Hold The Horde — Progress

Updated 2026-09-08 18:49 Jerusalem (UTC+3). PM and GPT work continues; only the two Claude roles are paused. All work remains design only.

26 tracked design packages: 24 preparation-closed, 2 open. Regional Discovery Map25 closed426 at18:32 Jerusalem after its one focused review/response. Equipment Acquisition And Rig Growth26 draft429 arrived18:42:21 and is in focused independent review; Systems is stopped awaiting critique. PM completed the narrow parent-equipment compatibility audit for04 and is preparing exact local alignment drafts; publication/integration and owner-dependent global branches remain open. The separate coverage map and unadopted intake407 contributions are not extra completed packages. These are bounded written outcomes, not overall game completion.

“Closed” means the bounded written design/review outcome is complete. It does not mean a feature is implemented, every detail approved or fun validated. This board covers the current design batch; it is not a complete campaign or production backlog, and the closed/total ratio is not an overall game-completion percentage. Stable IDs stay fixed; added/reopened work must be recorded explicitly.

Availability correction —8 Sep: only Claude is paused. PM and the existing GPT Systems designer continue useful work with bounded independent GPT reviews. Systems submitted Acquisition26 as429 and stopped; the independent reviewer is active on actual58ea915a using the previously saved criteria. PM has completed04’s read-only parent-equipment audit and is preparing targeted local alignment drafts for publication. Neither permanent Claude role will be woken or replaced before owner confirmation. Active one-minute fallback monitoring and15-minute progress/forecast reports continue.

Forward forecast — baseline F1

Planning answer: a coherent core design this week, a complete first-pass game-design wiki in about two weeks, and a detailed campaign specification in roughly two to three months. These are PM estimates to manage against, not promises or measured confidence intervals. They will change as the content inventory and owner choices become concrete.

All dates are2026; times are Jerusalem. Ranges are cumulative from8 September, not durations to add together. Baseline F1 was set8 September. Dates assume ordinary weekdays, about6–8 productive agent/PM operating hours per working day, functioning local hosts, and most consequential owner choices within a working day. That does not mean6–8hours of the owner's time or guaranteed overnight operation.

Milestone Target Current likely window Confidence What will be ready
M0 — current puzzle/rescue decision pack Achieved8 Sep15:59 Original target16:30; range16:30–17:00 Actual completion Both written comparisons reviewed and closed; owner choices remain separate
M1 — whole-game outline and scope bands Achieved8 Sep16:20 Original18:30; revised17:00 Actual completion Draft369, focused review370, response374 and PM integration378 complete; architecture, scope bands and missing-work inventory prepared
M2 — coherent core-design baseline Fri11 Sep 10–14 Sep Medium-low One compatible proposed/selected loop: opening, builds, combat, oxygen, death/shift, rescue and home; old conflicting rules replaced and consequential choices dispositioned
M3 — complete first-pass game-design wiki, v1 Tue22 Sep 18–29 Sep Low-medium Every major gameplay and campaign area has an actual design, a scoped content inventory, dependencies and a usable development handoff outline; major categories are no longer only menus of alternatives
M4 — detailed campaign/content specification Tue10 Nov 20 Oct–1 Dec Low The approved finite inventory of regions, rooms, puzzles, clues, encounters, rewards, cast scenes and endings is specified through its state changes and recovery paths

Will the full wiki be ready today? No. Today's decision pack and whole-game outline are prepared; they are not a complete design wiki. The working target for the first complete design wiki is22 September. The later detailed-content milestone expands that design into the actual authored campaign. Neither milestone claims that a written plan has proved fun, balance, performance or30/90/100–200hours of play.

For M3, “complete first pass” includes the story's causal chain and ending structure; station layout/shifts/persistence; equipment acquisition and progression; combat/horde/trap families; oxygen/resources; rescue/colony/cast arcs; both language-learning arcs and clue distribution; journal, controls and accessibility; content budget, production constraints and the later validation plan. Numerical tuning can remain explicitly provisional. A major domain marked only “TBD” does not satisfy completion.

