Blame

aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
1
# Hold The Horde — Progress
2
20e33e Anonymous 2026-09-15 20:19:54
Record completed build comparison and owner budget pause
3
Updated **15 September, 20:18 Jerusalem**. **Paused at the owner’s request to conserve the weekly token budget.** The current revision is complete, no assignments are running, and automatic PM wake-ups are paused. Work resumes when the owner asks. The owner has chosen **fresh hordes each expedition** and **regular growth through fighting, with larger transformations**. Permanent changes and carried property remain; temporary combat power resets whenever you return home.
6487d5 Anonymous 2026-09-10 15:14:39
Record owner-requested token pause; suspend active forecasts
4
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
5
## Ready to read
6487d5 Anonymous 2026-09-10 15:14:39
Record owner-requested token pause; suspend active forecasts
6
20e33e Anonymous 2026-09-15 20:19:54
Record completed build comparison and owner budget pause
7
**Twenty-two proposal or editorial packages have been completed today.** The latest finished at **20:17 Jerusalem time**: [Can a shot carry lightning?](/Hold%20The%20Flood/Build%20Comparison#can-a-shot-carry-lightning). The player connects an electrical effect to a projectile, learns to release it after a bank, and can reach a crowd beyond cover. The comparison explains what is lost by giving up separate local lightning. It remains an unselected proposal. [Who Is the Astronaut?](/Hold%20The%20Flood/Who%20Is%20the%20Astronaut) is also ready to compare, and the short-rescue choice remains open.
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
8
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
9
Start with [The Game](/Hold%20The%20Flood/The%20Game), continue through [three expeditions into the observation ward](/Hold%20The%20Flood/Expedition%20Proposal), then [Coming Home](/Hold%20The%20Flood/Coming%20Home) and [Discovery in a Changing Station](/Hold%20The%20Flood/Connecting%20The%20Station). For combat, follow [Hordes and Builds](/Hold%20The%20Flood/Hordes%20and%20Builds) into [Three Ways to Break a Horde](/Hold%20The%20Flood/Build%20Comparison).
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
10
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
11
| Completed package | Actual time today | What changed |
12
|---|---|---|
13
| 59–61 — Builds and three expeditions | 12:08 | Different movement and payoff proposals; successive trips pursue different discoveries |
14
| 56–58 — Hospital story and survival | 12:32 | Two possible core mysteries; comparable loadouts with a visible cost for the heavier kit |
15
| 62–63 — Regular growth and renewed combat | 12:45 | An ordinary improvement before a major breakthrough, with crowds and discovery quiet placed along an existing route |
16
| 64–65 — Combat after permanent seals | 13:26 | A second route state retains the seals and shortcut while enemies arrive from a distant open source; room and encounter references agree |
17
| 66–67 — Six main reading pages | 13:26 | Player scenes lead; unfamiliar terms are explained; onward links work; obsolete clearing and growth claims are removed |
c3f7d7 Anonymous 2026-09-15 14:02:52
F2.8: moving scan complete, preservation corrections published, short rescue working
18
| 68 — Moving scan and bridge | 14:01 | A rising fight through Cable Junction leads to a local optical discovery and usable bridge; living returns preserve the shortcut, while changed alignments have a visible rescan route |
74ec6e Anonymous 2026-09-15 14:22:20
F2.10: rescue comparison ready for owner choice; station completion working
19
| 69 — Short rescue and death comparison | 14:20 | A person’s records, a short horde crossing and a homecoming; two unselected failure approaches with explicit protection and retry costs |
27d380 Anonymous 2026-09-15 14:37:26
Link reviewed station-completion alternatives and update forecast F2.12
20
| 70 — Completing the station | 14:36 | The final join secures the last piece of a dependable home; an alternative adds optional departure with the whole station, with its production and story costs explicit |
