Commit 72a2b4

2026-09-09 12:11:54 Anonymous: Update closed35–37, active readiness38 and forecast assumptions through553
hold the flood/progress.md ..
@@ 1,14 1,12 @@
# Hold The Horde — Progress
- **Latest handoff update — 2026-09-09 11:20 Jerusalem, through528.** This supersedes worker states in the detailed521 snapshot below; counts and milestone forecasts are unchanged: **36 packages /34 preparation-closed /2 open (35,36)**. Lead submitted the Campaign Evidence And State Crosswalk in522 (9869a5a5,20,349bytes) and is STOPPED. The original Reviewer is WORKING on its one critique524; receiving and full source reading were verified. Mechanical35 candidate was accepted527 (2e604fc2,44,079bytes) after one critique/response and narrow PM integration; Systems is WORKING on twelve-parent compatibility alignment528; receiving11:19:39 and exact contract read11:19:52 were verified.35 stays open until that alignment is checked. Next targets:35 alignment12:15(11:45–13:00), reviewed13:00(12:15–14:00);36 critique11:45(11:30–12:00), reviewed14:00(13–15:30). All times today; estimates low-medium confidence. First-pass wiki still14September(11–18), low confidence. Automatic handoffs continue; no extra agent or owner forwarding is needed.
+ **Updated 2026-09-09 12:09 Jerusalem (UTC+3); current status through553.** The owner resumed all project work and original Claude roles in490. All work remains **design only**.
- **Updated 2026-09-09 11:13 Jerusalem (UTC+3); current status through521.** The owner resumed all project work and the original Claude roles in490. All work remains **design only**.
-
- **36 tracked design packages:34 preparation-closed,2 open (35 and36).** Room32 and Encounter33 prepare24 modules/40 rooms, ten encounters INCLUDING two setpieces and thirteen major mechanisms;13 is not every interactive object or owner-approved game size. [Player Information And Options34](/Hold%20The%20Flood/Player%20Information%20And%20Options) closed509 at10:53:59, final61e0be4a (30,692 bytes). Global04 closed518 at11:07:24 after the accepted577236e7 continuity candidate and all eleven parent alignments were independently verified. [Mechanical Interfaces And Opening Quantities35](/Hold%20The%20Flood/Mechanical%20Interfaces%20And%20Opening%20Quantities) was submitted515, received one critique520 and is in one author response521; [Campaign Evidence And State Crosswalk36](/Hold%20The%20Flood/Campaign%20Evidence%20And%20State%20Crosswalk) is assigned519. PM519 now classifies all15 domains as usable first-pass contracts, with0 partial; this is not M3 completion. Interface, scope/handoff and coherence work remains. Intake407 and administration add no packages; these counts measure bounded written outcomes, not overall game completion.
+ **38 tracked design packages:37 preparation-closed,1 open (38).** Scope and development handoff refresh37 ([Production Scope](/Hold%20The%20Flood/Production%20Scope); [Development And Validation Handoff](/Hold%20The%20Flood/Development%20And%20Validation%20Handoff)) closed550 at12:05:47. [V1 Readiness38](/Hold%20The%20Flood/V1%20Readiness), assigned551–553, gives a stable ID to the already-planned final coherence/readiness work; it adds no game scope. All15 domains have usable first-pass contracts/0 partial; M2/M3 are not yet declared complete and this is not a game-completion percentage. Existing24 modules/40 rooms,12 equipment definitions,10 encounters INCLUDING2 setpieces and13 major mechanisms remain proposed content;13 is not every interactive object. Intake407 and administration add no further packages.
“Closed” means the bounded written design/review outcome is complete. It does not mean a feature is implemented, every detail approved or fun validated. This board covers the current design batch; it is not a complete campaign or production backlog, and the closed/total ratio is not an overall game-completion percentage. Stable IDs stay fixed; added/reopened work must be recorded explicitly.
- **Actual availability and handoffs:** owner490 resumed the original roles; verified identities, models and efforts are unchanged. Systems is WORKING on its one35 response521, with public receiving11:11:46 verified after one native send. The original Reviewer is STOPPED after critique520. Lead is WORKING36 under519: one courierd244533e delivered; hashcheck11:09:46, matching hash11:09:49, full contract11:09:51 and source read11:10:05 were verified. Lead’s eleven parents/Information34 and Systems’ continuity article remain STOPPED. No further04/34 reviews are pending. PM owns integration, intake and forecasts; routine forwarding needs no owner intervention.
+ **Actual availability and handoffs:** original identities/models/efforts remain unchanged. Lead551 and Systems552 are WORKING on38; Reviewer553 is WORKING on independent criteria. Receiving/full contracts were verified at12:06:22/27 for Lead,12:06:18/22 for Systems and12:07:16/21 for Reviewer. Lead owns only the new administrative V1 Readiness article; Systems supplies a local factual audit for the same38 outcome; Reviewer prepares independent criteria before ONE critique of the actual stopped submission. All existing game articles and prior parent ownership are STOPPED; no37 follow-up is authorized. PM owns36/Home/Information STOPPED. No additional permanent agent or owner forwarding is needed.
## Forward forecast — baseline F1
@@ 24,11 22,11 @@
|M3 — complete first-pass game-design wiki, v1|Mon14 Sep|11–18 Sep|Low|Actual first-pass behavior and finite inventories across every major area, integrated dependencies and a revision-specific proposed development handoff; full scripts/exhaustive states belong to M4|
|M4 — detailed campaign/content specification|Tue10 Nov|20 Oct–1 Dec|Low|The approved finite inventory of regions, rooms, puzzles, clues, encounters, rewards, cast scenes and endings is specified through its state changes and recovery paths|
- **Will the full wiki be ready today? No. The adopted first-pass target is14 September (11–18 September), low confidence.** The finite room/encounter inventories are prepared, while35/36, remaining cross-domain integration, scope/handoff and coherence remain. The later detailed-content milestone expands that design into the actual authored campaign. Neither milestone claims that a written plan has proved fun, balance, performance or30/90/100–200hours of play.
+ **The current first-pass forecast remains14 September (11–18 September), low confidence.** It does not currently promise delivery today. The actual38 readiness result may justify earlier delivery; PM will revise the forecast after that result rather than exclude it in advance. Finite inventories and scope/handoff37 are prepared. M4 still expands the first pass into the detailed authored campaign. Neither milestone establishes fun, balance, performance or30/90/100–200hours of play.
For M3, “complete first pass” includes the story's causal chain and ending structure; station layout/shifts/persistence; equipment acquisition and progression; combat/horde/trap families; oxygen/resources; rescue/colony/cast arcs; both language-learning arcs and clue distribution; journal, controls and accessibility; content budget, production constraints and the later validation plan. Numerical tuning can remain explicitly provisional. A major domain marked only “TBD” does not satisfy completion.