M4 has the weakest estimate because no approved content inventory yet exists. It assumes a substantial authored campaign matching the brief's ambition and two additional specialists. It is approximately30–60 active working days; with the current team alone, the initial audit estimated40–80. A smaller approved campaign could be much quicker; a dense secret/language campaign or a changed global rule could exceed the range. I will revise M4 after the inventory and three representative detailed content packages are written and checked. Final gameplay validation belongs to a separately authorised implementation/playtest phase; it has no honest calendar endpoint yet.

Estimated work timeline

This is a planning schedule, not historical delivery data. “Buffer” is allowed revision/decision time, not an unassigned promise to polish indefinitely.

Workstream 8 Sep 9–11 Sep 14–18 Sep 21–29 Sep Oct Nov–1 Dec
Current decision pack Done15:59
Whole-game outline and scope Done16:20 Use for domain design
Core rules and shared integration Finish / buffer into14 Sep
Campaign, puzzles, cast, progression and languages Start Develop Integrate and review
Complete wiki v1 Draft coverage Target22 Sep; buffer to29 Sep
Detailed authored content Representative packages Expand approved inventory Main authoring Target10 Nov; buffer to1 Dec

The critical sequence is core decisions and interfaces → whole-game architecture/content budget → domain designs → cross-domain integration → v1. Content detail proceeds in parallel only where interfaces are stable. Extra writers do not eliminate the PM/review bottleneck.

Next delivery, today Jerusalem: Equipment Acquisition And Rig Growth26 draft arrived18:42:21 against its19:00 target(range18:45–19:20); focused review is active, with reviewed outcome19:45(range19:15–20:15) unchanged. Regional Discovery Map25 closed18:32 against its19:30 reviewed target. Production24 closed18:21 (target19:40), and Save And Content State23 closed18:09:56 (target19:00). Core11 Sep(10–14), complete first-pass wiki22 Sep(18–29), and specialist setup9–10 Sep remain unchanged. The144–247role-hourv1 allowance needs the9Sep capacity check; if both additional streams are absent10Sep, the provisional current-team scenario is25Sep(22Sep–2Oct).

Extra agents — when and why

Plan to add two agents tomorrow,9 September, with bounded briefs prepared today. The current team can finish today's work. We will begin the two specialist streams as the relevant scopes become ready, aiming to have both available by10 September rather than waiting a week.

Additional role Planned start First bounded responsibility Reason for adding it
Campaign and puzzle designer 9 Sep Develop the outline's discovery dependencies and two representative regional/puzzle chains, keeping owner mysteries revisable Most existing work is local examples; the campaign and its deep discoveries need a dedicated author
Technical design and production planner 9–10 Sep Audit proposed scope against Unity/Steam, state/save complexity, reusable content needs and available free-asset categories; identify constraints and likely expensive systems The largest forecast uncertainty is how much authored content and engineering complexity the design implies

These are design roles. No gamecode, prototypes, simulations, tests, purchases or AI art are authorised by this staffing plan. The owner has not yet created these sessions; no staffing completion is claimed. PM will guide setup one step at a time. Existing Systems retains the equipment economy; if that becomes the actual bottleneck, the second specialist brief can shift to economy/content planning rather than accumulate an idle role. No additional permanent critic is currently planned.

The independent schedule audit proposed campaign/puzzle and economy specialists after the core baseline. PM keeps its point that extra agents do not accelerate core decisions, but brings onboarding forward to9 Sep so a bounded content/production audit can begin alongside integration. The production role is chosen first because the absent content inventory and feasibility assumptions dominate the long-range estimate. This is a reversible staffing judgment, not a demonstrated speedup.

Why these estimates, and when they change

Recent focused comparison/review packages took about16–49 elapsed minutes. That supports today's short delivery windows; it does not establish campaign-authoring throughput. The independent remaining-scope audit estimated2–4 active days for a coherent core,6–12 with two specialists or8–15 with the current team for a whole-game first pass, and30–60 with two specialists for detailed content. PM has allowed calendar/integration buffer around the v1 target.

