Blame

aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
1
# Hold The Horde — Progress
2
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
3
Updated **15 September**. The owner has chosen **fresh hordes each expedition** and **regular growth through fighting, with larger transformations**. Permanent changes and carried property remain; temporary combat power resets whenever you return home.
6487d5 Anonymous 2026-09-10 15:14:39
Record owner-requested token pause; suspend active forecasts
4
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
5
## Ready to read
6487d5 Anonymous 2026-09-10 15:14:39
Record owner-requested token pause; suspend active forecasts
6
e8f2fb Anonymous 2026-09-15 18:57:43
Close clinical pass; show decision-guide work and forecast F2.33
7
**Nineteen proposal or editorial packages have been completed today.** The latest finished at **18:55 Jerusalem time**: [four places in the hospital](/Hold%20The%20Flood/Station%20Room%20And%20Module%20Inventory#region-2-clinical-exchange-r11r20). Meeting a survivor, fighting or bypassing the ward hall, comparing treatment effects and working around the sample line now have distinct descriptions. A writer is updating Open Decisions to reflect current proposals and unresolved choices. The separate short-rescue choice remains open.
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
8
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
9
Start with [The Game](/Hold%20The%20Flood/The%20Game), continue through [three expeditions into the observation ward](/Hold%20The%20Flood/Expedition%20Proposal), then [Coming Home](/Hold%20The%20Flood/Coming%20Home) and [Discovery in a Changing Station](/Hold%20The%20Flood/Connecting%20The%20Station). For combat, follow [Hordes and Builds](/Hold%20The%20Flood/Hordes%20and%20Builds) into [Three Ways to Break a Horde](/Hold%20The%20Flood/Build%20Comparison).
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
10
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
11
| Completed package | Actual time today | What changed |
12
|---|---|---|
13
| 59–61 — Builds and three expeditions | 12:08 | Different movement and payoff proposals; successive trips pursue different discoveries |
14
| 56–58 — Hospital story and survival | 12:32 | Two possible core mysteries; comparable loadouts with a visible cost for the heavier kit |
15
| 62–63 — Regular growth and renewed combat | 12:45 | An ordinary improvement before a major breakthrough, with crowds and discovery quiet placed along an existing route |
16
| 64–65 — Combat after permanent seals | 13:26 | A second route state retains the seals and shortcut while enemies arrive from a distant open source; room and encounter references agree |
17
| 66–67 — Six main reading pages | 13:26 | Player scenes lead; unfamiliar terms are explained; onward links work; obsolete clearing and growth claims are removed |
c3f7d7 Anonymous 2026-09-15 14:02:52
F2.8: moving scan complete, preservation corrections published, short rescue working
18
| 68 — Moving scan and bridge | 14:01 | A rising fight through Cable Junction leads to a local optical discovery and usable bridge; living returns preserve the shortcut, while changed alignments have a visible rescan route |
74ec6e Anonymous 2026-09-15 14:22:20
F2.10: rescue comparison ready for owner choice; station completion working
19
| 69 — Short rescue and death comparison | 14:20 | A person’s records, a short horde crossing and a homecoming; two unselected failure approaches with explicit protection and retry costs |
27d380 Anonymous 2026-09-15 14:37:26
Link reviewed station-completion alternatives and update forecast F2.12
20
| 70 — Completing the station | 14:36 | The final join secures the last piece of a dependable home; an alternative adds optional departure with the whole station, with its production and story costs explicit |
bc7aa4 Anonymous 2026-09-15 15:02:29
Record reviewed campaign scope and journal next delivery F2.15
21
| 71 — Campaign scope comparison | 14:56 | A 40-room reference versus 36 denser rooms, with named losses and retained work; current mechanism counts aligned and old hour allowances clearly qualified |
e7ba8b Anonymous 2026-09-15 15:08:14
Record accepted journal and active campaign overview F2.16
22
| 72 — Language journal | 15:06 | [Capture, compare and test a reading](/Hold%20The%20Flood/Language%20And%20Journal), with both language examples and the value of old records explained in place |
3f2d87 Anonymous 2026-09-15 15:34:42
Record completed campaign overview and active cast rewrite F2.18
23
| 73 — Whole campaign | 15:26 | [The campaign from docking to deepest discoveries](/Hold%20The%20Flood/Whole%20Game%20Outline), with the horde/build/bridge climax, human consequences and open endings explained |
8d9976 Anonymous 2026-09-15 15:46:03
Record reviewed cast and active equipment reference F2.19
24
