PM F1.13: cast reviewed; room inventory submitted and under review
hold the flood/progress.md ..
@@ 1,12 1,12 @@
# Hold The Horde — Progress
-
**Updated 2026-09-08 20:55 Jerusalem (UTC+3).** PM and GPT work continues; only the two Claude roles are paused. All work remains **design only**.
+
**Updated 2026-09-08 21:25 Jerusalem (UTC+3).** PM and GPT work continues; only the two Claude roles are paused. All work remains **design only**.
-
**31 tracked design packages: 29 preparation-closed, 2 open.** Story And Ending Map30 closed466 at20:42:22 Jerusalem, final03c9cb8e. Cast And Short Rescue Map31 was submitted470 at20:53:50, sourceadb7b4a4; Systems is STOPPED and the one pre-authorized review is proceeding under469. Narrow parent-equipment432, legacy Discovery/Expedition441–443 and home-parent456 compatibility are complete;04 remains open for global shift/rescue/full-station rules, their integration and pending owner choices. The separate coverage map and unadopted intake407 contributions are not extra completed packages. These are bounded written outcomes, not overall game completion.
+
**32 tracked design packages: 30 preparation-closed, 2 open.** Cast And Short Rescue Map31 closed473 at21:12:44 Jerusalem, final6456406b. Station Room And Module Inventory32 was submitted477 at21:22:49 Jerusalem, source15bb8454; Systems is STOPPED and the one pre-authorized review is active under476. Submission does not close32 or advance regional coverage. Narrow parent-equipment432, legacy Discovery/Expedition441–443 and home-parent456 compatibility are complete;04 remains open for global shift/rescue/full-station rules, their integration and pending owner choices. The separate coverage map and unadopted intake407 contributions are not extra completed packages. These are bounded written outcomes, not overall game completion.
“Closed” means the bounded written design/review outcome is complete. It does not mean a feature is implemented, every detail approved or fun validated. This board covers the current design batch; it is not a complete campaign or production backlog, and the closed/total ratio is not an overall game-completion percentage. Stable IDs stay fixed; added/reopened work must be recorded explicitly.
-
**Availability correction —8 Sep:** only Claude is paused. PM and the existing GPT Systems designer continue useful work with bounded independent GPT reviews. Systems retains STOPPED ownership of completed Story30 and submitted Cast31. Native468 receiving20:48:13.898 was verified; actual470 submitted20:53:50 with explicit STOP. Independent criteriae87d7950 were registered467 before assignment; the one review of the submitted revision proceeds under469, without acceptance. PM handles remaining integration, intake and forecasts. Neither permanent Claude role will be woken or replaced before owner confirmation. Active one-minute fallback monitoring and15-minute progress/forecast reports continue.
+
**Availability correction —8 Sep:** only Claude is paused. PM and the existing GPT Systems designer continue useful work with bounded independent GPT reviews. Systems retains STOPPED ownership of completed Cast31 and submitted Station Room And Module Inventory32. Native475 was sent once; receiving at21:13:24.363 and the contract/source reads were verified. Independent criteria6fffe707 were registered474 before assignment; actual477 submitted21:22:49 at15bb8454 with explicit STOP. The one review is active under476; no acceptance is claimed. PM handles remaining integration, intake and forecasts. Neither permanent Claude role will be woken or replaced before owner confirmation. Active one-minute fallback monitoring and15-minute progress/forecast reports continue.
## Forward forecast — baseline F1
@@ 43,7 43,7 @@
The critical sequence is core decisions and interfaces → whole-game architecture/content budget → domain designs → cross-domain integration → v1. Content detail proceeds in parallel only where interfaces are stable. Extra writers do not eliminate the PM/review bottleneck.
