Commit 287b77

2026-09-08 19:11:18 Anonymous: Record acquisition closeout, combat roster work and revised coverage
hold the flood/progress.md ..
@@ 1,12 1,12 @@
# Hold The Horde — Progress
- **Updated 2026-09-08 18:49 Jerusalem (UTC+3).** PM and GPT work continues; only the two Claude roles are paused. All work remains **design only**.
+ **Updated 2026-09-08 19:10 Jerusalem (UTC+3).** PM and GPT work continues; only the two Claude roles are paused. All work remains **design only**.
- **26 tracked design packages: 24 preparation-closed, 2 open.** Regional Discovery Map25 closed426 at18:32 Jerusalem after its one focused review/response. Equipment Acquisition And Rig Growth26 draft429 arrived18:42:21 and is in focused independent review; Systems is stopped awaiting critique. PM completed the narrow parent-equipment compatibility audit for04 and is preparing exact local alignment drafts; publication/integration and owner-dependent global branches remain open. The separate coverage map and unadopted intake407 contributions are not extra completed packages. These are bounded written outcomes, not overall game completion.
+ **27 tracked design packages: 25 preparation-closed, 2 open.** Equipment Acquisition And Rig Growth26 closed434 at18:57:01 Jerusalem. Combat And Enemy Roster27 is active under435; Systems received the native handoff once and began receiving work at18:58:15.181 Jerusalem. Narrow parent-equipment alignment432 is complete;04 remains open for global shift/rescue/full-station rules, their integration and pending owner choices. The separate coverage map and unadopted intake407 contributions are not extra completed packages. These are bounded written outcomes, not overall game completion.
“Closed” means the bounded written design/review outcome is complete. It does not mean a feature is implemented, every detail approved or fun validated. This board covers the current design batch; it is not a complete campaign or production backlog, and the closed/total ratio is not an overall game-completion percentage. Stable IDs stay fixed; added/reopened work must be recorded explicitly.
- **Availability correction —8 Sep:** only Claude is paused. PM and the existing GPT Systems designer continue useful work with bounded independent GPT reviews. Systems submitted Acquisition26 as429 and stopped; the independent reviewer is active on actual58ea915a using the previously saved criteria. PM has completed04’s read-only parent-equipment audit and is preparing targeted local alignment drafts for publication. Neither permanent Claude role will be woken or replaced before owner confirmation. Active one-minute fallback monitoring and15-minute progress/forecast reports continue.
+ **Availability correction —8 Sep:** only Claude is paused. PM and the existing GPT Systems designer continue useful work with bounded independent GPT reviews. Acquisition26 is preparation-closed and Systems retains STOPPED ownership of its final article. Systems is now active on Combat And Enemy Roster27; PM retains STOPPED ownership of the three aligned parents and handles integration, intake and forecasts. Neither permanent Claude role will be woken or replaced before owner confirmation. Active one-minute fallback monitoring and15-minute progress/forecast reports continue.
## Forward forecast — baseline F1
@@ 43,7 43,7 @@
The critical sequence is core decisions and interfaces → whole-game architecture/content budget → domain designs → cross-domain integration → v1. Content detail proceeds in parallel only where interfaces are stable. Extra writers do not eliminate the PM/review bottleneck.
- **Next delivery, today Jerusalem:** [Equipment Acquisition And Rig Growth26](/Hold%20The%20Flood/Equipment%20Acquisition%20And%20Rig%20Growth) draft arrived18:42:21 against its19:00 target(range18:45–19:20); focused review is active, with reviewed outcome19:45(range19:15–20:15) unchanged. [Regional Discovery Map25](/Hold%20The%20Flood/Regional%20Discovery%20Map) closed18:32 against its19:30 reviewed target. Production24 closed18:21 (target19:40), and Save And Content State23 closed18:09:56 (target19:00). Core11 Sep(10–14), complete first-pass wiki22 Sep(18–29), and specialist setup9–10 Sep remain unchanged. The144–247role-hourv1 allowance needs the9Sep capacity check; if both additional streams are absent10Sep, the provisional current-team scenario is25Sep(22Sep–2Oct).