| 74 — People and short rescues | 15:44 | [Five people and their fifteen scenes](/Hold%20The%20Flood/Cast%20And%20Short%20Rescue%20Map), with their wishes, disagreements and later changes of belief explained before the shared rules |
615ba5 Anonymous 2026-09-15 16:09:53
Close equipment guide and forecast Receiver Vault expedition F2.21
25
| 75 — Equipment and combinations | 16:05 | [Twelve equipment parts](/Hold%20The%20Flood/Equipment%20Catalogue), introduced through visible behavior and a working build; readiness and installed-part explanations corrected |
5b6e32 Anonymous 2026-09-15 16:34:53
Close reviewed Receiver Vault expedition and forecast enemy-guide review F2.24
26
| 76 — Receiver Vault expedition | 16:30 | [Turn the shelter, break a firing lane and investigate the iris](/Hold%20The%20Flood/Receiver%20Vault%20Expedition); proposed nearer arrival and existing longer route preserve different power choices |
e5ff81 Anonymous 2026-09-15 16:49:17
Record completed enemy guide and divergent upgrade proposal underway
27
| 77 — Enemy guide | 16:46 | [Nine creatures and two horde setpieces](/Hold%20The%20Flood/Combat%20And%20Enemy%20Roster), explained through visible warnings, pressure and responses; rescue and carrying examples corrected |
c2350d Anonymous 2026-09-15 17:27:24
Close the upgrade comparison; record active patient-scene work and delivery forecast F2.27
28
| 78 — Two trips, two different builds | 17:18 | [The same rig takes different earned paths](/Hold%20The%20Flood/Upgrade%20Choices); real declined alternatives, a hybrid, a new reach trade and the cost of a small offer pool |
5fe4f7 Anonymous 2026-09-15 18:07:44
F2.29: patient scene complete; opening rewrite working with independent criteria ready
29
| 79 — A person in the crowd | 17:59 | [Nadi's history and Ivo's memory](/Hold%20The%20Flood/Hospital%20Story%20Directions), with honest crossing evidence, ordinary horde combat and a cheaper record-only alternative |
00dd5c Anonymous 2026-09-15 18:31:16
F2.31: opening complete; four-room hospital pass working with current forecasts
30
| 80 — Your first useful invention | 18:28 | [One Fork, two useful contexts](/Hold%20The%20Flood/First%20Expedition%20Options); optional personal attack/defence control, a station tradeoff and clear arrival/latch explanations |
e8f2fb Anonymous 2026-09-15 18:57:43
Close clinical pass; show decision-guide work and forecast F2.33
31
| 81 — A hospital worth remembering | 18:55 | [Four existing clinical rooms](/Hold%20The%20Flood/Station%20Room%20And%20Module%20Inventory#region-2-clinical-exchange-r11r20), with human purpose and distinct activities; rescue access, shortcut growth and cap persistence clarified |
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
32
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
33
Each package received one focused critique, one response and PM checks. These are completed design proposals, not tested gameplay. The new Ricochet and Gravity controls remain proposed alternatives to the current detailed equipment rules. The two renewed-route examples do not yet cover every shifted layout or combination of permanent seals.
6487d5 Anonymous 2026-09-10 15:14:39
Record owner-requested token pause; suspend active forecasts
34
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
35
## Working now
474440 Anonymous 2026-09-09 13:05:20
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
36
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
37
| Outcome | Owner and current state | Next delivery, Jerusalem time |
38
|---|---|---|
e8f2fb Anonymous 2026-09-15 18:57:43
Close clinical pass; show decision-guide work and forecast F2.33
39
| 82 — A current decision guide | Temporary GPT author working on Open Decisions; independent criteria ready | Draft **21:00**, range **20:00–22:00**; reviewed **22:00**, range **21:00–23:30** |
c3f7d7 Anonymous 2026-09-15 14:02:52
F2.8: moving scan complete, preservation corrections published, short rescue working
40
| 38 — Full-design readiness, still reopened | Outside-edit preservation audit completed; eleven factual/reference corrections published. Supporting readability and broader experience coverage remain | Readiness reassessment with the coherent wiki pass, target **23 September**, range **21–28 September** |
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
41
5b6e32 Anonymous 2026-09-15 16:34:53
Close reviewed Receiver Vault expedition and forecast enemy-guide review F2.24
42
Read the scene in [Hordes and Builds](/Hold%20The%20Flood/Hordes%20and%20Builds), with placement in [Moving Scan Expedition](/Hold%20The%20Flood/Moving%20Scan%20Expedition). Its added rail, viewing bay, bridge and receiver make a fourteenth proposed major mechanism; physical fit and fun remain untested. The new Receiver Vault proposal tackles a different risk: a later expedition must deliver growing power and a horde climax before its quiet discovery. It uses the existing vault rooms, enemies and machinery; the new reward opportunity remains a proposal. Earlier rescue and station-completion comparisons are ready for owner reaction.