bc7aa4 Anonymous 2026-09-15 15:02:29
Record reviewed campaign scope and journal next delivery F2.15
21
| 71 — Campaign scope comparison | 14:56 | A 40-room reference versus 36 denser rooms, with named losses and retained work; current mechanism counts aligned and old hour allowances clearly qualified |
e7ba8b Anonymous 2026-09-15 15:08:14
Record accepted journal and active campaign overview F2.16
22
| 72 — Language journal | 15:06 | [Capture, compare and test a reading](/Hold%20The%20Flood/Language%20And%20Journal), with both language examples and the value of old records explained in place |
3f2d87 Anonymous 2026-09-15 15:34:42
Record completed campaign overview and active cast rewrite F2.18
23
| 73 — Whole campaign | 15:26 | [The campaign from docking to deepest discoveries](/Hold%20The%20Flood/Whole%20Game%20Outline), with the horde/build/bridge climax, human consequences and open endings explained |
8d9976 Anonymous 2026-09-15 15:46:03
Record reviewed cast and active equipment reference F2.19
24
| 74 — People and short rescues | 15:44 | [Five people and their fifteen scenes](/Hold%20The%20Flood/Cast%20And%20Short%20Rescue%20Map), with their wishes, disagreements and later changes of belief explained before the shared rules |
615ba5 Anonymous 2026-09-15 16:09:53
Close equipment guide and forecast Receiver Vault expedition F2.21
25
| 75 — Equipment and combinations | 16:05 | [Twelve equipment parts](/Hold%20The%20Flood/Equipment%20Catalogue), introduced through visible behavior and a working build; readiness and installed-part explanations corrected |
5b6e32 Anonymous 2026-09-15 16:34:53
Close reviewed Receiver Vault expedition and forecast enemy-guide review F2.24
26
| 76 — Receiver Vault expedition | 16:30 | [Turn the shelter, break a firing lane and investigate the iris](/Hold%20The%20Flood/Receiver%20Vault%20Expedition); proposed nearer arrival and existing longer route preserve different power choices |
e5ff81 Anonymous 2026-09-15 16:49:17
Record completed enemy guide and divergent upgrade proposal underway
27
| 77 — Enemy guide | 16:46 | [Nine creatures and two horde setpieces](/Hold%20The%20Flood/Combat%20And%20Enemy%20Roster), explained through visible warnings, pressure and responses; rescue and carrying examples corrected |
c2350d Anonymous 2026-09-15 17:27:24
Close the upgrade comparison; record active patient-scene work and delivery forecast F2.27
28
| 78 — Two trips, two different builds | 17:18 | [The same rig takes different earned paths](/Hold%20The%20Flood/Upgrade%20Choices); real declined alternatives, a hybrid, a new reach trade and the cost of a small offer pool |
5fe4f7 Anonymous 2026-09-15 18:07:44
F2.29: patient scene complete; opening rewrite working with independent criteria ready
29
| 79 — A person in the crowd | 17:59 | [Nadi's history and Ivo's memory](/Hold%20The%20Flood/Hospital%20Story%20Directions), with honest crossing evidence, ordinary horde combat and a cheaper record-only alternative |
00dd5c Anonymous 2026-09-15 18:31:16
F2.31: opening complete; four-room hospital pass working with current forecasts
30
| 80 — Your first useful invention | 18:28 | [One Fork, two useful contexts](/Hold%20The%20Flood/First%20Expedition%20Options); optional personal attack/defence control, a station tradeoff and clear arrival/latch explanations |
e8f2fb Anonymous 2026-09-15 18:57:43
Close clinical pass; show decision-guide work and forecast F2.33
31
| 81 — A hospital worth remembering | 18:55 | [Four existing clinical rooms](/Hold%20The%20Flood/Station%20Room%20And%20Module%20Inventory#region-2-clinical-exchange-r11r20), with human purpose and distinct activities; rescue access, shortcut growth and cap persistence clarified |
6bfbfd Anonymous 2026-09-15 19:27:27
Close reviewed decision guide; assign astronaut comparison and update forecast
32
| 82 — A current decision guide | 19:23 | [Current concerns and choices](/Hold%20The%20Flood/Open%20Decisions), with substantive criticism retained and stale reference questions repaired |
