Blame

aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
1
# Hold The Horde — Progress
2
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
3
Updated **15 September**. The owner has chosen **fresh hordes each expedition** and **regular growth through fighting, with larger transformations**. Permanent changes and carried property remain; temporary combat power resets whenever you return home.
6487d5 Anonymous 2026-09-10 15:14:39
Record owner-requested token pause; suspend active forecasts
4
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
5
## Ready to read
6487d5 Anonymous 2026-09-10 15:14:39
Record owner-requested token pause; suspend active forecasts
6
8d9976 Anonymous 2026-09-15 15:46:03
Record reviewed cast and active equipment reference F2.19
7
**Twelve proposal or editorial packages have been completed today.** The latest finished at **15:44 Jerusalem time**: five readable survivor portraits and their fifteen scenes, with a rescue-retry inconsistency corrected. The separate short-rescue choice remains open.
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
8
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
9
Start with [The Game](/Hold%20The%20Flood/The%20Game), continue through [three expeditions into the observation ward](/Hold%20The%20Flood/Expedition%20Proposal), then [Coming Home](/Hold%20The%20Flood/Coming%20Home) and [Discovery in a Changing Station](/Hold%20The%20Flood/Connecting%20The%20Station). For combat, follow [Hordes and Builds](/Hold%20The%20Flood/Hordes%20and%20Builds) into [Three Ways to Break a Horde](/Hold%20The%20Flood/Build%20Comparison).
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
10
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
11
| Completed package | Actual time today | What changed |
12
|---|---|---|
13
| 59–61 — Builds and three expeditions | 12:08 | Different movement and payoff proposals; successive trips pursue different discoveries |
14
| 56–58 — Hospital story and survival | 12:32 | Two possible core mysteries; comparable loadouts with a visible cost for the heavier kit |
15
| 62–63 — Regular growth and renewed combat | 12:45 | An ordinary improvement before a major breakthrough, with crowds and discovery quiet placed along an existing route |
16
| 64–65 — Combat after permanent seals | 13:26 | A second route state retains the seals and shortcut while enemies arrive from a distant open source; room and encounter references agree |
17
| 66–67 — Six main reading pages | 13:26 | Player scenes lead; unfamiliar terms are explained; onward links work; obsolete clearing and growth claims are removed |
c3f7d7 Anonymous 2026-09-15 14:02:52
F2.8: moving scan complete, preservation corrections published, short rescue working
18
| 68 — Moving scan and bridge | 14:01 | A rising fight through Cable Junction leads to a local optical discovery and usable bridge; living returns preserve the shortcut, while changed alignments have a visible rescan route |
74ec6e Anonymous 2026-09-15 14:22:20
F2.10: rescue comparison ready for owner choice; station completion working
19
| 69 — Short rescue and death comparison | 14:20 | A person’s records, a short horde crossing and a homecoming; two unselected failure approaches with explicit protection and retry costs |
27d380 Anonymous 2026-09-15 14:37:26
Link reviewed station-completion alternatives and update forecast F2.12
20
| 70 — Completing the station | 14:36 | The final join secures the last piece of a dependable home; an alternative adds optional departure with the whole station, with its production and story costs explicit |
bc7aa4 Anonymous 2026-09-15 15:02:29
Record reviewed campaign scope and journal next delivery F2.15
21
| 71 — Campaign scope comparison | 14:56 | A 40-room reference versus 36 denser rooms, with named losses and retained work; current mechanism counts aligned and old hour allowances clearly qualified |
e7ba8b Anonymous 2026-09-15 15:08:14
Record accepted journal and active campaign overview F2.16
22
| 72 — Language journal | 15:06 | [Capture, compare and test a reading](/Hold%20The%20Flood/Language%20And%20Journal), with both language examples and the value of old records explained in place |
3f2d87 Anonymous 2026-09-15 15:34:42
Record completed campaign overview and active cast rewrite F2.18
23
| 73 — Whole campaign | 15:26 | [The campaign from docking to deepest discoveries](/Hold%20The%20Flood/Whole%20Game%20Outline), with the horde/build/bridge climax, human consequences and open endings explained |
8d9976 Anonymous 2026-09-15 15:46:03
Record reviewed cast and active equipment reference F2.19
24
| 74 — People and short rescues | 15:44 | [Five people and their fifteen scenes](/Hold%20The%20Flood/Cast%20And%20Short%20Rescue%20Map), with their wishes, disagreements and later changes of belief explained before the shared rules |
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
25
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
26
Each package received one focused critique, one response and PM checks. These are completed design proposals, not tested gameplay. The new Ricochet and Gravity controls remain proposed alternatives to the current detailed equipment rules. The two renewed-route examples do not yet cover every shifted layout or combination of permanent seals.
