accessibility specification remain later work; no usability claim| |
||||||
|
136 | |19|[Survival and loadout](/Hold%20The%20Flood/Survival%20And%20Loadout)|Closed|Reviewed provisional resource contract|Sep8 16:45 disposition392|Detailed variants and balancing remain later work; integrate compatible core rules after owner decisions| |
||||||
|
137 | |20|[Equipment catalogue](/Hold%20The%20Flood/Equipment%20Catalogue)|Closed|Reviewed12-part planning sample; acquisition unchosen|Sep8 17:29 disposition400|35 supplies bounded thresholds/controller interfaces; acquisition remains a proposal and exhaustive tuning/catalogue variants remain open Current aligned533 3b641972| |
||||||
|
138 | |21|[Traps and encounter progression](/Hold%20The%20Flood/Traps%20And%20Encounter%20Progression)|Closed|Reviewed five-family/four-region SMALL proposal|Sep8 17:48 disposition410; roster27 prepared443|Thirteen actual mechanism briefs and ten encounter placements are prepared33; exhaustive variants and balance remain later| |
||||||
|
139 | |22|[Development and validation handoff](/Hold%20The%20Flood/Development%20And%20Validation%20Handoff)|Closed|Reviewed first-pass risk/evidence plan|Sep8 17:48 disposition410|Final v1-specific scope, staffing and estimates precede any owner phase decision; no development authorized| |
||||||
|
140 | |23|[Save and content state](/Hold%20The%20Flood/Save%20And%20Content%20State)|Closed|Reviewed first-pass continuity contract; save policy unselected|Sep8 18:09:56 disposition417|Final438cdf35; detailed transitions, rescue/shift ordering, save-policy and recovery choices remain open Current aligned533 c4cf4abd| |
||||||
|
141 | |24|[Production scope](/Hold%20The%20Flood/Production%20Scope)|Closed|Reviewed provisional finite scope and work accounting|Sep8 18:21 disposition423|Finalc1a60388;144–247role-hourv1 planning allowance, not measured labor; band/cuts unselected| |
||||||
|
142 | |25|[Regional discovery map](/Hold%20The%20Flood/Regional%20Discovery%20Map)|Closed|Reviewed four-region/twelve-objective SMALL planning proposal|Sep8 18:32 disposition426|Final3acda018; Room32 prepared24module/40room v1 briefs481; cross-domain interfaces, detailed placement variants and owner choices remain open| |
||||||
|
143 | |26|[Equipment acquisition and rig growth](/Hold%20The%20Flood/Equipment%20Acquisition%20And%20Rig%20Growth)|Closed|Reviewed twelve-part acquisition/growth proposal; owner preference unselected|Sep8 18:57:01 disposition434|Finalf5f6d768; Systems owns article STOPPED. Source-fixture details, exceptions, quantities and gameplay validation remain open Current aligned533 6ab4a94c| |
||||||
| 144 | |27|[Combat and enemy roster](/Hold%20The%20Flood/Combat%20And%20Enemy%20Roster)|Closed|Reviewed combat-state contract and proposed6ordinary/3special/2setpiece roster|Sep8 19:34 disposition443|Finalf1fe0d9a; Systems ownership STOPPED. Ten encounter/thirteen major-mechanism briefs are now prepared33; exhaustive cues/geometry remain M4 Current aligned533 bb15ab8d| |
|||||||
| 145 | |28|[Home and colony loop](/Hold%20The%20Flood/Home%20And%20Colony%20Loop)|Closed|Reviewed return/preparation contract and five project briefs; cast/economy unselected|Sep8 20:01:12 disposition450|Final5bff3436; PM STOPPED owner after532. Two reused/three new projects; exact fixture/control detail, full cast scene scripts/state variants and validation remain; first-pass cast allocation prepared473 Current aligned533 08f8dde6| |
|||||||
|
146 | |29|[Two-language discovery map](/Hold%20The%20Flood/Two%20Language%20Discovery%20Map)|Closed|Reviewed four-chain/two-language proposal; origins and final story unselected|Sep8 20:23:52 disposition459|Finaldf0f48f5; Systems STOPPED owner. Actual clue/string/physical-state variants, room placements and comprehension evidence remain| |
||||||
|
