Commit 27d380

2026-09-15 14:37:26 Anonymous: Link reviewed station-completion alternatives and update forecast F2.12
hold the flood/progress.md ..
@@ 4,7 4,7 @@
## Ready to read
- **Seven proposal packages have been completed today.** The latest finished at **14:20 Jerusalem time**: a short rescue scene and two explicit death outcomes, ready for the owner’s choice.
+ **Eight proposal packages have been completed today.** The latest finished at **14:36 Jerusalem time**: two possible payoffs for completing the entire station, ready for owner reaction. The separate short-rescue choice remains open.
Start with [The Game](/Hold%20The%20Flood/The%20Game), continue through [three expeditions into the observation ward](/Hold%20The%20Flood/Expedition%20Proposal), then [Coming Home](/Hold%20The%20Flood/Coming%20Home) and [Discovery in a Changing Station](/Hold%20The%20Flood/Connecting%20The%20Station). For combat, follow [Hordes and Builds](/Hold%20The%20Flood/Hordes%20and%20Builds) into [Three Ways to Break a Horde](/Hold%20The%20Flood/Build%20Comparison).
@@ 17,6 17,7 @@
| 66–67 — Six main reading pages | 13:26 | Player scenes lead; unfamiliar terms are explained; onward links work; obsolete clearing and growth claims are removed |
| 68 — Moving scan and bridge | 14:01 | A rising fight through Cable Junction leads to a local optical discovery and usable bridge; living returns preserve the shortcut, while changed alignments have a visible rescan route |
| 69 — Short rescue and death comparison | 14:20 | A person’s records, a short horde crossing and a homecoming; two unselected failure approaches with explicit protection and retry costs |
+ | 70 — Completing the station | 14:36 | The final join secures the last piece of a dependable home; an alternative adds optional departure with the whole station, with its production and story costs explicit |
Each package received one focused critique, one response and PM checks. These are completed design proposals, not tested gameplay. The new Ricochet and Gravity controls remain proposed alternatives to the current detailed equipment rules. The two renewed-route examples do not yet cover every shifted layout or combination of permanent seals.
@@ 24,19 25,18 @@
| Outcome | Owner and current state | Next delivery, Jerusalem time |
|---|---|---|
- | 70 — Completing the station | Draft delivered **14:23**, single critique complete; author is clarifying what the final join adds beyond earlier joins | Response **14:50**, range **14:40–15:10**; reviewed comparison **16:00**, range **15:15–17:00** |
- | 71 — Campaign scope choices | Systems has begun a current-inventory versus concentrated-campaign comparison; independent review preparation assigned | Draft **16:00**, range **15:15–17:00**; reviewed comparison **17:00**, range **16:00–18:30** |
+ | 71 — Campaign scope choices | Systems is preparing the current-inventory versus concentrated-campaign comparison; reviewer criteria are ready | Draft **16:00**, range **15:15–17:00**; reviewed comparison **17:00**, range **16:00–18:30** |
| 38 — Full-design readiness, still reopened | Outside-edit preservation audit completed; eleven factual/reference corrections published. Supporting readability and broader experience coverage remain | Readiness reassessment with the coherent wiki pass, target **23 September**, range **21–28 September** |
Read the scene in [Hordes and Builds](/Hold%20The%20Flood/Hordes%20and%20Builds), with placement in [Moving Scan Expedition](/Hold%20The%20Flood/Moving%20Scan%20Expedition). Its added rail, viewing bay, bridge and receiver make a fourteenth proposed major mechanism; physical fit and fun remain untested. The current proposals tackle two experience risks: making a short rescue feel like helping a person, and making the final station connection produce a lasting, perceptible payoff.
- The tracker contains **71 outcomes: 66 preparation outcomes closed, 2 current design outcomes, 1 readiness assessment reopened and 2 parked**. The completed preservation audit and its corrections belong within outcome 38; they do not close overall readiness. These counts are not a percentage of the finished game. Outcomes 39–40 remain parked and unaccepted pending the core corrections.
+ The tracker contains **71 outcomes: 67 preparation outcomes closed, 1 current design outcome, 1 readiness assessment reopened and 2 parked**. The completed preservation audit and its corrections belong within outcome 38; they do not close overall readiness. These counts are not a percentage of the finished game. Outcomes 39–40 remain parked and unaccepted pending the core corrections.
