Blame

aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
1
# Hold The Horde — Progress
2
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
3
Updated **15 September**. The owner has chosen **fresh hordes each expedition** and **regular growth through fighting, with larger transformations**. Permanent changes and carried property remain; temporary combat power resets whenever you return home.
6487d5 Anonymous 2026-09-10 15:14:39
Record owner-requested token pause; suspend active forecasts
4
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
5
## Ready to read
6487d5 Anonymous 2026-09-10 15:14:39
Record owner-requested token pause; suspend active forecasts
6
c3f7d7 Anonymous 2026-09-15 14:02:52
F2.8: moving scan complete, preservation corrections published, short rescue working
7
**Six proposal packages have been completed today.** The latest finished at **14:01 Jerusalem time**: the moving scan now has a placed horde fight, growth before its climax, and a discovered bridge that changes the next trip.
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
8
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
9
Start with [The Game](/Hold%20The%20Flood/The%20Game), continue through [three expeditions into the observation ward](/Hold%20The%20Flood/Expedition%20Proposal), then [Coming Home](/Hold%20The%20Flood/Coming%20Home) and [Discovery in a Changing Station](/Hold%20The%20Flood/Connecting%20The%20Station). For combat, follow [Hordes and Builds](/Hold%20The%20Flood/Hordes%20and%20Builds) into [Three Ways to Break a Horde](/Hold%20The%20Flood/Build%20Comparison).
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
10
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
11
| Completed package | Actual time today | What changed |
12
|---|---|---|
13
| 59–61 — Builds and three expeditions | 12:08 | Different movement and payoff proposals; successive trips pursue different discoveries |
14
| 56–58 — Hospital story and survival | 12:32 | Two possible core mysteries; comparable loadouts with a visible cost for the heavier kit |
15
| 62–63 — Regular growth and renewed combat | 12:45 | An ordinary improvement before a major breakthrough, with crowds and discovery quiet placed along an existing route |
16
| 64–65 — Combat after permanent seals | 13:26 | A second route state retains the seals and shortcut while enemies arrive from a distant open source; room and encounter references agree |
17
| 66–67 — Six main reading pages | 13:26 | Player scenes lead; unfamiliar terms are explained; onward links work; obsolete clearing and growth claims are removed |
c3f7d7 Anonymous 2026-09-15 14:02:52
F2.8: moving scan complete, preservation corrections published, short rescue working
18
| 68 — Moving scan and bridge | 14:01 | A rising fight through Cable Junction leads to a local optical discovery and usable bridge; living returns preserve the shortcut, while changed alignments have a visible rescan route |
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
19
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
20
Each package received one focused critique, one response and PM checks. These are completed design proposals, not tested gameplay. The new Ricochet and Gravity controls remain proposed alternatives to the current detailed equipment rules. The two renewed-route examples do not yet cover every shifted layout or combination of permanent seals.
6487d5 Anonymous 2026-09-10 15:14:39
Record owner-requested token pause; suspend active forecasts
21
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
22
## Working now
474440 Anonymous 2026-09-09 13:05:20
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
23
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
24
| Outcome | Owner and current state | Next delivery, Jerusalem time |
25
|---|---|---|
c3f7d7 Anonymous 2026-09-15 14:02:52
F2.8: moving scan complete, preservation corrections published, short rescue working
26
| 69 — Rescue under pressure | Systems Designer received the assignment and is working; independent review criteria are saved | Draft **14:30**, range **14:15–15:00**; reviewed proposal **15:15**, range **14:45–16:15** |
27
| 38 — Full-design readiness, still reopened | Outside-edit preservation audit completed; eleven factual/reference corrections published. Supporting readability and broader experience coverage remain | Readiness reassessment with the coherent wiki pass, target **23 September**, range **21–28 September** |
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
28
c3f7d7 Anonymous 2026-09-15 14:02:52
F2.8: moving scan complete, preservation corrections published, short rescue working
29
Read the scene in [Hordes and Builds](/Hold%20The%20Flood/Hordes%20and%20Builds), with placement in [Moving Scan Expedition](/Hold%20The%20Flood/Moving%20Scan%20Expedition). Its added rail, viewing bay, bridge and receiver make a fourteenth proposed major mechanism; physical fit and fun remain untested. The next proposal tackles another experience risk: making a short rescue feel like helping a person, with two clear alternatives for death during the crossing.
1f816c Anonymous 2026-09-10 10:55:46
Record completed discovery/home correction and active combat/build batch
30
c3f7d7 Anonymous 2026-09-15 14:02:52
F2.8: moving scan complete, preservation corrections published, short rescue working
31
The tracker contains **69 outcomes: 65 preparation outcomes closed, 1 current design outcome, 1 readiness assessment reopened and 2 parked**. The completed preservation audit and its corrections belong within outcome 38; they do not close overall readiness. These counts are not a percentage of the finished game. Outcomes 39–40 remain parked and unaccepted pending the core corrections.
1f816c Anonymous 2026-09-10 10:55:46
Record completed discovery/home correction and active combat/build batch
32
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
33
The original Claude Reviewer received the earlier assignment automatically but stopped at a monthly spend limit at 13:03. Temporary GPT support completed that review. The Lead was absent from the same directory check; availability will be checked again before a future handoff. No new permanent agent or manual message forwarding is needed for the current assignments.
