Blame

aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
1
# Hold The Horde — Progress
2
4904fc Anonymous 2026-09-08 20:59:08
Record Story30 closure and Cast31 submission/review; forecast F1.12
3
**Updated 2026-09-08 20:55 Jerusalem (UTC+3).** PM and GPT work continues; only the two Claude roles are paused. All work remains **design only**.
94064a Anonymous 2026-09-08 20:39:06
Record verified Story30 author-response handoff464; retain dated draft snapshot
4
4904fc Anonymous 2026-09-08 20:59:08
Record Story30 closure and Cast31 submission/review; forecast F1.12
5
**31 tracked design packages: 29 preparation-closed, 2 open.** Story And Ending Map30 closed466 at20:42:22 Jerusalem, final03c9cb8e. Cast And Short Rescue Map31 was submitted470 at20:53:50, sourceadb7b4a4; Systems is STOPPED and the one pre-authorized review is proceeding under469. Narrow parent-equipment432, legacy Discovery/Expedition441–443 and home-parent456 compatibility are complete;04 remains open for global shift/rescue/full-station rules, their integration and pending owner choices. The separate coverage map and unadopted intake407 contributions are not extra completed packages. These are bounded written outcomes, not overall game completion.
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
6
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
7
“Closed” means the bounded written design/review outcome is complete. It does not mean a feature is implemented, every detail approved or fun validated. This board covers the current design batch; it is not a complete campaign or production backlog, and the closed/total ratio is not an overall game-completion percentage. Stable IDs stay fixed; added/reopened work must be recorded explicitly.
8
4904fc Anonymous 2026-09-08 20:59:08
Record Story30 closure and Cast31 submission/review; forecast F1.12
9
**Availability correction —8 Sep:** only Claude is paused. PM and the existing GPT Systems designer continue useful work with bounded independent GPT reviews. Systems retains STOPPED ownership of completed Story30 and submitted Cast31. Native468 receiving20:48:13.898 was verified; actual470 submitted20:53:50 with explicit STOP. Independent criteriae87d7950 were registered467 before assignment; the one review of the submitted revision proceeds under469, without acceptance. PM handles remaining integration, intake and forecasts. Neither permanent Claude role will be woken or replaced before owner confirmation. Active one-minute fallback monitoring and15-minute progress/forecast reports continue.
a410b8 Anonymous 2026-09-08 16:43:32
PM close information package and honor owner Claude token pause
10
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
11
## Forward forecast — baseline F1
12
13
**Planning answer: a coherent core design this week, a complete first-pass game-design wiki in about two weeks, and a detailed campaign specification in roughly two to three months.** These are PM estimates to manage against, not promises or measured confidence intervals. They will change as the content inventory and owner choices become concrete.
14
15
All dates are2026; times are Jerusalem. Ranges are cumulative from8 September, not durations to add together. Baseline F1 was set8 September. Dates assume ordinary weekdays, about6–8 productive agent/PM operating hours per working day, functioning local hosts, and most consequential owner choices within a working day. That does **not** mean6–8hours of the owner's time or guaranteed overnight operation.
16
17
|Milestone|Target|Current likely window|Confidence|What will be ready|
18
|---|---|---|---|---|
49369b Anonymous 2026-09-08 16:27:44
PM forecast F1.2: actual outline completion and next scoped deliveries
19
|M0 — current puzzle/rescue decision pack|Achieved8 Sep15:59|Original target16:30; range16:30–17:00|Actual completion|Both written comparisons reviewed and closed; owner choices remain separate|
20
|M1 — whole-game outline and scope bands|Achieved8 Sep16:20|Original18:30; revised17:00|Actual completion|Draft369, focused review370, response374 and PM integration378 complete; architecture, scope bands and missing-work inventory prepared|
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
21
|M2 — coherent core-design baseline|Fri11 Sep|10–14 Sep|Medium-low|One compatible proposed/selected loop: opening, builds, combat, oxygen, death/shift, rescue and home; old conflicting rules replaced and consequential choices dispositioned|
22
|M3 — complete first-pass game-design wiki, v1|Tue22 Sep|18–29 Sep|Low-medium|Every major gameplay and campaign area has an actual design, a scoped content inventory, dependencies and a usable development handoff outline; major categories are no longer only menus of alternatives|
23
|M4 — detailed campaign/content specification|Tue10 Nov|20 Oct–1 Dec|Low|The approved finite inventory of regions, rooms, puzzles, clues, encounters, rewards, cast scenes and endings is specified through its state changes and recovery paths|
24
49369b Anonymous 2026-09-08 16:27:44
PM forecast F1.2: actual outline completion and next scoped deliveries
25
**Will the full wiki be ready today? No.** Today's decision pack and whole-game outline are prepared; they are not a complete design wiki. **The working target for the first complete design wiki is22 September.** The later detailed-content milestone expands that design into the actual authored campaign. Neither milestone claims that a written plan has proved fun, balance, performance or30/90/100–200hours of play.
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
26
27
For M3, “complete first pass” includes the story's causal chain and ending structure; station layout/shifts/persistence; equipment acquisition and progression; combat/horde/trap families; oxygen/resources; rescue/colony/cast arcs; both language-learning arcs and clue distribution; journal, controls and accessibility; content budget, production constraints and the later validation plan. Numerical tuning can remain explicitly provisional. A major domain marked only “TBD” does not satisfy completion.
