# Hold The Horde — Progress
2
db6396 Anonymous 2026-09-09 10:45:05
PM: resume team, record33 closure and499 submissions; adopt dated F1.14 forecast
3
**Updated 2026-09-09 10:45 Jerusalem (UTC+3); status through submissions 498–499.** The owner resumed all project work and the original Claude roles in490. All work remains **design only**.
98335c Anonymous 2026-09-08 22:15:31
Record owner overnight pause and hold active delivery targets
4
db6396 Anonymous 2026-09-09 10:45:05
PM: resume team, record33 closure and499 submissions; adopt dated F1.14 forecast
5
**34 tracked design packages:32 preparation-closed,2 open (global04 and34).** Room32 closed481 with24 module/40 room first-pass briefs. [Encounter And Mechanism Placement Inventory33](/Hold%20The%20Flood/Encounter%20And%20Mechanism%20Placement%20Inventory) closed493 at10:32:09 on9 September, final `5c1a9ad663ead360b3b80a66caca4e724d91dac38d50979d70f1d460bd0c23d2` (57,934 bytes), after one critique/response and narrow PM integration492. Ten encounters INCLUDE two setpieces; thirteen major mechanisms include independently operated core isolation, not all interactive objects or owner-approved game size. [Player Information And Options34](/Hold%20The%20Flood/Player%20Information%20And%20Options) was submitted499; [Death Shift And Rescue Continuity](/Hold%20The%20Flood/Death%20Shift%20And%20Rescue%20Continuity) was submitted498 within existing04. Intake407 and administration add no packages. These counts measure bounded written outcomes, not overall game completion.
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
6
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
7
“Closed” means the bounded written design/review outcome is complete. It does not mean a feature is implemented, every detail approved or fun validated. This board covers the current design batch; it is not a complete campaign or production backlog, and the closed/total ratio is not an overall game-completion percentage. Stable IDs stay fixed; added/reopened work must be recorded explicitly.
8
db6396 Anonymous 2026-09-09 10:45:05
PM: resume team, record33 closure and499 submissions; adopt dated F1.14 forecast
9
**Actual availability and handoffs:** the owner lifted both the overnight all-work pause and earlier Claude token pause in490. Original pinned Claude identities were freshly verified; models and efforts are unchanged. Lead and Systems have submitted both drafts (499 and 498) and stopped editing. Reviewer has read both submitted revisions under preauthorization 495. All three handoffs were delivered and receiving activity verified. PM owns integration, intake and forecasts. One-minute fallback monitoring and15-minute numeric/forecast reports resume; no manual forwarding is required.
a410b8 Anonymous 2026-09-08 16:43:32
PM close information package and honor owner Claude token pause
10
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
11
## Forward forecast — baseline F1
12
db6396 Anonymous 2026-09-09 10:45:05
PM: resume team, record33 closure and499 submissions; adopt dated F1.14 forecast
13
**Adopted F1.14 forecast — 9 September:** M3 first-pass wiki now targets **14 September (11–18 September), low confidence**. M2 coherent core remains11 September (10–14); M4 detailed campaign remains10 November (20 October–1 December). Earlier published22 September remains in the history below. These are estimates, not deadlines guaranteed by team agreement.
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
14
15
All dates are2026; times are Jerusalem. Ranges are cumulative from8 September, not durations to add together. Baseline F1 was set8 September. Dates assume ordinary weekdays, about6–8 productive agent/PM operating hours per working day, functioning local hosts, and most consequential owner choices within a working day. That does **not** mean6–8hours of the owner's time or guaranteed overnight operation.
16
17
|Milestone|Target|Current likely window|Confidence|What will be ready|
18
|---|---|---|---|---|
49369b Anonymous 2026-09-08 16:27:44
PM forecast F1.2: actual outline completion and next scoped deliveries
19
|M0 — current puzzle/rescue decision pack|Achieved8 Sep15:59|Original target16:30; range16:30–17:00|Actual completion|Both written comparisons reviewed and closed; owner choices remain separate|
20
|M1 — whole-game outline and scope bands|Achieved8 Sep16:20|Original18:30; revised17:00|Actual completion|Draft369, focused review370, response374 and PM integration378 complete; architecture, scope bands and missing-work inventory prepared|
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
21
|M2 — coherent core-design baseline|Fri11 Sep|10–14 Sep|Medium-low|One compatible proposed/selected loop: opening, builds, combat, oxygen, death/shift, rescue and home; old conflicting rules replaced and consequential choices dispositioned|
db6396 Anonymous 2026-09-09 10:45:05
PM: resume team, record33 closure and499 submissions; adopt dated F1.14 forecast
22
|M3 — complete first-pass game-design wiki, v1|Mon14 Sep|11–18 Sep|Low|Actual first-pass behavior and finite inventories across every major area, integrated dependencies and a revision-specific proposed development handoff; full scripts/exhaustive states belong to M4|
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
23
|M4 — detailed campaign/content specification|Tue10 Nov|20 Oct–1 Dec|Low|The approved finite inventory of regions, rooms, puzzles, clues, encounters, rewards, cast scenes and endings is specified through its state changes and recovery paths|
24
db6396 Anonymous 2026-09-09 10:45:05
PM: resume team, record33 closure and499 submissions; adopt dated F1.14 forecast
25
**Will the full wiki be ready today? No. The adopted first-pass target is14 September (11–18 September), low confidence.** The finite room/encounter inventories are prepared, while04/34 and cross-domain integration/handoff remain. The later detailed-content milestone expands that design into the actual authored campaign. Neither milestone claims that a written plan has proved fun, balance, performance or30/90/100–200hours of play.
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
26
27
For M3, “complete first pass” includes the story's causal chain and ending structure; station layout/shifts/persistence; equipment acquisition and progression; combat/horde/trap families; oxygen/resources; rescue/colony/cast arcs; both language-learning arcs and clue distribution; journal, controls and accessibility; content budget, production constraints and the later validation plan. Numerical tuning can remain explicitly provisional. A major domain marked only “TBD” does not satisfy completion.
28
29
M4 has the weakest estimate because no approved content inventory yet exists. It assumes a substantial authored campaign matching the brief's ambition and two additional specialists. It is approximately30–60 active working days; with the current team alone, the initial audit estimated40–80. A smaller approved campaign could be much quicker; a dense secret/language campaign or a changed global rule could exceed the range. I will revise M4 after the inventory and three representative detailed content packages are written and checked. Final gameplay validation belongs to a separately authorised implementation/playtest phase; it has no honest calendar endpoint yet.