  • Every15-minute progress report includes the next milestone's current target/range and whether it moved. The full forecast is reviewed at each day's close, with the next substantive re-estimate by9 Sep18:00 after the scope outline.
  • Keep the original target visible when revising it. Record old estimate, new estimate and the concrete cause; do not silently move dates.
  • A changed core mechanism or late owner story change may add roughly1–3 working days to the core/v1 forecast; quantify the actual affected work when it happens.
  • A blocked decision moves its dependent work, not every parallel stream. Host outages are reported with elapsed delay. If authors produce a queue waiting over a working day for review/integration, reduce parallel intake before adding more agents.
  • Forecasts must be useful even when confidence is low. Uncertainty is a reason to widen a range and state assumptions, not to omit an estimate or wait for certainty.
Forecast revision Recorded Change and reason
F1 8 Sep First forward baseline added at owner's request; prior board had actuals but omitted estimates. M3 target22 Sep; M4 target10 Nov.
F1.1 8 Sep16:04 M1 reviewed outline moved from18:00–20:00 to16:30–17:30 because the actual draft arrived16:01 and Reviewer had already fetched it. Review/rework still required. Core, full-wiki and detailed-content dates unchanged.
F1.2 8 Sep16:20 M0 actual15:59 and M1 actual16:20 recorded. Both prepared ahead of forecast. M2–M4 dates unchanged: the outline is a scaffold, and scope/unit reconciliation is still required before rolling up its partial111–208 role-hour inventory.
Availability correction 8 Sep17:10 Only Claude paused; PM/GPT work resumed after PM incorrectly stopped broader intake. Equipment Catalogue20 now targets reviewed18:30 today. M2–M4 dates unchanged pending coverage reassessment.
F1.3 8 Sep17:32 Catalogue actual17:29 and coverage actual17:27 recorded ahead of their18:30/17:45 targets. Next reviewed trap/encounter outcome targets18:45(18:15–19:15). M2–M4 unchanged: the coverage audit still identifies eight partial domains and three missing contracts; remaining-work estimates need deduplication.
F1.4 8 Sep17:54 Traps21 and Handoff22 actual17:48 recorded against18:45/18:15 targets. Next Save And Content State23 reviewed target19:00(18:30–19:30). M2–M4 unchanged: full campaign, content inventory and integration still require work.
F1.5 8 Sep18:09:56 State23 actual closeout417 recorded against its19:00 reviewed target. New418 outcomes: Regional Map25 reviewed19:30(19:00–20:00), Production Scope24 reviewed19:40(19:05–20:10). M2–M4 unchanged pending reviewed remaining-scope accounting; a Production draft is not a reviewed forecast.
F1.6 8 Sep18:21 Production24 closed423. Its reviewed response exposes previously unallocated v1 room/mechanism briefs:144–247role-hours replaces draft116–201. M2–M4 dates retained provisionally;9Sep re-estimate must check capacity. If extra streams are unavailable10Sep, current-teamv1 scenario25Sep(22Sep–2Oct). Regional25 reviewing420, target19:30.
F1.7 8 Sep18:32 Regional25 actual closeout426 recorded against its19:30 reviewed target. New Acquisition26 assignment427 targets draft19:00(18:45–19:20), reviewed19:45(19:15–20:15). M2–M4, the F1.6 planning allowance and current-team scenario remain unchanged; accepting a regional map does not complete its room inventory.

What changed in this report

  • Regional Discovery Map25 preparation-closed426 at18:32, final3acda018. Five earlier A/B occurrences and three address comparisons now support both proposed orders; a concrete pressure iris, visible failed prediction and slower alternative replace the abstract central gate. The calibration compares the same astronaut, and the later rig/source/access costs are explicit.
  • Equipment Acquisition And Rig Growth26 draft429 arrived18:42:21, submitted source58ea915a,26,193bytes. It proposes twelve part sources, reversible active-area growth, legal alternatives and property lifecycle. Systems is stopped; the independent reviewer is now active against criteria saved before the draft. Its recommendations remain unreviewed until the critique/response and PM disposition.
  • PM completed04’s narrow read-only parent-equipment compatibility audit; the full report174b4132 was read. Exact local parent-alignment drafts are being prepared for PM publication. This is targeted integration work, not a broad second review or a closed global station contract. Owner-dependent shift/rescue/full-station branches remain open.
  • The coverage map remains seven first-pass contracts and eight partial areas. Regional objectives are prepared, but24module/40room v1 briefs still remain. No overall percentage is implied.
  • Intake407 remains open and unadopted. Both owner questions and the Claude-only pause are preserved. M2–M4 and the F1.6 current-team scenario stay unchanged pending9Sep capacity review;144–247role-hours remains a planning allowance, not recorded effort.