28
29
M4 has the weakest estimate because no approved content inventory yet exists. It assumes a substantial authored campaign matching the brief's ambition and two additional specialists. It is approximately30–60 active working days; with the current team alone, the initial audit estimated40–80. A smaller approved campaign could be much quicker; a dense secret/language campaign or a changed global rule could exceed the range. I will revise M4 after the inventory and three representative detailed content packages are written and checked. Final gameplay validation belongs to a separately authorised implementation/playtest phase; it has no honest calendar endpoint yet.
30
31
## Estimated work timeline
32
33
This is a planning schedule, not historical delivery data. “Buffer” is allowed revision/decision time, not an unassigned promise to polish indefinitely.
34
35
|Workstream|8 Sep|9–11 Sep|14–18 Sep|21–29 Sep|Oct|Nov–1 Dec|
36
|---|---|---|---|---|---|---|
49369b Anonymous 2026-09-08 16:27:44
PM forecast F1.2: actual outline completion and next scoped deliveries
37
|Current decision pack|Done15:59||||||
38
|Whole-game outline and scope|Done16:20|Use for domain design|||||
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
39
|Core rules and shared integration||Finish / buffer into14 Sep|||||
40
|Campaign, puzzles, cast, progression and languages||Start|Develop|Integrate and review|||
41
|Complete wiki v1|||Draft coverage|Target22 Sep; buffer to29 Sep|||
42
|Detailed authored content|||Representative packages|Expand approved inventory|Main authoring|Target10 Nov; buffer to1 Dec|
43
44
The critical sequence is core decisions and interfaces → whole-game architecture/content budget → domain designs → cross-domain integration → v1. Content detail proceeds in parallel only where interfaces are stable. Extra writers do not eliminate the PM/review bottleneck.
45
4904fc Anonymous 2026-09-08 20:59:08
Record Story30 closure and Cast31 submission/review; forecast F1.12
46
**Next delivery, today Jerusalem:** [Cast And Short Rescue Map31](/Hold%20The%20Flood/Cast%20And%20Short%20Rescue%20Map) was submitted470 at20:53:50 before its21:30 draft target(range21:10–22:00) and is in review under469; reviewed outcome22:30(range22:00–23:30) remains the medium-low-confidence forecast. [Story And Ending Map30](/Hold%20The%20Flood/Story%20And%20Ending%20Map) closed466 at20:42:22, ahead of its22:15 reviewed target(range21:30–23:00). Core11 Sep(10–14), complete first-pass wiki22 Sep(18–29), and specialist setup9–10 Sep remain unchanged. The144–247role-hour allowance is the dated8Sep planning baseline, not a newly measured remaining balance; accepted depth must be deducted during the9Sep capacity check. If both additional streams are absent10Sep, the provisional current-team scenario remains25Sep(22Sep–2Oct).
49369b Anonymous 2026-09-08 16:27:44
PM forecast F1.2: actual outline completion and next scoped deliveries
47
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
48
## Extra agents — when and why
49
50
**Plan to add two agents tomorrow,9 September**, with bounded briefs prepared today. The current team can finish today's work. We will begin the two specialist streams as the relevant scopes become ready, aiming to have both available by10 September rather than waiting a week.
51
52
|Additional role|Planned start|First bounded responsibility|Reason for adding it|
53
|---|---|---|---|
54
|Campaign and puzzle designer|9 Sep|Develop the outline's discovery dependencies and two representative regional/puzzle chains, keeping owner mysteries revisable|Most existing work is local examples; the campaign and its deep discoveries need a dedicated author|
55
|Technical design and production planner|9–10 Sep|Audit proposed scope against Unity/Steam, state/save complexity, reusable content needs and available free-asset categories; identify constraints and likely expensive systems|The largest forecast uncertainty is how much authored content and engineering complexity the design implies|
56
57
These are design roles. No gamecode, prototypes, simulations, tests, purchases or AI art are authorised by this staffing plan. The owner has not yet created these sessions; no staffing completion is claimed. PM will guide setup one step at a time. Existing Systems retains the equipment economy; if that becomes the actual bottleneck, the second specialist brief can shift to economy/content planning rather than accumulate an idle role. No additional permanent critic is currently planned.
58
59
The independent schedule audit proposed campaign/puzzle and economy specialists after the core baseline. PM keeps its point that extra agents do not accelerate core decisions, but brings onboarding forward to9 Sep so a bounded content/production audit can begin alongside integration. The production role is chosen first because the absent content inventory and feasibility assumptions dominate the long-range estimate. This is a reversible staffing judgment, not a demonstrated speedup.
60
61
## Why these estimates, and when they change
62
63
Recent focused comparison/review packages took about16–49 elapsed minutes. That supports today's short delivery windows; it does not establish campaign-authoring throughput. The independent remaining-scope audit estimated2–4 active days for a coherent core,6–12 with two specialists or8–15 with the current team for a whole-game first pass, and30–60 with two specialists for detailed content. PM has allowed calendar/integration buffer around the v1 target.
64
65
- Every15-minute progress report includes the next milestone's current target/range and whether it moved. The full forecast is reviewed at each day's close, with the next substantive re-estimate by9 Sep18:00 after the scope outline.
