# Hold The Horde — Progress
2
6788ba Anonymous 2026-09-10 13:34:27
Close combined review and record both authors working on corrections
3
**10 September 2026, 13:34. The room and information correction batch is integrated. The next work develops large-horde build payoffs and satisfying successive expeditions. All times are Jerusalem.**
474440 Anonymous 2026-09-09 13:05:20
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
4
e3dd63 Anonymous 2026-09-10 12:07:59
Record completed combat/build proposals and active room/information work with revised forecasts
5
We are addressing three owner concerns: a convincing survivorslike with hordes and spectacular builds, a readable wiki, and a clear account of the player's fun, excitement, challenge and emotions.
1f816c Anonymous 2026-09-10 10:55:46
Record completed discovery/home correction and active combat/build batch
6
e3dd63 Anonymous 2026-09-10 12:07:59
Record completed combat/build proposals and active room/information work with revised forecasts
7
## Completed today
1f816c Anonymous 2026-09-10 10:55:46
Record completed discovery/home correction and active combat/build batch
8
e3dd63 Anonymous 2026-09-10 12:07:59
Record completed combat/build proposals and active room/information work with revised forecasts
9
- **Discovery and home:** two rewritten articles, a combined critique and author response, accepted at 10:48. Read [Discovery in a changing station](/Hold%20The%20Flood/Connecting%20The%20Station) and [Home and the people you bring back](/Hold%20The%20Flood/Home%20And%20Colony%20Loop).
10
- **Combat and encounters:** a rewritten [Fighting the Horde](/Hold%20The%20Flood/Combat%20Rules), crowd roles and ten encounter placements. The single review and author response are complete. PM corrected the remaining source, rescue and mechanism inconsistencies and accepted this written outcome at 11:57.
11
- **Builds:** [Build Rules](/Hold%20The%20Flood/Build%20Rules) and two supporting references accepted at 12:05. The stored-energy climax now uses one manual command and automatically resumes charging; repeated menu rewiring is removed from that example.
57a61d Anonymous 2026-09-10 12:54:09
Close room and information batch and schedule horde-scale builds and successive expeditions
12
- **Rooms and player information:** the corrected room inventory, player-information article, equipment catalogue and save-state reference were accepted at 12:51, following one review and author response. Shared encounter and reward rules are aligned.
eae020 Anonymous 2026-09-10 12:39:39
Record completed room and information review and earlier correction forecast
13
- **Pitch and build examples:** [The Game](/Hold%20The%20Flood/The%20Game) and [Hordes and Builds](/Hold%20The%20Flood/Hordes%20and%20Builds) now use the actual equipment and return rules. Large-horde payoffs remain explicit targets; their missing reach, branching and crowd coverage rules are identified for further design.
e3dd63 Anonymous 2026-09-10 12:07:59
Record completed combat/build proposals and active room/information work with revised forecasts
14
- **Reading links:** a [four-page starting route](/Hold%20The%20Flood) and scoped repairs to eight reference pages. This is not a claim that every reference is now readable or coherent.
1f816c Anonymous 2026-09-10 10:55:46
Record completed discovery/home correction and active combat/build batch
15
e3dd63 Anonymous 2026-09-10 12:07:59
Record completed combat/build proposals and active room/information work with revised forecasts
16
Temporary combat upgrades reset on **every return home**, alive or revived. Physical carried equipment, components and loot are retained. This owner decision is recorded and no longer needs an answer.