147 | |30|[Story and ending map](/Hold%20The%20Flood/Story%20And%20Ending%20Map)|Closed|Reviewed causal/choice map and four mystery-personal chains; final canon/ending rules unselected|Sep8 20:42:22 disposition466|Final03c9cb8e; Systems STOPPED owner. Actual placements, full scene scripts/state variants and emotional validation remain; first-pass cast allocation prepared473| |
||||||
|
148 | |31|[Cast And Short Rescue Map31](/Hold%20The%20Flood/Cast%20And%20Short%20Rescue%20Map)|Closed|Reviewed five-cast/fifteen-scene proposal; final cast/first survivor/mortality unselected|Sep8 21:12:44 disposition473|At closeout 6456406b; aligned518 61ff0b96; Lead ownership STOPPED after518. Three unique primary scenes per person; D2 initial operation includes Dorn. Full scripts, room/state variants and validation remain| |
||||||
|
149 | |32|[Station Room And Module Inventory32](/Hold%20The%20Flood/Station%20Room%20And%20Module%20Inventory)|Closed|Reviewed24module/40room first-pass inventory; physical/global scope remains proposed|Sep8 21:44:18 disposition481|At closeout d4ef2497; aligned533 011a4f7b; Systems ownership STOPPED after533.13major mechanisms including independent core isolation; ordinary service/join interfaces also have work. Encounter/mechanism briefs are prepared33; interface integration and M4 variants remain| |
||||||
| 150 | |33|[Encounter And Mechanism Placement Inventory33](/Hold%20The%20Flood/Encounter%20And%20Mechanism%20Placement%20Inventory)|Closed|Proposed ten encounters INCLUDING two setpieces and13 major mechanisms|9Sep10:32:09 closeout493 at5c1a9ad6; aligned533 4b40819e|One critique/response plus narrow integration492 complete; Systems ownership is STOPPED after verified alignment533. Full variants/tuning and ordinary-interface integration remain| |
|||||||
| 151 | |34|[Player Information And Options34](/Hold%20The%20Flood/Player%20Information%20And%20Options)|Closed|Reviewed proposed main cues, controls and options; no usability claim|9Sep10:53:59 closeout509, final61e0be4a|One critique/response plus PM508 integration complete; PM retains STOPPED ownership after532. Actual-ID/global/mechanical consumption and M4 variants remain Current aligned533 9ca194c2| |
|||||||
| 152 | |35|[Mechanical Interfaces And Opening Quantities35](/Hold%20The%20Flood/Mechanical%20Interfaces%20And%20Opening%20Quantities)|Closed|Reviewed conditional interfaces/quantities; no gameplay validation|9Sep11:35:17 closeout533, final2e604fc2|One critique/response, twelve-parent alignment and two532 fixes verified. Mechanical35/ten parents Systems STOPPED; Home/Information PM STOPPED. Owner choices and M4 variants remain| |
|||||||
| 153 | |36|[Campaign Evidence And State Crosswalk36](/Hold%20The%20Flood/Campaign%20Evidence%20And%20State%20Crosswalk)|Closed|Finite8-chain/15-scene crosswalk;26 evidence INDEX entries, not26 new objects|9Sep11:49:32 closeout545, final70e004e9 (28,144 bytes)|One critique/response and PM integration verified;7 host variants/5 personal variants/2 Regional25 orders. PM owns36 STOPPED; Lead STOPPED. Optional parent tags declined; no transfer needed. Prior reviewed14:00 target achieved| |
|||||||
| 154 | |37|Scope and development handoff refresh37 ([Production Scope](/Hold%20The%20Flood/Production%20Scope); [Development And Validation Handoff](/Hold%20The%20Flood/Development%20And%20Validation%20Handoff))|Closed|Reviewed scope/packet planning proposal; no development authority|9Sep12:05:47 closeout550; response54911:58:19; final68db46ea/59945901|ONE critique/response and exact factual verification.21,243/27,529 bytes; both Systems STOPPED. Prior15:00 reviewed target achieved; only10–18 coherence role-hours remains forward| |
|||||||
|
155 | |38|[V1 Readiness38](/Hold%20The%20Flood/V1%20Readiness)|Open — ONE critique558 underway|Previously planned final coherence/readiness assessment and supporting audit; no new game scope|Lead557/Systems555 STOPPED after submissions; Reviewer558 WORKING, receiving/full contract verified|Lead administrative draft13:30 (12:45–14:30); Systems support13:00 (12:30–14); Reviewer criteria12:45; ONE critique, at most ONE response, reviewed16:00 (14:30–18). PM decides M2/M3| |