-
**Next delivery, today Jerusalem:** [Cast And Short Rescue Map31](/Hold%20The%20Flood/Cast%20And%20Short%20Rescue%20Map) was submitted470 at20:53:50 before its21:30 draft target(range21:10–22:00) and is in review under469; reviewed outcome22:30(range22:00–23:30) remains the medium-low-confidence forecast. [Story And Ending Map30](/Hold%20The%20Flood/Story%20And%20Ending%20Map) closed466 at20:42:22, ahead of its22:15 reviewed target(range21:30–23:00). Core11 Sep(10–14), complete first-pass wiki22 Sep(18–29), and specialist setup9–10 Sep remain unchanged. The144–247role-hour allowance is the dated8Sep planning baseline, not a newly measured remaining balance; accepted depth must be deducted during the9Sep capacity check. If both additional streams are absent10Sep, the provisional current-team scenario remains25Sep(22Sep–2Oct).
+
**Next delivery, Jerusalem:** [Station Room And Module Inventory32](/Hold%20The%20Flood/Station%20Room%20And%20Module%20Inventory) was submitted477 at21:22:49 on8Sep, source15bb8454, before its23:00 draft target(range22:15 on8Sep–00:00 on9Sep). Systems is STOPPED; the one review is active under476. Reviewed outcome00:00 on9Sep(range23:15 on8Sep–01:15 on9Sep) remains the low-medium-confidence forecast. [Cast And Short Rescue Map31](/Hold%20The%20Flood/Cast%20And%20Short%20Rescue%20Map) closed473 at21:12:44 on8Sep, ahead of its22:30 reviewed target(range22:00–23:30); initial draft470 was submitted20:53:50. Room/module hosts will not complete the ten encounter and twelve mechanism briefs. Core11 Sep(10–14), complete first-pass wiki22 Sep(18–29), and specialist setup9–10 Sep remain unchanged. The144–247role-hour allowance is the dated8Sep planning baseline, not a newly measured remaining balance; accepted depth must be deducted during the9Sep capacity check. If both additional streams are absent10Sep, the provisional current-team scenario remains25Sep(22Sep–2Oct).
## Extra agents — when and why
@@ 84,17 84,19 @@
|F1.10|8 Sep20:07|Home28 actual closeout450 recorded against its21:15 reviewed target(20:45–22:00). Two Language Discovery Map29 assignment451 reached draft454 at20:07:22 before its21:00 target(20:35–21:30); independent review455 active, reviewed22:00(21:15–22:45) remains the medium-low-confidence forecast. Home/colony now has a usable first-pass contract; five cast arcs/15scenes and finite room/encounter/mechanism inventories remain unfinished. Global04, M2–M4 and the current-team scenario remain unchanged; the dated144–247 allowance still requires accepted-scope reconciliation.|
|F1.11|8 Sep20:28|Language29 actual closeout459 recorded against its22:00 reviewed target(21:15–22:45). Story And Ending Map30 assignment461 reached draft463 at20:30:02 before its21:15 target(20:50–21:45); one focused review underway under462, reviewed22:15(21:30–23:00) remains the medium-low-confidence forecast. Language/discovery now has a usable first-pass contract; story remains partial. Global04, M2–M4, planned9–10Sep staffing and the current-team scenario remain unchanged; the dated144–247 allowance still needs accepted-scope reconciliation.|
|F1.12|8 Sep20:55|Story30 actual closeout466 at20:42:22 recorded against its22:15 reviewed target(21:30–23:00). Cast And Short Rescue Map31 assignment468 reached draft470 at20:53:50 before its21:30 target(21:10–22:00); one review under469, reviewed22:30(22:00–23:30) remains the medium-low-confidence forecast. Story is now usable first-pass; cast remains partial. Global04, M2–M4, planned9–10Sep staffing, the current-team scenario and dated144–247 allowance caveat remain unchanged.|
+
|F1.13|8 Sep21:22|Cast31 actual closeout473 at21:12:44 recorded against its22:30 reviewed target(22:00–23:30); initial draft470 arrived20:53:50. Station Room And Module Inventory32 assigned475, native receiving verified21:13:24.363; draft477 submitted21:22:49 at15bb8454 before23:00 on8Sep(22:15 on8Sep–00:00 on9Sep). Systems STOPPED; one review active under476. Reviewed00:00 on9Sep(23:15 on8Sep–01:15 on9Sep) remains the low-medium-confidence forecast. Cast is now usable first-pass, bringing coverage to13usable/2partial; room/module and full encounter/mechanism inventories remain unfinished. Global04, M2–M4, planned9–10Sep staffing, the current-team scenario and dated144–247 allowance caveat remain unchanged.|
## What changed in this report
- [Combat And Enemy Roster27](/Hold%20The%20Flood/Combat%20And%20Enemy%20Roster) preparation-closed443 at19:34, finalf1fe0d9a. One focused review/response corrected the new-role triggers and counterplay, staged cues for both regional orders, and Bellback's warning-start cone lock. Six ordinary/three special roles and two setpieces are prepared within ten encounter placements; exact populations, geometry, presentation and tuning remain later work.