6487d5 Anonymous 2026-09-10 15:14:39
Record owner-requested token pause; suspend active forecasts
27
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
28
## Working now
474440 Anonymous 2026-09-09 13:05:20
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
29
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
30
| Outcome | Owner and current state | Next delivery, Jerusalem time |
31
|---|---|---|
8d9976 Anonymous 2026-09-15 15:46:03
Record reviewed cast and active equipment reference F2.19
32
| 75 — Equipment reference | Systems is rewriting the twelve-part catalogue around visible behavior, useful combinations and meaningful carrying choices. Its reviewer has saved independent criteria and is ready for the submitted page | Draft **16:30**, range **16:00–17:15**; reviewed page **17:30**, range **16:45–18:30** |
c3f7d7 Anonymous 2026-09-15 14:02:52
F2.8: moving scan complete, preservation corrections published, short rescue working
33
| 38 — Full-design readiness, still reopened | Outside-edit preservation audit completed; eleven factual/reference corrections published. Supporting readability and broader experience coverage remain | Readiness reassessment with the coherent wiki pass, target **23 September**, range **21–28 September** |
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
34
4f2ece Anonymous 2026-09-15 14:16:35
F2.9: rescue response and station-completion proposal in parallel
35
Read the scene in [Hordes and Builds](/Hold%20The%20Flood/Hordes%20and%20Builds), with placement in [Moving Scan Expedition](/Hold%20The%20Flood/Moving%20Scan%20Expedition). Its added rail, viewing bay, bridge and receiver make a fourteenth proposed major mechanism; physical fit and fun remain untested. The current proposals tackle two experience risks: making a short rescue feel like helping a person, and making the final station connection produce a lasting, perceptible payoff.
1f816c Anonymous 2026-09-10 10:55:46
Record completed discovery/home correction and active combat/build batch
36
8d9976 Anonymous 2026-09-15 15:46:03
Record reviewed cast and active equipment reference F2.19
37
The tracker contains **75 outcomes: 71 preparation outcomes closed, 1 current design outcome, 1 readiness assessment reopened and 2 parked**. The completed preservation audit and its corrections belong within outcome 38; they do not close overall readiness. These counts are not a percentage of the finished game. Outcomes 39–40 remain parked and unaccepted pending the core corrections.
1f816c Anonymous 2026-09-10 10:55:46
Record completed discovery/home correction and active combat/build batch
38
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
39
The original Claude Reviewer received the earlier assignment automatically but stopped at a monthly spend limit at 13:03. Temporary GPT support completed that review. The Lead was absent from the same directory check; availability will be checked again before a future handoff. No new permanent agent or manual message forwarding is needed for the current assignments.
1f816c Anonymous 2026-09-10 10:55:46
Record completed discovery/home correction and active combat/build batch
40
799925 Anonymous 2026-09-15 11:53:48
Align resumed design work and confirmed expedition choices
41
## Delivery forecast
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
42
8d9976 Anonymous 2026-09-15 15:46:03
Record reviewed cast and active equipment reference F2.19
43
Forecast **F2.19**, updated 15 September. Dates assume work continues today and about five further active working days for the first full pass.
