Commit e5ff81

2026-09-15 16:49:17 Anonymous: Record completed enemy guide and divergent upgrade proposal underway
hold the flood/progress.md ..
@@ 4,7 4,7 @@
## Ready to read
- **Fourteen proposal or editorial packages have been completed today.** The latest finished at **16:30 Jerusalem time**: a later expedition through the Receiver Vault, with a transformation during the horde and a discovery connecting an old hospital record to the astronaut's arrival. The enemy guide is in review. The separate short-rescue choice remains open.
+ **Fifteen proposal or editorial packages have been completed today.** The latest finished at **16:46 Jerusalem time**: the enemy guide explains each creature through the pressure it creates and the choices available to the player. The Receiver Vault expedition is also ready to read. Work has started on two trips using the same equipment but different earned upgrades, including a useful hybrid. The separate short-rescue choice remains open.
Start with [The Game](/Hold%20The%20Flood/The%20Game), continue through [three expeditions into the observation ward](/Hold%20The%20Flood/Expedition%20Proposal), then [Coming Home](/Hold%20The%20Flood/Coming%20Home) and [Discovery in a Changing Station](/Hold%20The%20Flood/Connecting%20The%20Station). For combat, follow [Hordes and Builds](/Hold%20The%20Flood/Hordes%20and%20Builds) into [Three Ways to Break a Horde](/Hold%20The%20Flood/Build%20Comparison).
@@ 24,6 24,7 @@
| 74 — People and short rescues | 15:44 | [Five people and their fifteen scenes](/Hold%20The%20Flood/Cast%20And%20Short%20Rescue%20Map), with their wishes, disagreements and later changes of belief explained before the shared rules |
| 75 — Equipment and combinations | 16:05 | [Twelve equipment parts](/Hold%20The%20Flood/Equipment%20Catalogue), introduced through visible behavior and a working build; readiness and installed-part explanations corrected |
| 76 — Receiver Vault expedition | 16:30 | [Turn the shelter, break a firing lane and investigate the iris](/Hold%20The%20Flood/Receiver%20Vault%20Expedition); proposed nearer arrival and existing longer route preserve different power choices |
+ | 77 — Enemy guide | 16:46 | [Nine creatures and two horde setpieces](/Hold%20The%20Flood/Combat%20And%20Enemy%20Roster), explained through visible warnings, pressure and responses; rescue and carrying examples corrected |
Each package received one focused critique, one response and PM checks. These are completed design proposals, not tested gameplay. The new Ricochet and Gravity controls remain proposed alternatives to the current detailed equipment rules. The two renewed-route examples do not yet cover every shifted layout or combination of permanent seals.
@@ 31,18 32,18 @@
| Outcome | Owner and current state | Next delivery, Jerusalem time |
|---|---|---|
- | 77 — Enemy guide | Draft submitted at 16:26; review complete and one author response working | Draft **delivered 16:26**; reviewed guide **17:15**, range **16:45–18:00** |
+ | 78 — Two trips, two different builds | Design support is writing; independent reviewer is preparing criteria | Draft **18:30**, range **18:15–19:15**; reviewed proposal **19:45**, range **19:00–20:45** |
| 38 — Full-design readiness, still reopened | Outside-edit preservation audit completed; eleven factual/reference corrections published. Supporting readability and broader experience coverage remain | Readiness reassessment with the coherent wiki pass, target **23 September**, range **21–28 September** |
Read the scene in [Hordes and Builds](/Hold%20The%20Flood/Hordes%20and%20Builds), with placement in [Moving Scan Expedition](/Hold%20The%20Flood/Moving%20Scan%20Expedition). Its added rail, viewing bay, bridge and receiver make a fourteenth proposed major mechanism; physical fit and fun remain untested. The new Receiver Vault proposal tackles a different risk: a later expedition must deliver growing power and a horde climax before its quiet discovery. It uses the existing vault rooms, enemies and machinery; the new reward opportunity remains a proposal. Earlier rescue and station-completion comparisons are ready for owner reaction.
- The tracker contains **77 outcomes: 73 preparation outcomes closed, 1 current design outcome, 1 readiness assessment reopened and 2 parked**. The completed preservation audit and its corrections belong within outcome 38; they do not close overall readiness. These counts are not a percentage of the finished game. Outcomes 39–40 remain parked and unaccepted pending the core corrections.