1f816c Anonymous 2026-09-10 10:55:46
Record completed discovery/home correction and active combat/build batch
43
e8f2fb Anonymous 2026-09-15 18:57:43
Close clinical pass; show decision-guide work and forecast F2.33
44
The tracker contains **82 outcomes: 78 preparation outcomes closed, 1 current outcome, 1 readiness assessment reopened and 2 parked**. The completed preservation audit and its corrections belong within outcome 38; they do not close overall readiness. These counts are not a percentage of the finished game. Outcomes 39–40 remain parked and unaccepted pending the core corrections.
1f816c Anonymous 2026-09-10 10:55:46
Record completed discovery/home correction and active combat/build batch
45
e8f2fb Anonymous 2026-09-15 18:57:43
Close clinical pass; show decision-guide work and forecast F2.33
46
The messaging directory did not list either original Claude task at **18:49**. A temporary GPT writer is working on the guide, with independent review criteria ready. Systems has completed the hospital pass. This is a messaging observation, not a judgment about the apps' health. No new agent or manual forwarding is needed for this work.
1f816c Anonymous 2026-09-10 10:55:46
Record completed discovery/home correction and active combat/build batch
47
799925 Anonymous 2026-09-15 11:53:48
Align resumed design work and confirmed expedition choices
48
## Delivery forecast
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
49
e8f2fb Anonymous 2026-09-15 18:57:43
Close clinical pass; show decision-guide work and forecast F2.33
50
Forecast **F2.33**, updated 15 September. Dates assume work continues today and about five further active working days for the first full pass.
9c9651 Anonymous 2026-09-09 19:15:21
Record the corrected proposal ready for owner reaction and remaining wiki work
51
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
52
| Milestone | Target | Plausible range | Completion means |
c8ab81 Anonymous 2026-09-10 10:25:09
Continue independent wiki correction and report actual role availability
53
|---|---|---|---|
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
54
| Reviewed sealed-source expedition | **Completed today 13:26** | Earlier than 15:00 target | Proposal, critique, response and integration into its owning references |
55
| Clear six-page reading path | **Completed today 13:26** | Earlier than 16:00 target | Main journey and combat branch revised and checked against current rules |
c3f7d7 Anonymous 2026-09-15 14:02:52
F2.8: moving scan complete, preservation corrections published, short rescue working
56
| Moving-scan proposal | **Delivered 13:39** | Earlier than 14:15 target | Concrete location, rising fight, build climax, discovery and next trip |
57
| Reviewed moving-scan proposal | **Completed 14:01** | Earlier than 15:30 target | One critique, one response and verified integration across six articles |
58
| Outside-edit preservation audit | **Completed 13:47; follow-up corrections 13:52** | Earlier than 14:15 report target | All 58 captured changes inspected with provenance; identified factual/preservation defects corrected |
c097f1 Anonymous 2026-09-15 14:07:33
Rescue draft delivered; single critique working
59
| Short-rescue proposal | **Delivered 14:03** | Earlier than 14:30 target | One personal rescue scene and two comparable failure approaches |
74ec6e Anonymous 2026-09-15 14:22:20
F2.10: rescue comparison ready for owner choice; station completion working
60
| Reviewed short-rescue proposal | **Completed 14:20** | Earlier than 15:15 target | One critique and response; owner comparison published, shared rules await selection |
27d380 Anonymous 2026-09-15 14:37:26
Link reviewed station-completion alternatives and update forecast F2.12
61
| Station-completion comparison | **Completed 14:36** | Earlier than 16:00 target | Two reviewed consequences of the last connection, with the next home visit and expedition |
bc7aa4 Anonymous 2026-09-15 15:02:29
Record reviewed campaign scope and journal next delivery F2.15
62
| Costed campaign comparison | **Completed 14:56** | Earlier than 17:00 target | Named retained, moved and removed experiences; current counts and historical allowance distinguished |
e7ba8b Anonymous 2026-09-15 15:08:14
Record accepted journal and active campaign overview F2.16
63
| Readable language journal | **Completed 15:06** | Earlier than 16:15 target | Existing journal explanation leads with player use and discovery, with current rules preserved through review |
3f2d87 Anonymous 2026-09-15 15:34:42
Record completed campaign overview and active cast rewrite F2.18
64
