Record catalogue closeout, coverage and next GPT trap outcome
hold the flood/progress.md ..
@@ 1,12 1,12 @@
# Hold The Horde — Progress
-
**Updated 2026-09-08 17:15 Jerusalem (UTC+3).** PM and GPT work continues; only the two Claude roles are paused. All work remains **design only**.
+
**Updated 2026-09-08 17:32 Jerusalem (UTC+3).** PM and GPT work continues; only the two Claude roles are paused. All work remains **design only**.
-
**20 tracked design packages: 18 preparation-closed, 2 open.** New package20 Equipment Catalogue was explicitly added394; shared integration04 remains dependent. Outline17, information18 and survival19 are prepared. These are bounded written outcomes, not complete game domains or an overall game-completion percentage.
+
**21 tracked design packages: 19 preparation-closed, 2 open.** Equipment20 closed400 at17:29; new outcome21 Traps and Encounter Progression was explicitly assigned401. Shared integration04 remains dependent. The published Design Coverage map is separate management work, not another counted package. These are bounded written outcomes, not complete game domains or an overall completion percentage.
“Closed” means the bounded written design/review outcome is complete. It does not mean a feature is implemented, every detail approved or fun validated. This board covers the current design batch; it is not a complete campaign or production backlog, and the closed/total ratio is not an overall game-completion percentage. Stable IDs stay fixed; added/reopened work must be recorded explicitly.
-
**Availability correction —8 Sep:** the owner paused only Claude, and explicitly confirmed PM and the existing GPT Systems designer should continue. PM’s broader stop was an incorrect inference and has been withdrawn. Systems is authoring; a temporary independent GPT reviewer handles the named review, while PM works on full-v1 coverage. Neither permanent Claude role will be woken or replaced before owner confirmation. Active one-minute fallback monitoring and15-minute progress/forecast reports are restored.
+
**Availability correction —8 Sep:** the owner paused only Claude, and explicitly confirmed PM and the existing GPT Systems designer should continue. PM’s broader stop was an incorrect inference and has been withdrawn. Systems is assigned the next trap/encounter outcome, a temporary GPT reviewer has saved fresh criteria, and PM has published the full-v1 coverage map. Neither permanent Claude role will be woken or replaced before owner confirmation. Active one-minute fallback monitoring and15-minute progress/forecast reports continue.
## Forward forecast — baseline F1
@@ 43,7 43,7 @@
The critical sequence is core decisions and interfaces → whole-game architecture/content budget → domain designs → cross-domain integration → v1. Content detail proceeds in parallel only where interfaces are stable. Extra writers do not eliminate the PM/review bottleneck.
-
**Next deliveries:** Equipment Catalogue draft target18:00 today(range17:30–18:15), reviewed package18:30(range18:00–19:00). PM’s whole-v1 coverage check targets17:45(range17:30–18:15), identifying the remaining domain work rather than counting prepared packages as full completion. Core11 Sep(10–14), complete first-pass wiki22 Sep(18–29), and specialist setup9–10 Sep remain unchanged.
+
**Next deliveries:** Traps and Encounter Progression draft target18:00 today(range17:45–18:30), reviewed outcome18:45(range18:15–19:15). Equipment Catalogue closed17:29 against its original reviewed18:30 target; PM’s [Design Coverage](/Hold%20The%20Flood/Design%20Coverage) was published17:27 against17:45. Core11 Sep(10–14), complete first-pass wiki22 Sep(18–29), and specialist setup9–10 Sep remain unchanged.