- M4 has the weakest estimate because no approved content inventory yet exists. It assumes a substantial authored campaign matching the brief's ambition and two additional specialists. It is approximately30–60 active working days; with the current team alone, the initial audit estimated40–80. A smaller approved campaign could be much quicker; a dense secret/language campaign or a changed global rule could exceed the range. I will revise M4 after the inventory and three representative detailed content packages are written and checked. Final gameplay validation belongs to a separately authorised implementation/playtest phase; it has no honest calendar endpoint yet.
+ M4 remains a low-confidence forecast: the SMALL inventory is prepared but not an owner-selected final game size, and exhaustive branch/arrangement depth is unproven. Scope37 supplies a current conditional350–590 role-hour M4 roll-up; it does not count uncreated specialists as available capacity. The initial30–60-working-day estimate with two additional specialists, and40–80 with the original team alone, are historical baseline scenarios rather than current staffing prerequisites. The10November target (20October–1December) remains unchanged pending actual evidence. Re-estimate after three representative detailed packages—a mechanism room, a two-language correction and a short rescue/home arc—are written and checked. Final gameplay validation requires a separately authorized phase and has no established endpoint.
## Estimated work timeline
@@ 36,14 34,14 @@
|Workstream|9 Sep|10–11 Sep|12–14 Sep|15–18 Sep|Oct–Nov|
|---|---|---|---|---|---|
- |35 mechanics +36 campaign interfaces|35 response12:00 / reviewed13:00;36 draft12:30 / reviewed14:00|Core integration; target11Sep|Core buffer through14Sep|||
- |Mechanical/quantity + reference interfaces|35 response and36 crosswalk working|Integrate accepted states and IDs|Resolve remaining conflicts|||
- |Scope, handoff and whole-v1 coherence|Prepare packet|Reconcile sources and scope|**M3 target14Sep**|Revision buffer through18Sep||
+ |36 campaign interfaces|**Closed11:49:32**, ahead of14:00 target|Use accepted crosswalk in whole-v1 coherence|Core buffer through14Sep|||
+ |37 scope and development handoff|**Closed12:05:47**, ahead of15:00 target|Use accepted scope/packet in coherence|Prepared input|||
+ |38 whole-v1 coherence/readiness|Draft13:30 / reviewed16:00|Bounded repairs only if evidenced|**Current M3 target14Sep; revisit after38**|Revision buffer through18Sep||
|Detailed finite campaign|Stable representative preparation|Representative packages|Continue after first-pass interfaces|Detailed authoring|**M4 target10Nov;20Oct–1Dec range**|
- The remaining critical sequence is35 mechanical/quantity disposition and36 evidence/state crosswalk → remaining actual-ID interface alignment → finite scope/handoff → one whole-v1 coherence disposition. Global04 and its eleven parents are now preparation-closed; prepared34 supplies the main information inventory. Packet preparation can proceed in parallel. Extra writers do not remove PM review and integration work.
+ The remaining critical sequence is38 readiness assessment + supporting factual audit → ONE critique and at most ONE consolidated response → bounded repairs and separate PM M2/M3 disposition.35,36 and37 are preparation-closed inputs. The14–26 role-hour allowance at response549 included37 response/disposition4–8 plus coherence10–18. With37 closed, only **10–18 role-hours for coherence/repair disposition** remains forward work. M4 **350–590 role-hours** and the future packet **289–490 role-hours /5–8 working weeks** are low-confidence conditional estimating proposals, not logged labor or development authority. No additional agent or development phase is assumed.
- **Next delivery, Jerusalem:** [Mechanical Interfaces And Opening Quantities35](/Hold%20The%20Flood/Mechanical%20Interfaces%20And%20Opening%20Quantities) was submitted515 at **11:04:48**, source `a2d3c5e4…` (38,858 bytes), and received its one critique520. Reviewer is STOPPED; Systems is WORKING on the one consolidated response521 after verified receiving11:11:46. The response targets **12:00 (11:30–12:30)**; reviewed preparation remains **13:00 (12:15–14:00)** today9 September, low-medium confidence. [Campaign Evidence And State Crosswalk36](/Hold%20The%20Flood/Campaign%20Evidence%20And%20State%20Crosswalk) was assigned519 at **11:09:24**; Lead is WORKING after verified receiving/source reads11:09–11:10. Its draft targets **12:30 (12:00–13:30)** and reviewed preparation **14:00 (13:00–15:30)**. Global04 closed518 at **11:07:24** after candidate577236e7 and all eleven parent revisions were independently verified; Lead has stopped those parents. Information34 closed509 at **10:53:59**, final61e0be4a. M2, M3 and M4 targets remain unchanged. Room32 closed8Sep21:44:18;33 draft arrived8Sep21:57:56 and response22:12:33, before the owner paused all work. PM closed33 at9Sep10:32:09 after resumption; the overnight target was held, not missed by an unattended worker. The144–247 role-hour allowance is the dated8 September baseline, not measured labor or a current remaining balance.
+ **Next delivery, Jerusalem:** [V1 Readiness38](/Hold%20The%20Flood/V1%20Readiness) numbers the previously planned whole-v1 coherence work. Draft target **13:30 (12:45–14:30)** and reviewed disposition **16:00 (14:30–18:00)** today9 September, low confidence; earlier completion can support an earlier M2/M3 delivery decision. Systems552 factual support targets **13:00 (12:30–14:00)**; Reviewer553 criteria **12:45 (12:30–13:15)**, then ONE critique roughly30–60 minutes after the stopped full submission. Lead551 and Systems552 are WORKING on38; Reviewer553 is WORKING on independent criteria. Receiving/full contracts were verified at12:06:22/27 for Lead,12:06:18/22 for Systems and12:07:16/21 for Reviewer. Lead owns only the new administrative V1 Readiness article; Systems supplies a local factual audit for the same38 outcome; Reviewer prepares independent criteria before ONE critique of the actual stopped submission. Scope and development handoff refresh37 ([Production Scope](/Hold%20The%20Flood/Production%20Scope); [Development And Validation Handoff](/Hold%20The%20Flood/Development%20And%20Validation%20Handoff)) closed550 at **12:05:47**, after response549 at11:58:19 and one critique/response: Production68db46ea (21,243 bytes), Handoff59945901 (27,529 bytes), before its15:00 reviewed target. Both parents are Systems STOPPED.35 closed11:35:17 and36 closed11:49:32. The14–26 role-hour allowance at response549 included37 response/disposition4–8 plus coherence10–18. With37 closed, only **10–18 role-hours for coherence/repair disposition** remains forward work. M4 **350–590 role-hours** and the future packet **289–490 role-hours /5–8 working weeks** are low-confidence conditional estimating proposals, not logged labor or development authority. F1.14 milestone dates remain unchanged pending38; five owner choices remain unanswered. The overnight owner pause was authorized downtime;144–247 remains dated8September planning history.
