2026-09-10 11:47:03
Anonymous:
Record submitted combat response and explain pending growth-rhythm choice
hold the flood/progress.md ..
@@ 18,7 18,7 @@
| Task | Responsible | Status and concrete result | Next estimate |
|---|---|---|---|
| 47 — Spectacular builds and expedition growth | Systems | Correcting the three submitted pages: actual loadouts, spectacular effects and upgrade rules | Response target 12:15, range 12:00–12:45 |
-
| 48 — Ordinary hordes and encounter pressure | Design Lead | Correcting the three submitted pages: crowd rewards, climax, rescue and source closures | Response target 12:15, range 12:00–12:45 |
+
| 48 — Ordinary hordes and encounter pressure | Design Lead | Response submitted at 11:41; PM is checking the actual repairs | Ahead of 12:15 response target |
| 49 — One combined review | Reviewer | Complete at 11:27; PM verified the critique and added source-backed corrections | Closed; no second review |
| Integration, source checks and owner updates | PM | Active: verify source claims and prepare the affected equipment, information, save-state and room references | Reviewed batch target 14:00 |
| 38 — Full design readiness | PM | Reopened after owner feedback | First-pass wiki target 15 September |
@@ 30,6 30,12 @@
Both original Claude tasks are available, automatic handoffs succeeded, and receiving activity was checked. The owner does not need to forward routine messages. No extra permanent agent is needed for this batch.
+
## Current choice for the owner
+
+
Should temporary power grow **regularly during fighting**, with bigger upgrades at major horde milestones, or **only after clearing or sealing a horde**? PM recommends regular growth: for example, two upgrades during a ward fight, then a transformation after its main surge. This gives combat a more continuous rise in power, at the cost of more frequent choices. The current draft uses horde-resolution rewards and remains provisional. Both options reset all temporary upgrades whenever you return home.
+
+
The question was explained directly to the owner; an answer is pending. Equipment, mechanism, rescue, room and readability corrections continue. The 14:00 correction target remains; final growth rules depend on this preference.