||||||
|
156 | |||||||
|
157 | ## Recent delivery timeline |
||||||
| 158 | ||||||||
| 159 | These are observed calendar spans from assignment to preparation closeout, including handoffs and review. They are historical measurements, not estimates of labour or promised future turnaround. |
|||||||
| 160 | ||||||||
| 161 | |Outcome|Assigned Sep8|Preparation closed Sep8|Elapsed| |
|||||||
| 162 | |---|---|---|---| |
|||||||
| 163 | |Equipment progression comparison|13:17|13:51|34 minutes| |
|||||||
| 164 | |Three horde creatures|13:51|14:07|16 minutes| |
|||||||
| 165 | |Hospital-story comparison|13:58|14:47|49 minutes| |
|||||||
| 166 | |Resurrection/corruption comparison|14:20|14:38|18 minutes| |
|||||||
| 167 | |Opening comparison|14:40|15:14|34 minutes| |
|||||||
| 168 | |Alien-language interaction|15:06|15:38|32 minutes| |
|||||||
| 169 | ||||||||
| 170 | ## Work sequence |
|||||||
| 171 | ||||||||
|
172 | |Stream|Now|Next| |
||||||
| 173 | |---|---|---| |
|||||||
|
174 | |Equipment catalogue|Preparation closed400; final737b3cfd; Acquisition26 prepared434|Use the twelve-part contract and current parent alignment; detailed controller/fixture exceptions remain| |
||||||
|
175 | |Whole-v1 coverage|Fifteen usable first-pass contracts/zero partial;35/36/37 preparation-closed|38 checks remaining actual interfaces and readiness; full scripts/exhaustive variants are M4| |
||||||
|
176 | |Trap/encounter progression|Traps21/Combat27 and Room32/Encounter33 first passes prepared;33 closed493|Use ten encounters INCLUDING two setpieces and13 major mechanisms; integrate remaining main cues and global continuity; full variants and tuning later| |
||||||
|
177 | |Development handoff|Refreshed37 preparation closed550 at59945901,27,529 bytes; earlier410c0c38e8b historical|Systems STOPPED; use the conditional UNAUTHORIZED packet in38, no further37 review| |
||||||
|
178 | |Save/content state|Preparation closed417 at18:09:56; final438cdf35|Use explicit continuity interfaces; detailed state work and owner selections remain later| |
||||||
|
179 | |[Production Scope24](/Hold%20The%20Flood/Production%20Scope)|Refreshed37 preparation closed550 at68db46ea,21,243 bytes; earlier423c1a60388 historical|Systems STOPPED;10–18 coherence hours remains forward. M4/packet ranges conditional; F1.14 dates unchanged| |
||||||
|
180 | |[Regional Discovery Map25](/Hold%20The%20Flood/Regional%20Discovery%20Map)|Preparation closed426 at18:32; final3acda018|Use both revised orders and explicit evidence/access conditions; finite module/room briefs remain| |
||||||
|
181 | |[Equipment Acquisition And Rig Growth26](/Hold%20The%20Flood/Equipment%20Acquisition%20And%20Rig%20Growth)|Preparation closed434 at18:57:01; finalf5f6d768; Systems ownership STOPPED|Use prepared acquisition/configuration paths; owner choices and source-fixture detail remain Current aligned533 6ab4a94c| |
||||||
| 182 | |[Combat And Enemy Roster27](/Hold%20The%20Flood/Combat%20And%20Enemy%20Roster)|Preparation closed443 at19:34; finalf1fe0d9a; Systems ownership STOPPED|Use the reviewed roster/state contract; finite placement, cue and recovery detail remains Current aligned533 bb15ab8d| |
|||||||
| 183 | |[Home And Colony Loop28](/Hold%20The%20Flood/Home%20And%20Colony%20Loop)|Preparation closed450 at20:01:12; final5bff3436; PM ownership STOPPED after532|Use reviewed return/project availability and property rules; exact interfaces, full cast scene scripts/state variants and management choices remain Current aligned533 08f8dde6| |
|||||||
|
184 | |[Two Language Discovery Map29](/Hold%20The%20Flood/Two%20Language%20Discovery%20Map)|Preparation closed459 at20:23:52; finaldf0f48f5; Systems ownership STOPPED|Use reviewed four-chain evidence/action contract; actual clue/string/room variants and validation remain| |