30
31
## Estimated work timeline
32
33
This is a planning schedule, not historical delivery data. “Buffer” is allowed revision/decision time, not an unassigned promise to polish indefinitely.
34
db6396 Anonymous 2026-09-09 10:45:05
PM: resume team, record33 closure and499 submissions; adopt dated F1.14 forecast
35
|Workstream|9 Sep|10–11 Sep|12–14 Sep|15–18 Sep|Oct–Nov|
36
|---|---|---|---|---|---|
37
|04 continuity +34 information|Draft12:00 / review13:00|Parent alignment; core target11Sep|Core buffer through14Sep|||
38
|Mechanical/quantity + reference interfaces|Prepare finite checks|Integrate actual states and IDs|Resolve remaining conflicts|||
39
|Scope, handoff and whole-v1 coherence|Prepare packet|Reconcile sources and scope|**M3 target14Sep**|Revision buffer through18Sep||
40
|Detailed finite campaign|Stable representative preparation|Representative packages|Continue after first-pass interfaces|Detailed authoring|**M4 target10Nov;20Oct–1Dec range**|
41
42
The remaining critical sequence is04/34 candidates → owning-parent and actual-ID interface alignment → finite scope/handoff → one whole-v1 coherence disposition. Mechanical/quantity and packet preparation can proceed in parallel. Extra writers do not remove PM review and integration work.
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
43
db6396 Anonymous 2026-09-09 10:45:05
PM: resume team, record33 closure and499 submissions; adopt dated F1.14 forecast
44
**Next delivery, Jerusalem:** Both drafts arrived early: continuity04 at **10:41:54** (498, `b20454c5…`,35,080 bytes), information34 at **10:42:21** (499, `134f2e9f…`,25,186 bytes). Both authors stopped; the Reviewer has read the sources for one focused critique each. Their original draft target was **12:00 (11:15–12:45)**. Reviewed candidates still target **13:00 (12:00–14:00)** today, low-medium confidence. Global04 additionally needs explicit parent compatibility integration before it can close. Room32 closed8Sep21:44:18;33 draft arrived8Sep21:57:56 and response22:12:33, before the owner paused all work. PM closed33 at9Sep10:32:09 after resumption; the overnight target was held, not missed by an unattended worker. The144–247 role-hour allowance is the dated8 September baseline, not measured labor or a current remaining balance.
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
45
db6396 Anonymous 2026-09-09 10:45:05
PM: resume team, record33 closure and499 submissions; adopt dated F1.14 forecast
46
**Adopted F1.14 forecast — 9 September:** M3 first-pass wiki now targets **14 September (11–18 September), low confidence**. M2 coherent core remains11 September (10–14); M4 detailed campaign remains10 November (20 October–1 December). The revision follows the remaining-deliverables audit and preparation closeouts25–33, including the actual24-module/40-room and ten-encounter/thirteen-mechanism first passes. It uses current PM, Systems and restored original Lead/Reviewer capacity; additional agents are not prerequisites. It is a scope-based calendar judgment, not a conversion of word counts or elapsed chat minutes into role-hours. A changed joining architecture, expanded first-pass scope, unresolved integration or unavailable capacity can move the estimate. Next scheduled re-estimate:9 September18:00 Jerusalem, or sooner after consequential acceptance, scope or capacity changes. The earlier absent-two-specialists→25Sep scenario is historical and no longer the current schedule. The earlier14Sep conditional calculation in yesterday’s unpublished draft is now explicitly adopted by PM.
49369b Anonymous 2026-09-08 16:27:44
PM forecast F1.2: actual outline completion and next scoped deliveries
47
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
48
## Extra agents — when and why
49
db6396 Anonymous 2026-09-09 10:45:05
PM: resume team, record33 closure and499 submissions; adopt dated F1.14 forecast
50
**No extra agent creation is required today.** Restored original Lead/Reviewer and existing Systems have substantive parallel assignments. Reconsider a technical/production specialist on10 September only if the concrete handoff queue needs independent expertise; campaign evidence integration is optional only for an actual unresolved gap.
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
51
52
|Additional role|Planned start|First bounded responsibility|Reason for adding it|
53
|---|---|---|---|
db6396 Anonymous 2026-09-09 10:45:05
PM: resume team, record33 closure and499 submissions; adopt dated F1.14 forecast
54
|Campaign and puzzle designer|Only if an actual finite integration gap warrants it|Reconcile existing language/story evidence, room hosts and cast knowledge; identify and fill only concrete missing first-pass links|A bounded independent cross-domain artifact may help; another general campaign map or two new chains would duplicate accepted25/29/30/31/32|
55
|Technical design and production planner|10 Sep candidate only if a concrete handoff gap needs independent expertise|Check specific Unity/Steam, save/content compatibility and free-asset suitability assumptions; contribute to a revision-specific proposed handoff|No session created or capacity counted; build on Production24/Save23/Handoff22|
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
56
db6396 Anonymous 2026-09-09 10:45:05
PM: resume team, record33 closure and499 submissions; adopt dated F1.14 forecast
57
These are design roles. No gamecode, prototypes, simulations, tests, purchases or AI art are authorised by this staffing plan. These additional sessions have not been created; setup is optional and capacity is counted only after independent onboarding, connectivity and a bounded assignment. PM will guide any needed setup one step at a time. Existing Systems retains its mechanical work; no new permanent critic is planned. Do not add writers when PM review/integration is the queue.
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
58
db6396 Anonymous 2026-09-09 10:45:05
PM: resume team, record33 closure and499 submissions; adopt dated F1.14 forecast
59
The original staffing proposal preceded accepted regional, language, story, cast, room and encounter inventories. Do not duplicate campaign maps or chains to occupy a role. Specialist absence no longer automatically implies a25 September wiki target; the adopted14 September estimate uses the restored existing team.
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
60
61
## Why these estimates, and when they change
62
db6396 Anonymous 2026-09-09 10:45:05
PM: resume team, record33 closure and499 submissions; adopt dated F1.14 forecast
63
The revision follows the remaining-deliverables audit and preparation closeouts25–33, including the actual24-module/40-room and ten-encounter/thirteen-mechanism first passes. It uses current PM, Systems and restored original Lead/Reviewer capacity; additional agents are not prerequisites. It is a scope-based calendar judgment, not a conversion of word counts or elapsed chat minutes into role-hours. A changed joining architecture, expanded first-pass scope, unresolved integration or unavailable capacity can move the estimate. Historical early2–4/6–12/8–15/30–60-day allowances remain dated planning hypotheses; no new labor balance is inferred from them.