**Adopted F1.14 forecast — 9 September:** M3 first-pass wiki now targets **14 September (11–18 September), low confidence**. M2 coherent core remains11 September (10–14); M4 detailed campaign remains10 November (20 October–1 December). The revision follows the remaining-deliverables audit and preparation closeouts25–33, including the actual24-module/40-room and ten-encounter/thirteen-mechanism first passes. It uses current PM, Systems and restored original Lead/Reviewer capacity; additional agents are not prerequisites. It is a scope-based calendar judgment, not a conversion of word counts or elapsed chat minutes into role-hours. A changed joining architecture, expanded first-pass scope, unresolved integration or unavailable capacity can move the estimate. Next scheduled re-estimate:9 September18:00 Jerusalem, or sooner after consequential acceptance, scope or capacity changes. The earlier absent-two-specialists→25Sep scenario is historical and no longer the current schedule. The earlier14Sep conditional calculation in yesterday’s unpublished draft is now explicitly adopted by PM.
@@ 64,7 62,7 @@
The revision follows the remaining-deliverables audit and preparation closeouts25–33, including the actual24-module/40-room and ten-encounter/thirteen-mechanism first passes. It uses current PM, Systems and restored original Lead/Reviewer capacity; additional agents are not prerequisites. It is a scope-based calendar judgment, not a conversion of word counts or elapsed chat minutes into role-hours. A changed joining architecture, expanded first-pass scope, unresolved integration or unavailable capacity can move the estimate. Historical early2–4/6–12/8–15/30–60-day allowances remain dated planning hypotheses; no new labor balance is inferred from them.
- - Every15-minute report includes the next target/range and any movement. Next ordinary forecast review is9 September18:00 Jerusalem; update sooner when35/36 acceptance, remaining interface/handoff scope, owner answers or actual capacity changes the assumptions.
+ - Every15-minute report includes the next target/range and any movement. Next ordinary forecast review is9 September18:00 Jerusalem; update sooner after the actual38 readiness result, or when owner answers or actual capacity change the assumptions.
- Keep the original target visible when revising it. Record old estimate, new estimate and the concrete cause; do not silently move dates.
- A changed core mechanism or late owner story change may add roughly1–3 working days to the core/v1 forecast; quantify the actual affected work when it happens.
- A blocked decision moves its dependent work, not every parallel stream. Host outages are reported with elapsed delay. If authors produce a queue waiting over a working day for review/integration, reduce parallel intake before adding more agents.
@@ 89,7 87,7 @@
|F1.13|8 Sep21:22|Cast31 actual closeout473 at21:12:44 recorded against its22:30 reviewed target(22:00–23:30); initial draft470 arrived20:53:50. Station Room And Module Inventory32 assigned475, native receiving verified21:13:24.363; draft477 submitted21:22:49 at15bb8454 before23:00 on8Sep(22:15 on8Sep–00:00 on9Sep). Systems STOPPED; one review active under476. Reviewed00:00 on9Sep(23:15 on8Sep–01:15 on9Sep) remains the low-medium-confidence forecast. Cast is now usable first-pass, bringing coverage to13usable/2partial; room/module and full encounter/mechanism inventories remain unfinished. Global04, M2–M4, planned9–10Sep staffing, the current-team scenario and dated144–247 allowance caveat remain unchanged.|
|F1.14|9 Sep 10:45|Owner resumed all roles490 after authorized overnight downtime. Room32 closed481 on8Sep21:44:18; Encounter33 closed493 on9Sep10:32:09, final5c1a9ad6, after one critique/response and narrow PM integration492.34 information assigned491; global04 assigned494; original Reviewer preauthorized495. Current34 tracked/32 closed/2 open;14 usable/1 partial. PM adopts M3 **14Sep (11–18), low confidence**, from remaining-scope audit and accepted25–33 with the restored team; no extra agents prerequisite.04/34 drafts9Sep12:00 (11:15–12:45), reviewed13:00 (12–14), low-medium. M2/M4 unchanged. Night pause is not a failed deadline. Earlier Sep22 and missing-two-specialists→Sep25 scenarios remain historical. Yesterday’s F1.14 draft was local and unpublished; this row is the new adoption record. Dated144–247 allowance is not current remaining labor.|
- ## What changed in this report
+ ## Delivery history and current changes
- [Combat And Enemy Roster27](/Hold%20The%20Flood/Combat%20And%20Enemy%20Roster) preparation-closed443 at19:34, finalf1fe0d9a. One focused review/response corrected the new-role triggers and counterplay, staged cues for both regional orders, and Bellback's warning-start cone lock. Six ordinary/three special roles and two setpieces are prepared within ten encounter placements; exact populations, geometry, presentation and tuning remain later work.
- [Home And Colony Loop28](/Hold%20The%20Flood/Home%20And%20Colony%20Loop) preparation-closed450 at20:01:12, final5bff3436. One focused review/response clarified shared commissioning, first-return actions and each project's participants and lasting facilities. Five project briefs remain two reused/three new with three new fixed ship fixtures; cast choices, full scene scripts/state variants and management economy remain separate; Cast31 first-pass allocation is now prepared473.
@@ 98,12 96,15 @@
- [Cast And Short Rescue Map31](/Hold%20The%20Flood/Cast%20And%20Short%20Rescue%20Map) preparation-closed473 at21:12:44, final6456406b: five proposed people and fifteen unique first-pass scene briefs, three primary per person. One focused critique/response resolved the initial walked rescue route, actual movement event and first bench operation. D2 retains Dorn participating in the initial demonstrated operation; later commissioned use follows Home28. First-survivor/global mortality and final cast remain unselected.
- [Station Room And Module Inventory32](/Hold%20The%20Flood/Station%20Room%20And%20Module%20Inventory) preparation-closed481 at21:44:18, finald4ef2497(61009bytes):24modules/40rooms with explicit arrangement and compact-assembly constraints, retained conversion clues and independent core-isolation mechanism13. The13major units are not every interactive object and remain a proposed scope sample.
- [Encounter And Mechanism Placement Inventory33](/Hold%20The%20Flood/Encounter%20And%20Mechanism%20Placement%20Inventory) preparation-closed493 on9 September10:32:09, final5c1a9ad6. The one response plus narrow PM integration makes later E03 population a later-death-shift selection, preserves self-contained reset thresholds, and corrects Lens heat/cold and single-Cycler conservation. Ten encounters including two setpieces and thirteen major mechanism briefs are prepared; full variants and gameplay validation remain later.
