2026-09-08 16:47:10
Anonymous:
PM day close: survival prepared and owner pause respected
hold the flood/progress.md ..
@@ 1,8 1,8 @@
# Hold The Horde — Progress
-
**Updated 2026-09-08 16:43 Jerusalem (UTC+3).** This is the PM's owner-facing outcome board. The wiki is the shared record. All work remains **design only**.
+
**Updated 2026-09-08 16:45 Jerusalem (UTC+3).** This is the PM's owner-facing outcome board. The wiki is the shared record. All work remains **design only**.
-
**19 tracked design packages: 17 preparation-closed, 2 open.** Whole-game outline17 closed16:20 and Player Information18 closed16:35 today. Survival and Loadout19 is in its one author response388; shared integration04 remains dependent. New package19 was explicitly added380, not silently substituted for another outcome. Closed preparation remains separate from owner selection and complete game design.
+
**19 tracked design packages: 18 preparation-closed, 1 open.** Whole-game outline17 closed16:20 and Player Information18 closed16:35 today. Survival and Loadout19 closed16:45. Shared integration04 remains dependent on the station contract and owner choices. New package19 was explicitly added380, not silently substituted for another outcome. Closed preparation remains separate from owner selection and complete game design.
“Closed” means the bounded written design/review outcome is complete. It does not mean a feature is implemented, every detail approved or fun validated. This board covers the current design batch; it is not a complete campaign or production backlog, and the closed/total ratio is not an overall game-completion percentage. Stable IDs stay fixed; added/reopened work must be recorded explicitly.
@@ 43,7 43,7 @@
The critical sequence is core decisions and interfaces → whole-game architecture/content budget → domain designs → cross-domain integration → v1. Content detail proceeds in parallel only where interfaces are stable. Extra writers do not eliminate the PM/review bottleneck.
-
**Next milestone:** resume coordination after the owner brings Claude back in the morning; specialist setup remains planned9–10 Sep. Systems is finishing survival response388; PM closeout remains targeted17:30 today, range17:00–18:00. The coherent core targets11 Sep(range10–14); the complete first-pass wiki targets22 Sep(range18–29).
+
**Next milestone:** resume coordination after the owner brings Claude back in the morning; specialist setup remains planned9–10 Sep. Today’s information contract closed16:35 and survival contract closed16:45, ahead of their closeout windows. The coherent core targets11 Sep(range10–14); the complete first-pass wiki targets22 Sep(range18–29).
## Extra agents — when and why
@@ 77,7 77,7 @@
## What changed in this report
- The whole-game outline is preparation-closed16:20, and the proposed information/accessibility contract closed16:35 after its focused review and response.
-
- Survival and loadout draft384/review385 are complete. Systems388 is making the consolidated response; PM closes it without another broad review.
+
- Survival and loadout closed16:45 after one review/response. Capacity, oxygen refill and prepared-canister states are explicit proposals; numerical balance remains unvalidated.
- The owner paused both Claude agents for token limits. They will remain paused until the owner confirms their return; no routine messages need forwarding.
- The UI estimates now distinguish the completed first-pass contract from a later35–59-role-hour inventory. Survival and UI overlap must be counted once; earlier planning envelopes are not logged effort or remaining-work totals. Scope reassessment remains9 Sep18:00.
@@ 105,7 105,7 @@
|16|[Testable alien-language interaction](/Hold%20The%20Flood/Alien%20Utterance%20Discovery)|Closed|Reviewed proposal|Sep8 15:38|Protocol discovery prepared; does not prove request semantics or a god|
|17|[Whole-game design outline and scope bands](/Hold%20The%20Flood/Whole%20Game%20Outline)|Closed|Reviewed planning scaffold|Sep8 16:20 disposition378|Use finite bands and dependencies for domain designs; story/ending/count choices and estimate coverage remain open|
|18|[Player information and accessibility](/Hold%20The%20Flood/Player%20Information)|Closed|Reviewed proposed information contract|Sep8 16:35 disposition387|Full cue/screen structure and accessibility specification remain later work; no usability claim|
|19|[Survival and loadout](/Hold%20The%20Flood/Survival%20And%20Loadout)|Closed|Reviewed provisional resource contract|Sep8 16:45 disposition392|Detailed variants and balancing remain later work; integrate compatible core rules after owner decisions|
## Recent delivery timeline
@@ 126,7 126,7 @@
|---|---|---|
|Whole-station puzzle and first survivor|Comparisons prepared; owner choices pending|Owner reaction to final layout and Yeva/Aster; shared integration04|
|Player information|Preparation closed387; Lead paused by owner|Later cue inventory after resource interfaces settle|
-
|Survival and loadout|Systems388 current response; PM disposition next|Core integration; distinct later resource variants|
+
|Survival and loadout|Prepared; no further author round|Core integration; distinct later resource variants|
|Claude review and next authoring|Paused by owner for token limits|Resume only after owner confirmation in the morning|
|Campaign and production scope|Outline17 prepared|Specialist setup9–10Sep; scope reassessment9Sep18:00|