+ The tracker contains **78 outcomes: 74 preparation outcomes closed, 1 current design outcome, 1 readiness assessment reopened and 2 parked**. The completed preservation audit and its corrections belong within outcome 38; they do not close overall readiness. These counts are not a percentage of the finished game. Outcomes 39–40 remain parked and unaccepted pending the core corrections.
The original Claude Reviewer received the earlier assignment automatically but stopped at a monthly spend limit at 13:03. Temporary GPT support completed that review. The Lead was absent from the same directory check; availability will be checked again before a future handoff. No new permanent agent or manual message forwarding is needed for the current assignments.
## Delivery forecast
- Forecast **F2.24**, updated 15 September. Dates assume work continues today and about five further active working days for the first full pass.
+ Forecast **F2.25**, updated 15 September. Dates assume work continues today and about five further active working days for the first full pass.
| Milestone | Target | Plausible range | Completion means |
|---|---|---|---|
@@ 60,13 61,14 @@
| Readable cast and rescue map | **Completed 15:44** | Earlier than 17:00 target | Five people and fifteen scenes lead with their choices and changing relationships; current waiting places and unresolved rescue choices remain clear |
| Readable equipment reference | **Completed 16:05** | Earlier than revised 16:30 target | A reader can picture the twelve parts and their combinations, find actual costs and distinguish current mechanisms from proposed alternatives |
| Reviewed Receiver Vault expedition | **Completed 16:30** | Earlier than revised 17:15 target | A complete later expedition, ordinary growth and a major transformation used during the fight, a meaningful climax and a discovery that changes the next trip; one critique and response |
- | Readable enemy guide | Today **17:15** | **16:45–18:00** | The nine creatures, their horde roles and two setpieces are explained through what the player sees, chooses and overcomes, with actual behaviors retained through review |
+ | Readable enemy guide | **Completed 16:46** | Earlier than revised 17:15 target | The nine creatures, their horde roles and two setpieces are explained through what the player sees, chooses and overcomes, with actual behaviors retained through review |
+ | Divergent upgrade choices | Today **18:30** draft; **19:45** reviewed | Draft **18:15–19:15**; reviewed **19:00–20:45** | The same equipment supports two different earned growth paths, a useful hybrid and understandable choices with costs; one critique and response |
| Coherent revised design wiki | **23 September** | **21–28 September** | Readable core and supporting rules aligned; consequential choices explicit |
| Full detailed campaign design | **24 November** | **3 November–22 December** | Proposed progression, content, mysteries, ending paths and production scope developed across the campaign |
- Near-term estimates have moderate confidence. The full-wiki estimate has low confidence. The campaign date has very low confidence and remains a planning allowance pending a fresh content estimate. None promises development, validated fun or the desired number of playable hours; those require a separately authorized phase.
+ The new upgrade-choice estimate has moderate-to-low confidence because compatibility may expose a mechanical limitation. Other near-term estimates have moderate confidence. The full-wiki estimate has low confidence. The campaign date has very low confidence and remains a planning allowance pending a fresh content estimate. None promises development, validated fun or the desired number of playable hours; those require a separately authorized phase.
- The pre-pause targets were 15 September for the readable wiki and 17 November for detailed campaign design. Five paused calendar days and the outside review's core-loop findings moved those dates. F2.24 records the equipment guide completed at 16:05 and the Receiver Vault expedition at 16:30. The enemy-guide draft arrived at 16:26, ahead of its 17:15 target, so its reviewed target moves from 18:00 to 17:15. The overall dates remain unchanged because broader experience coverage, supporting clarity and consequential creative choices still need work. Earlier estimates and reasons remain in revision history and the forecast checkpoint.
+ The pre-pause targets were 15 September for the readable wiki and 17 November for detailed campaign design. Five paused calendar days and the outside review's core-loop findings moved those dates. F2.25 records the enemy guide completed at 16:46, ahead of its revised 17:15 target. The next proposal began at 16:47 and addresses repeated upgrade choices, where the existing examples mostly follow fixed paths. Allow 90–150 minutes for the draft and 45–90 minutes for critique, response and integration. The overall dates remain unchanged because broader experience coverage, supporting clarity and consequential creative choices still need work. Earlier estimates and reasons remain in revision history and the forecast checkpoint.
## What still needs work
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9