- - PM verified04's narrow legacy integration under441–443: [Discovery Chain](/Hold%20The%20Flood/Discovery%20Chain)114e9267 and [Expedition Proposal](/Hold%20The%20Flood/Expedition%20Proposal)836ab2ae now use historical post-death routes and world-time capture/full frozen journal inspection. No new access guarantee was added; global04 remains open.
- - PM closed narrow [Coming Home](/Hold%20The%20Flood/Coming%20Home)/[Home Projects](/Hold%20The%20Flood/Home%20Projects) compatibility456 at20:15:57, revisionsacbc945c/996d235a. Current Fork/supply, unloading, historical-route and refill rules align; PM owns both parents STOPPED. This adds no package and does not close global04.
- - PM519 explicitly classifies15 usable first-pass domains and0 partial after global04 candidate and eleven-parent verification. This does not close M3:35 mechanical/quantity interfaces,36 evidence/state crosswalk, remaining actual-ID interfaces, scope/handoff and one coherence disposition remain. Full scripts and exhaustive states/layouts are M4; clusters are not extra numbered assignments.
- - Global04 preparation closed518 at11:07:24 after [Death Shift And Rescue Continuity](/Hold%20The%20Flood/Death%20Shift%20And%20Rescue%20Continuity) candidate577236e7 and all eleven aligned parents were fully checked and independently read back. Lead retains STOPPED ownership of those parents; Systems retains STOPPED ownership of the new continuity article. Protected retreat and final station behavior remain explicit unselected owner branches; preparation closure is not owner adoption.
+ - PM verified04's narrow legacy integration under441–443: [Discovery Chain](/Hold%20The%20Flood/Discovery%20Chain)114e9267 and [Expedition Proposal](/Hold%20The%20Flood/Expedition%20Proposal)836ab2ae now use historical post-death routes and world-time capture/full frozen journal inspection. No new access guarantee was added; global04 was still open at that historical narrow closeout and subsequently closed518.
+ - PM closed narrow [Coming Home](/Hold%20The%20Flood/Coming%20Home)/[Home Projects](/Hold%20The%20Flood/Home%20Projects) compatibility456 at20:15:57, revisionsacbc945c/996d235a. Current Fork/supply, unloading, historical-route and refill rules align; PM owns both parents STOPPED. This added no package and did not close global04 at that historical point; global04 subsequently closed518.
+ - PM519 classified15 usable first-pass domains/0 partial.35 closed533,36 closed545 and37 closed550. The already-planned final coherence disposition is now numbered38; it alone remains open. M2/M3 await its actual result. Full scripts and exhaustive states/layouts remain M4.
+ - Global04 preparation closed518 at11:07:24 after [Death Shift And Rescue Continuity](/Hold%20The%20Flood/Death%20Shift%20And%20Rescue%20Continuity) candidate577236e7 and all eleven aligned parents were fully checked and independently read back. Those parents are STOPPED under the current ownership recorded after533; Systems retains STOPPED Continuity ownership. Protected retreat and final station behavior remain explicit unselected owner branches; preparation closure is not owner adoption.
- [Player Information And Options34](/Hold%20The%20Flood/Player%20Information%20And%20Options) closed509 at61e0be4a:41 main states in9 bands,5 journal sections,4 manifest sections,10 options and4 walkthroughs. PM508 aligned recorded ship readings, essential target/readiness cues and the opening6→7→6 cargo example with4A.
- - [Mechanical Interfaces And Opening Quantities35](/Hold%20The%20Flood/Mechanical%20Interfaces%20And%20Opening%20Quantities) submitted515 at11:04:48, a2d3c5e4 (38,858 bytes), received one critique520; Systems WORKING on one response521, Reviewer STOPPED. [Campaign Evidence And State Crosswalk36](/Hold%20The%20Flood/Campaign%20Evidence%20And%20State%20Crosswalk) assigned519 at11:09:24; Lead WORKING after verified receiving, covering existing8 chains/15 scenes without new campaign content.
+ - [Mechanical Interfaces And Opening Quantities35](/Hold%20The%20Flood/Mechanical%20Interfaces%20And%20Opening%20Quantities) preparation closed533 at11:35:17, final2e604fc2 (44,079 bytes), after one critique/response, twelve independently verified parent revisions and two narrow PM532 collar fixes. Home is now08f8dde6 and Information9ca194c2; the other ten retain530 revisions. Counts/owner branches are unchanged.
+ - [Campaign Evidence And State Crosswalk36](/Hold%20The%20Flood/Campaign%20Evidence%20And%20State%20Crosswalk) closed545 at11:49:32, final70e004e9 (28,144 bytes), after one critique/response and PM integration. It maps 8 existing chains,15 scenes and26 evidence INDEX entries—not26 new objects or single captures—with7 host variants,5 personal variants and2 Regional25 orders. Optional parent tags were declined; no handoff remains. Lead stopped36 at closeout; PM36 remains STOPPED. Lead’s current38 administrative assignment is separate.
+ - Scope and development handoff refresh37 ([Production Scope](/Hold%20The%20Flood/Production%20Scope); [Development And Validation Handoff](/Hold%20The%20Flood/Development%20And%20Validation%20Handoff)) closed550 at12:05:47 after response549 at11:58:19, ONE critique547 and independent factual verification. Final Production68db46ea/Handoff59945901,21,243/27,529 bytes; both Systems STOPPED. The14–26 role-hour allowance at response549 included37 response/disposition4–8 plus coherence10–18. With37 closed, only **10–18 role-hours for coherence/repair disposition** remains forward work. M4 **350–590 role-hours** and the future packet **289–490 role-hours /5–8 working weeks** are low-confidence conditional estimating proposals, not logged labor or development authority.
+ - [V1 Readiness38](/Hold%20The%20Flood/V1%20Readiness) assigned551–553 for the existing final coherence/readiness obligation. Lead551 and Systems552 are WORKING on38; Reviewer553 is WORKING on independent criteria. Receiving/full contracts were verified at12:06:22/27 for Lead,12:06:18/22 for Systems and12:07:16/21 for Reviewer. Lead owns only the new administrative V1 Readiness article; Systems supplies a local factual audit for the same38 outcome; Reviewer prepares independent criteria before ONE critique of the actual stopped submission. Draft13:30 (12:45–14:30), reviewed16:00 (14:30–18:00); no new game content or scope.
- Five unanswered owner questions and unadopted intake407 remain. All original roles resumed490. M3 now targets14 September (11–18), low confidence; M2/M4 remain unchanged. The144–247 allowance remains dated. Yesterday’s F1.14 drafts were not published.
