Commit 8d9976

2026-09-15 15:46:03 Anonymous: Record reviewed cast and active equipment reference F2.19
hold the flood/progress.md ..
@@ 4,7 4,7 @@
## Ready to read
- **Eleven proposal or editorial packages have been completed today.** The latest finished at **15:26 Jerusalem time**: a readable campaign journey with visible horde scale, discovery payoffs and accurate return rules. The separate short-rescue choice remains open.
+ **Twelve proposal or editorial packages have been completed today.** The latest finished at **15:44 Jerusalem time**: five readable survivor portraits and their fifteen scenes, with a rescue-retry inconsistency corrected. The separate short-rescue choice remains open.
Start with [The Game](/Hold%20The%20Flood/The%20Game), continue through [three expeditions into the observation ward](/Hold%20The%20Flood/Expedition%20Proposal), then [Coming Home](/Hold%20The%20Flood/Coming%20Home) and [Discovery in a Changing Station](/Hold%20The%20Flood/Connecting%20The%20Station). For combat, follow [Hordes and Builds](/Hold%20The%20Flood/Hordes%20and%20Builds) into [Three Ways to Break a Horde](/Hold%20The%20Flood/Build%20Comparison).
@@ 21,6 21,7 @@
| 71 — Campaign scope comparison | 14:56 | A 40-room reference versus 36 denser rooms, with named losses and retained work; current mechanism counts aligned and old hour allowances clearly qualified |
| 72 — Language journal | 15:06 | [Capture, compare and test a reading](/Hold%20The%20Flood/Language%20And%20Journal), with both language examples and the value of old records explained in place |
| 73 — Whole campaign | 15:26 | [The campaign from docking to deepest discoveries](/Hold%20The%20Flood/Whole%20Game%20Outline), with the horde/build/bridge climax, human consequences and open endings explained |
+ | 74 — People and short rescues | 15:44 | [Five people and their fifteen scenes](/Hold%20The%20Flood/Cast%20And%20Short%20Rescue%20Map), with their wishes, disagreements and later changes of belief explained before the shared rules |
Each package received one focused critique, one response and PM checks. These are completed design proposals, not tested gameplay. The new Ricochet and Gravity controls remain proposed alternatives to the current detailed equipment rules. The two renewed-route examples do not yet cover every shifted layout or combination of permanent seals.
@@ 28,18 29,18 @@
| Outcome | Owner and current state | Next delivery, Jerusalem time |
|---|---|---|
- | 74 — People and short rescues | Draft submitted at 15:31; its independent reviewer is checking the people, fifteen scenes and ordinary-abort correction | Draft **delivered 15:31**; reviewed page **17:00**, range **16:20–18:00** |
+ | 75 — Equipment reference | Systems is rewriting the twelve-part catalogue around visible behavior, useful combinations and meaningful carrying choices. Its reviewer has saved independent criteria and is ready for the submitted page | Draft **16:30**, range **16:00–17:15**; reviewed page **17:30**, range **16:45–18:30** |
| 38 — Full-design readiness, still reopened | Outside-edit preservation audit completed; eleven factual/reference corrections published. Supporting readability and broader experience coverage remain | Readiness reassessment with the coherent wiki pass, target **23 September**, range **21–28 September** |
Read the scene in [Hordes and Builds](/Hold%20The%20Flood/Hordes%20and%20Builds), with placement in [Moving Scan Expedition](/Hold%20The%20Flood/Moving%20Scan%20Expedition). Its added rail, viewing bay, bridge and receiver make a fourteenth proposed major mechanism; physical fit and fun remain untested. The current proposals tackle two experience risks: making a short rescue feel like helping a person, and making the final station connection produce a lasting, perceptible payoff.
- The tracker contains **74 outcomes: 70 preparation outcomes closed, 1 current design outcome, 1 readiness assessment reopened and 2 parked**. The completed preservation audit and its corrections belong within outcome 38; they do not close overall readiness. These counts are not a percentage of the finished game. Outcomes 39–40 remain parked and unaccepted pending the core corrections.