134014 Anonymous 2026-09-15 19:50:04
Close astronaut comparison; record active equipment interaction and forecast
33
| 83 — Who is the astronaut? | 19:47 | [Two personalities in the same scenes](/Hold%20The%20Flood/Who%20Is%20the%20Astronaut), plus a quieter alternative; Nadi’s causal sequence clarified and tone risks retained |
20e33e Anonymous 2026-09-15 20:19:54
Record completed build comparison and owner budget pause
34
| 84 — Can a shot carry lightning? | 20:17 | [A player-assembled electrical projectile](/Hold%20The%20Flood/Build%20Comparison#can-a-shot-carry-lightning), with an early experiment, a later use beyond cover and the stronger local alternative |
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
35
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
36
Each package received one focused critique, one response and PM checks. These are completed design proposals, not tested gameplay. The new Ricochet and Gravity controls remain proposed alternatives to the current detailed equipment rules. The two renewed-route examples do not yet cover every shifted layout or combination of permanent seals.
6487d5 Anonymous 2026-09-10 15:14:39
Record owner-requested token pause; suspend active forecasts
37
20e33e Anonymous 2026-09-15 20:19:54
Record completed build comparison and owner budget pause
38
## Paused — next work after resumption
474440 Anonymous 2026-09-09 13:05:20
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
39
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
40
| Outcome | Owner and current state | Next delivery, Jerusalem time |
41
|---|---|---|
20e33e Anonymous 2026-09-15 20:19:54
Record completed build comparison and owner budget pause
42
| 84 — Can a shot carry lightning? | Closed; Systems and reviewer stopped | Reviewed **20:17**; no further round assigned |
43
| 38 — Full-design readiness, still reopened | Outside-edit preservation audit completed; eleven factual/reference corrections published. Supporting readability and broader experience coverage remain | Reassess after resumption; previous **23 September**, range **21–28 September**, is suspended |
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
44
5b6e32 Anonymous 2026-09-15 16:34:53
Close reviewed Receiver Vault expedition and forecast enemy-guide review F2.24
45
Read the scene in [Hordes and Builds](/Hold%20The%20Flood/Hordes%20and%20Builds), with placement in [Moving Scan Expedition](/Hold%20The%20Flood/Moving%20Scan%20Expedition). Its added rail, viewing bay, bridge and receiver make a fourteenth proposed major mechanism; physical fit and fun remain untested. The new Receiver Vault proposal tackles a different risk: a later expedition must deliver growing power and a horde climax before its quiet discovery. It uses the existing vault rooms, enemies and machinery; the new reward opportunity remains a proposal. Earlier rescue and station-completion comparisons are ready for owner reaction.
1f816c Anonymous 2026-09-10 10:55:46
Record completed discovery/home correction and active combat/build batch
46
20e33e Anonymous 2026-09-15 20:19:54
Record completed build comparison and owner budget pause
47
The tracker contains **84 outcomes: 81 preparation outcomes closed, none active, 1 readiness assessment reopened and 2 parked**. The completed preservation audit and its corrections belong within outcome 38; they do not close overall readiness. These counts are not a percentage of the finished game. Outcomes 39–40 remain parked and unaccepted pending the core corrections.
1f816c Anonymous 2026-09-10 10:55:46
Record completed discovery/home correction and active combat/build batch
48
20e33e Anonymous 2026-09-15 20:19:54
Record completed build comparison and owner budget pause
49
Systems has finished the single response and is confirmed idle. The independent reviewer and temporary design support have stopped. The owner’s budget pause prevents further assignments; no new agent or manual forwarding is needed. Automatic wake-ups are paused and will not restart merely because the budget resets.