-
- [Home And Colony Loop28](/Hold%20The%20Flood/Home%20And%20Colony%20Loop) preparation-closed450 at20:01:12, final5bff3436. One focused review/response clarified shared commissioning, first-return actions and each project's participants and lasting facilities. Five project briefs remain two reused/three new with three new fixed ship fixtures; cast choices, five final arcs/15scenes and management economy remain separate.
+
- [Home And Colony Loop28](/Hold%20The%20Flood/Home%20And%20Colony%20Loop) preparation-closed450 at20:01:12, final5bff3436. One focused review/response clarified shared commissioning, first-return actions and each project's participants and lasting facilities. Five project briefs remain two reused/three new with three new fixed ship fixtures; cast choices, full scene scripts/state variants and management economy remain separate; Cast31 first-pass allocation is now prepared473.
- [Two Language Discovery Map29](/Hold%20The%20Flood/Two%20Language%20Discovery%20Map) preparation-closed459 at20:23:52, finaldf0f48f5. One focused critique/response separated address/body evidence, retained valid captures across lives and supplied the iris variant's local B plate and completion state. Four proposed chains across two languages are prepared; actual clue/string/room variants and comprehension evidence remain unfinished.
- [Story And Ending Map30](/Hold%20The%20Flood/Story%20And%20Ending%20Map) preparation-closed466 at20:42:22, final03c9cb8e. One focused critique/response separated current diagnostic evidence from historical chronology, specified evidence retained/lost before and after isolation, and used shared mechanical cycle impressions. Four mystery/personal chains and layered choices are prepared proposals; final story, departure rules and full cast/room/scene variants remain open.
-
- [Cast And Short Rescue Map31](/Hold%20The%20Flood/Cast%20And%20Short%20Rescue%20Map) was submitted470 at20:53:50, sourceadb7b4a4: five proposed people and fifteen uniquely identified first-pass scenes, three primary scenes per person, with short current rescue routes, knowledge/participation/commissioning states and counted overlaps. Systems is STOPPED; one review proceeds under469 against pre-assignment criteriae87d7950. Submission does not close the cast domain or select first-survivor/mortality rules.
+
- [Cast And Short Rescue Map31](/Hold%20The%20Flood/Cast%20And%20Short%20Rescue%20Map) preparation-closed473 at21:12:44, final6456406b: five proposed people and fifteen unique first-pass scene briefs, three primary per person. One focused critique/response resolved the initial walked rescue route, actual movement event and first bench operation. D2 retains Dorn participating in the initial demonstrated operation; later commissioned use follows Home28. First-survivor/global mortality and final cast remain unselected.
+
- [Station Room And Module Inventory32](/Hold%20The%20Flood/Station%20Room%20And%20Module%20Inventory) was submitted477 at21:22:49, source15bb8454(55138bytes), with explicit author STOP. The proposed24module/40room inventory is now in the one review under476 against pre-assignment criteria6fffe707. Draft23:00 target achieved early; no preparation closeout or regional coverage advance is claimed. Hosting ten encounters/twelve mechanisms does not complete their detailed briefs.
- PM verified04's narrow legacy integration under441–443: [Discovery Chain](/Hold%20The%20Flood/Discovery%20Chain)114e9267 and [Expedition Proposal](/Hold%20The%20Flood/Expedition%20Proposal)836ab2ae now use historical post-death routes and world-time capture/full frozen journal inspection. No new access guarantee was added; global04 remains open.
