2026-09-08 17:54:18
Anonymous:
Record trap/handoff closeouts and active save-state design
hold the flood/progress.md ..
@@ 1,12 1,12 @@
# Hold The Horde — Progress
-
**Updated 2026-09-08 17:32 Jerusalem (UTC+3).** PM and GPT work continues; only the two Claude roles are paused. All work remains **design only**.
+
**Updated 2026-09-08 17:54 Jerusalem (UTC+3).** PM and GPT work continues; only the two Claude roles are paused. All work remains **design only**.
-
**21 tracked design packages: 19 preparation-closed, 2 open.** Equipment20 closed400 at17:29; new outcome21 Traps and Encounter Progression was explicitly assigned401. Shared integration04 remains dependent. The published Design Coverage map is separate management work, not another counted package. These are bounded written outcomes, not complete game domains or an overall completion percentage.
+
**23 tracked design packages: 21 preparation-closed, 2 open.** Traps21 and Development Handoff22 closed410 at17:48. New outcome23 Save And Content State was explicitly assigned411 at17:49; shared integration04 remains dependent. The separate management coverage map and two unadopted intake contributions are not extra completed packages. These are bounded written outcomes, not overall game completion.
“Closed” means the bounded written design/review outcome is complete. It does not mean a feature is implemented, every detail approved or fun validated. This board covers the current design batch; it is not a complete campaign or production backlog, and the closed/total ratio is not an overall game-completion percentage. Stable IDs stay fixed; added/reopened work must be recorded explicitly.
-
**Availability correction —8 Sep:** the owner paused only Claude, and explicitly confirmed PM and the existing GPT Systems designer should continue. PM’s broader stop was an incorrect inference and has been withdrawn. Systems is assigned the next trap/encounter outcome, a temporary GPT reviewer has saved fresh criteria, and PM has published the full-v1 coverage map. Neither permanent Claude role will be woken or replaced before owner confirmation. Active one-minute fallback monitoring and15-minute progress/forecast reports continue.
+
**Availability correction —8 Sep:** only Claude is paused. PM and the existing GPT Systems designer continue useful work with bounded independent GPT reviews. Systems is assigned the save/content-state contract; PM handles integration, new proposal intake and forecasts. Neither permanent Claude role will be woken or replaced before owner confirmation. Active one-minute fallback monitoring and15-minute progress/forecast reports continue.
## Forward forecast — baseline F1
@@ 43,7 43,7 @@
The critical sequence is core decisions and interfaces → whole-game architecture/content budget → domain designs → cross-domain integration → v1. Content detail proceeds in parallel only where interfaces are stable. Extra writers do not eliminate the PM/review bottleneck.
-
**Next deliveries:** Traps and Encounter Progression draft target18:00 today(range17:45–18:30), reviewed outcome18:45(range18:15–19:15). Equipment Catalogue closed17:29 against its original reviewed18:30 target; PM’s [Design Coverage](/Hold%20The%20Flood/Design%20Coverage) was published17:27 against17:45. Core11 Sep(10–14), complete first-pass wiki22 Sep(18–29), and specialist setup9–10 Sep remain unchanged.
+
**Next deliveries:** Save And Content State draft target18:20 today(range18:05–18:45), reviewed outcome19:00(range18:30–19:30). Traps21 and Development Handoff22 both closed17:48, ahead of their18:45/18:15 targets. Core11 Sep(10–14), complete first-pass wiki22 Sep(18–29), and specialist setup9–10 Sep remain unchanged.
## Extra agents — when and why
@@ 75,13 75,15 @@
|F1.2|8 Sep16:20|M0 actual15:59 and M1 actual16:20 recorded. Both prepared ahead of forecast. M2–M4 dates unchanged: the outline is a scaffold, and scope/unit reconciliation is still required before rolling up its partial111–208 role-hour inventory.|
|Availability correction|8 Sep17:10|Only Claude paused; PM/GPT work resumed after PM incorrectly stopped broader intake. Equipment Catalogue20 now targets reviewed18:30 today. M2–M4 dates unchanged pending coverage reassessment.|
|F1.3|8 Sep17:32|Catalogue actual17:29 and coverage actual17:27 recorded ahead of their18:30/17:45 targets. Next reviewed trap/encounter outcome targets18:45(18:15–19:15). M2–M4 unchanged: the coverage audit still identifies eight partial domains and three missing contracts; remaining-work estimates need deduplication.|
+
|F1.4|8 Sep17:54|Traps21 and Handoff22 actual17:48 recorded against18:45/18:15 targets. Next Save And Content State23 reviewed target19:00(18:30–19:30). M2–M4 unchanged: full campaign, content inventory and integration still require work.|
## What changed in this report
-
- Equipment Catalogue20 is preparation-closed400 after the actual draft396, independent GPT review and one author response399. Twelve reusable parts and three legal rig examples are prepared. The splitter now has an explicit provisional payload rule; targeting, readiness and physical effects are clearer.
