Commit e2f6a6

2026-09-15 18:51:18 Anonymous: Record clinical response and current decision-guide work; forecast F2.32
hold the flood/progress.md ..
@@ 4,7 4,7 @@
## Ready to read
- **Eighteen proposal or editorial packages have been completed today.** The latest finished at **18:28 Jerusalem time**: [the first useful invention](/Hold%20The%20Flood/First%20Expedition%20Options). The opening now connects an optional personal Fork use to its station use, restores the warning that makes docking frightening, and explains the shutter latch plainly. Systems is now developing four existing clinical rooms as recognisable hospital places. The separate short-rescue choice remains open.
+ **Eighteen proposal or editorial packages have been completed today.** The latest finished at **18:28 Jerusalem time**: [the first useful invention](/Hold%20The%20Flood/First%20Expedition%20Options). The opening now connects an optional personal Fork use to its station use, restores the warning that makes docking frightening, and explains the shutter latch plainly. The hospital-room draft arrived at 18:39 and completed its independent critique. Systems is making the single correction pass; a second writer is updating Open Decisions to reflect current proposals and unresolved choices. The separate short-rescue choice remains open.
Start with [The Game](/Hold%20The%20Flood/The%20Game), continue through [three expeditions into the observation ward](/Hold%20The%20Flood/Expedition%20Proposal), then [Coming Home](/Hold%20The%20Flood/Coming%20Home) and [Discovery in a Changing Station](/Hold%20The%20Flood/Connecting%20The%20Station). For combat, follow [Hordes and Builds](/Hold%20The%20Flood/Hordes%20and%20Builds) into [Three Ways to Break a Horde](/Hold%20The%20Flood/Build%20Comparison).
@@ 35,18 35,19 @@
| Outcome | Owner and current state | Next delivery, Jerusalem time |
|---|---|---|
- | 81 — A hospital worth remembering | Systems is working; independent review criteria ready | Draft **20:00**, range **19:15–20:45**; reviewed proposal **21:00**, range **20:00–22:00** |
+ | 81 — A hospital worth remembering | Systems is correcting the reviewed draft: rescue access, a human introduction and precise shortcut/cap wording | Draft delivered **18:39**; correction **19:10**, range **19:00–19:45**; reviewed **19:30**, range **19:00–20:15** |
+ | 82 — A current decision guide | Temporary GPT author working on Open Decisions; independent criteria being prepared | Draft **21:00**, range **20:00–22:00**; reviewed **22:00**, range **21:00–23:30** |
| 38 — Full-design readiness, still reopened | Outside-edit preservation audit completed; eleven factual/reference corrections published. Supporting readability and broader experience coverage remain | Readiness reassessment with the coherent wiki pass, target **23 September**, range **21–28 September** |
Read the scene in [Hordes and Builds](/Hold%20The%20Flood/Hordes%20and%20Builds), with placement in [Moving Scan Expedition](/Hold%20The%20Flood/Moving%20Scan%20Expedition). Its added rail, viewing bay, bridge and receiver make a fourteenth proposed major mechanism; physical fit and fun remain untested. The new Receiver Vault proposal tackles a different risk: a later expedition must deliver growing power and a horde climax before its quiet discovery. It uses the existing vault rooms, enemies and machinery; the new reward opportunity remains a proposal. Earlier rescue and station-completion comparisons are ready for owner reaction.
- The tracker contains **81 outcomes: 77 preparation outcomes closed, 1 current design outcome, 1 readiness assessment reopened and 2 parked**. The completed preservation audit and its corrections belong within outcome 38; they do not close overall readiness. These counts are not a percentage of the finished game. Outcomes 39–40 remain parked and unaccepted pending the core corrections.
+ The tracker contains **82 outcomes: 77 preparation outcomes closed, 2 current outcomes, 1 readiness assessment reopened and 2 parked**. The completed preservation audit and its corrections belong within outcome 38; they do not close overall readiness. These counts are not a percentage of the finished game. Outcomes 39–40 remain parked and unaccepted pending the core corrections.
- The messaging directory did not list either original Claude task at **18:24**. Systems and temporary GPT review support cover the current assignment. This is a messaging observation, not a judgment about the apps' health. No new agent or manual forwarding is needed for this work.
+ The messaging directory did not list either original Claude task at **18:49**. Systems and temporary GPT author/review support cover the current assignments. This is a messaging observation, not a judgment about the apps' health. No new agent or manual forwarding is needed for this work.