- PM closed narrow [Coming Home](/Hold%20The%20Flood/Coming%20Home)/[Home Projects](/Hold%20The%20Flood/Home%20Projects) compatibility456 at20:15:57, revisionsacbc945c/996d235a. Current Fork/supply, unloading, historical-route and refill rules align; PM owns both parents STOPPED. This adds no package and does not close global04.
-
- The [coverage map](/Hold%20The%20Flood/Design%20Coverage) now has twelve usable first-pass contracts and three partial areas. Only story/endings/corruption advances this time; cast/short rescue remains partial. The five cast arcs/15scenes,24module/40room, ten encounter-placement and twelve mechanism inventories still need actual briefs and integration; no full-v1 percentage is implied.
+
- The [coverage map](/Hold%20The%20Flood/Design%20Coverage) now has thirteen usable first-pass contracts and two partial areas. Only authored cast/short rescue advances this time; regional progression and global death/shifts/connections remain partial. Five cast briefs/fifteen unique primary scene briefs are prepared; their full scripts/state variants/geometry,24module/40room, ten encounter-placement and twelve mechanism inventories still need detail and integration. No full-v1 percentage is implied.
- Intake407, all four pending owner questions, the original Claude pause and planned9–10Sep specialist setup are preserved. M2–M4 remain unchanged;144–247role-hours is the dated8Sep planning allowance, not measured labor or an automatically current remaining total.
## Open and closed outcomes
@@ 130,10 132,11 @@
|25|[Regional discovery map](/Hold%20The%20Flood/Regional%20Discovery%20Map)|Closed|Reviewed four-region/twelve-objective SMALL planning proposal|Sep8 18:32 disposition426|Final3acda018;24module/40room v1 briefs, actual placements and owner story/ending choices remain open|
|26|[Equipment acquisition and rig growth](/Hold%20The%20Flood/Equipment%20Acquisition%20And%20Rig%20Growth)|Closed|Reviewed twelve-part acquisition/growth proposal; owner preference unselected|Sep8 18:57:01 disposition434|Finalf5f6d768; Systems owns article STOPPED. Source-fixture details, exceptions, quantities and gameplay validation remain open|
|27|[Combat and enemy roster](/Hold%20The%20Flood/Combat%20And%20Enemy%20Roster)|Closed|Reviewed combat-state contract and proposed6ordinary/3special/2setpiece roster|Sep8 19:34 disposition443|Finalf1fe0d9a; Systems ownership STOPPED. Ten encounter placements and twelve mechanism slots still need exact inventories, cues and geometry|
-
|28|[Home and colony loop](/Hold%20The%20Flood/Home%20And%20Colony%20Loop)|Closed|Reviewed return/preparation contract and five project briefs; cast/economy unselected|Sep8 20:01:12 disposition450|Final5bff3436; Systems STOPPED owner. Two reused/three new projects; exact fixture/control detail, five final cast arcs/15scenes and validation remain|
+
|28|[Home and colony loop](/Hold%20The%20Flood/Home%20And%20Colony%20Loop)|Closed|Reviewed return/preparation contract and five project briefs; cast/economy unselected|Sep8 20:01:12 disposition450|Final5bff3436; Systems STOPPED owner. Two reused/three new projects; exact fixture/control detail, full cast scene scripts/state variants and validation remain; first-pass cast allocation prepared473|
|29|[Two-language discovery map](/Hold%20The%20Flood/Two%20Language%20Discovery%20Map)|Closed|Reviewed four-chain/two-language proposal; origins and final story unselected|Sep8 20:23:52 disposition459|Finaldf0f48f5; Systems STOPPED owner. Actual clue/string/physical-state variants, room placements and comprehension evidence remain|
-
|30|[Story and ending map](/Hold%20The%20Flood/Story%20And%20Ending%20Map)|Closed|Reviewed causal/choice map and four mystery-personal chains; final canon/ending rules unselected|Sep8 20:42:22 disposition466|Final03c9cb8e; Systems STOPPED owner. Actual placements, full cast/15scene allocation, state variants and emotional validation remain|
-