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
64
db6396 Anonymous 2026-09-09 10:45:05
PM: resume team, record33 closure and499 submissions; adopt dated F1.14 forecast
65
- Every15-minute report includes the next target/range and any movement. Next ordinary forecast review is9 September18:00 Jerusalem; update sooner when04/34 acceptance, remaining interface/handoff scope, owner answers or actual capacity changes the assumptions.
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
66
- Keep the original target visible when revising it. Record old estimate, new estimate and the concrete cause; do not silently move dates.
67
- A changed core mechanism or late owner story change may add roughly1–3 working days to the core/v1 forecast; quantify the actual affected work when it happens.
68
- A blocked decision moves its dependent work, not every parallel stream. Host outages are reported with elapsed delay. If authors produce a queue waiting over a working day for review/integration, reduce parallel intake before adding more agents.
69
- Forecasts must be useful even when confidence is low. Uncertainty is a reason to widen a range and state assumptions, not to omit an estimate or wait for certainty.
70
71
|Forecast revision|Recorded|Change and reason|
72
|---|---|---|
73
|F1|8 Sep|First forward baseline added at owner's request; prior board had actuals but omitted estimates. M3 target22 Sep; M4 target10 Nov.|
fc05ee Anonymous 2026-09-08 16:04:47
Record early outline draft and revise near-term estimate
74
|F1.1|8 Sep16:04|M1 reviewed outline moved from18:00–20:00 to16:30–17:30 because the actual draft arrived16:01 and Reviewer had already fetched it. Review/rework still required. Core, full-wiki and detailed-content dates unchanged.|
49369b Anonymous 2026-09-08 16:27:44
PM forecast F1.2: actual outline completion and next scoped deliveries
75
|F1.2|8 Sep16:20|M0 actual15:59 and M1 actual16:20 recorded. Both prepared ahead of forecast. M2–M4 dates unchanged: the outline is a scaffold, and scope/unit reconciliation is still required before rolling up its partial111–208 role-hour inventory.|
1d867d Anonymous 2026-09-08 17:16:19
PM continuation: only Claude paused; GPT catalogue and coverage work active
76
|Availability correction|8 Sep17:10|Only Claude paused; PM/GPT work resumed after PM incorrectly stopped broader intake. Equipment Catalogue20 now targets reviewed18:30 today. M2–M4 dates unchanged pending coverage reassessment.|
8cd0af Anonymous 2026-09-08 17:32:04
Record catalogue closeout, coverage and next GPT trap outcome
77
|F1.3|8 Sep17:32|Catalogue actual17:29 and coverage actual17:27 recorded ahead of their18:30/17:45 targets. Next reviewed trap/encounter outcome targets18:45(18:15–19:15). M2–M4 unchanged: the coverage audit still identifies eight partial domains and three missing contracts; remaining-work estimates need deduplication.|
c715ff Anonymous 2026-09-08 17:54:18
Record trap/handoff closeouts and active save-state design
78
|F1.4|8 Sep17:54|Traps21 and Handoff22 actual17:48 recorded against18:45/18:15 targets. Next Save And Content State23 reviewed target19:00(18:30–19:30). M2–M4 unchanged: full campaign, content inventory and integration still require work.|
51e8e6 Anonymous 2026-09-08 18:22:41
Record State and Production closeouts, regional review, and aligned v1 scope forecast
79
|F1.5|8 Sep18:09:56|State23 actual closeout417 recorded against its19:00 reviewed target. New418 outcomes: Regional Map25 reviewed19:30(19:00–20:00), Production Scope24 reviewed19:40(19:05–20:10). M2–M4 unchanged pending reviewed remaining-scope accounting; a Production draft is not a reviewed forecast.|
80
|F1.6|8 Sep18:21|Production24 closed423. Its reviewed response exposes previously unallocated v1 room/mechanism briefs:144–247role-hours replaces draft116–201. M2–M4 dates retained provisionally;9Sep re-estimate must check capacity. If extra streams are unavailable10Sep, current-teamv1 scenario25Sep(22Sep–2Oct). Regional25 reviewing420, target19:30.|
16dda9 Anonymous 2026-09-08 18:49:23
Record regional closeout and acquisition review
81
|F1.7|8 Sep18:32|Regional25 actual closeout426 recorded against its19:30 reviewed target. New Acquisition26 assignment427 targets draft19:00(18:45–19:20), reviewed19:45(19:15–20:15). M2–M4, the F1.6 planning allowance and current-team scenario remain unchanged; accepting a regional map does not complete its room inventory.|
287b77 Anonymous 2026-09-08 19:11:18
Record acquisition closeout, combat roster work and revised coverage
82
|F1.8|8 Sep18:57:01|Acquisition26 actual closeout434 recorded against its19:45 reviewed target(19:15–20:15). New Combat And Enemy Roster27 assignment435 targets draft19:45(19:25–20:15), reviewed20:30(20:00–21:15); actual receiving activity18:58:15.181 verified. Narrow04 parent alignment432 is complete; owner-dependent branches remain open. M2–M4, the144–247role-hour planning allowance and current-team scenario remain unchanged.|
bd5466 Anonymous 2026-09-08 19:48:00
Record combat completion, home review and dated milestone forecast
83
|F1.9|8 Sep19:47|Combat27 actual closeout443 recorded against its20:30 reviewed target(20:00–21:15). Home And Colony Loop28 assignment444 reached draft446 at19:42:37 before its20:20 target(20:00–20:50); independent review447 active, reviewed21:15(20:45–22:00) remains a medium-low-confidence forecast. Narrow legacy04 integration441–443 is complete; global04 stays open. M2–M4 and the current-team scenario remain unchanged; the dated144–247 allowance needs accepted-scope reconciliation.|
0f3ff9 Anonymous 2026-09-08 20:16:30
Record Home28 closure and Language29 submission with independent review; forecast F1.10
84
|F1.10|8 Sep20:07|Home28 actual closeout450 recorded against its21:15 reviewed target(20:45–22:00). Two Language Discovery Map29 assignment451 reached draft454 at20:07:22 before its21:00 target(20:35–21:30); independent review455 active, reviewed22:00(21:15–22:45) remains the medium-low-confidence forecast. Home/colony now has a usable first-pass contract; five cast arcs/15scenes and finite room/encounter/mechanism inventories remain unfinished. Global04, M2–M4 and the current-team scenario remain unchanged; the dated144–247 allowance still requires accepted-scope reconciliation.|
1d0af6 Anonymous 2026-09-08 20:34:57
Record actual Story30 submission463 and preauthorised focused review status
85
