2026-09-08 20:34:57
Anonymous:
Record actual Story30 submission463 and preauthorised focused review status
hold the flood/progress.md ..
@@ 2,11 2,11 @@
**Updated 2026-09-08 20:28 Jerusalem (UTC+3).** PM and GPT work continues; only the two Claude roles are paused. All work remains **design only**.
-
**30 tracked design packages: 28 preparation-closed, 2 open.** Two Language Discovery Map29 closed459 at20:23:52 Jerusalem, finaldf0f48f5. Story And Ending Map30 is authoring under461; one native handoff and receiving20:24:58.675 verified. Narrow parent-equipment432, legacy Discovery/Expedition441–443 and home-parent456 compatibility are complete;04 remains open for global shift/rescue/full-station rules, their integration and pending owner choices. The separate coverage map and unadopted intake407 contributions are not extra completed packages. These are bounded written outcomes, not overall game completion.
+
**30 tracked design packages: 28 preparation-closed, 2 open.** Two Language Discovery Map29 closed459 at20:23:52 Jerusalem, finaldf0f48f5. Story And Ending Map30 was submitted463 at20:30:02, sourcee902a631; Systems is STOPPED and its one focused review is underway under462. Narrow parent-equipment432, legacy Discovery/Expedition441–443 and home-parent456 compatibility are complete;04 remains open for global shift/rescue/full-station rules, their integration and pending owner choices. The separate coverage map and unadopted intake407 contributions are not extra completed packages. These are bounded written outcomes, not overall game completion.
“Closed” means the bounded written design/review outcome is complete. It does not mean a feature is implemented, every detail approved or fun validated. This board covers the current design batch; it is not a complete campaign or production backlog, and the closed/total ratio is not an overall game-completion percentage. Stable IDs stay fixed; added/reopened work must be recorded explicitly.
-
**Availability correction —8 Sep:** only Claude is paused. PM and the existing GPT Systems designer continue useful work with bounded independent GPT reviews. Systems retains STOPPED ownership of Language29 and is authoring Story30 under461. One native handoff sent; receiving20:24:58.675 Jerusalem verified and Systems actively authoring. Independent criteriab1a66b77 were saved before assignment and registered460; reviewer is actively listening under462 and may start its one critique when the actual source/hash and author STOP arrive; no draft review has started. PM handles remaining integration, intake and forecasts. Neither permanent Claude role will be woken or replaced before owner confirmation. Active one-minute fallback monitoring and15-minute progress/forecast reports continue.
+
**Availability correction —8 Sep:** only Claude is paused. PM and the existing GPT Systems designer continue useful work with bounded independent GPT reviews. Systems retains STOPPED ownership of Language29 and submitted Story30. The one independent review of actual463 sourcee902a631 is underway under462, using unchanged pre-assignment criteriab1a66b77 registered460. PM handles remaining integration, intake and forecasts. Neither permanent Claude role will be woken or replaced before owner confirmation. Active one-minute fallback monitoring and15-minute progress/forecast reports continue.
## Forward forecast — baseline F1
@@ 43,7 43,7 @@
The critical sequence is core decisions and interfaces → whole-game architecture/content budget → domain designs → cross-domain integration → v1. Content detail proceeds in parallel only where interfaces are stable. Extra writers do not eliminate the PM/review bottleneck.
-
**Next delivery, today Jerusalem:** [Story And Ending Map30](/Hold%20The%20Flood/Story%20And%20Ending%20Map), assigned461, targets draft21:15(range20:50–21:45) and reviewed outcome22:15(range21:30–23:00), medium-low confidence. [Two Language Discovery Map29](/Hold%20The%20Flood/Two%20Language%20Discovery%20Map) closed459 at20:23:52, ahead of its22:00 reviewed target(range21:15–22:45). Core11 Sep(10–14), complete first-pass wiki22 Sep(18–29), and specialist setup9–10 Sep remain unchanged. The144–247role-hour allowance is the dated8Sep planning baseline, not a newly measured remaining balance; accepted depth must be deducted during the9Sep capacity check. If both additional streams are absent10Sep, the provisional current-team scenario remains25Sep(22Sep–2Oct).
+
**Next delivery, today Jerusalem:** [Story And Ending Map30](/Hold%20The%20Flood/Story%20And%20Ending%20Map), submitted463 at20:30:02 before its21:15 draft target(range20:50–21:45), is under its one focused review462; reviewed outcome22:15(range21:30–23:00) remains the medium-low-confidence forecast. [Two Language Discovery Map29](/Hold%20The%20Flood/Two%20Language%20Discovery%20Map) closed459 at20:23:52, ahead of its22:00 reviewed target(range21:15–22:45). Core11 Sep(10–14), complete first-pass wiki22 Sep(18–29), and specialist setup9–10 Sep remain unchanged. The144–247role-hour allowance is the dated8Sep planning baseline, not a newly measured remaining balance; accepted depth must be deducted during the9Sep capacity check. If both additional streams are absent10Sep, the provisional current-team scenario remains25Sep(22Sep–2Oct).
