F2.31: opening complete; four-room hospital pass working with current forecasts
hold the flood/progress.md ..
@@ 4,7 4,7 @@
## Ready to read
-
**Seventeen proposal or editorial packages have been completed today.** The latest finished at **17:59 Jerusalem time**: [recognising a former patient inside a horde](/Hold%20The%20Flood/Hospital%20Story%20Directions), with evidence-based knowledge and an optional conversation with Ivo. The opening rewrite was submitted at **18:10** and completed independent review at **18:17**. Systems is making one correction to the arrival context and shutter-latch explanation. The separate short-rescue choice remains open.
+
**Eighteen proposal or editorial packages have been completed today.** The latest finished at **18:28 Jerusalem time**: [the first useful invention](/Hold%20The%20Flood/First%20Expedition%20Options). The opening now connects an optional personal Fork use to its station use, restores the warning that makes docking frightening, and explains the shutter latch plainly. Systems is now developing four existing clinical rooms as recognisable hospital places. The separate short-rescue choice remains open.
Start with [The Game](/Hold%20The%20Flood/The%20Game), continue through [three expeditions into the observation ward](/Hold%20The%20Flood/Expedition%20Proposal), then [Coming Home](/Hold%20The%20Flood/Coming%20Home) and [Discovery in a Changing Station](/Hold%20The%20Flood/Connecting%20The%20Station). For combat, follow [Hordes and Builds](/Hold%20The%20Flood/Hordes%20and%20Builds) into [Three Ways to Break a Horde](/Hold%20The%20Flood/Build%20Comparison).
@@ 27,6 27,7 @@
| 77 — Enemy guide | 16:46 | [Nine creatures and two horde setpieces](/Hold%20The%20Flood/Combat%20And%20Enemy%20Roster), explained through visible warnings, pressure and responses; rescue and carrying examples corrected |
| 78 — Two trips, two different builds | 17:18 | [The same rig takes different earned paths](/Hold%20The%20Flood/Upgrade%20Choices); real declined alternatives, a hybrid, a new reach trade and the cost of a small offer pool |
| 79 — A person in the crowd | 17:59 | [Nadi's history and Ivo's memory](/Hold%20The%20Flood/Hospital%20Story%20Directions), with honest crossing evidence, ordinary horde combat and a cheaper record-only alternative |
+
| 80 — Your first useful invention | 18:28 | [One Fork, two useful contexts](/Hold%20The%20Flood/First%20Expedition%20Options); optional personal attack/defence control, a station tradeoff and clear arrival/latch explanations |
Each package received one focused critique, one response and PM checks. These are completed design proposals, not tested gameplay. The new Ricochet and Gravity controls remain proposed alternatives to the current detailed equipment rules. The two renewed-route examples do not yet cover every shifted layout or combination of permanent seals.
@@ 34,18 35,18 @@
| Outcome | Owner and current state | Next delivery, Jerusalem time |
|---|---|---|
-
| 80 — Your first useful invention | Systems is making one correction; independent critique complete | Correction **18:40**, range **18:30–19:00**; reviewed proposal **19:10**, range **18:45–19:40** |
+
| 81 — A hospital worth remembering | Systems is working; independent reviewer preparing criteria | Draft **20:00**, range **19:15–20:45**; reviewed proposal **21:00**, range **20:00–22:00** |
| 38 — Full-design readiness, still reopened | Outside-edit preservation audit completed; eleven factual/reference corrections published. Supporting readability and broader experience coverage remain | Readiness reassessment with the coherent wiki pass, target **23 September**, range **21–28 September** |
Read the scene in [Hordes and Builds](/Hold%20The%20Flood/Hordes%20and%20Builds), with placement in [Moving Scan Expedition](/Hold%20The%20Flood/Moving%20Scan%20Expedition). Its added rail, viewing bay, bridge and receiver make a fourteenth proposed major mechanism; physical fit and fun remain untested. The new Receiver Vault proposal tackles a different risk: a later expedition must deliver growing power and a horde climax before its quiet discovery. It uses the existing vault rooms, enemies and machinery; the new reward opportunity remains a proposal. Earlier rescue and station-completion comparisons are ready for owner reaction.
-
The tracker contains **80 outcomes: 76 preparation outcomes closed, 1 current design outcome, 1 readiness assessment reopened and 2 parked**. The completed preservation audit and its corrections belong within outcome 38; they do not close overall readiness. These counts are not a percentage of the finished game. Outcomes 39–40 remain parked and unaccepted pending the core corrections.
+
The tracker contains **81 outcomes: 77 preparation outcomes closed, 1 current design outcome, 1 readiness assessment reopened and 2 parked**. The completed preservation audit and its corrections belong within outcome 38; they do not close overall readiness. These counts are not a percentage of the finished game. Outcomes 39–40 remain parked and unaccepted pending the core corrections.