|F1.11|8 Sep20:28|Language29 actual closeout459 recorded against its22:00 reviewed target(21:15–22:45). Story And Ending Map30 assignment461 reached draft463 at20:30:02 before its21:15 target(20:50–21:45); one focused review underway under462, reviewed22:15(21:30–23:00) remains the medium-low-confidence forecast. Language/discovery now has a usable first-pass contract; story remains partial. Global04, M2–M4, planned9–10Sep staffing and the current-team scenario remain unchanged; the dated144–247 allowance still needs accepted-scope reconciliation.|
4904fc Anonymous 2026-09-08 20:59:08
Record Story30 closure and Cast31 submission/review; forecast F1.12
86
|F1.12|8 Sep20:55|Story30 actual closeout466 at20:42:22 recorded against its22:15 reviewed target(21:30–23:00). Cast And Short Rescue Map31 assignment468 reached draft470 at20:53:50 before its21:30 target(21:10–22:00); one review under469, reviewed22:30(22:00–23:30) remains the medium-low-confidence forecast. Story is now usable first-pass; cast remains partial. Global04, M2–M4, planned9–10Sep staffing, the current-team scenario and dated144–247 allowance caveat remain unchanged.|
fd2d28 Anonymous 2026-09-08 21:27:11
PM F1.13: cast reviewed; room inventory submitted and under review
87
|F1.13|8 Sep21:22|Cast31 actual closeout473 at21:12:44 recorded against its22:30 reviewed target(22:00–23:30); initial draft470 arrived20:53:50. Station Room And Module Inventory32 assigned475, native receiving verified21:13:24.363; draft477 submitted21:22:49 at15bb8454 before23:00 on8Sep(22:15 on8Sep–00:00 on9Sep). Systems STOPPED; one review active under476. Reviewed00:00 on9Sep(23:15 on8Sep–01:15 on9Sep) remains the low-medium-confidence forecast. Cast is now usable first-pass, bringing coverage to13usable/2partial; room/module and full encounter/mechanism inventories remain unfinished. Global04, M2–M4, planned9–10Sep staffing, the current-team scenario and dated144–247 allowance caveat remain unchanged.|
db6396 Anonymous 2026-09-09 10:45:05
PM: resume team, record33 closure and499 submissions; adopt dated F1.14 forecast
88
|F1.14|9 Sep 10:45|Owner resumed all roles490 after authorized overnight downtime. Room32 closed481 on8Sep21:44:18; Encounter33 closed493 on9Sep10:32:09, final5c1a9ad6, after one critique/response and narrow PM integration492.34 information assigned491; global04 assigned494; original Reviewer preauthorized495. Current34 tracked/32 closed/2 open;14 usable/1 partial. PM adopts M3 **14Sep (11–18), low confidence**, from remaining-scope audit and accepted25–33 with the restored team; no extra agents prerequisite.04/34 drafts9Sep12:00 (11:15–12:45), reviewed13:00 (12–14), low-medium. M2/M4 unchanged. Night pause is not a failed deadline. Earlier Sep22 and missing-two-specialists→Sep25 scenarios remain historical. Yesterday’s F1.14 draft was local and unpublished; this row is the new adoption record. Dated144–247 allowance is not current remaining labor.|
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
89
90
## What changed in this report
91
bd5466 Anonymous 2026-09-08 19:48:00
Record combat completion, home review and dated milestone forecast
92
- [Combat And Enemy Roster27](/Hold%20The%20Flood/Combat%20And%20Enemy%20Roster) preparation-closed443 at19:34, finalf1fe0d9a. One focused review/response corrected the new-role triggers and counterplay, staged cues for both regional orders, and Bellback's warning-start cone lock. Six ordinary/three special roles and two setpieces are prepared within ten encounter placements; exact populations, geometry, presentation and tuning remain later work.
fd2d28 Anonymous 2026-09-08 21:27:11
PM F1.13: cast reviewed; room inventory submitted and under review
93
- [Home And Colony Loop28](/Hold%20The%20Flood/Home%20And%20Colony%20Loop) preparation-closed450 at20:01:12, final5bff3436. One focused review/response clarified shared commissioning, first-return actions and each project's participants and lasting facilities. Five project briefs remain two reused/three new with three new fixed ship fixtures; cast choices, full scene scripts/state variants and management economy remain separate; Cast31 first-pass allocation is now prepared473.
471731 Anonymous 2026-09-08 20:30:17
Record Language29 closeout and Story30 authoring with preauthorised review; forecast F1.11
94
- [Two Language Discovery Map29](/Hold%20The%20Flood/Two%20Language%20Discovery%20Map) preparation-closed459 at20:23:52, finaldf0f48f5. One focused critique/response separated address/body evidence, retained valid captures across lives and supplied the iris variant's local B plate and completion state. Four proposed chains across two languages are prepared; actual clue/string/room variants and comprehension evidence remain unfinished.
4904fc Anonymous 2026-09-08 20:59:08
Record Story30 closure and Cast31 submission/review; forecast F1.12
95
- [Story And Ending Map30](/Hold%20The%20Flood/Story%20And%20Ending%20Map) preparation-closed466 at20:42:22, final03c9cb8e. One focused critique/response separated current diagnostic evidence from historical chronology, specified evidence retained/lost before and after isolation, and used shared mechanical cycle impressions. Four mystery/personal chains and layered choices are prepared proposals; final story, departure rules and full cast/room/scene variants remain open.
fd2d28 Anonymous 2026-09-08 21:27:11
PM F1.13: cast reviewed; room inventory submitted and under review
96
- [Cast And Short Rescue Map31](/Hold%20The%20Flood/Cast%20And%20Short%20Rescue%20Map) preparation-closed473 at21:12:44, final6456406b: five proposed people and fifteen unique first-pass scene briefs, three primary per person. One focused critique/response resolved the initial walked rescue route, actual movement event and first bench operation. D2 retains Dorn participating in the initial demonstrated operation; later commissioned use follows Home28. First-survivor/global mortality and final cast remain unselected.
db6396 Anonymous 2026-09-09 10:45:05
PM: resume team, record33 closure and499 submissions; adopt dated F1.14 forecast
97
- [Station Room And Module Inventory32](/Hold%20The%20Flood/Station%20Room%20And%20Module%20Inventory) preparation-closed481 at21:44:18, finald4ef2497(61009bytes):24modules/40rooms with explicit arrangement and compact-assembly constraints, retained conversion clues and independent core-isolation mechanism13. The13major units are not every interactive object and remain a proposed scope sample.
