Hold The Horde — Progress

Updated 2026-09-08 15:40 Jerusalem (UTC+3). This is the PM's owner-facing outcome board. The wiki is the shared record. All work remains design only.

16 tracked design packages: 13 preparation-closed, 3 open. Open: 1 working, 1 blocked on an agent host, 1 waiting on a design dependency. Of the13 closed packages,6 have owner-selected directions,1 has a tentative owner preference and6 are reviewed proposals/alternatives.

“Closed” means the bounded written design/review outcome is complete. It does not mean a feature is implemented, every detail approved or fun validated. This board covers the current design batch; it is not a complete campaign or production backlog, and13/16 is not an overall game-completion percentage. Stable IDs stay fixed; added/reopened work must be recorded explicitly.

What changed in this report

  • Opening A is now the owner's preferred direction: use a reusable part in station machinery to make extraction safer.
  • The alien-language interaction finished its focused review and correction. It supports learning a useful interaction protocol while keeping the speaker and exact meaning uncertain.
  • Both new station-wide puzzle concepts have been independently submitted and released. Systems is writing their practical comparison; Reviewer can review the actual submission without another PM handoff.
  • The first-survivor comparison is assigned, but its automatic handoff was not sent because the original Lead session is absent from a fresh local listing. Owner availability question pending. Other work continues.

Open and closed outcomes

All milestone times below are Jerusalem time. “Updated” separates later owner-rule integration from the original preparation closeout.

ID Outcome Preparation status Decision status Latest milestone Next step / remaining scope
01 Reusable equipment combinations Closed Selected direction Sep7 22:19; updated Sep8 13:45 Catalogue and numerical rules remain proposed
02 Oxygen visibility and journal pause Closed Selected direction Sep7 20:55; updated Sep8 13:45 Exact oxygen amounts remain open
03 Carried property returns on death Closed Selected rule Sep8 13:45 Shift and survivor ordering tracked separately
04 Shifts, persistent work and historical records Open — dependent Binding direction selected Sep8 14:49 direction recorded Integrate final station contract after15; older fixed-map clauses are superseded
05 Ordinary combat and horde encounters Closed Selected direction Sep8 10:51; updated13:45 Automatic ordinary fire, manual specials; balance remains open
06 First short human rescue Open — blocked Short rescue selected; scene unchosen Sep8 15:34 assigned Lead session unavailable for handoff; two encounter/homecoming options requested
07 Practical discovery and optional help Closed Selected direction Sep8 11:23; updated13:45 Current routes cannot be inferred from historical records
08 Cooperation and useful work aboard Closed Tentative preference Sep8 12:00; updated13:45 Equipment loans tentative; full colony/cast still open
09 Two-language expedition and journal use Closed Reviewed proposal Sep8 13:45 Detailed language system unselected;16 is a distinct evidence scene
10 How equipment is acquired and improves Closed Reviewed alternatives Sep8 13:51 Find working components versus observe/fabricate; owner choice later
11 Three distinct horde creatures Closed Reviewed proposals Sep8 14:07 Roster and origins unselected
12 Hospital story and its causal alternatives Closed Reviewed alternatives Sep8 14:47 Owner hospital/godhood draft leads; exact story/ending remain revisable
13 Player resurrection and corruption Closed Reviewed alternatives Sep8 14:38 No player decay or death budget adopted
14 Opening expedition: reusable machinery Closed Option A selected Prepared Sep8 15:14; selected15:30 Preferred direction recorded; exact starting items/rooms remain proposed
15 Deep puzzle connecting the entire station Open — working Goal selected; mechanism proposed Sep8 15:35 work verified Systems comparison349 → focused Reviewer review → one response/disposition
16 Testable alien-language interaction Closed Reviewed proposal Sep8 15:38 Protocol discovery prepared; does not prove request semantics or a god

Recent delivery timeline

These are observed calendar spans from assignment to preparation closeout, including handoffs and review. They are historical measurements, not estimates of labour or promised future turnaround.

Outcome Assigned Sep8 Preparation closed Sep8 Elapsed
Equipment progression comparison 13:17 13:51 34 minutes
Three horde creatures 13:51 14:07 16 minutes
Hospital-story comparison 13:58 14:47 49 minutes
Resurrection/corruption comparison 14:20 14:38 18 minutes
Opening comparison 14:40 15:14 34 minutes
Alien-language interaction 15:06 15:38 32 minutes

Work sequence

Stream Now Next After that
Whole-station puzzle Systems writes comparison Reviewer checks submitted revision One response if needed; PM disposition and owner-facing proposal
First survivor Lead handoff blocked on host Two concrete short encounter/rescue/homecoming options PM review and owner reaction
Shared consistency Old fixed-map claims marked superseded Use the new connection contract and owner payoff choice Replace conflicting rules in owning articles

The whole-station contract is the current dependency for shared integration. The first-survivor stream can run independently when its host is available. No completion deadline is promised before the current comparison is examined.

Decisions for the owner

Already answered: opening A and persistent room/group connections across shifts, culminating in connecting the entire station.

Open creative question: should completing the entire connection puzzle finally stabilise the layout, or should rooms keep moving while every established connection survives? PM recommends stabilisation as a reward for mastery. This is a proposed late payoff, not an answer inferred from the opening choice; the team can continue its comparison while it is pending.

The next new creative choice will be the first-survivor scenes. Progression, creature, story and corruption alternatives are prepared for later reactions; the owner is not expected to review the whole wiki at once.

Reporting agreement

PM sends a compact report every15 minutes while useful work is active, plus meaningful completion, disagreement, blocker or decision updates. Each report gives the timestamp, changes since the previous report, numeric open/closed preparation counts, real worker activity, blocker and next deliverable, and a link here. An unchanged interval is stated honestly. No page/message counts, invented completion percentages or ungrounded Gantt deadlines stand in for progress. The local monitor requires the computer and apps to remain available.