9c9651 Anonymous 2026-09-09 19:15:21
Record the corrected proposal ready for owner reaction and remaining wiki work
44
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
45
| Milestone | Target | Plausible range | Completion means |
c8ab81 Anonymous 2026-09-10 10:25:09
Continue independent wiki correction and report actual role availability
46
|---|---|---|---|
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
47
| Reviewed sealed-source expedition | **Completed today 13:26** | Earlier than 15:00 target | Proposal, critique, response and integration into its owning references |
48
| Clear six-page reading path | **Completed today 13:26** | Earlier than 16:00 target | Main journey and combat branch revised and checked against current rules |
c3f7d7 Anonymous 2026-09-15 14:02:52
F2.8: moving scan complete, preservation corrections published, short rescue working
49
| Moving-scan proposal | **Delivered 13:39** | Earlier than 14:15 target | Concrete location, rising fight, build climax, discovery and next trip |
50
| Reviewed moving-scan proposal | **Completed 14:01** | Earlier than 15:30 target | One critique, one response and verified integration across six articles |
51
| Outside-edit preservation audit | **Completed 13:47; follow-up corrections 13:52** | Earlier than 14:15 report target | All 58 captured changes inspected with provenance; identified factual/preservation defects corrected |
c097f1 Anonymous 2026-09-15 14:07:33
Rescue draft delivered; single critique working
52
| Short-rescue proposal | **Delivered 14:03** | Earlier than 14:30 target | One personal rescue scene and two comparable failure approaches |
74ec6e Anonymous 2026-09-15 14:22:20
F2.10: rescue comparison ready for owner choice; station completion working
53
| Reviewed short-rescue proposal | **Completed 14:20** | Earlier than 15:15 target | One critique and response; owner comparison published, shared rules await selection |
27d380 Anonymous 2026-09-15 14:37:26
Link reviewed station-completion alternatives and update forecast F2.12
54
| Station-completion comparison | **Completed 14:36** | Earlier than 16:00 target | Two reviewed consequences of the last connection, with the next home visit and expedition |
bc7aa4 Anonymous 2026-09-15 15:02:29
Record reviewed campaign scope and journal next delivery F2.15
55
| Costed campaign comparison | **Completed 14:56** | Earlier than 17:00 target | Named retained, moved and removed experiences; current counts and historical allowance distinguished |
e7ba8b Anonymous 2026-09-15 15:08:14
Record accepted journal and active campaign overview F2.16
56
| Readable language journal | **Completed 15:06** | Earlier than 16:15 target | Existing journal explanation leads with player use and discovery, with current rules preserved through review |
3f2d87 Anonymous 2026-09-15 15:34:42
Record completed campaign overview and active cast rewrite F2.18
57
| Readable campaign overview | **Completed 15:26** | Earlier than 16:00 target | Opening through deeper and optional play shows horde growth, discoveries and people, with current proposals distinguished |
8d9976 Anonymous 2026-09-15 15:46:03
Record reviewed cast and active equipment reference F2.19
58
| Readable cast and rescue map | **Completed 15:44** | Earlier than 17:00 target | Five people and fifteen scenes lead with their choices and changing relationships; current waiting places and unresolved rescue choices remain clear |
59
| Readable equipment reference | Today **17:30** | **16:45–18:30** | A reader can picture the twelve parts and their combinations, find actual costs and distinguish current mechanisms from proposed alternatives |
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
60
| Coherent revised design wiki | **23 September** | **21–28 September** | Readable core and supporting rules aligned; consequential choices explicit |
61
| Full detailed campaign design | **24 November** | **3 November–22 December** | Proposed progression, content, mysteries, ending paths and production scope developed across the campaign |
49369b Anonymous 2026-09-08 16:27:44
PM forecast F1.2: actual outline completion and next scoped deliveries
62
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
63
Near-term estimates have moderate confidence. The full-wiki estimate has low confidence. The campaign date has very low confidence and remains a planning allowance pending a fresh content estimate. None promises development, validated fun or the desired number of playable hours; those require a separately authorized phase.