1f816c Anonymous 2026-09-10 10:55:46
Record completed discovery/home correction and active combat/build batch
34
799925 Anonymous 2026-09-15 11:53:48
Align resumed design work and confirmed expedition choices
35
## Delivery forecast
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
36
c3f7d7 Anonymous 2026-09-15 14:02:52
F2.8: moving scan complete, preservation corrections published, short rescue working
37
Forecast **F2.8**, updated 15 September. Dates assume work continues today and about five further active working days for the first full pass.
9c9651 Anonymous 2026-09-09 19:15:21
Record the corrected proposal ready for owner reaction and remaining wiki work
38
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
39
| Milestone | Target | Plausible range | Completion means |
c8ab81 Anonymous 2026-09-10 10:25:09
Continue independent wiki correction and report actual role availability
40
|---|---|---|---|
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
41
| Reviewed sealed-source expedition | **Completed today 13:26** | Earlier than 15:00 target | Proposal, critique, response and integration into its owning references |
42
| Clear six-page reading path | **Completed today 13:26** | Earlier than 16:00 target | Main journey and combat branch revised and checked against current rules |
c3f7d7 Anonymous 2026-09-15 14:02:52
F2.8: moving scan complete, preservation corrections published, short rescue working
43
| Moving-scan proposal | **Delivered 13:39** | Earlier than 14:15 target | Concrete location, rising fight, build climax, discovery and next trip |
44
| Reviewed moving-scan proposal | **Completed 14:01** | Earlier than 15:30 target | One critique, one response and verified integration across six articles |
45
| Outside-edit preservation audit | **Completed 13:47; follow-up corrections 13:52** | Earlier than 14:15 report target | All 58 captured changes inspected with provenance; identified factual/preservation defects corrected |
46
| Short-rescue proposal | Today **14:30** | **14:15–15:00** | One personal rescue scene and two comparable failure approaches |
47
| Reviewed short-rescue proposal | Today **15:15** | **14:45–16:15** | One critique and response; an understandable owner choice with costs |
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
48
| Coherent revised design wiki | **23 September** | **21–28 September** | Readable core and supporting rules aligned; consequential choices explicit |
49
| Full detailed campaign design | **24 November** | **3 November–22 December** | Proposed progression, content, mysteries, ending paths and production scope developed across the campaign |
49369b Anonymous 2026-09-08 16:27:44
PM forecast F1.2: actual outline completion and next scoped deliveries
50
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
51
Near-term estimates have moderate confidence. The full-wiki estimate has low confidence. The campaign date has very low confidence and remains a planning allowance pending a fresh content estimate. None promises development, validated fun or the desired number of playable hours; those require a separately authorized phase.
dc0998 Anonymous 2026-09-09 19:06:07
Record completed critique, focused response and earlier owner delivery estimate
52
c3f7d7 Anonymous 2026-09-15 14:02:52
F2.8: moving scan complete, preservation corrections published, short rescue working
53
The pre-pause targets were 15 September for the readable wiki and 17 November for detailed campaign design. Five paused calendar days and the outside review's core-loop findings moved those dates. Today's first packet finished at 12:08 against a revised 13:00 target; subsequent packages finished at 12:32, 12:45 and 13:26. F2.8 records the moving-scan completion at 14:01 and the completed preservation audit, and adds the short-rescue proposal. The overall dates remain unchanged because supporting design and creative choices still need work. Earlier estimates remain in revision history and the forecast checkpoint.
e3dd63 Anonymous 2026-09-10 12:07:59
Record completed combat/build proposals and active room/information work with revised forecasts
54
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
55
## What still needs work
95a115 Anonymous 2026-09-10 13:59:59
Close build/expedition batch and forecast story/survival work
56
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
57
- Broader expeditions must sustain fresh combat, meaningful growth and different discoveries around persistent changes.
58
- Build combinations need distinct decisions and room for surprising interactions. The new alternatives still need selection and detailed integration.
59
- Rooms, people, languages and story consequences need concrete scenes with emotional and discovery payoffs.
c3f7d7 Anonymous 2026-09-15 14:02:52
F2.8: moving scan complete, preservation corrections published, short rescue working
60
- Supporting pages need the same clarity as the entry path. The captured outside-edit bundle has been audited and its identified factual defects corrected; that preservation check does not establish that every page is easy for a human to read.
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
61
- Full readiness requires a coherent player journey and honest scope, beyond internally consistent tables.
284b2f Anonymous 2026-09-10 11:47:03
Record submitted combat response and explain pending growth-rhythm choice
62
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
63
## Owner choices
284b2f Anonymous 2026-09-10 11:47:03
Record submitted combat response and explain pending growth-rhythm choice
64
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
65
The two immediate combat questions are answered in the [Owner Brief](/Hold%20The%20Flood/Brief). One priority question remains: which build direction to deepen first. It does not discard the others or approve every proposed rule.
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
66
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
67
PM will next bring concrete story and rescue alternatives, the effect of completing the station connection, and a costed scope proposal. [Open Decisions](/Hold%20The%20Flood/Open%20Decisions) is the wider issue index; its recommendations remain proposals. Its fourteen categories are not fourteen answers needed before work can continue.