|31|[Cast and short rescue map](/Hold%20The%20Flood/Cast%20And%20Short%20Rescue%20Map)|Open — independent review|Submitted five-cast/fifteen-scene proposal; final cast/first survivor/mortality unselected|Sep8 submission470 at20:53:50; review under469|Systems STOPPED sole owner; draft21:30 target achieved early, reviewed22:30(22:00–23:30) forecast. Three primary scenes per person; actual room/state/dialogue variants remain separate|
+
|30|[Story and ending map](/Hold%20The%20Flood/Story%20And%20Ending%20Map)|Closed|Reviewed causal/choice map and four mystery-personal chains; final canon/ending rules unselected|Sep8 20:42:22 disposition466|Final03c9cb8e; Systems STOPPED owner. Actual placements, full scene scripts/state variants and emotional validation remain; first-pass cast allocation prepared473|
+
|31|[Cast And Short Rescue Map31](/Hold%20The%20Flood/Cast%20And%20Short%20Rescue%20Map)|Closed|Reviewed five-cast/fifteen-scene proposal; final cast/first survivor/mortality unselected|Sep8 21:12:44 disposition473|Final6456406b; Systems STOPPED owner. Three unique primary scenes per person; D2 initial operation includes Dorn. Full scripts, room/state variants and validation remain|
+
|32|[Station Room And Module Inventory32](/Hold%20The%20Flood/Station%20Room%20And%20Module%20Inventory)|Open — independent review|Submitted twenty-four-module/forty-room and counted content-host proposal|Sep8 submission477 at21:22:49; review active under476|Submitted draft15bb8454; Systems STOPPED sole owner; criteria474. Draft23:00 Sep8 target achieved early; reviewed00:00 Sep9(23:15 Sep8–01:15 Sep9), low-medium confidence. Ten encounter/twelve mechanism detailed briefs remain separate|
## Recent delivery timeline
@@ 153,7 156,7 @@
|Stream|Now|Next|
|---|---|---|
|Equipment catalogue|Preparation closed400; final737b3cfd; Acquisition26 prepared434|Use the twelve-part contract and current parent alignment; detailed controller/fixture exceptions remain|
-
|Whole-v1 coverage|Fifteen-domain map has twelve usable first-pass contracts and three partial areas|Story/ending first pass prepared; five cast arcs/15scenes,24module/40room, ten encounter-placement and twelve mechanism inventories and integration remain|
+
|Whole-v1 coverage|Fifteen-domain map has thirteen usable first-pass contracts and two partial areas|Five cast/fifteen primary scene first-pass briefs prepared; full scene scripts/state variants,24module/40room, ten encounter-placement and twelve mechanism inventories and integration remain|
|Trap/encounter progression|Traps21 prepared410; Combat27 prepared443 atf1fe0d9a|Author exact ten encounter-placement and twelve mechanism briefs, with geometry, populations, cue variants and recovery|
|Development handoff|Preparation closed410; finalc0c38e8b|Keep gates explicit; final handoff packet depends on concrete v1/development scope|
|Save/content state|Preparation closed417 at18:09:56; final438cdf35|Use explicit continuity interfaces; detailed state work and owner selections remain later|
@@ 161,10 164,11 @@
|[Regional Discovery Map25](/Hold%20The%20Flood/Regional%20Discovery%20Map)|Preparation closed426 at18:32; final3acda018|Use both revised orders and explicit evidence/access conditions; finite module/room briefs remain|
|[Equipment Acquisition And Rig Growth26](/Hold%20The%20Flood/Equipment%20Acquisition%20And%20Rig%20Growth)|Preparation closed434 at18:57:01; finalf5f6d768; Systems ownership STOPPED|Use prepared acquisition/configuration paths; owner choices and source-fixture detail remain|
|[Combat And Enemy Roster27](/Hold%20The%20Flood/Combat%20And%20Enemy%20Roster)|Preparation closed443 at19:34; finalf1fe0d9a; Systems ownership STOPPED|Use the reviewed roster/state contract; finite placement, cue and recovery detail remains|
-
|[Home And Colony Loop28](/Hold%20The%20Flood/Home%20And%20Colony%20Loop)|Preparation closed450 at20:01:12; final5bff3436; Systems ownership STOPPED|Use reviewed return/project availability and property rules; exact interfaces, cast arcs/scenes and management choices remain|