||||||
|
185 | |[Story And Ending Map30](/Hold%20The%20Flood/Story%20And%20Ending%20Map)|Preparation closed466 at20:42:22; final03c9cb8e; Systems ownership STOPPED|Use reviewed causal/evidence/choice contract; final canon, departure preference and finite state/scene/room details remain| |
||||||
|
186 | |[Cast And Short Rescue Map31](/Hold%20The%20Flood/Cast%20And%20Short%20Rescue%20Map)|Preparation closed473 at21:12:44; at closeout 6456406b; aligned518 61ff0b96; Lead ownership STOPPED after518|Use reviewed five-cast/fifteen-scene first pass and initial D2 participant rule; final cast, scripts, state variants and placements remain| |
||||||
|
187 | |[Station Room And Module Inventory32](/Hold%20The%20Flood/Station%20Room%20And%20Module%20Inventory)|Preparation closed481 at21:44:18; at closeout d4ef2497; aligned533 011a4f7b; Systems ownership STOPPED after533|Use24module/40room hosts and13major-mechanism ledger; preserve compact/current-only constraints and unselected owner branches| |
||||||
| 188 | |[Encounter And Mechanism Placement Inventory33](/Hold%20The%20Flood/Encounter%20And%20Mechanism%20Placement%20Inventory)|Preparation closed493; at closeout 5c1a9ad6; aligned533 4b40819e; Systems ownership STOPPED after533|Use accepted placed behavior; no second broad review or new population rule inferred| |
|||||||
| 189 | |[Player Information And Options34](/Hold%20The%20Flood/Player%20Information%20And%20Options)|Preparation closed509 at10:53:59; final61e0be4a; PM ownership STOPPED after532|Use main state/action/option inventory; representative mechanical/global interfaces and M4 presentation variants remain| |
|||||||
| 190 | |[Mechanical Interfaces And Opening Quantities35](/Hold%20The%20Flood/Mechanical%20Interfaces%20And%20Opening%20Quantities)|Preparation closed533 at11:35:17; final2e604fc2; prior13:00 target achieved|Use reviewed interfaces/quantities and exact aligned parents; no second review or phase authorization| |
|||||||
| 191 | |[Campaign Evidence And State Crosswalk36](/Hold%20The%20Flood/Campaign%20Evidence%20And%20State%20Crosswalk)|Preparation closed545 at11:49:32, final70e004e9; prior14:00 target achieved|Use accepted8-chain/15-scene/26-index crosswalk in whole-v1 coherence. PM owns36 STOPPED; no parent transfer needed| |
|||||||
| 192 | |Scope and development handoff refresh37 ([Production Scope](/Hold%20The%20Flood/Production%20Scope); [Development And Validation Handoff](/Hold%20The%20Flood/Development%20And%20Validation%20Handoff))|Closed550 at12:05:47, final68db46ea/59945901; Systems STOPPED|Use accepted scope/packet in38; no second37 review| |
|||||||
|
193 | |[V1 Readiness38](/Hold%20The%20Flood/V1%20Readiness)|Lead557/Systems555 STOPPED after submissions; Reviewer558 WORKING, receiving/full contract verified. One administrative result with local factual support|Draft13:30 (12:45–14:30), support13:00 (12:30–14), criteria12:45, reviewed16:00 (14:30–18)| |
||||||
|
194 | |Additional proposal intake|Both full pages read; explicitly unadopted|Track authorship and assess protected retreat/next-shift meeting before integrating| |
||||||
|
195 | |Shared integration04|Preparation closed518 at11:07:24 after accepted [Death Shift And Rescue Continuity](/Hold%20The%20Flood/Death%20Shift%20And%20Rescue%20Continuity) candidate577236e7 and eleven verified parent alignments|All affected parents and Continuity STOPPED under current533 ownership. No further04 review; owner-dependent branches and remaining whole-v1 interfaces stay explicit| |
||||||
|
196 | |Original Claude Lead/Reviewer|Original roles resumed490; identities unchanged|Lead557 and Systems555 submitted/STOPPED. Reviewer558 WORKING after verified receiving/full contract; criteria554 complete; earlier35/36/37 reviews complete| |
||||||
|
197 | |Additional specialist setup|No extra agent required today; no new sessions created|Technical/production candidate10Sep only for concrete independent handoff scope; optional campaign integration only for an actual gap| |