The original Claude Reviewer received the earlier assignment automatically but stopped at a monthly spend limit at 13:03. Temporary GPT support completed that review. The Lead was absent from the same directory check; availability will be checked again before a future handoff. No new permanent agent or manual message forwarding is needed for the current assignments.
## Delivery forecast
- Forecast **F2.11**, updated 15 September. Dates assume work continues today and about five further active working days for the first full pass.
+ Forecast **F2.12**, updated 15 September. Dates assume work continues today and about five further active working days for the first full pass.
| Milestone | Target | Plausible range | Completion means |
|---|---|---|---|
@@ 47,14 47,14 @@
| Outside-edit preservation audit | **Completed 13:47; follow-up corrections 13:52** | Earlier than 14:15 report target | All 58 captured changes inspected with provenance; identified factual/preservation defects corrected |
| Short-rescue proposal | **Delivered 14:03** | Earlier than 14:30 target | One personal rescue scene and two comparable failure approaches |
| Reviewed short-rescue proposal | **Completed 14:20** | Earlier than 15:15 target | One critique and response; owner comparison published, shared rules await selection |
- | Station-completion comparison | Today **16:00** | **15:15–17:00** | Two reviewed consequences of the last connection, with the next home visit and expedition |
+ | Station-completion comparison | **Completed 14:36** | Earlier than 16:00 target | Two reviewed consequences of the last connection, with the next home visit and expedition |
| Costed campaign comparison | Today **17:00** | **16:00–18:30** | Named retained, moved and removed experiences, production deltas and honest authoring assumptions |
| Coherent revised design wiki | **23 September** | **21–28 September** | Readable core and supporting rules aligned; consequential choices explicit |
| Full detailed campaign design | **24 November** | **3 November–22 December** | Proposed progression, content, mysteries, ending paths and production scope developed across the campaign |
Near-term estimates have moderate confidence. The full-wiki estimate has low confidence. The campaign date has very low confidence and remains a planning allowance pending a fresh content estimate. None promises development, validated fun or the desired number of playable hours; those require a separately authorized phase.
- The pre-pause targets were 15 September for the readable wiki and 17 November for detailed campaign design. Five paused calendar days and the outside review's core-loop findings moved those dates. Today's first packet finished at 12:08 against a revised 13:00 target; subsequent packages finished at 12:32, 12:45 and 13:26. F2.11 records the station-completion draft at 14:23 and its one focused response, and starts the costed campaign comparison. The rescue comparison was completed at 14:20. The moving scan and preservation audit are complete. The overall dates remain unchanged because supporting design and creative choices still need work. Earlier estimates remain in revision history and the forecast checkpoint.
+ The pre-pause targets were 15 September for the readable wiki and 17 November for detailed campaign design. Five paused calendar days and the outside review's core-loop findings moved those dates. Today's first packet finished at 12:08 against a revised 13:00 target; subsequent packages finished at 12:32, 12:45 and 13:26. F2.12 records the station-completion comparison finished at 14:36 and the costed campaign comparison in progress. The rescue comparison was completed at 14:20. The moving scan and preservation audit are complete. The overall dates remain unchanged because supporting design and creative choices still need work. Earlier estimates remain in revision history and the forecast checkpoint.
## What still needs work
@@ 70,4 70,4 @@
The earlier build-priority question also remains: which direction to deepen first. It does not discard the others or approve every proposed rule.
- PM is preparing the effect of completing the station connection and a costed scope proposal; existing story alternatives remain available for reaction. [Open Decisions](/Hold%20The%20Flood/Open%20Decisions) is the wider issue index; its recommendations remain proposals. Its fourteen categories are not fourteen answers needed before work can continue.
+ [Completing The Station](/Hold%20The%20Flood/Completing%20The%20Station) is ready to compare: finish securing a dependable home, or add an optional departure carrying the entire place. This is prepared for a subsequent owner choice; the rescue question above remains the current question. The costed scope proposal is in progress, and existing story alternatives remain available for reaction. [Open Decisions](/Hold%20The%20Flood/Open%20Decisions) is the wider issue index; its recommendations remain proposals. Its fourteen categories are not fourteen answers needed before work can continue.
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9