## Open and closed outcomes
@@ 115,7 116,7 @@
|01|[Reusable equipment combinations](/Hold%20The%20Flood/Build%20Rules)|Closed|Selected direction|Sep7 22:19; updated Sep8 13:45|Catalogue and numerical rules remain proposed|
|02|[Oxygen visibility and journal pause](/Hold%20The%20Flood/Oxygen%20and%20Observation)|Closed|Selected direction|Sep7 20:55; updated Sep8 13:45|Exact oxygen amounts remain open|
|03|[Carried property returns on death](/Hold%20The%20Flood/Death%20And%20Persistence)|Closed|Selected rule|Sep8 13:45|Shift and survivor ordering tracked separately|
- |04|[Death Shift And Rescue Continuity](/Hold%20The%20Flood/Death%20Shift%20And%20Rescue%20Continuity)|Closed|Local permanence selected; rescue/finish branches provisional|9Sep11:07:24 closeout518|Accepted577236e7 and eleven parent revisions independently verified. Lead parents and Systems continuity article STOPPED; owner choices, exhaustive arrangements and whole-v1 integration remain|
+ |04|[Death Shift And Rescue Continuity](/Hold%20The%20Flood/Death%20Shift%20And%20Rescue%20Continuity)|Closed|Local permanence selected; rescue/finish branches provisional|9Sep11:07:24 closeout518|Accepted577236e7 and eleven parent revisions independently verified. All affected parents and Continuity STOPPED under current533 ownership; owner choices, exhaustive arrangements and whole-v1 integration remain|
|05|[Ordinary combat and horde encounters](/Hold%20The%20Flood/Combat%20Rules)|Closed|Selected direction|Sep8 10:51; updated13:45|Automatic ordinary fire, manual specials; balance remains open|
|06|[First-survivor comparison](/Hold%20The%20Flood/First%20Survivor)|Closed|Short rescue selected; person unchosen|Sep8 response364/disposition368|Yeva versus Aster ready; short-route condition and death/refuge timing remain explicit limits|
|07|[Practical discovery and optional help](/Hold%20The%20Flood/Clues%20and%20Help)|Closed|Selected direction|Sep8 11:23; updated13:45|Current routes cannot be inferred from historical records|
@@ 131,23 132,25 @@
|17|[Whole-game design outline and scope bands](/Hold%20The%20Flood/Whole%20Game%20Outline)|Closed|Reviewed planning scaffold|Sep8 16:20 disposition378|Use finite bands and dependencies for domain designs; story/ending/count choices and estimate coverage remain open|
|18|[Player information and accessibility](/Hold%20The%20Flood/Player%20Information)|Closed|Reviewed proposed information contract|Sep8 16:35 disposition387|Full cue/screen structure and accessibility specification remain later work; no usability claim|
|19|[Survival and loadout](/Hold%20The%20Flood/Survival%20And%20Loadout)|Closed|Reviewed provisional resource contract|Sep8 16:45 disposition392|Detailed variants and balancing remain later work; integrate compatible core rules after owner decisions|
- |20|[Equipment catalogue](/Hold%20The%20Flood/Equipment%20Catalogue)|Closed|Reviewed12-part planning sample; acquisition unchosen|Sep8 17:29 disposition400|Exact thresholds, multi-actuator controller rules, acquisition and later finite catalogue remain open|
+ |20|[Equipment catalogue](/Hold%20The%20Flood/Equipment%20Catalogue)|Closed|Reviewed12-part planning sample; acquisition unchosen|Sep8 17:29 disposition400|35 supplies bounded thresholds/controller interfaces; acquisition remains a proposal and exhaustive tuning/catalogue variants remain open Current aligned533 3b641972|
|21|[Traps and encounter progression](/Hold%20The%20Flood/Traps%20And%20Encounter%20Progression)|Closed|Reviewed five-family/four-region SMALL proposal|Sep8 17:48 disposition410; roster27 prepared443|Thirteen actual mechanism briefs and ten encounter placements are prepared33; exhaustive variants and balance remain later|
|22|[Development and validation handoff](/Hold%20The%20Flood/Development%20And%20Validation%20Handoff)|Closed|Reviewed first-pass risk/evidence plan|Sep8 17:48 disposition410|Final v1-specific scope, staffing and estimates precede any owner phase decision; no development authorized|
- |23|[Save and content state](/Hold%20The%20Flood/Save%20And%20Content%20State)|Closed|Reviewed first-pass continuity contract; save policy unselected|Sep8 18:09:56 disposition417|Final438cdf35; detailed transitions, rescue/shift ordering, save-policy and recovery choices remain open|
+ |23|[Save and content state](/Hold%20The%20Flood/Save%20And%20Content%20State)|Closed|Reviewed first-pass continuity contract; save policy unselected|Sep8 18:09:56 disposition417|Final438cdf35; detailed transitions, rescue/shift ordering, save-policy and recovery choices remain open Current aligned533 c4cf4abd|
|24|[Production scope](/Hold%20The%20Flood/Production%20Scope)|Closed|Reviewed provisional finite scope and work accounting|Sep8 18:21 disposition423|Finalc1a60388;144–247role-hourv1 planning allowance, not measured labor; band/cuts unselected|
|25|[Regional discovery map](/Hold%20The%20Flood/Regional%20Discovery%20Map)|Closed|Reviewed four-region/twelve-objective SMALL planning proposal|Sep8 18:32 disposition426|Final3acda018; Room32 prepared24module/40room v1 briefs481; cross-domain interfaces, detailed placement variants and owner choices remain open|
- |26|[Equipment acquisition and rig growth](/Hold%20The%20Flood/Equipment%20Acquisition%20And%20Rig%20Growth)|Closed|Reviewed twelve-part acquisition/growth proposal; owner preference unselected|Sep8 18:57:01 disposition434|Finalf5f6d768; Systems owns article STOPPED. Source-fixture details, exceptions, quantities and gameplay validation remain open|
- |27|[Combat and enemy roster](/Hold%20The%20Flood/Combat%20And%20Enemy%20Roster)|Closed|Reviewed combat-state contract and proposed6ordinary/3special/2setpiece roster|Sep8 19:34 disposition443|Finalf1fe0d9a; Systems ownership STOPPED. Ten encounter/thirteen major-mechanism briefs are now prepared33; exhaustive cues/geometry remain M4|
- |28|[Home and colony loop](/Hold%20The%20Flood/Home%20And%20Colony%20Loop)|Closed|Reviewed return/preparation contract and five project briefs; cast/economy unselected|Sep8 20:01:12 disposition450|Final5bff3436; Systems STOPPED owner. Two reused/three new projects; exact fixture/control detail, full cast scene scripts/state variants and validation remain; first-pass cast allocation prepared473|