98
- [Encounter And Mechanism Placement Inventory33](/Hold%20The%20Flood/Encounter%20And%20Mechanism%20Placement%20Inventory) preparation-closed493 on9 September10:32:09, final5c1a9ad6. The one response plus narrow PM integration makes later E03 population a later-death-shift selection, preserves self-contained reset thresholds, and corrects Lens heat/cold and single-Cycler conservation. Ten encounters including two setpieces and thirteen major mechanism briefs are prepared; full variants and gameplay validation remain later.
bd5466 Anonymous 2026-09-08 19:48:00
Record combat completion, home review and dated milestone forecast
99
- PM verified04's narrow legacy integration under441–443: [Discovery Chain](/Hold%20The%20Flood/Discovery%20Chain)114e9267 and [Expedition Proposal](/Hold%20The%20Flood/Expedition%20Proposal)836ab2ae now use historical post-death routes and world-time capture/full frozen journal inspection. No new access guarantee was added; global04 remains open.
471731 Anonymous 2026-09-08 20:30:17
Record Language29 closeout and Story30 authoring with preauthorised review; forecast F1.11
100
- PM closed narrow [Coming Home](/Hold%20The%20Flood/Coming%20Home)/[Home Projects](/Hold%20The%20Flood/Home%20Projects) compatibility456 at20:15:57, revisionsacbc945c/996d235a. Current Fork/supply, unloading, historical-route and refill rules align; PM owns both parents STOPPED. This adds no package and does not close global04.
db6396 Anonymous 2026-09-09 10:45:05
PM: resume team, record33 closure and499 submissions; adopt dated F1.14 forecast
101
- Coverage is14 usable first-pass contracts and one partial area: global death/shifts/connections. Room32 and33 finite briefs are prepared. Remaining M3 clusters are04,34 information/options, bounded mechanical/quantity interfaces, actual-ID references, scope/handoff and one coherence disposition. Full scripts and exhaustive states/layouts are M4. Clusters are not extra numbered assignments.
102
- Global04 independent positions were saved and compared485; the shared protected-retreat candidate remains a proposal, with the alternative costs disclosed. No rule adoption, article transfer or extra counted package occurred.
103
- Five unanswered owner questions and unadopted intake407 remain. All original roles resumed490. M3 now targets14 September (11–18), low confidence; M2/M4 remain unchanged. The144–247 allowance remains dated. Yesterday’s F1.14 drafts were not published.
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
104
105
## Open and closed outcomes
106
107
All milestone times below are Jerusalem time. “Updated” separates later owner-rule integration from the original preparation closeout.
108
109
|ID|Outcome|Preparation status|Decision status|Latest milestone|Next step / remaining scope|
110
|---|---|---|---|---|---|
111
|01|[Reusable equipment combinations](/Hold%20The%20Flood/Build%20Rules)|Closed|Selected direction|Sep7 22:19; updated Sep8 13:45|Catalogue and numerical rules remain proposed|
112
|02|[Oxygen visibility and journal pause](/Hold%20The%20Flood/Oxygen%20and%20Observation)|Closed|Selected direction|Sep7 20:55; updated Sep8 13:45|Exact oxygen amounts remain open|
113
|03|[Carried property returns on death](/Hold%20The%20Flood/Death%20And%20Persistence)|Closed|Selected rule|Sep8 13:45|Shift and survivor ordering tracked separately|
db6396 Anonymous 2026-09-09 10:45:05
PM: resume team, record33 closure and499 submissions; adopt dated F1.14 forecast
114
|04|[Death Shift And Rescue Continuity](/Hold%20The%20Flood/Death%20Shift%20And%20Rescue%20Continuity)|Open — submitted498, focused review|Local permanence selected; global rescue/finish branches provisional|9Sep10:41:54 submission498, b20454c5; Systems STOPPED|Systems owns new candidate only. Draft12:00 (11:15–12:45), reviewed candidate13:00 (12–14); explicit parent alignment and PM disposition required before04 closure|
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
115
|05|[Ordinary combat and horde encounters](/Hold%20The%20Flood/Combat%20Rules)|Closed|Selected direction|Sep8 10:51; updated13:45|Automatic ordinary fire, manual specials; balance remains open|
0c6bef Anonymous 2026-09-08 16:01:08
Record reviewed survivor package alongside forecast F1
116
|06|[First-survivor comparison](/Hold%20The%20Flood/First%20Survivor)|Closed|Short rescue selected; person unchosen|Sep8 response364/disposition368|Yeva versus Aster ready; short-route condition and death/refuge timing remain explicit limits|
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
117
|07|[Practical discovery and optional help](/Hold%20The%20Flood/Clues%20and%20Help)|Closed|Selected direction|Sep8 11:23; updated13:45|Current routes cannot be inferred from historical records|
118
|08|[Cooperation and useful work aboard](/Hold%20The%20Flood/Home%20Projects)|Closed|Tentative preference|Sep8 12:00; updated13:45|Equipment loans tentative; full colony/cast still open|
119
|09|[Two-language expedition and journal use](/Hold%20The%20Flood/Language%20Expedition)|Closed|Reviewed proposal|Sep8 13:45|Detailed language system unselected;16 is a distinct evidence scene|
120
|10|[How equipment is acquired and improves](/Hold%20The%20Flood/Progression%20Options)|Closed|Reviewed alternatives|Sep8 13:51|Find working components versus observe/fabricate; owner choice later|
121
|11|[Three distinct horde creatures](/Hold%20The%20Flood/Horde%20Creature%20Proposals)|Closed|Reviewed proposals|Sep8 14:07|Roster and origins unselected|
122
|12|[Hospital story and its causal alternatives](/Hold%20The%20Flood/Hospital%20Story%20Directions)|Closed|Reviewed alternatives|Sep8 14:47|Owner hospital/godhood draft leads; exact story/ending remain revisable|
123
|13|[Player resurrection and corruption](/Hold%20The%20Flood/Resurrection%20And%20Corruption)|Closed|Reviewed alternatives|Sep8 14:38|No player decay or death budget adopted|
124
|14|[Opening expedition: reusable machinery](/Hold%20The%20Flood/First%20Expedition%20Options)|Closed|Option A selected|Prepared Sep8 15:14; selected15:30|Preferred direction recorded; exact starting items/rooms remain proposed|
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
125
|15|[Whole-station mechanism comparison](/Hold%20The%20Flood/Connecting%20The%20Station)|Closed|Goal selected; mechanism conditional|Sep8 15:51 disposition363|Physical connection candidate prepared; owner payoff choice and detailed content remain open|