66
- Keep the original target visible when revising it. Record old estimate, new estimate and the concrete cause; do not silently move dates.
67
- A changed core mechanism or late owner story change may add roughly1–3 working days to the core/v1 forecast; quantify the actual affected work when it happens.
68
- A blocked decision moves its dependent work, not every parallel stream. Host outages are reported with elapsed delay. If authors produce a queue waiting over a working day for review/integration, reduce parallel intake before adding more agents.
69
- Forecasts must be useful even when confidence is low. Uncertainty is a reason to widen a range and state assumptions, not to omit an estimate or wait for certainty.
70
71
|Forecast revision|Recorded|Change and reason|
72
|---|---|---|
73
|F1|8 Sep|First forward baseline added at owner's request; prior board had actuals but omitted estimates. M3 target22 Sep; M4 target10 Nov.|
fc05ee Anonymous 2026-09-08 16:04:47
Record early outline draft and revise near-term estimate
74
|F1.1|8 Sep16:04|M1 reviewed outline moved from18:00–20:00 to16:30–17:30 because the actual draft arrived16:01 and Reviewer had already fetched it. Review/rework still required. Core, full-wiki and detailed-content dates unchanged.|
49369b Anonymous 2026-09-08 16:27:44
PM forecast F1.2: actual outline completion and next scoped deliveries
75
|F1.2|8 Sep16:20|M0 actual15:59 and M1 actual16:20 recorded. Both prepared ahead of forecast. M2–M4 dates unchanged: the outline is a scaffold, and scope/unit reconciliation is still required before rolling up its partial111–208 role-hour inventory.|
1d867d Anonymous 2026-09-08 17:16:19
PM continuation: only Claude paused; GPT catalogue and coverage work active
76
|Availability correction|8 Sep17:10|Only Claude paused; PM/GPT work resumed after PM incorrectly stopped broader intake. Equipment Catalogue20 now targets reviewed18:30 today. M2–M4 dates unchanged pending coverage reassessment.|
8cd0af Anonymous 2026-09-08 17:32:04
Record catalogue closeout, coverage and next GPT trap outcome
77
|F1.3|8 Sep17:32|Catalogue actual17:29 and coverage actual17:27 recorded ahead of their18:30/17:45 targets. Next reviewed trap/encounter outcome targets18:45(18:15–19:15). M2–M4 unchanged: the coverage audit still identifies eight partial domains and three missing contracts; remaining-work estimates need deduplication.|
c715ff Anonymous 2026-09-08 17:54:18
Record trap/handoff closeouts and active save-state design
78
|F1.4|8 Sep17:54|Traps21 and Handoff22 actual17:48 recorded against18:45/18:15 targets. Next Save And Content State23 reviewed target19:00(18:30–19:30). M2–M4 unchanged: full campaign, content inventory and integration still require work.|
51e8e6 Anonymous 2026-09-08 18:22:41
Record State and Production closeouts, regional review, and aligned v1 scope forecast
79
|F1.5|8 Sep18:09:56|State23 actual closeout417 recorded against its19:00 reviewed target. New418 outcomes: Regional Map25 reviewed19:30(19:00–20:00), Production Scope24 reviewed19:40(19:05–20:10). M2–M4 unchanged pending reviewed remaining-scope accounting; a Production draft is not a reviewed forecast.|
80
|F1.6|8 Sep18:21|Production24 closed423. Its reviewed response exposes previously unallocated v1 room/mechanism briefs:144–247role-hours replaces draft116–201. M2–M4 dates retained provisionally;9Sep re-estimate must check capacity. If extra streams are unavailable10Sep, current-teamv1 scenario25Sep(22Sep–2Oct). Regional25 reviewing420, target19:30.|
16dda9 Anonymous 2026-09-08 18:49:23
Record regional closeout and acquisition review
81
|F1.7|8 Sep18:32|Regional25 actual closeout426 recorded against its19:30 reviewed target. New Acquisition26 assignment427 targets draft19:00(18:45–19:20), reviewed19:45(19:15–20:15). M2–M4, the F1.6 planning allowance and current-team scenario remain unchanged; accepting a regional map does not complete its room inventory.|
287b77 Anonymous 2026-09-08 19:11:18
Record acquisition closeout, combat roster work and revised coverage
82
|F1.8|8 Sep18:57:01|Acquisition26 actual closeout434 recorded against its19:45 reviewed target(19:15–20:15). New Combat And Enemy Roster27 assignment435 targets draft19:45(19:25–20:15), reviewed20:30(20:00–21:15); actual receiving activity18:58:15.181 verified. Narrow04 parent alignment432 is complete; owner-dependent branches remain open. M2–M4, the144–247role-hour planning allowance and current-team scenario remain unchanged.|
bd5466 Anonymous 2026-09-08 19:48:00
Record combat completion, home review and dated milestone forecast
83
|F1.9|8 Sep19:47|Combat27 actual closeout443 recorded against its20:30 reviewed target(20:00–21:15). Home And Colony Loop28 assignment444 reached draft446 at19:42:37 before its20:20 target(20:00–20:50); independent review447 active, reviewed21:15(20:45–22:00) remains a medium-low-confidence forecast. Narrow legacy04 integration441–443 is complete; global04 stays open. M2–M4 and the current-team scenario remain unchanged; the dated144–247 allowance needs accepted-scope reconciliation.|
0f3ff9 Anonymous 2026-09-08 20:16:30
Record Home28 closure and Language29 submission with independent review; forecast F1.10