1f816c Anonymous 2026-09-10 10:55:46
Record completed discovery/home correction and active combat/build batch
50
799925 Anonymous 2026-09-15 11:53:48
Align resumed design work and confirmed expedition choices
51
## Delivery forecast
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
52
20e33e Anonymous 2026-09-15 20:19:54
Record completed build comparison and owner budget pause
53
Forecast **F2.39**, updated 15 September for the owner’s pause. The current comparison is complete. No live calendar deadline is promised while the restart date is unknown; re-estimate on resumption. The previous first-pass allowance was about five further active working days, with low confidence.
9c9651 Anonymous 2026-09-09 19:15:21
Record the corrected proposal ready for owner reaction and remaining wiki work
54
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
55
| Milestone | Target | Plausible range | Completion means |
c8ab81 Anonymous 2026-09-10 10:25:09
Continue independent wiki correction and report actual role availability
56
|---|---|---|---|
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
57
| Reviewed sealed-source expedition | **Completed today 13:26** | Earlier than 15:00 target | Proposal, critique, response and integration into its owning references |
58
| Clear six-page reading path | **Completed today 13:26** | Earlier than 16:00 target | Main journey and combat branch revised and checked against current rules |
c3f7d7 Anonymous 2026-09-15 14:02:52
F2.8: moving scan complete, preservation corrections published, short rescue working
59
| Moving-scan proposal | **Delivered 13:39** | Earlier than 14:15 target | Concrete location, rising fight, build climax, discovery and next trip |
60
| Reviewed moving-scan proposal | **Completed 14:01** | Earlier than 15:30 target | One critique, one response and verified integration across six articles |
61
| Outside-edit preservation audit | **Completed 13:47; follow-up corrections 13:52** | Earlier than 14:15 report target | All 58 captured changes inspected with provenance; identified factual/preservation defects corrected |
c097f1 Anonymous 2026-09-15 14:07:33
Rescue draft delivered; single critique working
62
| Short-rescue proposal | **Delivered 14:03** | Earlier than 14:30 target | One personal rescue scene and two comparable failure approaches |
74ec6e Anonymous 2026-09-15 14:22:20
F2.10: rescue comparison ready for owner choice; station completion working
63
| Reviewed short-rescue proposal | **Completed 14:20** | Earlier than 15:15 target | One critique and response; owner comparison published, shared rules await selection |
27d380 Anonymous 2026-09-15 14:37:26
Link reviewed station-completion alternatives and update forecast F2.12
64
| Station-completion comparison | **Completed 14:36** | Earlier than 16:00 target | Two reviewed consequences of the last connection, with the next home visit and expedition |
bc7aa4 Anonymous 2026-09-15 15:02:29
Record reviewed campaign scope and journal next delivery F2.15
65
| Costed campaign comparison | **Completed 14:56** | Earlier than 17:00 target | Named retained, moved and removed experiences; current counts and historical allowance distinguished |
e7ba8b Anonymous 2026-09-15 15:08:14
Record accepted journal and active campaign overview F2.16
66
| Readable language journal | **Completed 15:06** | Earlier than 16:15 target | Existing journal explanation leads with player use and discovery, with current rules preserved through review |
3f2d87 Anonymous 2026-09-15 15:34:42
Record completed campaign overview and active cast rewrite F2.18
67
| Readable campaign overview | **Completed 15:26** | Earlier than 16:00 target | Opening through deeper and optional play shows horde growth, discoveries and people, with current proposals distinguished |
8d9976 Anonymous 2026-09-15 15:46:03
Record reviewed cast and active equipment reference F2.19
68
| Readable cast and rescue map | **Completed 15:44** | Earlier than 17:00 target | Five people and fifteen scenes lead with their choices and changing relationships; current waiting places and unresolved rescue choices remain clear |
615ba5 Anonymous 2026-09-15 16:09:53
Close equipment guide and forecast Receiver Vault expedition F2.21
69
| Readable equipment reference | **Completed 16:05** | Earlier than revised 16:30 target | A reader can picture the twelve parts and their combinations, find actual costs and distinguish current mechanisms from proposed alternatives |
