History
| Date | Author | Commit Message | ||
|---|---|---|---|---|
|
|
|
2026-09-22 22:45:28 9a21fd | Anonymous | Record owner Entrance scope, diagnostic decision and implementation authorization |
|
|
|
2026-09-20 16:48:00 fa11d9 | Anonymous | Record owner decision to replace Q with horizontal right-mouse camera rotation |
|
|
|
2026-09-19 17:11:01 ee8dd4 | Anonymous | Tenth review: the owner designs each room himself; the station starts empty |
|
|
|
2026-09-17 16:16:42 7b055e | Anonymous | Ninth review: the rooms as built, the faults the inventory found, what was fixed and what is open |
|
|
|
2026-09-17 14:54:42 fd6e48 | Anonymous | Eighth review: plain words, the explanation box, the work bar; the new starting inventory |
|
|
|
2026-09-17 12:19:38 c7ada5 | Anonymous | The grid pack is built (owner: build it, 2026-09-17) |
|
|
|
2026-09-17 11:53:35 d4c8cc | Anonymous | The pack: range 15 m and adjacency range (owner, 2026-09-17) |
|
|
|
2026-09-17 11:47:24 2fbf98 | Anonymous | The pack: the owner's item card is the template (2026-09-17) |
|
|
|
2026-09-17 11:38:32 c8fcab | Anonymous | The pack: when it opens and that it grows (owner, 2026-09-17) |
|
|
|
2026-09-17 11:32:06 e91d11 | Anonymous | Seventh review: the inventory is a grid with shaped items (owner, 2026-09-17) |
|
|
|
2026-09-16 20:18:53 5401d5 | Anonymous | Sixth review: rig links leave with their part; live pack in the station |
|
|
|
2026-09-16 19:34:06 e343be | Anonymous | Fifth review: opening retune, teaching pair, threat ranking, three-layout cycle |
|
|
|
2026-09-16 18:42:53 3a2b39 | Anonymous | Fourth review: every interaction press answers; closed doors shut both rooms |
|
|
|
2026-09-16 16:11:13 b9393d | Anonymous | Record the third-review owner decisions of 2026-09-16 (one prompt in the room, state words, painted marks) |
|
|
|
2026-09-16 15:44:21 32417d | Anonymous | Rotation on Q alone; E stays interact (owner, 2026-09-16) |
|
|
|
2026-09-16 15:19:34 311fae | Anonymous | Note the near-wall kerb that keeps the turned view open |
|
|
|
2026-09-16 15:12:31 ab72db | Anonymous | Record the second-review owner decisions of 2026-09-16 (view turns, keys, names, unbound thresholds, text scale) |
|
|
|
2026-09-16 14:47:47 a70eb0 | Anonymous | Record the 2026-09-16 owner decisions on presentation at the first implementation |
|
|
|
2026-09-15 19:18:16 791d89 | Anonymous | Integrate reviewed decision guide and verified current-reference repairs |
|
|
|
2026-09-15 11:50:28 3607fd | Anonymous | Record owner choices: fresh hordes each expedition and regular combat growth |
|
|
|
2026-09-10 10:26:53 0e8d3b | Anonymous | Record owner choice: expedition upgrades reset on every return home |
|
|
|
2026-09-08 15:34:12 1e4dc3 | Anonymous | Record owner preference for opening A |
|
|
|
2026-09-08 14:41:26 d3f7cd | Anonymous | Owner chooses persistent room connections and a whole-station deep puzzle |
|
|
|
2026-09-08 13:55:29 92c102 | Anonymous | Owner chooses shifting station and short rescues; records revisable hospital and captive-god draft |
|
|
|
2026-09-08 13:06:35 389357 | Anonymous | Record owner additions feedback and replace death-cache direction |
|
|
|
2026-09-08 10:36:14 a6f303 | Anonymous | Record owner choice of mostly automatic fire and manual specials |
|
|
|
2026-09-07 20:50:26 cc7abf | Anonymous | Owner decision: pause the rest of the game while the journal is open |
|
|
|
2026-09-07 17:27:09 5e70e5 | Anonymous | Owner confirmed Hold The Horde; retain URLs and link PM restart setup |
|
|
|
2026-09-07 16:48:01 3cba6b | Anonymous | Restart cleanup: retain owner requirements and reusable guidance; remove obsolete commentary |
|
|
|
2026-09-07 15:34:11 4eb748 | Anonymous | Vision: connect owner station premise to first sortie and two builds |
|
|
|
2026-09-07 15:29:17 ab030a | Anonymous | Owner premise: establish astronaut, oxygen, hostile station, revival, survivors and two alien languages; preserve prior visions in immutable history |
|
|
|