+ **Next delivery, today Jerusalem:** [Combat And Enemy Roster27](/Hold%20The%20Flood/Combat%20And%20Enemy%20Roster), assigned435 with actual receiving activity verified at18:58:15.181, targets draft19:45(range19:25–20:15) and reviewed outcome20:30(range20:00–21:15). [Equipment Acquisition And Rig Growth26](/Hold%20The%20Flood/Equipment%20Acquisition%20And%20Rig%20Growth) closed18:57:01 against its19:45 reviewed target(range19:15–20:15); its draft arrived18:42:21 against19:00(range18:45–19:20). Regional25 closed18:32 (target19:30), Production24 closed18:21 (target19:40), and State23 closed18:09:56 (target19:00). Core11 Sep(10–14), complete first-pass wiki22 Sep(18–29), and specialist setup9–10 Sep remain unchanged. The144–247role-hourv1 allowance needs the9Sep capacity check; if both additional streams are absent10Sep, the provisional current-team scenario is25Sep(22Sep–2Oct).
## Extra agents — when and why
@@ 79,14 79,16 @@
|F1.5|8 Sep18:09:56|State23 actual closeout417 recorded against its19:00 reviewed target. New418 outcomes: Regional Map25 reviewed19:30(19:00–20:00), Production Scope24 reviewed19:40(19:05–20:10). M2–M4 unchanged pending reviewed remaining-scope accounting; a Production draft is not a reviewed forecast.|
|F1.6|8 Sep18:21|Production24 closed423. Its reviewed response exposes previously unallocated v1 room/mechanism briefs:144–247role-hours replaces draft116–201. M2–M4 dates retained provisionally;9Sep re-estimate must check capacity. If extra streams are unavailable10Sep, current-teamv1 scenario25Sep(22Sep–2Oct). Regional25 reviewing420, target19:30.|
|F1.7|8 Sep18:32|Regional25 actual closeout426 recorded against its19:30 reviewed target. New Acquisition26 assignment427 targets draft19:00(18:45–19:20), reviewed19:45(19:15–20:15). M2–M4, the F1.6 planning allowance and current-team scenario remain unchanged; accepting a regional map does not complete its room inventory.|
+ |F1.8|8 Sep18:57:01|Acquisition26 actual closeout434 recorded against its19:45 reviewed target(19:15–20:15). New Combat And Enemy Roster27 assignment435 targets draft19:45(19:25–20:15), reviewed20:30(20:00–21:15); actual receiving activity18:58:15.181 verified. Narrow04 parent alignment432 is complete; owner-dependent branches remain open. M2–M4, the144–247role-hour planning allowance and current-team scenario remain unchanged.|
## What changed in this report
- [Regional Discovery Map25](/Hold%20The%20Flood/Regional%20Discovery%20Map) preparation-closed426 at18:32, final3acda018. Five earlier A/B occurrences and three address comparisons now support both proposed orders; a concrete pressure iris, visible failed prediction and slower alternative replace the abstract central gate. The calibration compares the same astronaut, and the later rig/source/access costs are explicit.
- - [Equipment Acquisition And Rig Growth26](/Hold%20The%20Flood/Equipment%20Acquisition%20And%20Rig%20Growth) draft429 arrived18:42:21, submitted source58ea915a,26,193bytes. It proposes twelve part sources, reversible active-area growth, legal alternatives and property lifecycle. Systems is stopped; the independent reviewer is now active against criteria saved before the draft. Its recommendations remain unreviewed until the critique/response and PM disposition.
- - PM completed04’s narrow read-only parent-equipment compatibility audit; the full report174b4132 was read. Exact local parent-alignment drafts are being prepared for PM publication. This is targeted integration work, not a broad second review or a closed global station contract. Owner-dependent shift/rescue/full-station branches remain open.