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
126
|16|[Testable alien-language interaction](/Hold%20The%20Flood/Alien%20Utterance%20Discovery)|Closed|Reviewed proposal|Sep8 15:38|Protocol discovery prepared; does not prove request semantics or a god|
49369b Anonymous 2026-09-08 16:27:44
PM forecast F1.2: actual outline completion and next scoped deliveries
127
|17|[Whole-game design outline and scope bands](/Hold%20The%20Flood/Whole%20Game%20Outline)|Closed|Reviewed planning scaffold|Sep8 16:20 disposition378|Use finite bands and dependencies for domain designs; story/ending/count choices and estimate coverage remain open|
a410b8 Anonymous 2026-09-08 16:43:32
PM close information package and honor owner Claude token pause
128
|18|[Player information and accessibility](/Hold%20The%20Flood/Player%20Information)|Closed|Reviewed proposed information contract|Sep8 16:35 disposition387|Full cue/screen structure and accessibility specification remain later work; no usability claim|
cfac10 Anonymous 2026-09-08 16:47:10
PM day close: survival prepared and owner pause respected
129
|19|[Survival and loadout](/Hold%20The%20Flood/Survival%20And%20Loadout)|Closed|Reviewed provisional resource contract|Sep8 16:45 disposition392|Detailed variants and balancing remain later work; integrate compatible core rules after owner decisions|
8cd0af Anonymous 2026-09-08 17:32:04
Record catalogue closeout, coverage and next GPT trap outcome
130
|20|[Equipment catalogue](/Hold%20The%20Flood/Equipment%20Catalogue)|Closed|Reviewed12-part planning sample; acquisition unchosen|Sep8 17:29 disposition400|Exact thresholds, multi-actuator controller rules, acquisition and later finite catalogue remain open|
db6396 Anonymous 2026-09-09 10:45:05
PM: resume team, record33 closure and499 submissions; adopt dated F1.14 forecast
131
|21|[Traps and encounter progression](/Hold%20The%20Flood/Traps%20And%20Encounter%20Progression)|Closed|Reviewed five-family/four-region SMALL proposal|Sep8 17:48 disposition410; roster27 prepared443|Thirteen actual mechanism briefs and ten encounter placements are prepared33; exhaustive variants and balance remain later|
c715ff Anonymous 2026-09-08 17:54:18
Record trap/handoff closeouts and active save-state design
132
|22|[Development and validation handoff](/Hold%20The%20Flood/Development%20And%20Validation%20Handoff)|Closed|Reviewed first-pass risk/evidence plan|Sep8 17:48 disposition410|Final v1-specific scope, staffing and estimates precede any owner phase decision; no development authorized|
51e8e6 Anonymous 2026-09-08 18:22:41
Record State and Production closeouts, regional review, and aligned v1 scope forecast
133
|23|[Save and content state](/Hold%20The%20Flood/Save%20And%20Content%20State)|Closed|Reviewed first-pass continuity contract; save policy unselected|Sep8 18:09:56 disposition417|Final438cdf35; detailed transitions, rescue/shift ordering, save-policy and recovery choices remain open|
134
|24|[Production scope](/Hold%20The%20Flood/Production%20Scope)|Closed|Reviewed provisional finite scope and work accounting|Sep8 18:21 disposition423|Finalc1a60388;144–247role-hourv1 planning allowance, not measured labor; band/cuts unselected|
db6396 Anonymous 2026-09-09 10:45:05
PM: resume team, record33 closure and499 submissions; adopt dated F1.14 forecast
135
|25|[Regional discovery map](/Hold%20The%20Flood/Regional%20Discovery%20Map)|Closed|Reviewed four-region/twelve-objective SMALL planning proposal|Sep8 18:32 disposition426|Final3acda018; Room32 prepared24module/40room v1 briefs481; cross-domain interfaces, detailed placement variants and owner choices remain open|
287b77 Anonymous 2026-09-08 19:11:18
Record acquisition closeout, combat roster work and revised coverage
136
|26|[Equipment acquisition and rig growth](/Hold%20The%20Flood/Equipment%20Acquisition%20And%20Rig%20Growth)|Closed|Reviewed twelve-part acquisition/growth proposal; owner preference unselected|Sep8 18:57:01 disposition434|Finalf5f6d768; Systems owns article STOPPED. Source-fixture details, exceptions, quantities and gameplay validation remain open|
db6396 Anonymous 2026-09-09 10:45:05
PM: resume team, record33 closure and499 submissions; adopt dated F1.14 forecast
137
|27|[Combat and enemy roster](/Hold%20The%20Flood/Combat%20And%20Enemy%20Roster)|Closed|Reviewed combat-state contract and proposed6ordinary/3special/2setpiece roster|Sep8 19:34 disposition443|Finalf1fe0d9a; Systems ownership STOPPED. Ten encounter/thirteen major-mechanism briefs are now prepared33; exhaustive cues/geometry remain M4|
fd2d28 Anonymous 2026-09-08 21:27:11
PM F1.13: cast reviewed; room inventory submitted and under review
138
|28|[Home and colony loop](/Hold%20The%20Flood/Home%20And%20Colony%20Loop)|Closed|Reviewed return/preparation contract and five project briefs; cast/economy unselected|Sep8 20:01:12 disposition450|Final5bff3436; Systems STOPPED owner. Two reused/three new projects; exact fixture/control detail, full cast scene scripts/state variants and validation remain; first-pass cast allocation prepared473|
471731 Anonymous 2026-09-08 20:30:17
Record Language29 closeout and Story30 authoring with preauthorised review; forecast F1.11
139
|29|[Two-language discovery map](/Hold%20The%20Flood/Two%20Language%20Discovery%20Map)|Closed|Reviewed four-chain/two-language proposal; origins and final story unselected|Sep8 20:23:52 disposition459|Finaldf0f48f5; Systems STOPPED owner. Actual clue/string/physical-state variants, room placements and comprehension evidence remain|
fd2d28 Anonymous 2026-09-08 21:27:11
PM F1.13: cast reviewed; room inventory submitted and under review
140
|30|[Story and ending map](/Hold%20The%20Flood/Story%20And%20Ending%20Map)|Closed|Reviewed causal/choice map and four mystery-personal chains; final canon/ending rules unselected|Sep8 20:42:22 disposition466|Final03c9cb8e; Systems STOPPED owner. Actual placements, full scene scripts/state variants and emotional validation remain; first-pass cast allocation prepared473|
141
|31|[Cast And Short Rescue Map31](/Hold%20The%20Flood/Cast%20And%20Short%20Rescue%20Map)|Closed|Reviewed five-cast/fifteen-scene proposal; final cast/first survivor/mortality unselected|Sep8 21:12:44 disposition473|Final6456406b; Systems STOPPED owner. Three unique primary scenes per person; D2 initial operation includes Dorn. Full scripts, room/state variants and validation remain|
