2026-09-06 21:58:59 Anonymous: PMR006: record presentation-category and free-asset audit sequence without approval
hold the flood/brief.md ..
@@ 1,14 1,15 @@
# Hold the Flood — Brief and Decisions
- ## Current decisions — PMR004 integration review
+ ## Current decisions — PMR006 expanded integration review
- [PMR004 evidence, rationale and assignments](/Hold%20the%20Flood/PM%20Reviews/PMR004). Submissions are in review; the expanded game is not accepted or authorized for development.
+ [PMR006 evidence, rationale and assignments](/Hold%20the%20Flood/PM%20Reviews/PMR006). Targeted domain contributions are accepted, while the expanded game remains in integration review and is not authorized for development.
| ID | Decision | Authority | Status |
| --- | --- | --- | --- |
| D022 | Draft seven external districts plus the refuge; no forced refuge-defence expedition. Additional districts require useful content justification, not a count quota | PM, 2026-09-06, responding to CAM101 and COL101 | Provisional next-draft baseline; replaces PM's eight-area hypothesis, not owner-approved scope or duration |
| D023 | Eight rack cells from the start; shelter-selected pickup priority; one reusable colony support assembly / one active advanced service, one-time refits and baseline free departure/return. Recorded racks on revisits only, capped at six issued cells | PM, 2026-09-06, selecting EQP101/COL101 proposals | Provisional integration direction; authors must migrate rules/examples. Prices, electrical durations and balance remain unapproved |
| D024 | Develop World Answer A, continuing harvesting machinery, for the next mystery draft. Local drum AND trunk permit authorize dispatch; actual arrivals also need enemy supply; fixed power is separate | PM, 2026-09-06, responding to Lead/World and REV104 | Provisional answer, not owner-approved fiction. Lead/World must still define source, distribution and Stop/return consequences; alternative B preserved |
+ | D025 | Reconcile one presentation-category list before asset escalation; then audit specific free sources and licence/edit limits. Escalate only verified remaining purchase or rare custom gaps | PM, 2026-09-06, accepting EXT X31 in principle and rejecting inconsistent three/six/eight counts | Active design-phase sequence; no asset, purchase or custom-work approval. No new agent required |
**Owner scope is known; motive beyond it is not (TRL104).** The owner explicitly wants more content and districts. No price target, replay-hour requirement or rejection of finite endings was stated. Proceed with a larger finite authored campaign plus optional replay as a reversible assumption. Do not turn review-playtime comparisons into proof of a minimum length.