+ |26|[Equipment acquisition and rig growth](/Hold%20The%20Flood/Equipment%20Acquisition%20And%20Rig%20Growth)|Closed|Reviewed twelve-part acquisition/growth proposal; owner preference unselected|Sep8 18:57:01 disposition434|Finalf5f6d768; Systems owns article STOPPED. Source-fixture details, exceptions, quantities and gameplay validation remain open Current aligned533 6ab4a94c|
+ |27|[Combat and enemy roster](/Hold%20The%20Flood/Combat%20And%20Enemy%20Roster)|Closed|Reviewed combat-state contract and proposed6ordinary/3special/2setpiece roster|Sep8 19:34 disposition443|Finalf1fe0d9a; Systems ownership STOPPED. Ten encounter/thirteen major-mechanism briefs are now prepared33; exhaustive cues/geometry remain M4 Current aligned533 bb15ab8d|
+ |28|[Home and colony loop](/Hold%20The%20Flood/Home%20And%20Colony%20Loop)|Closed|Reviewed return/preparation contract and five project briefs; cast/economy unselected|Sep8 20:01:12 disposition450|Final5bff3436; PM STOPPED owner after532. Two reused/three new projects; exact fixture/control detail, full cast scene scripts/state variants and validation remain; first-pass cast allocation prepared473 Current aligned533 08f8dde6|
|29|[Two-language discovery map](/Hold%20The%20Flood/Two%20Language%20Discovery%20Map)|Closed|Reviewed four-chain/two-language proposal; origins and final story unselected|Sep8 20:23:52 disposition459|Finaldf0f48f5; Systems STOPPED owner. Actual clue/string/physical-state variants, room placements and comprehension evidence remain|
|30|[Story and ending map](/Hold%20The%20Flood/Story%20And%20Ending%20Map)|Closed|Reviewed causal/choice map and four mystery-personal chains; final canon/ending rules unselected|Sep8 20:42:22 disposition466|Final03c9cb8e; Systems STOPPED owner. Actual placements, full scene scripts/state variants and emotional validation remain; first-pass cast allocation prepared473|
|31|[Cast And Short Rescue Map31](/Hold%20The%20Flood/Cast%20And%20Short%20Rescue%20Map)|Closed|Reviewed five-cast/fifteen-scene proposal; final cast/first survivor/mortality unselected|Sep8 21:12:44 disposition473|At closeout 6456406b; aligned518 61ff0b96; Lead ownership STOPPED after518. Three unique primary scenes per person; D2 initial operation includes Dorn. Full scripts, room/state variants and validation remain|
- |32|[Station Room And Module Inventory32](/Hold%20The%20Flood/Station%20Room%20And%20Module%20Inventory)|Closed|Reviewed24module/40room first-pass inventory; physical/global scope remains proposed|Sep8 21:44:18 disposition481|At closeout d4ef2497; aligned518 7ba1e1ab; Lead ownership STOPPED after518.13major mechanisms including independent core isolation; ordinary service/join interfaces also have work. Encounter/mechanism briefs are prepared33; interface integration and M4 variants remain|
- |33|[Encounter And Mechanism Placement Inventory33](/Hold%20The%20Flood/Encounter%20And%20Mechanism%20Placement%20Inventory)|Closed|Proposed ten encounters INCLUDING two setpieces and13 major mechanisms|9Sep10:32:09 closeout493 at5c1a9ad6; aligned518 acbf9d31|One critique/response plus narrow integration492 complete; Lead ownership is STOPPED after verified alignment518. Full variants/tuning and ordinary-interface integration remain|
- |34|[Player Information And Options34](/Hold%20The%20Flood/Player%20Information%20And%20Options)|Closed|Reviewed proposed main cues, controls and options; no usability claim|9Sep10:53:59 closeout509, final61e0be4a|One critique/response plus PM508 integration complete; Lead retains STOPPED ownership. Actual-ID/global/mechanical consumption and M4 variants remain|
- |35|[Mechanical Interfaces And Opening Quantities35](/Hold%20The%20Flood/Mechanical%20Interfaces%20And%20Opening%20Quantities)|Open — one author response521 working|Proposed bounded mechanical interfaces and provisional quantities|Submission515 at11:04:48, a2d3c5e4; one critique520 complete|Systems receiving11:11:46 verified. Response12:00 (11:30–12:30), reviewed preparation13:00 (12:15–14:00), low-medium; Reviewer STOPPED|
- |36|[Campaign Evidence And State Crosswalk36](/Hold%20The%20Flood/Campaign%20Evidence%20And%20State%20Crosswalk)|Open — authoring519|Proposed finite crosswalk of8 existing chains/15 scenes|9Sep11:09:24 assignment519; receiving/source reads verified11:09–11:10|Lead WORKING. Draft12:30 (12–13:30), reviewed14:00 (13–15:30); no new content, extra scripts or mechanical35 authorship|
+ |32|[Station Room And Module Inventory32](/Hold%20The%20Flood/Station%20Room%20And%20Module%20Inventory)|Closed|Reviewed24module/40room first-pass inventory; physical/global scope remains proposed|Sep8 21:44:18 disposition481|At closeout d4ef2497; aligned533 011a4f7b; Systems ownership STOPPED after533.13major mechanisms including independent core isolation; ordinary service/join interfaces also have work. Encounter/mechanism briefs are prepared33; interface integration and M4 variants remain|
+ |33|[Encounter And Mechanism Placement Inventory33](/Hold%20The%20Flood/Encounter%20And%20Mechanism%20Placement%20Inventory)|Closed|Proposed ten encounters INCLUDING two setpieces and13 major mechanisms|9Sep10:32:09 closeout493 at5c1a9ad6; aligned533 4b40819e|One critique/response plus narrow integration492 complete; Systems ownership is STOPPED after verified alignment533. Full variants/tuning and ordinary-interface integration remain|
+ |34|[Player Information And Options34](/Hold%20The%20Flood/Player%20Information%20And%20Options)|Closed|Reviewed proposed main cues, controls and options; no usability claim|9Sep10:53:59 closeout509, final61e0be4a|One critique/response plus PM508 integration complete; PM retains STOPPED ownership after532. Actual-ID/global/mechanical consumption and M4 variants remain Current aligned533 9ca194c2|
+ |35|[Mechanical Interfaces And Opening Quantities35](/Hold%20The%20Flood/Mechanical%20Interfaces%20And%20Opening%20Quantities)|Closed|Reviewed conditional interfaces/quantities; no gameplay validation|9Sep11:35:17 closeout533, final2e604fc2|One critique/response, twelve-parent alignment and two532 fixes verified. Mechanical35/ten parents Systems STOPPED; Home/Information PM STOPPED. Owner choices and M4 variants remain|