dc0998 Anonymous 2026-09-09 19:06:07
Record completed critique, focused response and earlier owner delivery estimate
64
8d9976 Anonymous 2026-09-15 15:46:03
Record reviewed cast and active equipment reference F2.19
65
The pre-pause targets were 15 September for the readable wiki and 17 November for detailed campaign design. Five paused calendar days and the outside review's core-loop findings moved those dates. Today's first packet finished at 12:08 against a revised 13:00 target; subsequent packages finished at 12:32, 12:45 and 13:26. F2.19 records the campaign overview completed at 15:26 and the cast page at 15:44. The equipment reference is now being rewritten; its review target is 17:30. The cast review found that death before a rescue retry must preserve the current shelter, and the relevant pages now agree. The home-loop page also now correctly says that either return brings fresh hordes next expedition. The journal finished at 15:06. The reviewed scope comparison and factual reference alignment finished at 14:56. The station-completion comparison finished at 14:36. The rescue comparison was completed at 14:20. The moving scan and preservation audit are complete. The overall dates remain unchanged because supporting design and creative choices still need work. Earlier estimates remain in revision history and the forecast checkpoint.
e3dd63 Anonymous 2026-09-10 12:07:59
Record completed combat/build proposals and active room/information work with revised forecasts
66
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
67
## What still needs work
95a115 Anonymous 2026-09-10 13:59:59
Close build/expedition batch and forecast story/survival work
68
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
69
- Broader expeditions must sustain fresh combat, meaningful growth and different discoveries around persistent changes.
70
- Build combinations need distinct decisions and room for surprising interactions. The new alternatives still need selection and detailed integration.
71
- Rooms, people, languages and story consequences need concrete scenes with emotional and discovery payoffs.
c3f7d7 Anonymous 2026-09-15 14:02:52
F2.8: moving scan complete, preservation corrections published, short rescue working
72
- Supporting pages need the same clarity as the entry path. The captured outside-edit bundle has been audited and its identified factual defects corrected; that preservation check does not establish that every page is easy for a human to read.
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
73
- Full readiness requires a coherent player journey and honest scope, beyond internally consistent tables.
284b2f Anonymous 2026-09-10 11:47:03
Record submitted combat response and explain pending growth-rhythm choice
74
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
75
## Owner choices
284b2f Anonymous 2026-09-10 11:47:03
Record submitted combat response and explain pending growth-rhythm choice
76
74ec6e Anonymous 2026-09-15 14:22:20
F2.10: rescue comparison ready for owner choice; station completion working
77
The two immediate combat questions are answered in the [Owner Brief](/Hold%20The%20Flood/Brief). The current concrete choice is in [Rescue Under Pressure](/Hold%20The%20Flood/Rescue%20Under%20Pressure): if the astronaut dies after Yeva starts crossing the prepared short route, does she finish and reach the ship, or take shelter and require a new attempt after the shift? PM recommends finishing; the stronger failure/retry case and both safety exceptions are explained. The owner has been asked directly; no answer is inferred. The first survivor and wider survivor mortality remain open.
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
78
74ec6e Anonymous 2026-09-15 14:22:20
F2.10: rescue comparison ready for owner choice; station completion working
79
The earlier build-priority question also remains: which direction to deepen first. It does not discard the others or approve every proposed rule.
80
bc7aa4 Anonymous 2026-09-15 15:02:29
Record reviewed campaign scope and journal next delivery F2.15
81
[Completing The Station](/Hold%20The%20Flood/Completing%20The%20Station) is ready to compare: finish securing a dependable home, or add an optional departure carrying the entire place. This is prepared for a subsequent owner choice; the rescue question above remains the current question. The [campaign scope comparison](/Hold%20The%20Flood/Campaign%20Scope%20Choices) is reviewed and ready for subsequent reaction; neither size is selected, and existing story alternatives remain available for reaction. [Open Decisions](/Hold%20The%20Flood/Open%20Decisions) is the wider issue index; its recommendations remain proposals. Its fourteen categories are not fourteen answers needed before work can continue.