# Hold The Horde — Progress
2
e2a891 Anonymous 2026-09-10 11:34:44
Record completed combined review and the single author response
3
**10 September 2026. Discovery and home rewrites are complete. The combat/build review is complete; both designers are making the consolidated corrections. All times below are Jerusalem.**
474440 Anonymous 2026-09-09 13:05:20
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
4
1f816c Anonymous 2026-09-10 10:55:46
Record completed discovery/home correction and active combat/build batch
5
We are addressing three owner concerns: convincing survivorslike hordes and spectacular builds, a readable wiki, and a clear account of the player's fun, excitement, challenge and emotional experience.
6
7
## Completed this morning
8
9
- **Two existing articles rewritten and reviewed:** [Discovery in a changing station](/Hold%20The%20Flood/Connecting%20The%20Station) and [Home and the people you bring back](/Hold%20The%20Flood/Home%20And%20Colony%20Loop).
10
- **One independent critique and one consolidated author response completed.** PM checked the actual sources and corrected factual overclaims. The pair closed at 10:48, ahead of the revised 11:15 estimate.
11
- **Eight reference pages repaired** so the new explanations link to the right definitions. This was scoped repair, not a full rewrite of those references.
12
- **Four-page reading route published:** [start with the game](/Hold%20The%20Flood).
13
14
Your decision is recorded: temporary combat upgrades reset on every return home, alive or revived. Physical equipment, components and loot are retained.
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
15
c8ab81 Anonymous 2026-09-10 10:25:09
Continue independent wiki correction and report actual role availability
16
## Work happening now
9c9651 Anonymous 2026-09-09 19:15:21
Record the corrected proposal ready for owner reaction and remaining wiki work
17
1f816c Anonymous 2026-09-10 10:55:46
Record completed discovery/home correction and active combat/build batch
18
| Task | Responsible | Status and concrete result | Next estimate |
c8ab81 Anonymous 2026-09-10 10:25:09
Continue independent wiki correction and report actual role availability
19
|---|---|---|---|
e2a891 Anonymous 2026-09-10 11:34:44
Record completed combined review and the single author response
20
| 47 — Spectacular builds and expedition growth | Systems | Correcting the three submitted pages: actual loadouts, spectacular effects and upgrade rules | Response target 12:15, range 12:00–12:45 |
284b2f Anonymous 2026-09-10 11:47:03
Record submitted combat response and explain pending growth-rhythm choice
21
| 48 — Ordinary hordes and encounter pressure | Design Lead | Response submitted at 11:41; PM is checking the actual repairs | Ahead of 12:15 response target |
e2a891 Anonymous 2026-09-10 11:34:44
Record completed combined review and the single author response
22
| 49 — One combined review | Reviewer | Complete at 11:27; PM verified the critique and added source-backed corrections | Closed; no second review |
8aa4e0 Anonymous 2026-09-10 11:23:34
Record both draft submissions and combined review handoff
23
| Integration, source checks and owner updates | PM | Active: verify source claims and prepare the affected equipment, information, save-state and room references | Reviewed batch target 14:00 |
d7fa70 Anonymous 2026-09-10 10:47:03
Report completed review, final corrections and earlier delivery estimate
24
| 38 — Full design readiness | PM | Reopened after owner feedback | First-pass wiki target 15 September |
1f816c Anonymous 2026-09-10 10:55:46
Record completed discovery/home correction and active combat/build batch
25
| 39–40 — Earlier detailed samples | Systems / Design Lead | Parked and unaccepted | Reassess after correction |
d7fa70 Anonymous 2026-09-10 10:47:03
Report completed review, final corrections and earlier delivery estimate
26
e2a891 Anonymous 2026-09-10 11:34:44
Record completed combined review and the single author response
27
**49 tracked outcomes: 44 preparation outcomes closed, 2 current correction assignments, 1 reopened readiness outcome and 2 parked drafts.** These are writing/review counts, not a percentage of a finished game.