84
|F1.10|8 Sep20:07|Home28 actual closeout450 recorded against its21:15 reviewed target(20:45–22:00). Two Language Discovery Map29 assignment451 reached draft454 at20:07:22 before its21:00 target(20:35–21:30); independent review455 active, reviewed22:00(21:15–22:45) remains the medium-low-confidence forecast. Home/colony now has a usable first-pass contract; five cast arcs/15scenes and finite room/encounter/mechanism inventories remain unfinished. Global04, M2–M4 and the current-team scenario remain unchanged; the dated144–247 allowance still requires accepted-scope reconciliation.|
1d0af6 Anonymous 2026-09-08 20:34:57
Record actual Story30 submission463 and preauthorised focused review status
85
|F1.11|8 Sep20:28|Language29 actual closeout459 recorded against its22:00 reviewed target(21:15–22:45). Story And Ending Map30 assignment461 reached draft463 at20:30:02 before its21:15 target(20:50–21:45); one focused review underway under462, reviewed22:15(21:30–23:00) remains the medium-low-confidence forecast. Language/discovery now has a usable first-pass contract; story remains partial. Global04, M2–M4, planned9–10Sep staffing and the current-team scenario remain unchanged; the dated144–247 allowance still needs accepted-scope reconciliation.|
4904fc Anonymous 2026-09-08 20:59:08
Record Story30 closure and Cast31 submission/review; forecast F1.12
86
|F1.12|8 Sep20:55|Story30 actual closeout466 at20:42:22 recorded against its22:15 reviewed target(21:30–23:00). Cast And Short Rescue Map31 assignment468 reached draft470 at20:53:50 before its21:30 target(21:10–22:00); one review under469, reviewed22:30(22:00–23:30) remains the medium-low-confidence forecast. Story is now usable first-pass; cast remains partial. Global04, M2–M4, planned9–10Sep staffing, the current-team scenario and dated144–247 allowance caveat remain unchanged.|
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
87
88
## What changed in this report
89
bd5466 Anonymous 2026-09-08 19:48:00
Record combat completion, home review and dated milestone forecast
90
- [Combat And Enemy Roster27](/Hold%20The%20Flood/Combat%20And%20Enemy%20Roster) preparation-closed443 at19:34, finalf1fe0d9a. One focused review/response corrected the new-role triggers and counterplay, staged cues for both regional orders, and Bellback's warning-start cone lock. Six ordinary/three special roles and two setpieces are prepared within ten encounter placements; exact populations, geometry, presentation and tuning remain later work.
0f3ff9 Anonymous 2026-09-08 20:16:30
Record Home28 closure and Language29 submission with independent review; forecast F1.10
91
- [Home And Colony Loop28](/Hold%20The%20Flood/Home%20And%20Colony%20Loop) preparation-closed450 at20:01:12, final5bff3436. One focused review/response clarified shared commissioning, first-return actions and each project's participants and lasting facilities. Five project briefs remain two reused/three new with three new fixed ship fixtures; cast choices, five final arcs/15scenes and management economy remain separate.
471731 Anonymous 2026-09-08 20:30:17
Record Language29 closeout and Story30 authoring with preauthorised review; forecast F1.11
92
- [Two Language Discovery Map29](/Hold%20The%20Flood/Two%20Language%20Discovery%20Map) preparation-closed459 at20:23:52, finaldf0f48f5. One focused critique/response separated address/body evidence, retained valid captures across lives and supplied the iris variant's local B plate and completion state. Four proposed chains across two languages are prepared; actual clue/string/room variants and comprehension evidence remain unfinished.
4904fc Anonymous 2026-09-08 20:59:08
Record Story30 closure and Cast31 submission/review; forecast F1.12
93
- [Story And Ending Map30](/Hold%20The%20Flood/Story%20And%20Ending%20Map) preparation-closed466 at20:42:22, final03c9cb8e. One focused critique/response separated current diagnostic evidence from historical chronology, specified evidence retained/lost before and after isolation, and used shared mechanical cycle impressions. Four mystery/personal chains and layered choices are prepared proposals; final story, departure rules and full cast/room/scene variants remain open.
94
- [Cast And Short Rescue Map31](/Hold%20The%20Flood/Cast%20And%20Short%20Rescue%20Map) was submitted470 at20:53:50, sourceadb7b4a4: five proposed people and fifteen uniquely identified first-pass scenes, three primary scenes per person, with short current rescue routes, knowledge/participation/commissioning states and counted overlaps. Systems is STOPPED; one review proceeds under469 against pre-assignment criteriae87d7950. Submission does not close the cast domain or select first-survivor/mortality rules.
bd5466 Anonymous 2026-09-08 19:48:00
Record combat completion, home review and dated milestone forecast
95
- PM verified04's narrow legacy integration under441–443: [Discovery Chain](/Hold%20The%20Flood/Discovery%20Chain)114e9267 and [Expedition Proposal](/Hold%20The%20Flood/Expedition%20Proposal)836ab2ae now use historical post-death routes and world-time capture/full frozen journal inspection. No new access guarantee was added; global04 remains open.