db6396 Anonymous 2026-09-09 10:45:05
PM: resume team, record33 closure and499 submissions; adopt dated F1.14 forecast
142
|32|[Station Room And Module Inventory32](/Hold%20The%20Flood/Station%20Room%20And%20Module%20Inventory)|Closed|Reviewed24module/40room first-pass inventory; physical/global scope remains proposed|Sep8 21:44:18 disposition481|Finald4ef2497; Systems STOPPED owner.13major mechanisms including independent core isolation; ordinary service/join interfaces also have work. Encounter/mechanism briefs are prepared33; interface integration and M4 variants remain|
143
|33|[Encounter And Mechanism Placement Inventory33](/Hold%20The%20Flood/Encounter%20And%20Mechanism%20Placement%20Inventory)|Closed|Proposed ten encounters INCLUDING two setpieces and13 major mechanisms|9Sep10:32:09 closeout493, final5c1a9ad6|One critique/response plus narrow integration492 complete; stopped ownership returned to Systems. Full variants/tuning and ordinary-interface integration remain|
144
|34|[Player Information And Options34](/Hold%20The%20Flood/Player%20Information%20And%20Options)|Open — submitted499, focused review|Proposed main cues, controls and options; no usability claim|9Sep10:42:21 submission499, 134f2e9f; Lead STOPPED|Draft12:00 (11:15–12:45), reviewed13:00 (12–14), low-medium. Reviewer preauthorized495 after independent criteria and actual submitted source/STOP|
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
145
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
146
## Recent delivery timeline
147
148
These are observed calendar spans from assignment to preparation closeout, including handoffs and review. They are historical measurements, not estimates of labour or promised future turnaround.
149
150
|Outcome|Assigned Sep8|Preparation closed Sep8|Elapsed|
151
|---|---|---|---|
152
|Equipment progression comparison|13:17|13:51|34 minutes|
153
|Three horde creatures|13:51|14:07|16 minutes|
154
|Hospital-story comparison|13:58|14:47|49 minutes|
155
|Resurrection/corruption comparison|14:20|14:38|18 minutes|
156
|Opening comparison|14:40|15:14|34 minutes|
157
|Alien-language interaction|15:06|15:38|32 minutes|
158
159
## Work sequence
160
a410b8 Anonymous 2026-09-08 16:43:32
PM close information package and honor owner Claude token pause
161
|Stream|Now|Next|
162
|---|---|---|
287b77 Anonymous 2026-09-08 19:11:18
Record acquisition closeout, combat roster work and revised coverage
163
|Equipment catalogue|Preparation closed400; final737b3cfd; Acquisition26 prepared434|Use the twelve-part contract and current parent alignment; detailed controller/fixture exceptions remain|
db6396 Anonymous 2026-09-09 10:45:05
PM: resume team, record33 closure and499 submissions; adopt dated F1.14 forecast
164
|Whole-v1 coverage|Fourteen usable first-pass contracts; global death/shifts/connections remains partial|See Coverage for the residual M3 clusters and separate M4 extensions; full scripts/exhaustive variants are not M3 completion gates|
165
|Trap/encounter progression|Traps21/Combat27 and Room32/Encounter33 first passes prepared;33 closed493|Use ten encounters INCLUDING two setpieces and13 major mechanisms; integrate remaining main cues and global continuity; full variants and tuning later|
c715ff Anonymous 2026-09-08 17:54:18
Record trap/handoff closeouts and active save-state design
166
|Development handoff|Preparation closed410; finalc0c38e8b|Keep gates explicit; final handoff packet depends on concrete v1/development scope|
51e8e6 Anonymous 2026-09-08 18:22:41
Record State and Production closeouts, regional review, and aligned v1 scope forecast
167
|Save/content state|Preparation closed417 at18:09:56; final438cdf35|Use explicit continuity interfaces; detailed state work and owner selections remain later|
168
|[Production Scope24](/Hold%20The%20Flood/Production%20Scope)|Preparation closed423 at18:21; finalc1a60388|Use144–247role-hour planning allowance with explicit v1/M4 depth and capacity limits|
16dda9 Anonymous 2026-09-08 18:49:23
Record regional closeout and acquisition review
169
|[Regional Discovery Map25](/Hold%20The%20Flood/Regional%20Discovery%20Map)|Preparation closed426 at18:32; final3acda018|Use both revised orders and explicit evidence/access conditions; finite module/room briefs remain|
287b77 Anonymous 2026-09-08 19:11:18
Record acquisition closeout, combat roster work and revised coverage
170
|[Equipment Acquisition And Rig Growth26](/Hold%20The%20Flood/Equipment%20Acquisition%20And%20Rig%20Growth)|Preparation closed434 at18:57:01; finalf5f6d768; Systems ownership STOPPED|Use prepared acquisition/configuration paths; owner choices and source-fixture detail remain|
bd5466 Anonymous 2026-09-08 19:48:00
Record combat completion, home review and dated milestone forecast
171
|[Combat And Enemy Roster27](/Hold%20The%20Flood/Combat%20And%20Enemy%20Roster)|Preparation closed443 at19:34; finalf1fe0d9a; Systems ownership STOPPED|Use the reviewed roster/state contract; finite placement, cue and recovery detail remains|
fd2d28 Anonymous 2026-09-08 21:27:11
PM F1.13: cast reviewed; room inventory submitted and under review
172
|[Home And Colony Loop28](/Hold%20The%20Flood/Home%20And%20Colony%20Loop)|Preparation closed450 at20:01:12; final5bff3436; Systems ownership STOPPED|Use reviewed return/project availability and property rules; exact interfaces, full cast scene scripts/state variants and management choices remain|
471731 Anonymous 2026-09-08 20:30:17
Record Language29 closeout and Story30 authoring with preauthorised review; forecast F1.11
173
|[Two Language Discovery Map29](/Hold%20The%20Flood/Two%20Language%20Discovery%20Map)|Preparation closed459 at20:23:52; finaldf0f48f5; Systems ownership STOPPED|Use reviewed four-chain evidence/action contract; actual clue/string/room variants and validation remain|
4904fc Anonymous 2026-09-08 20:59:08
Record Story30 closure and Cast31 submission/review; forecast F1.12
174
|[Story And Ending Map30](/Hold%20The%20Flood/Story%20And%20Ending%20Map)|Preparation closed466 at20:42:22; final03c9cb8e; Systems ownership STOPPED|Use reviewed causal/evidence/choice contract; final canon, departure preference and finite state/scene/room details remain|
fd2d28 Anonymous 2026-09-08 21:27:11
PM F1.13: cast reviewed; room inventory submitted and under review
175