Open and closed outcomes

All milestone times below are Jerusalem time. “Updated” separates later owner-rule integration from the original preparation closeout.

ID Outcome Preparation status Decision status Latest milestone Next step / remaining scope
01 Reusable equipment combinations Closed Selected direction Sep7 22:19; updated Sep8 13:45 Catalogue and numerical rules remain proposed
02 Oxygen visibility and journal pause Closed Selected direction Sep7 20:55; updated Sep8 13:45 Exact oxygen amounts remain open
03 Carried property returns on death Closed Selected rule Sep8 13:45 Shift and survivor ordering tracked separately
04 Shifts, persistent work and historical records Open — alignment drafting Binding direction selected Sep8 narrow PM compatibility audit complete Exact local parent-equipment alignment drafts in preparation; PM publication/integration pending. Owner-dependent shift/rescue/full-station branches remain open
05 Ordinary combat and horde encounters Closed Selected direction Sep8 10:51; updated13:45 Automatic ordinary fire, manual specials; balance remains open
06 First-survivor comparison Closed Short rescue selected; person unchosen Sep8 response364/disposition368 Yeva versus Aster ready; short-route condition and death/refuge timing remain explicit limits
07 Practical discovery and optional help Closed Selected direction Sep8 11:23; updated13:45 Current routes cannot be inferred from historical records
08 Cooperation and useful work aboard Closed Tentative preference Sep8 12:00; updated13:45 Equipment loans tentative; full colony/cast still open
09 Two-language expedition and journal use Closed Reviewed proposal Sep8 13:45 Detailed language system unselected;16 is a distinct evidence scene
10 How equipment is acquired and improves Closed Reviewed alternatives Sep8 13:51 Find working components versus observe/fabricate; owner choice later
11 Three distinct horde creatures Closed Reviewed proposals Sep8 14:07 Roster and origins unselected
12 Hospital story and its causal alternatives Closed Reviewed alternatives Sep8 14:47 Owner hospital/godhood draft leads; exact story/ending remain revisable
13 Player resurrection and corruption Closed Reviewed alternatives Sep8 14:38 No player decay or death budget adopted
14 Opening expedition: reusable machinery Closed Option A selected Prepared Sep8 15:14; selected15:30 Preferred direction recorded; exact starting items/rooms remain proposed
15 Whole-station mechanism comparison Closed Goal selected; mechanism conditional Sep8 15:51 disposition363 Physical connection candidate prepared; owner payoff choice and detailed content remain open
16 Testable alien-language interaction Closed Reviewed proposal Sep8 15:38 Protocol discovery prepared; does not prove request semantics or a god
17 Whole-game design outline and scope bands Closed Reviewed planning scaffold Sep8 16:20 disposition378 Use finite bands and dependencies for domain designs; story/ending/count choices and estimate coverage remain open
18 Player information and accessibility Closed Reviewed proposed information contract Sep8 16:35 disposition387 Full cue/screen structure and accessibility specification remain later work; no usability claim
19 Survival and loadout Closed Reviewed provisional resource contract Sep8 16:45 disposition392 Detailed variants and balancing remain later work; integrate compatible core rules after owner decisions
20 Equipment catalogue Closed Reviewed12-part planning sample; acquisition unchosen Sep8 17:29 disposition400 Exact thresholds, multi-actuator controller rules, acquisition and later finite catalogue remain open
21 Traps and encounter progression Closed Reviewed five-family/four-region SMALL proposal Sep8 17:48 disposition410 Twelve actual instances, full roster/placement, reset boundaries and balance remain later
22 Development and validation handoff Closed Reviewed first-pass risk/evidence plan Sep8 17:48 disposition410 Final v1-specific scope, staffing and estimates precede any owner phase decision; no development authorized
23 Save and content state Closed Reviewed first-pass continuity contract; save policy unselected Sep8 18:09:56 disposition417 Final438cdf35; detailed transitions, rescue/shift ordering, save-policy and recovery choices remain open
24 Production scope Closed Reviewed provisional finite scope and work accounting Sep8 18:21 disposition423 Finalc1a60388;144–247role-hourv1 planning allowance, not measured labor; band/cuts unselected
25 Regional discovery map Closed Reviewed four-region/twelve-objective SMALL planning proposal Sep8 18:32 disposition426 Final3acda018;24module/40room v1 briefs, actual placements and owner story/ending choices remain open
26 Equipment acquisition and rig growth Open — reviewing Proposed sources and active-area growth; owner acquisition choice remains open Sep8 18:42:21 draft429 Actual58ea915a; Systems stopped, independent reviewer active. Draft19:00 target achieved early; reviewed19:45(19:15–20:15) unchanged