5b6e32 Anonymous 2026-09-15 16:34:53
Close reviewed Receiver Vault expedition and forecast enemy-guide review F2.24
70
| Reviewed Receiver Vault expedition | **Completed 16:30** | Earlier than revised 17:15 target | A complete later expedition, ordinary growth and a major transformation used during the fight, a meaningful climax and a discovery that changes the next trip; one critique and response |
e5ff81 Anonymous 2026-09-15 16:49:17
Record completed enemy guide and divergent upgrade proposal underway
71
| Readable enemy guide | **Completed 16:46** | Earlier than revised 17:15 target | The nine creatures, their horde roles and two setpieces are explained through what the player sees, chooses and overcomes, with actual behaviors retained through review |
c2350d Anonymous 2026-09-15 17:27:24
Close the upgrade comparison; record active patient-scene work and delivery forecast F2.27
72
| Divergent upgrade choices | **Completed 17:18** | Earlier than revised 18:00 target | The same equipment supports two different earned growth paths, a useful hybrid and understandable choices with costs; one critique and response |
5fe4f7 Anonymous 2026-09-15 18:07:44
F2.29: patient scene complete; opening rewrite working with independent criteria ready
73
| A person in the crowd | **Completed 17:59** | Earlier than revised 18:50 target | One existing ward encounter becomes a personal discovery, with an optional home response, a simpler record-only alternative and explicit renewal/content costs |
00dd5c Anonymous 2026-09-15 18:31:16
F2.31: opening complete; four-room hospital pass working with current forecasts
74
| Your first useful invention | **Completed 18:28** | Earlier than revised 19:10 target | A newcomer can picture a useful first equipment discovery, the same part's station tradeoff, crowd pressure, relief and the next human mystery |
e8f2fb Anonymous 2026-09-15 18:57:43
Close clinical pass; show decision-guide work and forecast F2.33
75
| A hospital worth remembering | **Completed 18:55** | Earlier than revised 19:30 target | Four existing [clinical spaces](/Hold%20The%20Flood/Station%20Room%20And%20Module%20Inventory#region-2-clinical-exchange-r11r20) become memorable places of care, crowd pressure and disturbing discovery while preserving their current rules |
6bfbfd Anonymous 2026-09-15 19:27:27
Close reviewed decision guide; assign astronaut comparison and update forecast
76
| A current decision guide | **Completed 19:23** | Earlier than revised 20:00 target | Current proposals and choices explained, substantive objections retained, routine reference repairs verified |
134014 Anonymous 2026-09-15 19:50:04
Close astronaut comparison; record active equipment interaction and forecast
77
| Who is the astronaut? | **Completed 19:47** | Earlier than revised 20:30 target | Two contrasting personalities and a quieter alternative, with one critique, response and verified integration |
20e33e Anonymous 2026-09-15 20:19:54
Record completed build comparison and owner budget pause
78
| Can a shot carry lightning? | **Completed 20:17** | Earlier than revised 21:30 target | Existing hybrid versus proposed remote electrical delivery, with a discoverable experiment, horde payoff and explicit costs |
79
| Coherent revised design wiki | **Suspended**; previous 23 September | Previous 21–28 September; rebase after restart | Readable core and supporting rules aligned; consequential choices explicit |
80
| Full detailed campaign design | **Suspended**; previous 24 November | Previous 3 November–22 December; rebase after restart | Proposed progression, content, mysteries, ending paths and production scope developed across the campaign |
49369b Anonymous 2026-09-08 16:27:44
PM forecast F1.2: actual outline completion and next scoped deliveries
81
20e33e Anonymous 2026-09-15 20:19:54
Record completed build comparison and owner budget pause
82
The comparison completed one critique, one response and PM verification. Its bank-arming relationship remains an authored proposal, and the value of its geometry, hints and reconfiguration is untested. Acceptance makes it ready to compare; it does not adopt it into the detailed equipment rules. The full-wiki estimate had low confidence, and the campaign estimate very low confidence pending a fresh content estimate. These are documentation forecasts, not gameplay validation or development dates.