|[Cast And Short Rescue Map31](/Hold%20The%20Flood/Cast%20And%20Short%20Rescue%20Map)|Preparation closed473 at21:12:44; final6456406b; Systems ownership STOPPED|Use reviewed five-cast/fifteen-scene first pass and initial D2 participant rule; final cast, scripts, state variants and placements remain|
db6396 Anonymous 2026-09-09 10:45:05
PM: resume team, record33 closure and499 submissions; adopt dated F1.14 forecast
176
|[Station Room And Module Inventory32](/Hold%20The%20Flood/Station%20Room%20And%20Module%20Inventory)|Preparation closed481 at21:44:18; finald4ef2497; Systems STOPPED owner|Use24module/40room hosts and13major-mechanism ledger; preserve compact/current-only constraints and remaining global04 obligations|
177
|[Encounter And Mechanism Placement Inventory33](/Hold%20The%20Flood/Encounter%20And%20Mechanism%20Placement%20Inventory)|Preparation closed493; final5c1a9ad6; Systems ownership STOPPED|Use accepted placed behavior; no second broad review or new population rule inferred|
178
|[Player Information And Options34](/Hold%20The%20Flood/Player%20Information%20And%20Options)|Submitted499 at134f2e9f; Lead STOPPED; Reviewer source read verified|Draft9Sep12:00 (11:15–12:45), reviewed13:00 (12–14)|
c715ff Anonymous 2026-09-08 17:54:18
Record trap/handoff closeouts and active save-state design
179
|Additional proposal intake|Both full pages read; explicitly unadopted|Track authorship and assess protected retreat/next-shift meeting before integrating|
db6396 Anonymous 2026-09-09 10:45:05
PM: resume team, record33 closure and499 submissions; adopt dated F1.14 forecast
180
|Shared integration04|Narrow parent-equipment432, legacy441–443 and home456 slices complete; new [Death Shift And Rescue Continuity](/Hold%20The%20Flood/Death%20Shift%20And%20Rescue%20Continuity) assigned494|Submitted498 atb20454c5; Systems STOPPED. Candidate review then explicit owning-parent alignment; global04 remains open|
181
|Original Claude Lead/Reviewer|Owner resumed both490; pinned identities verified|Both original Claude handoffs delivered; Lead submitted499. Reviewer criteria497 saved before new drafts, with earlier comparison/contract exposure disclosed; one critique per draft is underway|
182
|Additional specialist setup|No extra agent required today; no new sessions created|Technical/production candidate10Sep only for concrete independent handoff scope; optional campaign integration only for an actual gap|
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
183
db6396 Anonymous 2026-09-09 10:45:05
PM: resume team, record33 closure and499 submissions; adopt dated F1.14 forecast
184
The restored team has parallel authorized assignments. Assigned, sent, received, working and submitted remain distinct; a wiki post alone does not establish receiving activity.
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
185
186
## Decisions for the owner
187
188
**Already answered:** opening A and persistent room/group connections across shifts, culminating in connecting the entire station.
189
190
**Open creative question:** should completing the entire connection puzzle finally stabilise the layout, or should rooms keep moving while every established connection survives? PM recommends stabilisation as a reward for mastery. This is a proposed late payoff, not an answer inferred from the opening choice; the team can continue its comparison while it is pending.
191
49369b Anonymous 2026-09-08 16:27:44
PM forecast F1.2: actual outline completion and next scoped deliveries
192
The first-survivor choice is also already with the owner: Yeva, the pressure technician preserving ward measurements (PM recommendation), versus Aster, the supply clerk suspicious of the arrival and requesting one reversible door closure. Neither is selected. Progression, creature, story and corruption alternatives are prepared for later reactions; the owner is not expected to review the whole wiki at once.
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
193
db6396 Anonymous 2026-09-09 10:45:05
PM: resume team, record33 closure and499 submissions; adopt dated F1.14 forecast
194
**Equipment acquisition question now with the owner:** find working parts in station machines, accepting loss of their local function until the part is returned (PM recommendation), or study working examples and spend salvage to fabricate parts aboard. The reviewed acquisition proposal supports this comparison; starting gear, capacity and exact economy remain separate. Independent interface work can continue while the choice is pending.
4904fc Anonymous 2026-09-08 20:59:08
Record Story30 closure and Cast31 submission/review; forecast F1.12
195
196
**New apparent-ending question now with the owner:** show credits and allow continuing from before departure (PM recommendation), or make departure permanently end this save. The question is unanswered; neither continuation behavior nor permanent save closure is adopted. Together with final station-layout behavior, first survivor and equipment acquisition, this makes four pending owner questions.
287b77 Anonymous 2026-09-08 19:11:18
Record acquisition closeout, combat roster work and revised coverage
197
db6396 Anonymous 2026-09-09 10:45:05
PM: resume team, record33 closure and499 submissions; adopt dated F1.14 forecast
198
**New rescue question now with the owner (485):** if the astronaut dies during an eligible short rescue, use a protected retreat that leaves the survivor alive and unsent in the prepared refuge before one shift, with spent supplies still spent and a new short route to find; or allow danger and prepare concrete injury/loss options for a later choice. The proposed protection is new and unselected. No answer is inferred; the earlier four questions remain pending, making five.
199
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
200
## Reporting agreement
201
db6396 Anonymous 2026-09-09 10:45:05
PM: resume team, record33 closure and499 submissions; adopt dated F1.14 forecast
202
PM sends a compact report every15 minutes during authorized active work, plus meaningful completion, disagreement, blocker or decision updates. Owner pause suspends work/check-ins;490 explicitly resumed them. Reports include open/closed preparation counts, actual delivery/activity, next target/range, current v1 forecast and its changes. No page/message count or invented game-completion percentage substitutes for progress. The fallback requires the computer and apps to remain available.