||||||
|
198 | |||||||
|
199 | Current ownership through558: Lead owns only the new administrative V1 Readiness article for38. Systems552 has local factual-support work and no new article ownership. Reviewer553 criteria554 are complete; ONE critique558 is underway; Lead557 and Systems555 are STOPPED after their38 submissions; Reviewer558 is WORKING on the ONE combined critique after criteria554. Receiving558 and the full contract were verified at12:14:39/44. All existing game articles retain their STOPPED owners, including Systems’ two37 parents, Mechanical35 and ten mechanical parents; PM36/Home/Information remain STOPPED. Any actual parent repair requires a later explicit transfer; none is assumed here. |
||||||
|
200 | |||||||
| 201 | ## Decisions for the owner |
|||||||
| 202 | ||||||||
| 203 | **Already answered:** opening A and persistent room/group connections across shifts, culminating in connecting the entire station. |
|||||||
| 204 | ||||||||
| 205 | **Open creative question:** should completing the entire connection puzzle finally stabilise the layout, or should rooms keep moving while every established connection survives? PM recommends stabilisation as a reward for mastery. This is a proposed late payoff, not an answer inferred from the opening choice; the team can continue its comparison while it is pending. |
|||||||
| 206 | ||||||||
|
207 | The first-survivor choice is also already with the owner: Yeva, the pressure technician preserving ward measurements (PM recommendation), versus Aster, the supply clerk suspicious of the arrival and requesting one reversible door closure. Neither is selected. Progression, creature, story and corruption alternatives are prepared for later reactions; the owner is not expected to review the whole wiki at once. |
||||||
|
208 | |||||||
|
209 | **Equipment acquisition question now with the owner:** find working parts in station machines, accepting loss of their local function until the part is returned (PM recommendation), or study working examples and spend salvage to fabricate parts aboard. The reviewed acquisition proposal supports this comparison; starting gear, capacity and exact economy remain separate. Independent interface work can continue while the choice is pending. |
||||||
|
210 | |||||||
|
211 | **New apparent-ending question now with the owner:** show credits and allow continuing from before departure (PM recommendation), or make departure permanently end this save. The question is unanswered; neither continuation behavior nor permanent save closure is adopted. Together with final station-layout behavior, first survivor and equipment acquisition, this was the fourth question; rescue question485 below brings the current total to five. |
||||||
|
212 | |||||||
|
213 | **New rescue question now with the owner (485):** if the astronaut dies during an eligible short rescue, use a protected retreat that leaves the survivor alive and unsent in the prepared refuge before one shift, with spent supplies still spent and a new short route to find; or allow danger and prepare concrete injury/loss options for a later choice. The proposed protection is new and unselected. No answer is inferred; the earlier four questions remain pending, making five. |
||||||
| 214 | ||||||||
|
215 | ## Reporting agreement |
||||||
| 216 | ||||||||
|
217 | PM sends a compact report every15 minutes during authorized active work, plus meaningful completion, disagreement, blocker or decision updates. Owner pause suspends work/check-ins;490 explicitly resumed them. Reports include open/closed preparation counts, actual delivery/activity, next target/range, current v1 forecast and its changes. No page/message count or invented game-completion percentage substitutes for progress. The fallback requires the computer and apps to remain available. |
||||||