471731 Anonymous 2026-09-08 20:30:17
Record Language29 closeout and Story30 authoring with preauthorised review; forecast F1.11
96
- PM closed narrow [Coming Home](/Hold%20The%20Flood/Coming%20Home)/[Home Projects](/Hold%20The%20Flood/Home%20Projects) compatibility456 at20:15:57, revisionsacbc945c/996d235a. Current Fork/supply, unloading, historical-route and refill rules align; PM owns both parents STOPPED. This adds no package and does not close global04.
4904fc Anonymous 2026-09-08 20:59:08
Record Story30 closure and Cast31 submission/review; forecast F1.12
97
- The [coverage map](/Hold%20The%20Flood/Design%20Coverage) now has twelve usable first-pass contracts and three partial areas. Only story/endings/corruption advances this time; cast/short rescue remains partial. The five cast arcs/15scenes,24module/40room, ten encounter-placement and twelve mechanism inventories still need actual briefs and integration; no full-v1 percentage is implied.
98
- Intake407, all four pending owner questions, the original Claude pause and planned9–10Sep specialist setup are preserved. M2–M4 remain unchanged;144–247role-hours is the dated8Sep planning allowance, not measured labor or an automatically current remaining total.
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
99
100
## Open and closed outcomes
101
102
All milestone times below are Jerusalem time. “Updated” separates later owner-rule integration from the original preparation closeout.
103
104
|ID|Outcome|Preparation status|Decision status|Latest milestone|Next step / remaining scope|
105
|---|---|---|---|---|---|
106
|01|[Reusable equipment combinations](/Hold%20The%20Flood/Build%20Rules)|Closed|Selected direction|Sep7 22:19; updated Sep8 13:45|Catalogue and numerical rules remain proposed|
107
|02|[Oxygen visibility and journal pause](/Hold%20The%20Flood/Oxygen%20and%20Observation)|Closed|Selected direction|Sep7 20:55; updated Sep8 13:45|Exact oxygen amounts remain open|
108
|03|[Carried property returns on death](/Hold%20The%20Flood/Death%20And%20Persistence)|Closed|Selected rule|Sep8 13:45|Shift and survivor ordering tracked separately|
bd5466 Anonymous 2026-09-08 19:48:00
Record combat completion, home review and dated milestone forecast
109
|04|[Shifts, persistent work and historical records](/Hold%20The%20Flood/Shifting%20Station%20Options)|Open — global rules and choices|Binding direction selected|Sep8 narrow legacy integration verified443|Parent-equipment432 and Discovery/Expedition441–443 slices complete; PM retains stopped ownership. Global shift/rescue/full-station branches and choices remain open|
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
110
|05|[Ordinary combat and horde encounters](/Hold%20The%20Flood/Combat%20Rules)|Closed|Selected direction|Sep8 10:51; updated13:45|Automatic ordinary fire, manual specials; balance remains open|
0c6bef Anonymous 2026-09-08 16:01:08
Record reviewed survivor package alongside forecast F1
111
|06|[First-survivor comparison](/Hold%20The%20Flood/First%20Survivor)|Closed|Short rescue selected; person unchosen|Sep8 response364/disposition368|Yeva versus Aster ready; short-route condition and death/refuge timing remain explicit limits|
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
112
|07|[Practical discovery and optional help](/Hold%20The%20Flood/Clues%20and%20Help)|Closed|Selected direction|Sep8 11:23; updated13:45|Current routes cannot be inferred from historical records|
113
|08|[Cooperation and useful work aboard](/Hold%20The%20Flood/Home%20Projects)|Closed|Tentative preference|Sep8 12:00; updated13:45|Equipment loans tentative; full colony/cast still open|
114
|09|[Two-language expedition and journal use](/Hold%20The%20Flood/Language%20Expedition)|Closed|Reviewed proposal|Sep8 13:45|Detailed language system unselected;16 is a distinct evidence scene|
115
|10|[How equipment is acquired and improves](/Hold%20The%20Flood/Progression%20Options)|Closed|Reviewed alternatives|Sep8 13:51|Find working components versus observe/fabricate; owner choice later|
116
|11|[Three distinct horde creatures](/Hold%20The%20Flood/Horde%20Creature%20Proposals)|Closed|Reviewed proposals|Sep8 14:07|Roster and origins unselected|
117
|12|[Hospital story and its causal alternatives](/Hold%20The%20Flood/Hospital%20Story%20Directions)|Closed|Reviewed alternatives|Sep8 14:47|Owner hospital/godhood draft leads; exact story/ending remain revisable|
118
|13|[Player resurrection and corruption](/Hold%20The%20Flood/Resurrection%20And%20Corruption)|Closed|Reviewed alternatives|Sep8 14:38|No player decay or death budget adopted|
119
|14|[Opening expedition: reusable machinery](/Hold%20The%20Flood/First%20Expedition%20Options)|Closed|Option A selected|Prepared Sep8 15:14; selected15:30|Preferred direction recorded; exact starting items/rooms remain proposed|
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
120
|15|[Whole-station mechanism comparison](/Hold%20The%20Flood/Connecting%20The%20Station)|Closed|Goal selected; mechanism conditional|Sep8 15:51 disposition363|Physical connection candidate prepared; owner payoff choice and detailed content remain open|
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
121
|16|[Testable alien-language interaction](/Hold%20The%20Flood/Alien%20Utterance%20Discovery)|Closed|Reviewed proposal|Sep8 15:38|Protocol discovery prepared; does not prove request semantics or a god|
49369b Anonymous 2026-09-08 16:27:44
PM forecast F1.2: actual outline completion and next scoped deliveries
122
|17|[Whole-game design outline and scope bands](/Hold%20The%20Flood/Whole%20Game%20Outline)|Closed|Reviewed planning scaffold|Sep8 16:20 disposition378|Use finite bands and dependencies for domain designs; story/ending/count choices and estimate coverage remain open|
a410b8 Anonymous 2026-09-08 16:43:32
PM close information package and honor owner Claude token pause