- - The [coverage map](/Hold%20The%20Flood/Design%20Coverage) remains seven first-pass contracts and eight partial areas. Regional objectives are prepared, but24module/40room v1 briefs still remain. No overall percentage is implied.
- - Intake407 remains open and unadopted. Both owner questions and the Claude-only pause are preserved. M2–M4 and the F1.6 current-team scenario stay unchanged pending9Sep capacity review;144–247role-hours remains a planning allowance, not recorded effort.
+ - [Equipment Acquisition And Rig Growth26](/Hold%20The%20Flood/Equipment%20Acquisition%20And%20Rig%20Growth) preparation-closed434 at18:57:01, finalf5f6d7681325bc5e52d1a7503133a15d8e4293f55df3961fe6f7210b9503db6e. The reviewed contract covers all twelve parts, four proposed starters/eight physical sources, three added fixtures, active/carrying growth and legal alternatives. The response distinguishes player preparation from independent receiver acceptance; consumed cargo is not refunded after downstream refusal. Repair/adapter recovery remains an unplaced template and the empty-ship guarantee is bounded to these paths. Late notice436 records author revisionf7ede725 before PM’s paragraph-only maintenance433; it is not a rollback of finalf5f6d768.
+ - PM integrated04’s narrow parent-equipment alignment432 with exact readbacks: Build Rulesb7b70875, Progression Options42a0be59 and Whole Game Outline2d6de3c0. The three parents remain PM-owned and STOPPED. This closes only the compatibility slice; owner-dependent shift/rescue/full-station branches remain open.
+ - [Combat And Enemy Roster27](/Hold%20The%20Flood/Combat%20And%20Enemy%20Roster) is the new active Systems outcome435: a shared combat-state sheet, six ordinary/three special pressure roles and two setpieces mapped to existing regional objectives. Native delivery occurred once; actual receiving activity at15:58:15.181UTC was verified. Draft19:45(19:25–20:15), reviewed20:30(20:00–21:15), Jerusalem.
+ - The [coverage map](/Hold%20The%20Flood/Design%20Coverage) now has eight usable first-pass contracts and seven partial areas after Acquisition26. Equipment still needs source-fixture detail and exceptions;24module/40room/12mechanism v1 briefs still remain. No overall percentage or finished domain is implied.
+ - Intake407 remains open and unadopted. The pending owner questions and the Claude-only pause are preserved. M2–M4 and the F1.6 current-team scenario stay unchanged pending9Sep capacity review;144–247role-hours remains a planning allowance, not recorded effort.
## Open and closed outcomes
@@ 97,7 99,7 @@
|01|[Reusable equipment combinations](/Hold%20The%20Flood/Build%20Rules)|Closed|Selected direction|Sep7 22:19; updated Sep8 13:45|Catalogue and numerical rules remain proposed|
|02|[Oxygen visibility and journal pause](/Hold%20The%20Flood/Oxygen%20and%20Observation)|Closed|Selected direction|Sep7 20:55; updated Sep8 13:45|Exact oxygen amounts remain open|
|03|[Carried property returns on death](/Hold%20The%20Flood/Death%20And%20Persistence)|Closed|Selected rule|Sep8 13:45|Shift and survivor ordering tracked separately|
- |04|[Shifts, persistent work and historical records](/Hold%20The%20Flood/Shifting%20Station%20Options)|Open — alignment drafting|Binding direction selected|Sep8 narrow PM compatibility audit complete|Exact local parent-equipment alignment drafts in preparation; PM publication/integration pending. Owner-dependent shift/rescue/full-station branches remain open|
+ |04|[Shifts, persistent work and historical records](/Hold%20The%20Flood/Shifting%20Station%20Options)|Open — global rules and choices|Binding direction selected|Sep8 narrow alignment integrated432|Parent-equipment compatibility slice complete; three parents PM-owned and STOPPED. Owner-dependent shift/rescue/full-station branches remain open|