+
|[Home And Colony Loop28](/Hold%20The%20Flood/Home%20And%20Colony%20Loop)|Preparation closed450 at20:01:12; final5bff3436; Systems ownership STOPPED|Use reviewed return/project availability and property rules; exact interfaces, full cast scene scripts/state variants and management choices remain|
|[Two Language Discovery Map29](/Hold%20The%20Flood/Two%20Language%20Discovery%20Map)|Preparation closed459 at20:23:52; finaldf0f48f5; Systems ownership STOPPED|Use reviewed four-chain evidence/action contract; actual clue/string/room variants and validation remain|
|[Story And Ending Map30](/Hold%20The%20Flood/Story%20And%20Ending%20Map)|Preparation closed466 at20:42:22; final03c9cb8e; Systems ownership STOPPED|Use reviewed causal/evidence/choice contract; final canon, departure preference and finite state/scene/room details remain|
-
|[Cast And Short Rescue Map31](/Hold%20The%20Flood/Cast%20And%20Short%20Rescue%20Map)|Draft470 submitted20:53:50 atadb7b4a4; Systems STOPPED; one review under469 against criteriae87d7950|Draft21:30 target achieved early; reviewed22:30(22:00–23:30) remains forecast; one critique/response then PM disposition|
+
|[Cast And Short Rescue Map31](/Hold%20The%20Flood/Cast%20And%20Short%20Rescue%20Map)|Preparation closed473 at21:12:44; final6456406b; Systems ownership STOPPED|Use reviewed five-cast/fifteen-scene first pass and initial D2 participant rule; final cast, scripts, state variants and placements remain|
+
|[Station Room And Module Inventory32](/Hold%20The%20Flood/Station%20Room%20And%20Module%20Inventory)|Draft477 submitted21:22:49 at15bb8454; Systems STOPPED; one review active under476 against criteria6fffe707|Draft23:00 Sep8 target achieved early; reviewed00:00 Sep9(23:15 Sep8–01:15 Sep9), low-medium confidence. One focused critique/response then PM disposition; encounter/mechanism detailed briefs remain successors|
|Additional proposal intake|Both full pages read; explicitly unadopted|Track authorship and assess protected retreat/next-shift meeting before integrating|
|Claude Lead/Reviewer|Paused by owner for token limits|Resume only when owner confirms; GPT work continues meanwhile|
@@ 180,7 184,7 @@
The first-survivor choice is also already with the owner: Yeva, the pressure technician preserving ward measurements (PM recommendation), versus Aster, the supply clerk suspicious of the arrival and requesting one reversible door closure. Neither is selected. Progression, creature, story and corruption alternatives are prepared for later reactions; the owner is not expected to review the whole wiki at once.
-
**Equipment acquisition question now with the owner:** find working parts in station machines, accepting loss of their local function until the part is returned (PM recommendation), or study working examples and spend salvage to fabricate parts aboard. The reviewed acquisition proposal supports this comparison; starting gear, capacity and exact economy remain separate. Cast/rescue work can continue while the choice is pending.
+
**Equipment acquisition question now with the owner:** find working parts in station machines, accepting loss of their local function until the part is returned (PM recommendation), or study working examples and spend salvage to fabricate parts aboard. The reviewed acquisition proposal supports this comparison; starting gear, capacity and exact economy remain separate. Room/module review can continue while the choice is pending.
**New apparent-ending question now with the owner:** show credits and allow continuing from before departure (PM recommendation), or make departure permanently end this save. The question is unanswered; neither continuation behavior nor permanent save closure is adopted. Together with final station-layout behavior, first survivor and equipment acquisition, this makes four pending owner questions.