123
|18|[Player information and accessibility](/Hold%20The%20Flood/Player%20Information)|Closed|Reviewed proposed information contract|Sep8 16:35 disposition387|Full cue/screen structure and accessibility specification remain later work; no usability claim|
cfac10 Anonymous 2026-09-08 16:47:10
PM day close: survival prepared and owner pause respected
124
|19|[Survival and loadout](/Hold%20The%20Flood/Survival%20And%20Loadout)|Closed|Reviewed provisional resource contract|Sep8 16:45 disposition392|Detailed variants and balancing remain later work; integrate compatible core rules after owner decisions|
8cd0af Anonymous 2026-09-08 17:32:04
Record catalogue closeout, coverage and next GPT trap outcome
125
|20|[Equipment catalogue](/Hold%20The%20Flood/Equipment%20Catalogue)|Closed|Reviewed12-part planning sample; acquisition unchosen|Sep8 17:29 disposition400|Exact thresholds, multi-actuator controller rules, acquisition and later finite catalogue remain open|
bd5466 Anonymous 2026-09-08 19:48:00
Record combat completion, home review and dated milestone forecast
126
|21|[Traps and encounter progression](/Hold%20The%20Flood/Traps%20And%20Encounter%20Progression)|Closed|Reviewed five-family/four-region SMALL proposal|Sep8 17:48 disposition410; roster27 prepared443|Twelve actual mechanism briefs, encounter geometry/populations, reset boundaries and balance remain later|
c715ff Anonymous 2026-09-08 17:54:18
Record trap/handoff closeouts and active save-state design
127
|22|[Development and validation handoff](/Hold%20The%20Flood/Development%20And%20Validation%20Handoff)|Closed|Reviewed first-pass risk/evidence plan|Sep8 17:48 disposition410|Final v1-specific scope, staffing and estimates precede any owner phase decision; no development authorized|
51e8e6 Anonymous 2026-09-08 18:22:41
Record State and Production closeouts, regional review, and aligned v1 scope forecast
128
|23|[Save and content state](/Hold%20The%20Flood/Save%20And%20Content%20State)|Closed|Reviewed first-pass continuity contract; save policy unselected|Sep8 18:09:56 disposition417|Final438cdf35; detailed transitions, rescue/shift ordering, save-policy and recovery choices remain open|
129
|24|[Production scope](/Hold%20The%20Flood/Production%20Scope)|Closed|Reviewed provisional finite scope and work accounting|Sep8 18:21 disposition423|Finalc1a60388;144–247role-hourv1 planning allowance, not measured labor; band/cuts unselected|
16dda9 Anonymous 2026-09-08 18:49:23
Record regional closeout and acquisition review
130
|25|[Regional discovery map](/Hold%20The%20Flood/Regional%20Discovery%20Map)|Closed|Reviewed four-region/twelve-objective SMALL planning proposal|Sep8 18:32 disposition426|Final3acda018;24module/40room v1 briefs, actual placements and owner story/ending choices remain open|
287b77 Anonymous 2026-09-08 19:11:18
Record acquisition closeout, combat roster work and revised coverage
131
|26|[Equipment acquisition and rig growth](/Hold%20The%20Flood/Equipment%20Acquisition%20And%20Rig%20Growth)|Closed|Reviewed twelve-part acquisition/growth proposal; owner preference unselected|Sep8 18:57:01 disposition434|Finalf5f6d768; Systems owns article STOPPED. Source-fixture details, exceptions, quantities and gameplay validation remain open|
bd5466 Anonymous 2026-09-08 19:48:00
Record combat completion, home review and dated milestone forecast
132
|27|[Combat and enemy roster](/Hold%20The%20Flood/Combat%20And%20Enemy%20Roster)|Closed|Reviewed combat-state contract and proposed6ordinary/3special/2setpiece roster|Sep8 19:34 disposition443|Finalf1fe0d9a; Systems ownership STOPPED. Ten encounter placements and twelve mechanism slots still need exact inventories, cues and geometry|
0f3ff9 Anonymous 2026-09-08 20:16:30
Record Home28 closure and Language29 submission with independent review; forecast F1.10
133
|28|[Home and colony loop](/Hold%20The%20Flood/Home%20And%20Colony%20Loop)|Closed|Reviewed return/preparation contract and five project briefs; cast/economy unselected|Sep8 20:01:12 disposition450|Final5bff3436; Systems STOPPED owner. Two reused/three new projects; exact fixture/control detail, five final cast arcs/15scenes and validation remain|
471731 Anonymous 2026-09-08 20:30:17
Record Language29 closeout and Story30 authoring with preauthorised review; forecast F1.11
134
|29|[Two-language discovery map](/Hold%20The%20Flood/Two%20Language%20Discovery%20Map)|Closed|Reviewed four-chain/two-language proposal; origins and final story unselected|Sep8 20:23:52 disposition459|Finaldf0f48f5; Systems STOPPED owner. Actual clue/string/physical-state variants, room placements and comprehension evidence remain|
4904fc Anonymous 2026-09-08 20:59:08
Record Story30 closure and Cast31 submission/review; forecast F1.12
135
|30|[Story and ending map](/Hold%20The%20Flood/Story%20And%20Ending%20Map)|Closed|Reviewed causal/choice map and four mystery-personal chains; final canon/ending rules unselected|Sep8 20:42:22 disposition466|Final03c9cb8e; Systems STOPPED owner. Actual placements, full cast/15scene allocation, state variants and emotional validation remain|
136
|31|[Cast and short rescue map](/Hold%20The%20Flood/Cast%20And%20Short%20Rescue%20Map)|Open — independent review|Submitted five-cast/fifteen-scene proposal; final cast/first survivor/mortality unselected|Sep8 submission470 at20:53:50; review under469|Systems STOPPED sole owner; draft21:30 target achieved early, reviewed22:30(22:00–23:30) forecast. Three primary scenes per person; actual room/state/dialogue variants remain separate|
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
137
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
138
## Recent delivery timeline
139
140
These are observed calendar spans from assignment to preparation closeout, including handoffs and review. They are historical measurements, not estimates of labour or promised future turnaround.