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
17
e3dd63 Anonymous 2026-09-10 12:07:59
Record completed combat/build proposals and active room/information work with revised forecasts
18
## Open and closed work
9c9651 Anonymous 2026-09-09 19:15:21
Record the corrected proposal ready for owner reaction and remaining wiki work
19
e3dd63 Anonymous 2026-09-10 12:07:59
Record completed combat/build proposals and active room/information work with revised forecasts
20
| Task | Responsible | Current state | Next delivery |
c8ab81 Anonymous 2026-09-10 10:25:09
Continue independent wiki correction and report actual role availability
21
|---|---|---|---|
e3dd63 Anonymous 2026-09-10 12:07:59
Record completed combat/build proposals and active room/information work with revised forecasts
22
| 47 — Builds and expedition growth | Systems / PM | Closed at 12:05; final connected-build rules and examples published | Written proposal accepted; growth preference still open |
23
| 48 — Hordes and encounter pressure | Design Lead / PM | Closed at 11:57; actual room layout work follows below | Written proposal accepted |
24
| 49 — Combat/build review | Reviewer | Closed at 11:27; one author-response cycle completed | No repeat review |
57a61d Anonymous 2026-09-10 12:54:09
Close room and information batch and schedule horde-scale builds and successive expeditions
25
| 50 — Rooms and return routes | Design Lead / PM | Closed at 12:51 after author response and verification | Complete as a written proposal |
eae020 Anonymous 2026-09-10 12:39:39
Record completed room and information review and earlier correction forecast
26
| 51 — Room and information review | Reviewer | Submitted 12:31; closed after PM checked its findings | Complete; no repeat review |
57a61d Anonymous 2026-09-10 12:54:09
Close room and information batch and schedule horde-scale builds and successive expeditions
27
| 52 — Player information and supporting rules | Systems / PM | Closed at 12:51 after author response and verification | Complete as a written proposal |
6788ba Anonymous 2026-09-10 13:34:27
Close combined review and record both authors working on corrections
28
| 53 — Three builds at horde scale | Systems | Working on the single correction response | Response 13:55, range 13:45–14:15 |
29
| 54 — Three worthwhile expeditions | Design Lead | Working on the single correction response | Response 13:55, range 13:45–14:15 |
30
| 55 — Build and expedition review | Reviewer | Submitted 13:26; erratum 13:27; PM closed 13:30 | Complete; no repeat review |
e3dd63 Anonymous 2026-09-10 12:07:59
Record completed combat/build proposals and active room/information work with revised forecasts
31
| 38 — Full design readiness | PM | Reopened after owner feedback | First-pass wiki 15 September |
1f816c Anonymous 2026-09-10 10:55:46
Record completed discovery/home correction and active combat/build batch
32
| 39–40 — Earlier detailed samples | Systems / Design Lead | Parked and unaccepted | Reassess after correction |
d7fa70 Anonymous 2026-09-10 10:47:03
Report completed review, final corrections and earlier delivery estimate
33
6788ba Anonymous 2026-09-10 13:34:27
Close combined review and record both authors working on corrections
34
**55 tracked outcomes: 50 preparation outcomes closed, 2 current author corrections, 1 reopened readiness review and 2 parked drafts.** These are writing/review counts, not a percentage of a finished game.
49369b Anonymous 2026-09-08 16:27:44
PM forecast F1.2: actual outline completion and next scoped deliveries
35
eae020 Anonymous 2026-09-10 12:39:39
Record completed room and information review and earlier correction forecast
36
The room draft gives crowds physical arrival paths while preserving walking exits, quiet discovery spaces and short rescue routes. It proposes 16 enemy source volumes behind apertures; these add authoring work but are not extra traversable rooms. Two return routes now show what happens when temporary power resets while cleared ground stays clear. Repeated returns can push fresh combat farther away; that design problem remains open.
dc0998 Anonymous 2026-09-09 19:06:07
Record completed critique, focused response and earlier owner delivery estimate
37
57a61d Anonymous 2026-09-10 12:54:09
Close room and information batch and schedule horde-scale builds and successive expeditions
38
The electrical weapon’s basic chain attack is restored, missing player cues are back and the revised routes now define their doorways. The five save examples, ten options and twelve physical equipment parts were preserved. These checks close that writing task; they do not establish readable combat in play.
e3dd63 Anonymous 2026-09-10 12:07:59
Record completed combat/build proposals and active room/information work with revised forecasts
39
6788ba Anonymous 2026-09-10 13:34:27
Close combined review and record both authors working on corrections
40
The next work puts the player experience first. The lightning, ricochet and gravity drafts now propose special attacks reaching up to 42–48 distinct bodies, supported by finite geometry, real stored charge, heat and recovery rules. These are proposed coverage ceilings, not measured kills or validated fun. The expedition draft now recommends restoring a transport line to a visited room, with cargo delivery home. It shortens repeat travel but leaves the third outing without a fresh rise in temporary power under the provisional reward rule. That weakness is under review. The correction must make the early rig fit and function, reconcile heat and projectile endings, and separate passenger transport from optional cargo delivery. Both authors received their assignments automatically. Its new travel rules remain proposals for reaction. The existing three agents are sufficient; assignments go automatically to their existing tasks. The owner does not need to forward routine messages.
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
41
284b2f Anonymous 2026-09-10 11:47:03
Record submitted combat response and explain pending growth-rhythm choice
42
## Current choice for the owner
43
e3dd63 Anonymous 2026-09-10 12:07:59
Record completed combat/build proposals and active room/information work with revised forecasts
44
Should temporary power grow **regularly during fighting**, with bigger upgrades at major horde milestones, or **only after clearing or sealing a horde**? PM recommends regular growth: for example, two upgrades during a ward fight, then a transformation after its main surge. This provides a more continuous rise in power, at the cost of more frequent choices. The current stage-only draft remains provisional. Both options reset temporary upgrades whenever you return home.