## Extra agents — when and why
@@ 82,14 82,14 @@
|F1.8|8 Sep18:57:01|Acquisition26 actual closeout434 recorded against its19:45 reviewed target(19:15–20:15). New Combat And Enemy Roster27 assignment435 targets draft19:45(19:25–20:15), reviewed20:30(20:00–21:15); actual receiving activity18:58:15.181 verified. Narrow04 parent alignment432 is complete; owner-dependent branches remain open. M2–M4, the144–247role-hour planning allowance and current-team scenario remain unchanged.|
|F1.9|8 Sep19:47|Combat27 actual closeout443 recorded against its20:30 reviewed target(20:00–21:15). Home And Colony Loop28 assignment444 reached draft446 at19:42:37 before its20:20 target(20:00–20:50); independent review447 active, reviewed21:15(20:45–22:00) remains a medium-low-confidence forecast. Narrow legacy04 integration441–443 is complete; global04 stays open. M2–M4 and the current-team scenario remain unchanged; the dated144–247 allowance needs accepted-scope reconciliation.|
|F1.10|8 Sep20:07|Home28 actual closeout450 recorded against its21:15 reviewed target(20:45–22:00). Two Language Discovery Map29 assignment451 reached draft454 at20:07:22 before its21:00 target(20:35–21:30); independent review455 active, reviewed22:00(21:15–22:45) remains the medium-low-confidence forecast. Home/colony now has a usable first-pass contract; five cast arcs/15scenes and finite room/encounter/mechanism inventories remain unfinished. Global04, M2–M4 and the current-team scenario remain unchanged; the dated144–247 allowance still requires accepted-scope reconciliation.|
-
|F1.11|8 Sep20:28|Language29 actual closeout459 recorded against its22:00 reviewed target(21:15–22:45). New Story And Ending Map30 assignment461 targets draft21:15(20:50–21:45), reviewed22:15(21:30–23:00), medium-low confidence. Language/discovery now has a usable first-pass contract; story remains partial. Global04, M2–M4, planned9–10Sep staffing and the current-team scenario remain unchanged; the dated144–247 allowance still needs accepted-scope reconciliation.|
+
|F1.11|8 Sep20:28|Language29 actual closeout459 recorded against its22:00 reviewed target(21:15–22:45). Story And Ending Map30 assignment461 reached draft463 at20:30:02 before its21:15 target(20:50–21:45); one focused review underway under462, reviewed22:15(21:30–23:00) remains the medium-low-confidence forecast. Language/discovery now has a usable first-pass contract; story remains partial. Global04, M2–M4, planned9–10Sep staffing and the current-team scenario remain unchanged; the dated144–247 allowance still needs accepted-scope reconciliation.|
## What changed in this report
- [Combat And Enemy Roster27](/Hold%20The%20Flood/Combat%20And%20Enemy%20Roster) preparation-closed443 at19:34, finalf1fe0d9a. One focused review/response corrected the new-role triggers and counterplay, staged cues for both regional orders, and Bellback's warning-start cone lock. Six ordinary/three special roles and two setpieces are prepared within ten encounter placements; exact populations, geometry, presentation and tuning remain later work.
- [Home And Colony Loop28](/Hold%20The%20Flood/Home%20And%20Colony%20Loop) preparation-closed450 at20:01:12, final5bff3436. One focused review/response clarified shared commissioning, first-return actions and each project's participants and lasting facilities. Five project briefs remain two reused/three new with three new fixed ship fixtures; cast choices, five final arcs/15scenes and management economy remain separate.
- [Two Language Discovery Map29](/Hold%20The%20Flood/Two%20Language%20Discovery%20Map) preparation-closed459 at20:23:52, finaldf0f48f5. One focused critique/response separated address/body evidence, retained valid captures across lives and supplied the iris variant's local B plate and completion state. Four proposed chains across two languages are prepared; actual clue/string/room variants and comprehension evidence remain unfinished.
-
- [Story And Ending Map30](/Hold%20The%20Flood/Story%20And%20Ending%20Map) is assigned461: a revisable causal spine, four mystery/personal chains, apparent/deeper/optional-secret layers, visible choices and human consequences, both regional orders and counted reuse/new obligations. One native handoff sent; receiving20:24:58.675 Jerusalem verified and Systems actively authoring. Independent criteriab1a66b77 were saved before assignment and registered460; reviewer is actively listening under462 and may start its one critique when the actual source/hash and author STOP arrive; no draft review has started.
+
- [Story And Ending Map30](/Hold%20The%20Flood/Story%20And%20Ending%20Map) was submitted463 at20:30:02, sourcee902a631: a proposed causal spine, four mystery/personal chains, apparent/deeper/optional-secret layers, choices and human consequences, both regional orders and scope accounting. Systems is STOPPED; one focused review is underway under462 against pre-assignment criteriab1a66b77. Submission does not close the story domain or select its creative choices.