141
142
|Outcome|Assigned Sep8|Preparation closed Sep8|Elapsed|
143
|---|---|---|---|
144
|Equipment progression comparison|13:17|13:51|34 minutes|
145
|Three horde creatures|13:51|14:07|16 minutes|
146
|Hospital-story comparison|13:58|14:47|49 minutes|
147
|Resurrection/corruption comparison|14:20|14:38|18 minutes|
148
|Opening comparison|14:40|15:14|34 minutes|
149
|Alien-language interaction|15:06|15:38|32 minutes|
150
151
## Work sequence
152
a410b8 Anonymous 2026-09-08 16:43:32
PM close information package and honor owner Claude token pause
153
|Stream|Now|Next|
154
|---|---|---|
287b77 Anonymous 2026-09-08 19:11:18
Record acquisition closeout, combat roster work and revised coverage
155
|Equipment catalogue|Preparation closed400; final737b3cfd; Acquisition26 prepared434|Use the twelve-part contract and current parent alignment; detailed controller/fixture exceptions remain|
4904fc Anonymous 2026-09-08 20:59:08
Record Story30 closure and Cast31 submission/review; forecast F1.12
156
|Whole-v1 coverage|Fifteen-domain map has twelve usable first-pass contracts and three partial areas|Story/ending first pass prepared; five cast arcs/15scenes,24module/40room, ten encounter-placement and twelve mechanism inventories and integration remain|
bd5466 Anonymous 2026-09-08 19:48:00
Record combat completion, home review and dated milestone forecast
157
|Trap/encounter progression|Traps21 prepared410; Combat27 prepared443 atf1fe0d9a|Author exact ten encounter-placement and twelve mechanism briefs, with geometry, populations, cue variants and recovery|
c715ff Anonymous 2026-09-08 17:54:18
Record trap/handoff closeouts and active save-state design
158
|Development handoff|Preparation closed410; finalc0c38e8b|Keep gates explicit; final handoff packet depends on concrete v1/development scope|
51e8e6 Anonymous 2026-09-08 18:22:41
Record State and Production closeouts, regional review, and aligned v1 scope forecast
159
|Save/content state|Preparation closed417 at18:09:56; final438cdf35|Use explicit continuity interfaces; detailed state work and owner selections remain later|
160
|[Production Scope24](/Hold%20The%20Flood/Production%20Scope)|Preparation closed423 at18:21; finalc1a60388|Use144–247role-hour planning allowance with explicit v1/M4 depth and capacity limits|
16dda9 Anonymous 2026-09-08 18:49:23
Record regional closeout and acquisition review
161
|[Regional Discovery Map25](/Hold%20The%20Flood/Regional%20Discovery%20Map)|Preparation closed426 at18:32; final3acda018|Use both revised orders and explicit evidence/access conditions; finite module/room briefs remain|
287b77 Anonymous 2026-09-08 19:11:18
Record acquisition closeout, combat roster work and revised coverage
162
|[Equipment Acquisition And Rig Growth26](/Hold%20The%20Flood/Equipment%20Acquisition%20And%20Rig%20Growth)|Preparation closed434 at18:57:01; finalf5f6d768; Systems ownership STOPPED|Use prepared acquisition/configuration paths; owner choices and source-fixture detail remain|
bd5466 Anonymous 2026-09-08 19:48:00
Record combat completion, home review and dated milestone forecast
163
|[Combat And Enemy Roster27](/Hold%20The%20Flood/Combat%20And%20Enemy%20Roster)|Preparation closed443 at19:34; finalf1fe0d9a; Systems ownership STOPPED|Use the reviewed roster/state contract; finite placement, cue and recovery detail remains|
0f3ff9 Anonymous 2026-09-08 20:16:30
Record Home28 closure and Language29 submission with independent review; forecast F1.10
164
|[Home And Colony Loop28](/Hold%20The%20Flood/Home%20And%20Colony%20Loop)|Preparation closed450 at20:01:12; final5bff3436; Systems ownership STOPPED|Use reviewed return/project availability and property rules; exact interfaces, cast arcs/scenes and management choices remain|
471731 Anonymous 2026-09-08 20:30:17
Record Language29 closeout and Story30 authoring with preauthorised review; forecast F1.11
165
|[Two Language Discovery Map29](/Hold%20The%20Flood/Two%20Language%20Discovery%20Map)|Preparation closed459 at20:23:52; finaldf0f48f5; Systems ownership STOPPED|Use reviewed four-chain evidence/action contract; actual clue/string/room variants and validation remain|
4904fc Anonymous 2026-09-08 20:59:08
Record Story30 closure and Cast31 submission/review; forecast F1.12
166
|[Story And Ending Map30](/Hold%20The%20Flood/Story%20And%20Ending%20Map)|Preparation closed466 at20:42:22; final03c9cb8e; Systems ownership STOPPED|Use reviewed causal/evidence/choice contract; final canon, departure preference and finite state/scene/room details remain|
167
|[Cast And Short Rescue Map31](/Hold%20The%20Flood/Cast%20And%20Short%20Rescue%20Map)|Draft470 submitted20:53:50 atadb7b4a4; Systems STOPPED; one review under469 against criteriae87d7950|Draft21:30 target achieved early; reviewed22:30(22:00–23:30) remains forecast; one critique/response then PM disposition|