+ The tracker contains **75 outcomes: 71 preparation outcomes closed, 1 current design outcome, 1 readiness assessment reopened and 2 parked**. The completed preservation audit and its corrections belong within outcome 38; they do not close overall readiness. These counts are not a percentage of the finished game. Outcomes 39–40 remain parked and unaccepted pending the core corrections.
The original Claude Reviewer received the earlier assignment automatically but stopped at a monthly spend limit at 13:03. Temporary GPT support completed that review. The Lead was absent from the same directory check; availability will be checked again before a future handoff. No new permanent agent or manual message forwarding is needed for the current assignments.
## Delivery forecast
- Forecast **F2.18**, updated 15 September. Dates assume work continues today and about five further active working days for the first full pass.
+ Forecast **F2.19**, updated 15 September. Dates assume work continues today and about five further active working days for the first full pass.
| Milestone | Target | Plausible range | Completion means |
|---|---|---|---|
@@ 54,13 55,14 @@
| Costed campaign comparison | **Completed 14:56** | Earlier than 17:00 target | Named retained, moved and removed experiences; current counts and historical allowance distinguished |
| Readable language journal | **Completed 15:06** | Earlier than 16:15 target | Existing journal explanation leads with player use and discovery, with current rules preserved through review |
| Readable campaign overview | **Completed 15:26** | Earlier than 16:00 target | Opening through deeper and optional play shows horde growth, discoveries and people, with current proposals distinguished |
- | Readable cast and rescue map | Today **17:00** | **16:20–18:00** | Five people and fifteen scenes lead with their choices and changing relationships; existing conditions and unresolved rescue choices remain clear |
+ | Readable cast and rescue map | **Completed 15:44** | Earlier than 17:00 target | Five people and fifteen scenes lead with their choices and changing relationships; current waiting places and unresolved rescue choices remain clear |
+ | Readable equipment reference | Today **17:30** | **16:45–18:30** | A reader can picture the twelve parts and their combinations, find actual costs and distinguish current mechanisms from proposed alternatives |
| Coherent revised design wiki | **23 September** | **21–28 September** | Readable core and supporting rules aligned; consequential choices explicit |
| Full detailed campaign design | **24 November** | **3 November–22 December** | Proposed progression, content, mysteries, ending paths and production scope developed across the campaign |
Near-term estimates have moderate confidence. The full-wiki estimate has low confidence. The campaign date has very low confidence and remains a planning allowance pending a fresh content estimate. None promises development, validated fun or the desired number of playable hours; those require a separately authorized phase.
- The pre-pause targets were 15 September for the readable wiki and 17 November for detailed campaign design. Five paused calendar days and the outside review's core-loop findings moved those dates. Today's first packet finished at 12:08 against a revised 13:00 target; subsequent packages finished at 12:32, 12:45 and 13:26. F2.18 records the campaign overview completed at 15:26 and the cast draft submitted at 15:31, now in review. The home-loop page also now correctly says that either return brings fresh hordes next expedition. The journal finished at 15:06. The reviewed scope comparison and factual reference alignment finished at 14:56. The station-completion comparison finished at 14:36. The rescue comparison was completed at 14:20. The moving scan and preservation audit are complete. The overall dates remain unchanged because supporting design and creative choices still need work. Earlier estimates remain in revision history and the forecast checkpoint.
+ The pre-pause targets were 15 September for the readable wiki and 17 November for detailed campaign design. Five paused calendar days and the outside review's core-loop findings moved those dates. Today's first packet finished at 12:08 against a revised 13:00 target; subsequent packages finished at 12:32, 12:45 and 13:26. F2.19 records the campaign overview completed at 15:26 and the cast page at 15:44. The equipment reference is now being rewritten; its review target is 17:30. The cast review found that death before a rescue retry must preserve the current shelter, and the relevant pages now agree. The home-loop page also now correctly says that either return brings fresh hordes next expedition. The journal finished at 15:06. The reviewed scope comparison and factual reference alignment finished at 14:56. The station-completion comparison finished at 14:36. The rescue comparison was completed at 14:20. The moving scan and preservation audit are complete. The overall dates remain unchanged because supporting design and creative choices still need work. Earlier estimates remain in revision history and the forecast checkpoint.
## What still needs work
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9