- PM verified04's narrow legacy integration under441–443: [Discovery Chain](/Hold%20The%20Flood/Discovery%20Chain)114e9267 and [Expedition Proposal](/Hold%20The%20Flood/Expedition%20Proposal)836ab2ae now use historical post-death routes and world-time capture/full frozen journal inspection. No new access guarantee was added; global04 remains open.
- PM closed narrow [Coming Home](/Hold%20The%20Flood/Coming%20Home)/[Home Projects](/Hold%20The%20Flood/Home%20Projects) compatibility456 at20:15:57, revisionsacbc945c/996d235a. Current Fork/supply, unloading, historical-route and refill rules align; PM owns both parents STOPPED. This adds no package and does not close global04.
- The [coverage map](/Hold%20The%20Flood/Design%20Coverage) now has eleven usable first-pass contracts and four partial areas. Only the language/discovery category advances this time; story remains partial during30. The five cast arcs/15scenes,24module/40room, ten encounter-placement and twelve mechanism inventories still need actual briefs and integration; no full-v1 percentage is implied.
@@ 130,7 130,7 @@
|27|[Combat and enemy roster](/Hold%20The%20Flood/Combat%20And%20Enemy%20Roster)|Closed|Reviewed combat-state contract and proposed6ordinary/3special/2setpiece roster|Sep8 19:34 disposition443|Finalf1fe0d9a; Systems ownership STOPPED. Ten encounter placements and twelve mechanism slots still need exact inventories, cues and geometry|
|28|[Home and colony loop](/Hold%20The%20Flood/Home%20And%20Colony%20Loop)|Closed|Reviewed return/preparation contract and five project briefs; cast/economy unselected|Sep8 20:01:12 disposition450|Final5bff3436; Systems STOPPED owner. Two reused/three new projects; exact fixture/control detail, five final cast arcs/15scenes and validation remain|
|29|[Two-language discovery map](/Hold%20The%20Flood/Two%20Language%20Discovery%20Map)|Closed|Reviewed four-chain/two-language proposal; origins and final story unselected|Sep8 20:23:52 disposition459|Finaldf0f48f5; Systems STOPPED owner. Actual clue/string/physical-state variants, room placements and comprehension evidence remain|
-
|30|[Story and ending map](/Hold%20The%20Flood/Story%20And%20Ending%20Map)|Open — authoring|Proposed causal/choice map and four mystery-personal chains; final story unselected|Sep8 assignment461; receiving20:24:58.675 verified|Systems sole author; draft21:15(20:50–21:45), reviewed22:15(21:30–23:00). Reviewer actively listening under462 with criteria registered460; full cast/scene/room inventories remain separate|
+
|30|[Story and ending map](/Hold%20The%20Flood/Story%20And%20Ending%20Map)|Open — independent review|Submitted causal/choice map and four mystery-personal chains; final story unselected|Sep8 submission463 at20:30:02; review underway under462|Systems STOPPED sole owner; draft21:15 target achieved early, reviewed22:15(21:30–23:00) forecast. Criteria unchanged; full cast/scene/room inventories remain separate|
## Recent delivery timeline
@@ 160,7 160,7 @@
|[Combat And Enemy Roster27](/Hold%20The%20Flood/Combat%20And%20Enemy%20Roster)|Preparation closed443 at19:34; finalf1fe0d9a; Systems ownership STOPPED|Use the reviewed roster/state contract; finite placement, cue and recovery detail remains|
|[Home And Colony Loop28](/Hold%20The%20Flood/Home%20And%20Colony%20Loop)|Preparation closed450 at20:01:12; final5bff3436; Systems ownership STOPPED|Use reviewed return/project availability and property rules; exact interfaces, cast arcs/scenes and management choices remain|
|[Two Language Discovery Map29](/Hold%20The%20Flood/Two%20Language%20Discovery%20Map)|Preparation closed459 at20:23:52; finaldf0f48f5; Systems ownership STOPPED|Use reviewed four-chain evidence/action contract; actual clue/string/room variants and validation remain|
-
|[Story And Ending Map30](/Hold%20The%20Flood/Story%20And%20Ending%20Map)|Systems authoring461; receiving20:24:58.675 verified; independent criteria registered460|Draft21:15(20:50–21:45), reviewed22:15(21:30–23:00); one focused critique/response then PM disposition|
+
|[Story And Ending Map30](/Hold%20The%20Flood/Story%20And%20Ending%20Map)|Draft463 submitted20:30:02 at e902a631; Systems STOPPED; one review underway under462|Draft21:15 target achieved early; reviewed22:15(21:30–23:00) remains forecast; one focused critique/response then PM disposition|
|Additional proposal intake|Both full pages read; explicitly unadopted|Track authorship and assess protected retreat/next-shift meeting before integrating|