Recent delivery timeline

These are observed calendar spans from assignment to preparation closeout, including handoffs and review. They are historical measurements, not estimates of labour or promised future turnaround.

Outcome Assigned Sep8 Preparation closed Sep8 Elapsed
Equipment progression comparison 13:17 13:51 34 minutes
Three horde creatures 13:51 14:07 16 minutes
Hospital-story comparison 13:58 14:47 49 minutes
Resurrection/corruption comparison 14:20 14:38 18 minutes
Opening comparison 14:40 15:14 34 minutes
Alien-language interaction 15:06 15:38 32 minutes

Work sequence

Stream Now Next
Equipment catalogue Preparation closed400; final737b3cfd Use in trap/encounter examples; detailed controller and acquisition integration later
Whole-v1 coverage Fifteen-domain map remains seven first-pass contracts and eight partial areas Regional25 prepares objective dependencies; module/room inventories and integration still need authoring
Trap/encounter progression Preparation closed410; finala280131b Use concrete family rules; detailed instances/roster later
Development handoff Preparation closed410; finalc0c38e8b Keep gates explicit; final handoff packet depends on concrete v1/development scope
Save/content state Preparation closed417 at18:09:56; final438cdf35 Use explicit continuity interfaces; detailed state work and owner selections remain later
Production Scope24 Preparation closed423 at18:21; finalc1a60388 Use144–247role-hour planning allowance with explicit v1/M4 depth and capacity limits
Regional Discovery Map25 Preparation closed426 at18:32; final3acda018 Use both revised orders and explicit evidence/access conditions; finite module/room briefs remain
Equipment Acquisition And Rig Growth26 Draft429 received18:42:21; Systems stopped, independent focused review active One critique/response then PM disposition; reviewed19:45(19:15–20:15) unchanged
Additional proposal intake Both full pages read; explicitly unadopted Track authorship and assess protected retreat/next-shift meeting before integrating
Shared integration04 Narrow read-only parent-equipment audit complete; exact local alignment drafts being prepared PM owns publication; owner-dependent global branches stay open. No broad review or integration completion claimed
Claude Lead/Reviewer Paused by owner for token limits Resume only when owner confirms; GPT work continues meanwhile
Specialist setup Two bounded briefs ready Planned9–10Sep; no new permanent sessions created

The available team continues useful work. No manual message forwarding is needed, and a paused provider does not suspend other authorized agents.

Decisions for the owner

Already answered: opening A and persistent room/group connections across shifts, culminating in connecting the entire station.

Open creative question: should completing the entire connection puzzle finally stabilise the layout, or should rooms keep moving while every established connection survives? PM recommends stabilisation as a reward for mastery. This is a proposed late payoff, not an answer inferred from the opening choice; the team can continue its comparison while it is pending.

The first-survivor choice is also already with the owner: Yeva, the pressure technician preserving ward measurements (PM recommendation), versus Aster, the supply clerk suspicious of the arrival and requesting one reversible door closure. Neither is selected. Progression, creature, story and corruption alternatives are prepared for later reactions; the owner is not expected to review the whole wiki at once.

Reporting agreement

PM sends a compact report every15 minutes while useful work is active, plus meaningful completion, disagreement, blocker or decision updates. The Claude-only pause does not stop reporting while PM/GPT work is active. Use quiet hourly checks only when no useful authorized work can continue. Each report gives the timestamp, changes since the previous report, numeric open/closed preparation counts, real worker activity, blockers, next deliverable with ETA, current v1 target and any forecast change, and a link here. An unchanged interval is stated honestly. No page/message counts or invented completion percentages stand in for progress. Clearly labelled estimated dates and ranges are required; never present them as known facts or guaranteed deadlines. The local monitor requires the computer and apps to remain available.