-
- New outcome21 gives Systems five trap/mechanism families and a four-region encounter-pressure map. It continues useful design work under the Claude-only pause.
-
- [Design Coverage](/Hold%20The%20Flood/Design%20Coverage) maps fifteen domains: four with usable first-pass rules, eight with examples/alternatives and three missing dedicated contracts. Those categories are not a game-completion percentage.
-
- No new owner choice, game implementation or permanent agent creation is claimed. Full-wiki forecast remains22 Sep(18–29).
+
- Traps21 is preparation-closed410: five families, a four-region pressure map and two legal encounter traces. One review/response corrected Triage's trigger/override and the cap-work opportunity after crowd clearance; actual placements and balance remain later.
+
- Development Handoff22 is preparation-closed410. It now includes a distinct later evidence path for sustained discovery/build changes across successive expeditions, following independent review. No development or test phase is authorized.
+
- Systems411 continues with the save/content-state contract. The [coverage map](/Hold%20The%20Flood/Design%20Coverage) now distinguishes five first-pass contracts, eight partial areas and two missing dedicated contracts; no overall percentage is implied.
+
- Two previously untracked contributions—[Rescue Shift Proposal](/Hold%20The%20Flood/Rescue%20Shift%20Proposal) and [Station Assembly Example](/Hold%20The%20Flood/Station%20Assembly%20Example)—remain unadopted intake. PM has read them; contributor/ownership context and consequential choices remain to be dispositioned. A tracking gap is not proof of unauthorized work.
+
- The collector's13changed snapshots,6available before-diffs and30messages were reviewed and acknowledged with follow-ups. Known closures show no rollback. Full-wiki forecast remains22 Sep(18–29).
## Open and closed outcomes
@@ 109,7 111,9 @@
|18|[Player information and accessibility](/Hold%20The%20Flood/Player%20Information)|Closed|Reviewed proposed information contract|Sep8 16:35 disposition387|Full cue/screen structure and accessibility specification remain later work; no usability claim|
|19|[Survival and loadout](/Hold%20The%20Flood/Survival%20And%20Loadout)|Closed|Reviewed provisional resource contract|Sep8 16:45 disposition392|Detailed variants and balancing remain later work; integrate compatible core rules after owner decisions|
|20|[Equipment catalogue](/Hold%20The%20Flood/Equipment%20Catalogue)|Closed|Reviewed12-part planning sample; acquisition unchosen|Sep8 17:29 disposition400|Exact thresholds, multi-actuator controller rules, acquisition and later finite catalogue remain open|
-
|21|[Traps and encounter progression](/Hold%20The%20Flood/Traps%20And%20Encounter%20Progression)|Open — authoring|Five families/four-region SMALL proposal|Sep8 17:29 assignment401|Draft18:00(17:45–18:30); one focused GPT review/response; reviewed target18:45(18:15–19:15)|
+
|21|[Traps and encounter progression](/Hold%20The%20Flood/Traps%20And%20Encounter%20Progression)|Closed|Reviewed five-family/four-region SMALL proposal|Sep8 17:48 disposition410|Twelve actual instances, full roster/placement, reset boundaries and balance remain later|
+
|22|[Development and validation handoff](/Hold%20The%20Flood/Development%20And%20Validation%20Handoff)|Closed|Reviewed first-pass risk/evidence plan|Sep8 17:48 disposition410|Final v1-specific scope, staffing and estimates precede any owner phase decision; no development authorized|
+
|23|[Save and content state](/Hold%20The%20Flood/Save%20And%20Content%20State)|Open — authoring|Proposed save policy and continuity contract|Sep8 17:49 assignment411|Draft18:20(18:05–18:45); reviewed19:00(18:30–19:30); unresolved rescue/shift choices stay visible|
## Recent delivery timeline
@@ 129,8 133,11 @@
|Stream|Now|Next|
|---|---|---|
|Equipment catalogue|Preparation closed400; final737b3cfd|Use in trap/encounter examples; detailed controller and acquisition integration later|
-
|Whole-v1 coverage|Published398; fifteen-domain map checked|Use unique deliverables to reconcile scope/forecast; PM validation-handoff plan can proceed|
-
|Trap/encounter progression|Systems401 receiving/source reads verified17:31; GPT criteria saved|Inspect actual submission, one focused review/response, PM disposition|
+
|Whole-v1 coverage|Fifteen-domain map updated after410|Reconcile unique remaining work; save and production contracts still need preparation|
+
|Trap/encounter progression|Preparation closed410; finala280131b|Use concrete family rules; detailed instances/roster later|
+
|Development handoff|Preparation closed410; finalc0c38e8b|Keep gates explicit; final handoff packet depends on concrete v1/development scope|