49369b Anonymous 2026-09-08 16:27:44
PM forecast F1.2: actual outline completion and next scoped deliveries
28
e2a891 Anonymous 2026-09-10 11:34:44
Record completed combined review and the single author response
29
The submitted drafts replace the old 1–5-creature encounter contract with ordinary crowds and larger climaxes, permit multiple ordinary weapons, and put compatible link changes inside journal pause. The review and PM checks found specific repairs: incomplete equipment lists, unclear reward resolution, and climax/rescue examples that diverge from their rules. One consolidated response is underway. The dependent references and room layouts also need alignment. Particular populations, growth effects and editing details remain proposals.
dc0998 Anonymous 2026-09-09 19:06:07
Record completed critique, focused response and earlier owner delivery estimate
30
1f816c Anonymous 2026-09-10 10:55:46
Record completed discovery/home correction and active combat/build batch
31
Both original Claude tasks are available, automatic handoffs succeeded, and receiving activity was checked. The owner does not need to forward routine messages. No extra permanent agent is needed for this batch.
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
32
284b2f Anonymous 2026-09-10 11:47:03
Record submitted combat response and explain pending growth-rhythm choice
33
## Current choice for the owner
34
35
Should temporary power grow **regularly during fighting**, with bigger upgrades at major horde milestones, or **only after clearing or sealing a horde**? PM recommends regular growth: for example, two upgrades during a ward fight, then a transformation after its main surge. This gives combat a more continuous rise in power, at the cost of more frequent choices. The current draft uses horde-resolution rewards and remains provisional. Both options reset all temporary upgrades whenever you return home.
36
37
The question was explained directly to the owner; an answer is pending. Equipment, mechanism, rescue, room and readability corrections continue. The 14:00 correction target remains; final growth rules depend on this preference.
38
c8ab81 Anonymous 2026-09-10 10:25:09
Continue independent wiki correction and report actual role availability
39
## Estimated deliveries
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
40
d7fa70 Anonymous 2026-09-10 10:47:03
Report completed review, final corrections and earlier delivery estimate
41
| Milestone | Target | Plausible range |
c8ab81 Anonymous 2026-09-10 10:25:09
Continue independent wiki correction and report actual role availability
42
|---|---|---|
8aa4e0 Anonymous 2026-09-10 11:23:34
Record both draft submissions and combined review handoff
43
| Combat/build drafts and scoped reference repairs | Actual today 11:17 | Ahead of 12:30 draft target |
1f816c Anonymous 2026-09-10 10:55:46
Record completed discovery/home correction and active combat/build batch
44
| Reviewed, integrated combat/build batch | Today 14:00 | 13:00–15:00 |
d7fa70 Anonymous 2026-09-10 10:47:03
Report completed review, final corrections and earlier delivery estimate
45
| Whole readable first-pass wiki | 15 September | 13–17 September |
46
| Detailed campaign design | 17 November | 27 October–15 December |
9c9651 Anonymous 2026-09-09 19:15:21
Record the corrected proposal ready for owner reaction and remaining wiki work
47
e2a891 Anonymous 2026-09-10 11:34:44
Record completed combined review and the single author response
48
Both drafts arrived early: the Lead at 11:07 and Systems at 11:17; the combined critique arrived at 11:27. PM checked its claims and dispatched one response to both designers. The 14:00 batch target remains while those corrections and dependent references are completed. Room migration covers eleven reusable room types and their affected instances; space and traversal timing remain design obligations, not tested results. The broader dates are unchanged. Confidence is moderate for the next batch, low for the first-pass wiki and very low for detailed campaign work until scope is re-estimated.
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
49
1f816c Anonymous 2026-09-10 10:55:46
Record completed discovery/home correction and active combat/build batch
50
Dates assume the three existing roles and PM are available approximately 6–8 active hours per working day. A first-pass wiki means a coherent, readable proposed design with open choices clearly identified. It does not establish fun, balance or campaign duration. Game implementation, simulation, playtesting and assets require their separate authorization. Unanswered creative choices block only the work that depends on them.