|05|[Ordinary combat and horde encounters](/Hold%20The%20Flood/Combat%20Rules)|Closed|Selected direction|Sep8 10:51; updated13:45|Automatic ordinary fire, manual specials; balance remains open|
|06|[First-survivor comparison](/Hold%20The%20Flood/First%20Survivor)|Closed|Short rescue selected; person unchosen|Sep8 response364/disposition368|Yeva versus Aster ready; short-route condition and death/refuge timing remain explicit limits|
|07|[Practical discovery and optional help](/Hold%20The%20Flood/Clues%20and%20Help)|Closed|Selected direction|Sep8 11:23; updated13:45|Current routes cannot be inferred from historical records|
@@ 119,7 121,8 @@
|23|[Save and content state](/Hold%20The%20Flood/Save%20And%20Content%20State)|Closed|Reviewed first-pass continuity contract; save policy unselected|Sep8 18:09:56 disposition417|Final438cdf35; detailed transitions, rescue/shift ordering, save-policy and recovery choices remain open|
|24|[Production scope](/Hold%20The%20Flood/Production%20Scope)|Closed|Reviewed provisional finite scope and work accounting|Sep8 18:21 disposition423|Finalc1a60388;144–247role-hourv1 planning allowance, not measured labor; band/cuts unselected|
|25|[Regional discovery map](/Hold%20The%20Flood/Regional%20Discovery%20Map)|Closed|Reviewed four-region/twelve-objective SMALL planning proposal|Sep8 18:32 disposition426|Final3acda018;24module/40room v1 briefs, actual placements and owner story/ending choices remain open|
- |26|[Equipment acquisition and rig growth](/Hold%20The%20Flood/Equipment%20Acquisition%20And%20Rig%20Growth)|Open — reviewing|Proposed sources and active-area growth; owner acquisition choice remains open|Sep8 18:42:21 draft429|Actual58ea915a; Systems stopped, independent reviewer active. Draft19:00 target achieved early; reviewed19:45(19:15–20:15) unchanged|
+ |26|[Equipment acquisition and rig growth](/Hold%20The%20Flood/Equipment%20Acquisition%20And%20Rig%20Growth)|Closed|Reviewed twelve-part acquisition/growth proposal; owner preference unselected|Sep8 18:57:01 disposition434|Finalf5f6d768; Systems owns article STOPPED. Source-fixture details, exceptions, quantities and gameplay validation remain open|
+ |27|[Combat and enemy roster](/Hold%20The%20Flood/Combat%20And%20Enemy%20Roster)|Open — authoring|Proposed combat-state contract and SMALL pressure roster|Sep8 assignment435; receiving18:58:15.181 verified|Systems active; draft19:45(19:25–20:15), reviewed20:30(20:00–21:15). Six ordinary/three special roles and two setpieces; twelve placed-mechanism briefs still remain|
## Recent delivery timeline
@@ 138,16 141,17 @@
|Stream|Now|Next|
|---|---|---|
- |Equipment catalogue|Preparation closed400; final737b3cfd|Use in trap/encounter examples; detailed controller and acquisition integration later|
- |Whole-v1 coverage|Fifteen-domain map remains seven first-pass contracts and eight partial areas|Regional25 prepares objective dependencies; module/room inventories and integration still need authoring|
- |Trap/encounter progression|Preparation closed410; finala280131b|Use concrete family rules; detailed instances/roster later|
+ |Equipment catalogue|Preparation closed400; final737b3cfd; Acquisition26 prepared434|Use the twelve-part contract and current parent alignment; detailed controller/fixture exceptions remain|
+ |Whole-v1 coverage|Fifteen-domain map now has eight usable first-pass contracts and seven partial areas|Regional objectives and acquisition paths are prepared; module/room/mechanism inventories and integration still need authoring|
+ |Trap/encounter progression|Preparation closed410; finala280131b; Combat27 authoring|Use family rules in the roster; twelve placed-mechanism v1 briefs still need authoring|
|Development handoff|Preparation closed410; finalc0c38e8b|Keep gates explicit; final handoff packet depends on concrete v1/development scope|
|Save/content state|Preparation closed417 at18:09:56; final438cdf35|Use explicit continuity interfaces; detailed state work and owner selections remain later|