+ |36|[Campaign Evidence And State Crosswalk36](/Hold%20The%20Flood/Campaign%20Evidence%20And%20State%20Crosswalk)|Closed|Finite8-chain/15-scene crosswalk;26 evidence INDEX entries, not26 new objects|9Sep11:49:32 closeout545, final70e004e9 (28,144 bytes)|One critique/response and PM integration verified;7 host variants/5 personal variants/2 Regional25 orders. PM owns36 STOPPED; Lead STOPPED. Optional parent tags declined; no transfer needed. Prior reviewed14:00 target achieved|
+ |37|Scope and development handoff refresh37 ([Production Scope](/Hold%20The%20Flood/Production%20Scope); [Development And Validation Handoff](/Hold%20The%20Flood/Development%20And%20Validation%20Handoff))|Closed|Reviewed scope/packet planning proposal; no development authority|9Sep12:05:47 closeout550; response54911:58:19; final68db46ea/59945901|ONE critique/response and exact factual verification.21,243/27,529 bytes; both Systems STOPPED. Prior15:00 reviewed target achieved; only10–18 coherence role-hours remains forward|
+ |38|[V1 Readiness38](/Hold%20The%20Flood/V1%20Readiness)|Open — assignments551–553 sent|Previously planned final coherence/readiness assessment and supporting audit; no new game scope|Lead/Systems WORKING38; Reviewer criteria WORKING; all receiving/full contracts verified|Lead administrative draft13:30 (12:45–14:30); Systems support13:00 (12:30–14); Reviewer criteria12:45; ONE critique, at most ONE response, reviewed16:00 (14:30–18). PM decides M2/M3|
## Recent delivery timeline
@@ 167,29 170,31 @@
|Stream|Now|Next|
|---|---|---|
|Equipment catalogue|Preparation closed400; final737b3cfd; Acquisition26 prepared434|Use the twelve-part contract and current parent alignment; detailed controller/fixture exceptions remain|
- |Whole-v1 coverage|Fourteen usable first-pass contracts; global death/shifts/connections remains partial|See Coverage for the residual M3 clusters and separate M4 extensions; full scripts/exhaustive variants are not M3 completion gates|
+ |Whole-v1 coverage|Fifteen usable first-pass contracts/zero partial;35/36/37 preparation-closed|38 checks remaining actual interfaces and readiness; full scripts/exhaustive variants are M4|
|Trap/encounter progression|Traps21/Combat27 and Room32/Encounter33 first passes prepared;33 closed493|Use ten encounters INCLUDING two setpieces and13 major mechanisms; integrate remaining main cues and global continuity; full variants and tuning later|
- |Development handoff|Preparation closed410; finalc0c38e8b|Keep gates explicit; final handoff packet depends on concrete v1/development scope|
+ |Development handoff|Refreshed37 preparation closed550 at59945901,27,529 bytes; earlier410c0c38e8b historical|Systems STOPPED; use the conditional UNAUTHORIZED packet in38, no further37 review|
|Save/content state|Preparation closed417 at18:09:56; final438cdf35|Use explicit continuity interfaces; detailed state work and owner selections remain later|
- |[Production Scope24](/Hold%20The%20Flood/Production%20Scope)|Preparation closed423 at18:21; finalc1a60388|Use144–247role-hour planning allowance with explicit v1/M4 depth and capacity limits|
+ |[Production Scope24](/Hold%20The%20Flood/Production%20Scope)|Refreshed37 preparation closed550 at68db46ea,21,243 bytes; earlier423c1a60388 historical|Systems STOPPED;10–18 coherence hours remains forward. M4/packet ranges conditional; F1.14 dates unchanged|
|[Regional Discovery Map25](/Hold%20The%20Flood/Regional%20Discovery%20Map)|Preparation closed426 at18:32; final3acda018|Use both revised orders and explicit evidence/access conditions; finite module/room briefs remain|
- |[Equipment Acquisition And Rig Growth26](/Hold%20The%20Flood/Equipment%20Acquisition%20And%20Rig%20Growth)|Preparation closed434 at18:57:01; finalf5f6d768; Systems ownership STOPPED|Use prepared acquisition/configuration paths; owner choices and source-fixture detail remain|
- |[Combat And Enemy Roster27](/Hold%20The%20Flood/Combat%20And%20Enemy%20Roster)|Preparation closed443 at19:34; finalf1fe0d9a; Systems ownership STOPPED|Use the reviewed roster/state contract; finite placement, cue and recovery detail remains|
- |[Home And Colony Loop28](/Hold%20The%20Flood/Home%20And%20Colony%20Loop)|Preparation closed450 at20:01:12; final5bff3436; Systems ownership STOPPED|Use reviewed return/project availability and property rules; exact interfaces, full cast scene scripts/state variants and management choices remain|
+ |[Equipment Acquisition And Rig Growth26](/Hold%20The%20Flood/Equipment%20Acquisition%20And%20Rig%20Growth)|Preparation closed434 at18:57:01; finalf5f6d768; Systems ownership STOPPED|Use prepared acquisition/configuration paths; owner choices and source-fixture detail remain Current aligned533 6ab4a94c|
+ |[Combat And Enemy Roster27](/Hold%20The%20Flood/Combat%20And%20Enemy%20Roster)|Preparation closed443 at19:34; finalf1fe0d9a; Systems ownership STOPPED|Use the reviewed roster/state contract; finite placement, cue and recovery detail remains Current aligned533 bb15ab8d|
+ |[Home And Colony Loop28](/Hold%20The%20Flood/Home%20And%20Colony%20Loop)|Preparation closed450 at20:01:12; final5bff3436; PM ownership STOPPED after532|Use reviewed return/project availability and property rules; exact interfaces, full cast scene scripts/state variants and management choices remain Current aligned533 08f8dde6|
|[Two Language Discovery Map29](/Hold%20The%20Flood/Two%20Language%20Discovery%20Map)|Preparation closed459 at20:23:52; finaldf0f48f5; Systems ownership STOPPED|Use reviewed four-chain evidence/action contract; actual clue/string/room variants and validation remain|
|[Story And Ending Map30](/Hold%20The%20Flood/Story%20And%20Ending%20Map)|Preparation closed466 at20:42:22; final03c9cb8e; Systems ownership STOPPED|Use reviewed causal/evidence/choice contract; final canon, departure preference and finite state/scene/room details remain|
|[Cast And Short Rescue Map31](/Hold%20The%20Flood/Cast%20And%20Short%20Rescue%20Map)|Preparation closed473 at21:12:44; at closeout 6456406b; aligned518 61ff0b96; Lead ownership STOPPED after518|Use reviewed five-cast/fifteen-scene first pass and initial D2 participant rule; final cast, scripts, state variants and placements remain|
- |[Station Room And Module Inventory32](/Hold%20The%20Flood/Station%20Room%20And%20Module%20Inventory)|Preparation closed481 at21:44:18; at closeout d4ef2497; aligned518 7ba1e1ab; Lead ownership STOPPED after518|Use24module/40room hosts and13major-mechanism ledger; preserve compact/current-only constraints and unselected owner branches|