284b2f Anonymous 2026-09-10 11:47:03
Record submitted combat response and explain pending growth-rhythm choice
45
e3dd63 Anonymous 2026-09-10 12:07:59
Record completed combat/build proposals and active room/information work with revised forecasts
46
An answer is pending. Room geometry, controls, accessibility, equipment and readability work continue. Only the dependent final growth rules wait for this preference.
284b2f Anonymous 2026-09-10 11:47:03
Record submitted combat response and explain pending growth-rhythm choice
47
c8ab81 Anonymous 2026-09-10 10:25:09
Continue independent wiki correction and report actual role availability
48
## Estimated deliveries
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
49
d7fa70 Anonymous 2026-09-10 10:47:03
Report completed review, final corrections and earlier delivery estimate
50
| Milestone | Target | Plausible range |
c8ab81 Anonymous 2026-09-10 10:25:09
Continue independent wiki correction and report actual role availability
51
|---|---|---|
e3dd63 Anonymous 2026-09-10 12:07:59
Record completed combat/build proposals and active room/information work with revised forecasts
52
| Combat/build initial drafts | Actual today 11:17 | Lead submitted 11:07 |
53
| Single combat/build author responses | Actual today 11:49 | Lead 11:41; Systems 11:49 |
eae020 Anonymous 2026-09-10 12:39:39
Record completed room and information review and earlier correction forecast
54
| Room and information drafts | Actual today 12:23 | Systems 12:18; Lead 12:23 |
55
| Combined room/information review | Actual today 12:31 | Earlier than the 14:15 estimate |
57a61d Anonymous 2026-09-10 12:54:09
Close room and information batch and schedule horde-scale builds and successive expeditions
56
| Single room/information author corrections | Actual today 12:43 | Lead 12:42; Systems 12:43 |
57
| Integrated room/information correction batch | Actual today 12:51 | Earlier than the 14:00 target |
fc73d6 Anonymous 2026-09-10 13:11:22
Record submitted expedition draft and active review
58
| Three-expedition proposal | Actual today 13:06 | Earlier than the 13:45 target |
f9c9eb Anonymous 2026-09-10 13:16:42
Record both drafts submitted and advance review forecast
59
| Three-build mechanical proposal | Actual today 13:12 | Earlier than the 14:00 target |
6788ba Anonymous 2026-09-10 13:34:27
Close combined review and record both authors working on corrections
60
| Combined build/expedition review | Actual today 13:26 | Closed after PM checked the findings and erratum |
61
| Single build/expedition corrections | Today 13:55 | 13:45–14:15 |
f9c9eb Anonymous 2026-09-10 13:16:42
Record both drafts submitted and advance review forecast
62
| Reviewed next proposal packet | Today 14:45 | 14:00–15:45 |
d7fa70 Anonymous 2026-09-10 10:47:03
Report completed review, final corrections and earlier delivery estimate
63
| Whole readable first-pass wiki | 15 September | 13–17 September |
64
| Detailed campaign design | 17 November | 27 October–15 December |
9c9651 Anonymous 2026-09-09 19:15:21
Record the corrected proposal ready for owner reaction and remaining wiki work
65
57a61d Anonymous 2026-09-10 12:54:09
Close room and information batch and schedule horde-scale builds and successive expeditions
66
The completed batch retains 24 module identities and 40 rooms. The next proposal may reopen provisional effect limits or propose new travel behavior where the present rules undermine the intended experience. Crowd capacity, traversal timing, readable combat and fun remain untested.
e3dd63 Anonymous 2026-09-10 12:07:59
Record completed combat/build proposals and active room/information work with revised forecasts
67
6788ba Anonymous 2026-09-10 13:34:27
Close combined review and record both authors working on corrections
68
**Forecast updated at 13:34:** the combined review arrived at 13:26 and is closed after PM checked its findings and assembly-count correction. Both authors have started their single correction response, targeting 13:55. The reviewed packet keeps its 14:45 target and 14:00–15:45 range, allowing verification and supporting-reference integration. Overall wiki and campaign dates are unchanged.
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
69
e3dd63 Anonymous 2026-09-10 12:07:59
Record completed combat/build proposals and active room/information work with revised forecasts
70
Confidence is moderate for the next batch, low for the first-pass wiki and very low for detailed campaign work pending fresh scope estimation. Dates assume the existing three roles and PM are available approximately 6–8 active hours per working day. A first-pass wiki means a coherent, readable proposed design with open choices clearly identified. It does not establish fun, balance or campaign duration. Implementation, simulation, playtesting and assets require separate authorization.