-
The original Claude Reviewer received the earlier assignment automatically but stopped at a monthly spend limit at 13:03. Temporary GPT support completed that review. The Lead was absent from the same directory check; availability will be checked again before a future handoff. No new permanent agent or manual message forwarding is needed for the current assignments.
+
The messaging directory did not list either original Claude task at **18:24**. Systems and temporary GPT review support cover the current assignment. This is a messaging observation, not a judgment about the apps' health. No new agent or manual forwarding is needed for this work.
## Delivery forecast
-
Forecast **F2.30**, updated 15 September. Dates assume work continues today and about five further active working days for the first full pass.
+
Forecast **F2.31**, updated 15 September. Dates assume work continues today and about five further active working days for the first full pass.
| Milestone | Target | Plausible range | Completion means |
|---|---|---|---|
@@ 66,13 67,14 @@
| Readable enemy guide | **Completed 16:46** | Earlier than revised 17:15 target | The nine creatures, their horde roles and two setpieces are explained through what the player sees, chooses and overcomes, with actual behaviors retained through review |
| Divergent upgrade choices | **Completed 17:18** | Earlier than revised 18:00 target | The same equipment supports two different earned growth paths, a useful hybrid and understandable choices with costs; one critique and response |
| A person in the crowd | **Completed 17:59** | Earlier than revised 18:50 target | One existing ward encounter becomes a personal discovery, with an optional home response, a simpler record-only alternative and explicit renewal/content costs |
-
| Your first useful invention | Draft **delivered 18:10**; **19:10** reviewed | Earlier than 19:15 draft target; reviewed **18:45–19:40** | A newcomer can picture a useful first equipment discovery, the same part's station tradeoff, crowd pressure, relief and the next human mystery |
+
| Your first useful invention | **Completed 18:28** | Earlier than revised 19:10 target | A newcomer can picture a useful first equipment discovery, the same part's station tradeoff, crowd pressure, relief and the next human mystery |
+
| A hospital worth remembering | Today **20:00** draft; **21:00** reviewed | Draft **19:15–20:45**; reviewed **20:00–22:00** | Four existing [clinical spaces](/Hold%20The%20Flood/Station%20Room%20And%20Module%20Inventory#region-2-clinical-exchange-r11r20) become memorable places of care, crowd pressure and disturbing discovery while preserving their current rules |
| Full detailed campaign design | **24 November** | **3 November–22 December** | Proposed progression, content, mysteries, ending paths and production scope developed across the campaign |
-
The opening estimate has moderate confidence: the draft and critique are complete, with two reader-facing corrections and final integration remaining. The full-wiki estimate has low confidence. The campaign date has very low confidence and remains a planning allowance pending a fresh content estimate. None promises development, validated fun or the desired number of playable hours; those require a separately authorized phase.
+
The hospital-place estimate has moderate-to-low confidence: four spaces and their obligations already exist, but making them distinctive without expanding the design needs judgment. The full-wiki estimate has low confidence. The campaign date has very low confidence and remains a planning allowance pending a fresh content estimate. None promises development, validated fun or the desired number of playable hours; those require a separately authorized phase.
-
The pre-pause targets were 15 September for the readable wiki and 17 November for detailed campaign design. Five paused calendar days and the outside review's core-loop findings moved those dates. F2.30 records the opening draft delivered at 18:10, ahead of 19:15, and its independent critique completed at 18:17. The reviewed target moves from 20:15 to 19:10 to allow one correction and final integration. The personal Fork use and station tradeoff are clearer; the response restores the forced arrival despite the stay-away warning and explains the physical shutter latch without internal codes or editing history. The optional owner reaction to horde, home and opening experiences remains unanswered. The overall dates remain unchanged because broader experience coverage, supporting clarity and consequential creative choices still need work. Earlier estimates and reasons remain in revision history and the forecast checkpoint.
+
The pre-pause targets were 15 September for the readable wiki and 17 November for detailed campaign design. Five paused calendar days and the outside review's core-loop findings moved those dates. F2.31 records the opening completed at 18:28, ahead of the revised 19:10 target. The four-room clinical pass began at 18:29. It addresses an existing gap: the region explains its machines more clearly than the hospital people lived in. The pass adds no room or encounter and must preserve the current combat, rescue, evidence and persistence rules. The optional owner reaction to horde, home and opening experiences remains unanswered. The overall dates remain unchanged because broader experience coverage, supporting clarity and consequential creative choices still need work. Earlier estimates and reasons remain in revision history and the forecast checkpoint.