c715ff Anonymous 2026-09-08 17:54:18
Record trap/handoff closeouts and active save-state design
168
|Additional proposal intake|Both full pages read; explicitly unadopted|Track authorship and assess protected retreat/next-shift meeting before integrating|
471731 Anonymous 2026-09-08 20:30:17
Record Language29 closeout and Story30 authoring with preauthorised review; forecast F1.11
169
|Shared integration04|Narrow parent-equipment432, legacy Discovery/Expedition441–443 and Coming Home/Home Projects456 compatibility complete; PM retains stopped ownership|Global shift/rescue/full-station rules, remaining integration and pending owner choices remain open|
1d867d Anonymous 2026-09-08 17:16:19
PM continuation: only Claude paused; GPT catalogue and coverage work active
170
|Claude Lead/Reviewer|Paused by owner for token limits|Resume only when owner confirms; GPT work continues meanwhile|
171
|Specialist setup|Two bounded briefs ready|Planned9–10Sep; no new permanent sessions created|
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
172
1d867d Anonymous 2026-09-08 17:16:19
PM continuation: only Claude paused; GPT catalogue and coverage work active
173
The available team continues useful work. No manual message forwarding is needed, and a paused provider does not suspend other authorized agents.
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
174
175
## Decisions for the owner
176
177
**Already answered:** opening A and persistent room/group connections across shifts, culminating in connecting the entire station.
178
179
**Open creative question:** should completing the entire connection puzzle finally stabilise the layout, or should rooms keep moving while every established connection survives? PM recommends stabilisation as a reward for mastery. This is a proposed late payoff, not an answer inferred from the opening choice; the team can continue its comparison while it is pending.
180
49369b Anonymous 2026-09-08 16:27:44
PM forecast F1.2: actual outline completion and next scoped deliveries
181
The first-survivor choice is also already with the owner: Yeva, the pressure technician preserving ward measurements (PM recommendation), versus Aster, the supply clerk suspicious of the arrival and requesting one reversible door closure. Neither is selected. Progression, creature, story and corruption alternatives are prepared for later reactions; the owner is not expected to review the whole wiki at once.
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
182
4904fc Anonymous 2026-09-08 20:59:08
Record Story30 closure and Cast31 submission/review; forecast F1.12
183
**Equipment acquisition question now with the owner:** find working parts in station machines, accepting loss of their local function until the part is returned (PM recommendation), or study working examples and spend salvage to fabricate parts aboard. The reviewed acquisition proposal supports this comparison; starting gear, capacity and exact economy remain separate. Cast/rescue work can continue while the choice is pending.
184
185
**New apparent-ending question now with the owner:** show credits and allow continuing from before departure (PM recommendation), or make departure permanently end this save. The question is unanswered; neither continuation behavior nor permanent save closure is adopted. Together with final station-layout behavior, first survivor and equipment acquisition, this makes four pending owner questions.
287b77 Anonymous 2026-09-08 19:11:18
Record acquisition closeout, combat roster work and revised coverage
186
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
187
## Reporting agreement
188
1d867d Anonymous 2026-09-08 17:16:19
PM continuation: only Claude paused; GPT catalogue and coverage work active
189
PM sends a compact report every15 minutes while useful work is active, plus meaningful completion, disagreement, blocker or decision updates. The Claude-only pause does not stop reporting while PM/GPT work is active. Use quiet hourly checks only when no useful authorized work can continue. Each report gives the timestamp, changes since the previous report, numeric open/closed preparation counts, real worker activity, blockers, next deliverable with ETA, current v1 target and any forecast change, and a link here. An unchanged interval is stated honestly. No page/message counts or invented completion percentages stand in for progress. Clearly labelled estimated dates and ranges are required; never present them as known facts or guaranteed deadlines. The local monitor requires the computer and apps to remain available.