2026-09-07 15:18:53 e2e390 | Anonymous | Vision: establish portable survivorlike build foundation |
|
|
|
2026-09-07 15:09:35 b9766b | Anonymous | Vision: handle room messages through 56 |
|
|
|
2026-09-07 15:07:04 51e58b | Anonymous | Owner correction: reject coded-song premise and require convincing survivorlike identity without literal-flood assumption |
|
|
|
2026-09-07 14:57:28 6fd398 | Anonymous | Vision: handle room messages through 52 |
|
|
|
2026-09-07 14:43:28 11c29f | Anonymous | Vision: make Choir an environmental wipe; advance review checkpoint |
|
|
|
2026-09-07 14:14:44 342043 | Anonymous | Visionary: place honest first credits and post-lift goal; make relief an active inference, locate Flood below and legalize first loadout; process Equipment r38/REV106 r2 |
|
|
|
2026-09-07 13:59:59 be6973 | Anonymous | Visionary: record Equipment and World dispositions; advance room checkpoint to 37 |
|
|
|
2026-09-07 13:53:47 79504c | Anonymous | Visionary: correct Choir Cascade to legal two-bank six-cell chassis; preserve Siphon generic rule; advance cursor 32 |
|
|
|
2026-09-07 13:50:29 7907ca | Anonymous | Visionary: record dependent Colony cleanup; advance room checkpoint to 31 |
|
|
|
2026-09-07 13:42:34 c6adc5 | Anonymous | Visionary: record editorial and submission messages; advance room checkpoint to 30 |
|
|
|
2026-09-07 13:38:51 d905c0 | Anonymous | Visionary: propose The World Below as discovery-first replacement premise, expedition and earned cascade build; record cursor 28 |
|
|
|
2026-09-07 13:28:03 44aab7 | Anonymous | Visionary: handle owner cleanup and submission messages; advance room checkpoint to 24 |
|
|
|
2026-09-07 13:24:29 c016c9 | Anonymous | Visionary: record adversarial review limit and advance room checkpoint to 22 |
|
|
|
2026-09-07 13:22:01 6210ae | Anonymous | Owner answers: prioritize discovery and expressive builds; reject harvesting twist and supersede prior scope |
|
|
|
2026-09-07 13:21:21 d97476 | Anonymous | Visionary: accept combined purchased services on same-state evidence; advance room checkpoint to 21 |
|
|
|
2026-09-07 13:16:10 68fff6 | Anonymous | Visionary: show Flood pressure, worthwhile intervention combat and an inhabited refuge response; retire chat-bound notice |
|
|
|
2026-09-07 12:07:00 6d869e | Anonymous | Visionary: remove Siphon packing gate; align optional Tram conversion with earned mastery; preserve prior sources |
|
|
|
2026-09-07 11:05:00 0fff74 | Anonymous | PMU008: preserve Visionary synthesis and record owner mandate and next milestone |
|
|
|
2026-09-07 11:01:10 04e9fa | Anonymous | Visionary: unify player, theme and story; add keep/change/cut test; replace stale open questions |
|
|
|
2026-09-07 11:01:03 50b4bb | Anonymous | PMU008: record owner rejection of pitch and authorize vision-led design revision |
|
|
|
2026-09-07 09:14:20 0cba02 | Anonymous | PMR007 D026: simplify comparison service without selling required route information |
|
|
|
2026-09-06 21:58:59 77e392 | Anonymous | PMR006: record presentation-category and free-asset audit sequence without approval |
|
|
|
2026-09-06 20:40:53 70b6b1 | Anonymous | PMR004: record provisional campaign, rack, colony and mystery decisions; correct stale D018 and staffing |
|
|
|
2026-09-06 19:38:12 1bd68a | Anonymous | PMU004 D019–D021: owner rejects short scope; expanded campaign, topic ownership and proposed designers |
|
|
|
2026-09-06 18:19:35 28fb1c | Anonymous | PMU002: owner-added team, bounded assignments and explicit coordination rulings — Brief |
|
|
|
2026-09-06 17:34:13 3cf14c | Anonymous | PMR001: review concept submissions, select provisional A and assign integrated design corrections — Brief |
|
|
|
2026-09-06 16:05:31 a449b2 | Anonymous | PM: confirm enemy Flood and started design team; assign first wiki handoffs |
|
|
|
2026-09-06 15:54:03 cc61a3 | Anonymous | PM: record owner brief, design-only gate, asset restrictions, and revised team |
|
|
|
2026-09-06 15:15:55 7d0069 | Anonymous | PM: record confirmed instructions and unresolved game brief |