| Readable campaign overview | **Completed 15:26** | Earlier than 16:00 target | Opening through deeper and optional play shows horde growth, discoveries and people, with current proposals distinguished |
8d9976 Anonymous 2026-09-15 15:46:03
Record reviewed cast and active equipment reference F2.19
65
| Readable cast and rescue map | **Completed 15:44** | Earlier than 17:00 target | Five people and fifteen scenes lead with their choices and changing relationships; current waiting places and unresolved rescue choices remain clear |
615ba5 Anonymous 2026-09-15 16:09:53
Close equipment guide and forecast Receiver Vault expedition F2.21
66
| Readable equipment reference | **Completed 16:05** | Earlier than revised 16:30 target | A reader can picture the twelve parts and their combinations, find actual costs and distinguish current mechanisms from proposed alternatives |
5b6e32 Anonymous 2026-09-15 16:34:53
Close reviewed Receiver Vault expedition and forecast enemy-guide review F2.24
67
| Reviewed Receiver Vault expedition | **Completed 16:30** | Earlier than revised 17:15 target | A complete later expedition, ordinary growth and a major transformation used during the fight, a meaningful climax and a discovery that changes the next trip; one critique and response |
e5ff81 Anonymous 2026-09-15 16:49:17
Record completed enemy guide and divergent upgrade proposal underway
68
| Readable enemy guide | **Completed 16:46** | Earlier than revised 17:15 target | The nine creatures, their horde roles and two setpieces are explained through what the player sees, chooses and overcomes, with actual behaviors retained through review |
c2350d Anonymous 2026-09-15 17:27:24
Close the upgrade comparison; record active patient-scene work and delivery forecast F2.27
69
| Divergent upgrade choices | **Completed 17:18** | Earlier than revised 18:00 target | The same equipment supports two different earned growth paths, a useful hybrid and understandable choices with costs; one critique and response |
5fe4f7 Anonymous 2026-09-15 18:07:44
F2.29: patient scene complete; opening rewrite working with independent criteria ready
70
| A person in the crowd | **Completed 17:59** | Earlier than revised 18:50 target | One existing ward encounter becomes a personal discovery, with an optional home response, a simpler record-only alternative and explicit renewal/content costs |
00dd5c Anonymous 2026-09-15 18:31:16
F2.31: opening complete; four-room hospital pass working with current forecasts
71
| Your first useful invention | **Completed 18:28** | Earlier than revised 19:10 target | A newcomer can picture a useful first equipment discovery, the same part's station tradeoff, crowd pressure, relief and the next human mystery |
e8f2fb Anonymous 2026-09-15 18:57:43
Close clinical pass; show decision-guide work and forecast F2.33
72
| A hospital worth remembering | **Completed 18:55** | Earlier than revised 19:30 target | Four existing [clinical spaces](/Hold%20The%20Flood/Station%20Room%20And%20Module%20Inventory#region-2-clinical-exchange-r11r20) become memorable places of care, crowd pressure and disturbing discovery while preserving their current rules |
e2f6a6 Anonymous 2026-09-15 18:51:18
Record clinical response and current decision-guide work; forecast F2.32
73
| A current decision guide | Today **21:00** draft; **22:00** reviewed | Draft **20:00–22:00**; reviewed **21:00–23:30** | Open Decisions identifies current proposals, confirmed directions and remaining choices, with stale factual claims removed and unresolved objections retained |
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
74
| Coherent revised design wiki | **23 September** | **21–28 September** | Readable core and supporting rules aligned; consequential choices explicit |
75
| Full detailed campaign design | **24 November** | **3 November–22 December** | Proposed progression, content, mysteries, ending paths and production scope developed across the campaign |
49369b Anonymous 2026-09-08 16:27:44
PM forecast F1.2: actual outline completion and next scoped deliveries
76
e8f2fb Anonymous 2026-09-15 18:57:43
Close clinical pass; show decision-guide work and forecast F2.33
77
The decision-guide estimate has moderate-to-low confidence: fourteen overlapping concerns require selective source checks and careful preservation of unresolved choices. The full-wiki estimate has low confidence. The campaign date has very low confidence and remains a planning allowance pending a fresh content estimate. None promises development, validated fun or the desired number of playable hours; those require a separately authorized phase.