- |[Encounter And Mechanism Placement Inventory33](/Hold%20The%20Flood/Encounter%20And%20Mechanism%20Placement%20Inventory)|Preparation closed493; at closeout 5c1a9ad6; aligned518 acbf9d31; Lead ownership STOPPED after518|Use accepted placed behavior; no second broad review or new population rule inferred|
- |[Player Information And Options34](/Hold%20The%20Flood/Player%20Information%20And%20Options)|Preparation closed509 at10:53:59; final61e0be4a; Lead ownership STOPPED|Use main state/action/option inventory; representative mechanical/global interfaces and M4 presentation variants remain|
- |[Mechanical Interfaces And Opening Quantities35](/Hold%20The%20Flood/Mechanical%20Interfaces%20And%20Opening%20Quantities)|One critique520 complete; Systems WORKING on response521 after verified receiving; Reviewer STOPPED|Response12:00 (11:30–12:30), reviewed preparation13:00 (12:15–14:00)|
- |[Campaign Evidence And State Crosswalk36](/Hold%20The%20Flood/Campaign%20Evidence%20And%20State%20Crosswalk)|Assigned519 at11:09:24; Lead WORKING with receiving/source reads verified|Draft12:30 (12–13:30), reviewed14:00 (13–15:30); finite existing evidence/scene interfaces|
+ |[Station Room And Module Inventory32](/Hold%20The%20Flood/Station%20Room%20And%20Module%20Inventory)|Preparation closed481 at21:44:18; at closeout d4ef2497; aligned533 011a4f7b; Systems ownership STOPPED after533|Use24module/40room hosts and13major-mechanism ledger; preserve compact/current-only constraints and unselected owner branches|
+ |[Encounter And Mechanism Placement Inventory33](/Hold%20The%20Flood/Encounter%20And%20Mechanism%20Placement%20Inventory)|Preparation closed493; at closeout 5c1a9ad6; aligned533 4b40819e; Systems ownership STOPPED after533|Use accepted placed behavior; no second broad review or new population rule inferred|
+ |[Player Information And Options34](/Hold%20The%20Flood/Player%20Information%20And%20Options)|Preparation closed509 at10:53:59; final61e0be4a; PM ownership STOPPED after532|Use main state/action/option inventory; representative mechanical/global interfaces and M4 presentation variants remain|
+ |[Mechanical Interfaces And Opening Quantities35](/Hold%20The%20Flood/Mechanical%20Interfaces%20And%20Opening%20Quantities)|Preparation closed533 at11:35:17; final2e604fc2; prior13:00 target achieved|Use reviewed interfaces/quantities and exact aligned parents; no second review or phase authorization|
+ |[Campaign Evidence And State Crosswalk36](/Hold%20The%20Flood/Campaign%20Evidence%20And%20State%20Crosswalk)|Preparation closed545 at11:49:32, final70e004e9; prior14:00 target achieved|Use accepted8-chain/15-scene/26-index crosswalk in whole-v1 coherence. PM owns36 STOPPED; no parent transfer needed|
+ |Scope and development handoff refresh37 ([Production Scope](/Hold%20The%20Flood/Production%20Scope); [Development And Validation Handoff](/Hold%20The%20Flood/Development%20And%20Validation%20Handoff))|Closed550 at12:05:47, final68db46ea/59945901; Systems STOPPED|Use accepted scope/packet in38; no second37 review|
+ |[V1 Readiness38](/Hold%20The%20Flood/V1%20Readiness)|Lead/Systems WORKING38; Reviewer criteria WORKING; all receiving/full contracts verified. One administrative result with local factual support|Draft13:30 (12:45–14:30), support13:00 (12:30–14), criteria12:45, reviewed16:00 (14:30–18)|
|Additional proposal intake|Both full pages read; explicitly unadopted|Track authorship and assess protected retreat/next-shift meeting before integrating|
- |Shared integration04|Preparation closed518 at11:07:24 after accepted [Death Shift And Rescue Continuity](/Hold%20The%20Flood/Death%20Shift%20And%20Rescue%20Continuity) candidate577236e7 and eleven verified parent alignments|Lead parents and Systems continuity article STOPPED. No further04 review; owner-dependent branches and remaining whole-v1 interfaces stay explicit|
- |Original Claude Lead/Reviewer|Owner resumed both490; pinned identities verified|Lead WORKING519; eleven parents/34 remain STOPPED. Reviewer STOPPED after one35 critique520; no repeated04/34 review|
+ |Shared integration04|Preparation closed518 at11:07:24 after accepted [Death Shift And Rescue Continuity](/Hold%20The%20Flood/Death%20Shift%20And%20Rescue%20Continuity) candidate577236e7 and eleven verified parent alignments|All affected parents and Continuity STOPPED under current533 ownership. No further04 review; owner-dependent branches and remaining whole-v1 interfaces stay explicit|
+ |Original Claude Lead/Reviewer|Original roles resumed490; identities unchanged|Lead551 readiness and Reviewer553 independent criteria WORKING after verified receiving/full contracts. Existing Systems552 supports the same38 outcome; earlier35/36/37 reviews complete|
|Additional specialist setup|No extra agent required today; no new sessions created|Technical/production candidate10Sep only for concrete independent handoff scope; optional campaign integration only for an actual gap|
- The restored team has parallel authorized assignments. Assigned, sent, received, working and submitted remain distinct; a wiki post alone does not establish receiving activity. Lead retains STOPPED ownership after accepted alignment518 of these compatibility parents: Save And Content State; Connecting The Station; Rescue Rules; First Survivor; Cast And Short Rescue Map; Station Room And Module Inventory; Encounter And Mechanism Placement Inventory; First Expedition Options; Player Information; Death And Persistence; Shifting Station Options. All other article ownership remains unchanged; Information34 and the continuity article are STOPPED. Lead owns only new36 for current writing; Systems owns the one35 response521.
+ Current ownership through553: Lead owns only the new administrative V1 Readiness article for38. Systems552 has local factual-support work and no new article ownership. Reviewer553 prepares independent criteria then ONE critique; Lead551 and Systems552 are WORKING on38; Reviewer553 is WORKING on independent criteria. All existing game articles retain their STOPPED owners, including Systems’ two37 parents, Mechanical35 and ten mechanical parents; PM36/Home/Information remain STOPPED. Any actual parent repair requires a later explicit transfer; none is assumed here.
## Decisions for the owner