dc0998 Anonymous 2026-09-09 19:06:07
Record completed critique, focused response and earlier owner delivery estimate
83
20e33e Anonymous 2026-09-15 20:19:54
Record completed build comparison and owner budget pause
84
F2.39 suspends the overall dates because the owner requested a budget pause. F2.38 recorded the draft at 19:59 against a 21:30 draft target; critique found gaps in assembly and spatial advantage. The single response targeted 21:00 and review 21:30, then completed review at 20:17. Earlier overall targets moved from 15 September/17 November to 23 September/24 November after five paused calendar days and the outside review’s core-loop findings. Those prior targets and their ranges remain above as history; the restart date and available capacity will determine new dates.
e3dd63 Anonymous 2026-09-10 12:07:59
Record completed combat/build proposals and active room/information work with revised forecasts
85
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
86
## What still needs work
95a115 Anonymous 2026-09-10 13:59:59
Close build/expedition batch and forecast story/survival work
87
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
88
- Broader expeditions must sustain fresh combat, meaningful growth and different discoveries around persistent changes.
89
- Build combinations need distinct decisions and room for surprising interactions. The new alternatives still need selection and detailed integration.
90
- Rooms, people, languages and story consequences need concrete scenes with emotional and discovery payoffs.
c3f7d7 Anonymous 2026-09-15 14:02:52
F2.8: moving scan complete, preservation corrections published, short rescue working
91
- Supporting pages need the same clarity as the entry path. The captured outside-edit bundle has been audited and its identified factual defects corrected; that preservation check does not establish that every page is easy for a human to read.
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
92
- Full readiness requires a coherent player journey and honest scope, beyond internally consistent tables.
284b2f Anonymous 2026-09-10 11:47:03
Record submitted combat response and explain pending growth-rhythm choice
93
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
94
## Owner choices
284b2f Anonymous 2026-09-10 11:47:03
Record submitted combat response and explain pending growth-rhythm choice
95
74ec6e Anonymous 2026-09-15 14:22:20
F2.10: rescue comparison ready for owner choice; station completion working
96
The two immediate combat questions are answered in the [Owner Brief](/Hold%20The%20Flood/Brief). The current concrete choice is in [Rescue Under Pressure](/Hold%20The%20Flood/Rescue%20Under%20Pressure): if the astronaut dies after Yeva starts crossing the prepared short route, does she finish and reach the ship, or take shelter and require a new attempt after the shift? PM recommends finishing; the stronger failure/retry case and both safety exceptions are explained. The owner has been asked directly; no answer is inferred. The first survivor and wider survivor mortality remain open.
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
97
74ec6e Anonymous 2026-09-15 14:22:20
F2.10: rescue comparison ready for owner choice; station completion working
98
The earlier build-priority question also remains: which direction to deepen first. It does not discard the others or approve every proposed rule.
99
bc7aa4 Anonymous 2026-09-15 15:02:29
Record reviewed campaign scope and journal next delivery F2.15
100
[Completing The Station](/Hold%20The%20Flood/Completing%20The%20Station) is ready to compare: finish securing a dependable home, or add an optional departure carrying the entire place. This is prepared for a subsequent owner choice; the rescue question above remains the current question. The [campaign scope comparison](/Hold%20The%20Flood/Campaign%20Scope%20Choices) is reviewed and ready for subsequent reaction; neither size is selected, and existing story alternatives remain available for reaction. [Open Decisions](/Hold%20The%20Flood/Open%20Decisions) is the wider issue index; its recommendations remain proposals. Its fourteen categories are not fourteen answers needed before work can continue.