dc0998 Anonymous 2026-09-09 19:06:07
Record completed critique, focused response and earlier owner delivery estimate
78
e8f2fb Anonymous 2026-09-15 18:57:43
Close clinical pass; show decision-guide work and forecast F2.33
79
The pre-pause targets were 15 September for the readable wiki and 17 November for detailed campaign design. Five paused calendar days and the outside review's core-loop findings moved those dates. F2.33 records the clinical pass completed at 18:55, ahead of the revised 19:30 target. Its single correction preserved discovery before rescue preparation and introduced the remembered patient through her history. The decision-guide rewrite began at 18:49 alongside that response. The clinical pass addresses rooms that explain machines more clearly than the hospital people lived in. The guide addresses stale claims about missing proposals while preserving criticisms that still apply. The pass adds no room or encounter and must preserve the current combat, rescue, evidence and persistence rules. The optional owner reaction to horde, home and opening experiences remains unanswered. The overall dates remain unchanged because broader experience coverage, supporting clarity and consequential creative choices still need work. Earlier estimates and reasons remain in revision history and the forecast checkpoint.
e3dd63 Anonymous 2026-09-10 12:07:59
Record completed combat/build proposals and active room/information work with revised forecasts
80
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
81
## What still needs work
95a115 Anonymous 2026-09-10 13:59:59
Close build/expedition batch and forecast story/survival work
82
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
83
- Broader expeditions must sustain fresh combat, meaningful growth and different discoveries around persistent changes.
84
- Build combinations need distinct decisions and room for surprising interactions. The new alternatives still need selection and detailed integration.
85
- Rooms, people, languages and story consequences need concrete scenes with emotional and discovery payoffs.
c3f7d7 Anonymous 2026-09-15 14:02:52
F2.8: moving scan complete, preservation corrections published, short rescue working
86
- Supporting pages need the same clarity as the entry path. The captured outside-edit bundle has been audited and its identified factual defects corrected; that preservation check does not establish that every page is easy for a human to read.
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
87
- Full readiness requires a coherent player journey and honest scope, beyond internally consistent tables.
284b2f Anonymous 2026-09-10 11:47:03
Record submitted combat response and explain pending growth-rhythm choice
88
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
89
## Owner choices
284b2f Anonymous 2026-09-10 11:47:03
Record submitted combat response and explain pending growth-rhythm choice
90
74ec6e Anonymous 2026-09-15 14:22:20
F2.10: rescue comparison ready for owner choice; station completion working
91
The two immediate combat questions are answered in the [Owner Brief](/Hold%20The%20Flood/Brief). The current concrete choice is in [Rescue Under Pressure](/Hold%20The%20Flood/Rescue%20Under%20Pressure): if the astronaut dies after Yeva starts crossing the prepared short route, does she finish and reach the ship, or take shelter and require a new attempt after the shift? PM recommends finishing; the stronger failure/retry case and both safety exceptions are explained. The owner has been asked directly; no answer is inferred. The first survivor and wider survivor mortality remain open.
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
92
74ec6e Anonymous 2026-09-15 14:22:20
F2.10: rescue comparison ready for owner choice; station completion working
93
The earlier build-priority question also remains: which direction to deepen first. It does not discard the others or approve every proposed rule.
94
bc7aa4 Anonymous 2026-09-15 15:02:29
Record reviewed campaign scope and journal next delivery F2.15
95
[Completing The Station](/Hold%20The%20Flood/Completing%20The%20Station) is ready to compare: finish securing a dependable home, or add an optional departure carrying the entire place. This is prepared for a subsequent owner choice; the rescue question above remains the current question. The [campaign scope comparison](/Hold%20The%20Flood/Campaign%20Scope%20Choices) is reviewed and ready for subsequent reaction; neither size is selected, and existing story alternatives remain available for reaction. [Open Decisions](/Hold%20The%20Flood/Open%20Decisions) is the wider issue index; its recommendations remain proposals. Its fourteen categories are not fourteen answers needed before work can continue.