## Extra agents — when and why
@@ 74,13 74,14 @@
|F1.1|8 Sep16:04|M1 reviewed outline moved from18:00–20:00 to16:30–17:30 because the actual draft arrived16:01 and Reviewer had already fetched it. Review/rework still required. Core, full-wiki and detailed-content dates unchanged.|
|F1.2|8 Sep16:20|M0 actual15:59 and M1 actual16:20 recorded. Both prepared ahead of forecast. M2–M4 dates unchanged: the outline is a scaffold, and scope/unit reconciliation is still required before rolling up its partial111–208 role-hour inventory.|
|Availability correction|8 Sep17:10|Only Claude paused; PM/GPT work resumed after PM incorrectly stopped broader intake. Equipment Catalogue20 now targets reviewed18:30 today. M2–M4 dates unchanged pending coverage reassessment.|
+
|F1.3|8 Sep17:32|Catalogue actual17:29 and coverage actual17:27 recorded ahead of their18:30/17:45 targets. Next reviewed trap/encounter outcome targets18:45(18:15–19:15). M2–M4 unchanged: the coverage audit still identifies eight partial domains and three missing contracts; remaining-work estimates need deduplication.|
## What changed in this report
-
- GPT work continues under the owner’s clarification393. The Claude-only token pause is not a project-wide blocker.
-
- Systems394 is producing12 proposed reusable parts with individual behavior, costs, discovery contexts and concrete legal combinations. Existing model/effort and ownership are preserved.
-
- A temporary GPT reviewer saved and hashed independent criteria before seeing the draft. PM will relay one focused review and author response; Claude Reviewer remains paused.
-
- PM is checking full-v1 coverage and unique remaining deliverables. The18 prepared packages include local examples and alternatives; campaign, content, cast and integration work still need a complete backlog.
+
- Equipment Catalogue20 is preparation-closed400 after the actual draft396, independent GPT review and one author response399. Twelve reusable parts and three legal rig examples are prepared. The splitter now has an explicit provisional payload rule; targeting, readiness and physical effects are clearer.
+
- New outcome21 gives Systems five trap/mechanism families and a four-region encounter-pressure map. It continues useful design work under the Claude-only pause.
+
- [Design Coverage](/Hold%20The%20Flood/Design%20Coverage) maps fifteen domains: four with usable first-pass rules, eight with examples/alternatives and three missing dedicated contracts. Those categories are not a game-completion percentage.
+
- No new owner choice, game implementation or permanent agent creation is claimed. Full-wiki forecast remains22 Sep(18–29).
## Open and closed outcomes
@@ 107,7 108,8 @@
|17|[Whole-game design outline and scope bands](/Hold%20The%20Flood/Whole%20Game%20Outline)|Closed|Reviewed planning scaffold|Sep8 16:20 disposition378|Use finite bands and dependencies for domain designs; story/ending/count choices and estimate coverage remain open|
|18|[Player information and accessibility](/Hold%20The%20Flood/Player%20Information)|Closed|Reviewed proposed information contract|Sep8 16:35 disposition387|Full cue/screen structure and accessibility specification remain later work; no usability claim|
|19|[Survival and loadout](/Hold%20The%20Flood/Survival%20And%20Loadout)|Closed|Reviewed provisional resource contract|Sep8 16:45 disposition392|Detailed variants and balancing remain later work; integrate compatible core rules after owner decisions|
|Whole-v1 coverage|PM with a bounded source audit|Publish missing domain outcomes and distinguish genuine decision blockers from usable independent work|
+
|Equipment catalogue|Preparation closed400; final737b3cfd|Use in trap/encounter examples; detailed controller and acquisition integration later|
+
|Whole-v1 coverage|Published398; fifteen-domain map checked|Use unique deliverables to reconcile scope/forecast; PM validation-handoff plan can proceed|
+
|Trap/encounter progression|Systems401 assigned; independent GPT criteria saved|Inspect actual submission, one focused review/response, PM disposition|
|Shared integration04|Current owner rules known; some mechanisms/choices pending|Integrate confirmed rules and explicitly isolate unresolved decisions|
|Claude Lead/Reviewer|Paused by owner for token limits|Resume only when owner confirms; GPT work continues meanwhile|
|Specialist setup|Two bounded briefs ready|Planned9–10Sep; no new permanent sessions created|