|[Production Scope24](/Hold%20The%20Flood/Production%20Scope)|Preparation closed423 at18:21; finalc1a60388|Use144–247role-hour planning allowance with explicit v1/M4 depth and capacity limits|
|[Regional Discovery Map25](/Hold%20The%20Flood/Regional%20Discovery%20Map)|Preparation closed426 at18:32; final3acda018|Use both revised orders and explicit evidence/access conditions; finite module/room briefs remain|
- |[Equipment Acquisition And Rig Growth26](/Hold%20The%20Flood/Equipment%20Acquisition%20And%20Rig%20Growth)|Draft429 received18:42:21; Systems stopped, independent focused review active|One critique/response then PM disposition; reviewed19:45(19:15–20:15) unchanged|
+ |[Equipment Acquisition And Rig Growth26](/Hold%20The%20Flood/Equipment%20Acquisition%20And%20Rig%20Growth)|Preparation closed434 at18:57:01; finalf5f6d768; Systems ownership STOPPED|Use prepared acquisition/configuration paths; owner choices and source-fixture detail remain|
+ |[Combat And Enemy Roster27](/Hold%20The%20Flood/Combat%20And%20Enemy%20Roster)|Assigned435; Systems active, actual receiving18:58:15.181 verified|Draft19:45(19:25–20:15), reviewed20:30(20:00–21:15); one focused critique/response and PM disposition|
|Additional proposal intake|Both full pages read; explicitly unadopted|Track authorship and assess protected retreat/next-shift meeting before integrating|
- |Shared integration04|Narrow read-only parent-equipment audit complete; exact local alignment drafts being prepared|PM owns publication; owner-dependent global branches stay open. No broad review or integration completion claimed|
+ |Shared integration04|Narrow parent-equipment alignment integrated432; PM owns three parents STOPPED|Global shift/rescue/full-station rules, integration and pending owner choices remain open; no broad contract closure claimed|
|Claude Lead/Reviewer|Paused by owner for token limits|Resume only when owner confirms; GPT work continues meanwhile|
|Specialist setup|Two bounded briefs ready|Planned9–10Sep; no new permanent sessions created|
@@ 161,6 165,8 @@
The first-survivor choice is also already with the owner: Yeva, the pressure technician preserving ward measurements (PM recommendation), versus Aster, the supply clerk suspicious of the arrival and requesting one reversible door closure. Neither is selected. Progression, creature, story and corruption alternatives are prepared for later reactions; the owner is not expected to review the whole wiki at once.
+ **Equipment acquisition question now with the owner:** find working parts in station machines, accepting loss of their local function until the part is returned (PM recommendation), or study working examples and spend salvage to fabricate parts aboard. The reviewed acquisition proposal supports this comparison; starting gear, capacity and exact economy remain separate. Combat/roster work continues while the choice is pending.
+
## Reporting agreement
PM sends a compact report every15 minutes while useful work is active, plus meaningful completion, disagreement, blocker or decision updates. The Claude-only pause does not stop reporting while PM/GPT work is active. Use quiet hourly checks only when no useful authorized work can continue. Each report gives the timestamp, changes since the previous report, numeric open/closed preparation counts, real worker activity, blockers, next deliverable with ETA, current v1 target and any forecast change, and a link here. An unchanged interval is stated honestly. No page/message counts or invented completion percentages stand in for progress. Clearly labelled estimated dates and ranges are required; never present them as known facts or guaranteed deadlines. The local monitor requires the computer and apps to remain available.
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9