## Delivery forecast
- Forecast **F2.31**, updated 15 September. Dates assume work continues today and about five further active working days for the first full pass.
+ Forecast **F2.32**, updated 15 September. Dates assume work continues today and about five further active working days for the first full pass.
| Milestone | Target | Plausible range | Completion means |
|---|---|---|---|
@@ 68,13 69,14 @@
| Divergent upgrade choices | **Completed 17:18** | Earlier than revised 18:00 target | The same equipment supports two different earned growth paths, a useful hybrid and understandable choices with costs; one critique and response |
| A person in the crowd | **Completed 17:59** | Earlier than revised 18:50 target | One existing ward encounter becomes a personal discovery, with an optional home response, a simpler record-only alternative and explicit renewal/content costs |
| Your first useful invention | **Completed 18:28** | Earlier than revised 19:10 target | A newcomer can picture a useful first equipment discovery, the same part's station tradeoff, crowd pressure, relief and the next human mystery |
- | A hospital worth remembering | Today **20:00** draft; **21:00** reviewed | Draft **19:15–20:45**; reviewed **20:00–22:00** | Four existing [clinical spaces](/Hold%20The%20Flood/Station%20Room%20And%20Module%20Inventory#region-2-clinical-exchange-r11r20) become memorable places of care, crowd pressure and disturbing discovery while preserving their current rules |
+ | A hospital worth remembering | Draft delivered **18:39**; **19:30** reviewed | Reviewed **19:00–20:15** | Four existing [clinical spaces](/Hold%20The%20Flood/Station%20Room%20And%20Module%20Inventory#region-2-clinical-exchange-r11r20) become memorable places of care, crowd pressure and disturbing discovery while preserving their current rules |
+ | A current decision guide | Today **21:00** draft; **22:00** reviewed | Draft **20:00–22:00**; reviewed **21:00–23:30** | Open Decisions identifies current proposals, confirmed directions and remaining choices, with stale factual claims removed and unresolved objections retained |
| Coherent revised design wiki | **23 September** | **21–28 September** | Readable core and supporting rules aligned; consequential choices explicit |
| Full detailed campaign design | **24 November** | **3 November–22 December** | Proposed progression, content, mysteries, ending paths and production scope developed across the campaign |
- The hospital-place estimate has moderate-to-low confidence: four spaces and their obligations already exist, but making them distinctive without expanding the design needs judgment. The full-wiki estimate has low confidence. The campaign date has very low confidence and remains a planning allowance pending a fresh content estimate. None promises development, validated fun or the desired number of playable hours; those require a separately authorized phase.
+ The hospital estimate has moderate confidence now that the draft and critique are complete. The decision-guide estimate has moderate-to-low confidence: fourteen overlapping concerns require selective source checks and careful preservation of unresolved choices. The full-wiki estimate has low confidence. The campaign date has very low confidence and remains a planning allowance pending a fresh content estimate. None promises development, validated fun or the desired number of playable hours; those require a separately authorized phase.
- The pre-pause targets were 15 September for the readable wiki and 17 November for detailed campaign design. Five paused calendar days and the outside review's core-loop findings moved those dates. F2.31 records the opening completed at 18:28, ahead of the revised 19:10 target. The four-room clinical pass began at 18:29. It addresses an existing gap: the region explains its machines more clearly than the hospital people lived in. The pass adds no room or encounter and must preserve the current combat, rescue, evidence and persistence rules. The optional owner reaction to horde, home and opening experiences remains unanswered. The overall dates remain unchanged because broader experience coverage, supporting clarity and consequential creative choices still need work. Earlier estimates and reasons remain in revision history and the forecast checkpoint.
+ The pre-pause targets were 15 September for the readable wiki and 17 November for detailed campaign design. Five paused calendar days and the outside review's core-loop findings moved those dates. F2.32 records the clinical draft delivered at 18:39 and its single correction started at 18:47, bringing the reviewed target forward from 21:00 to 19:30. The decision-guide rewrite began at 18:49 alongside that response. The clinical pass addresses rooms that explain machines more clearly than the hospital people lived in. The guide addresses stale claims about missing proposals while preserving criticisms that still apply. The pass adds no room or encounter and must preserve the current combat, rescue, evidence and persistence rules. The optional owner reaction to horde, home and opening experiences remains unanswered. The overall dates remain unchanged because broader experience coverage, supporting clarity and consequential creative choices still need work. Earlier estimates and reasons remain in revision history and the forecast checkpoint.
## What still needs work
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9