Blame

aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
1
# Hold The Horde — Progress
2
799925 Anonymous 2026-09-15 11:53:48
Align resumed design work and confirmed expedition choices
3
Work resumed on **15 September**. The immediate goal is a game proposal that delivers fresh horde combat, an exciting rise in power, surprising discoveries and builds that play differently on successive expeditions.
6487d5 Anonymous 2026-09-10 15:14:39
Record owner-requested token pause; suspend active forecasts
4
799925 Anonymous 2026-09-15 11:53:48
Align resumed design work and confirmed expedition choices
5
The owner has now chosen **fresh hordes each expedition** and **regular growth through fighting, with larger transformations**. Permanent changes and carried property remain; temporary combat power resets whenever you return home. The answers are recorded in the [Owner Brief](/Hold%20The%20Flood/Brief).
6487d5 Anonymous 2026-09-10 15:14:39
Record owner-requested token pause; suspend active forecasts
6
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
7
## Latest result
8
8b36e4 Anonymous 2026-09-15 12:53:25
Record completed combat package and next expedition case; forecast F2.5
9
**Three proposal packages are complete today, 15 September: builds/expeditions at 12:08, story/survival at 12:32, and combat growth through the sample route at 12:45.** Each passed one independent critique, an author response and PM checks. They provide concrete experiences for your reaction; practical validation remains ahead.
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
10
11
| Completed outcome | Result |
12
|---|---|
13
| 59 — Three different build experiences | [Three ways to break a horde](/Hold%20The%20Flood/Build%20Comparison): stored electrical chains, timed ricochet fragments and movement-driven heat |
14
| 60 — Three worthwhile expeditions | [The observation ward](/Hold%20The%20Flood/Expedition%20Proposal): repair, test an apparent window as an alien instrument, then reach a hidden refuge |
15
| 61 — Independent review and response | Corrected unearned puzzle inference, mismatched rig abilities, growth order and unexplained cost notation |
700227 Anonymous 2026-09-15 12:34:36
Record completed story and survival packet and combat author correction
16
| 56 — Hospital story directions | [Two core mysteries](/Hold%20The%20Flood/Hospital%20Story%20Directions), with observable evidence, affected treatment and reversible consequences distinguished |
17
| 57 — Survival and loadout | [Packing for spectacle and discovery](/Hold%20The%20Flood/Survival%20And%20Loadout): compare both kits at the same progression; both retain ordinary disc spectacle |
18
| 58 — Story/survival review and response | Clarified causal scope, evidence preservation and the real cost of the heavier kit |
8b36e4 Anonymous 2026-09-15 12:53:25
Record completed combat package and next expedition case; forecast F2.5
19
| 62 — Growth and a renewed combat route | [Combat Rules](/Hold%20The%20Flood/Combat%20Rules): regular improvements, a major breakthrough, meaningful crowds and discovery quiet mapped onto existing rooms |
20
| 63 — Combat review and response | Corrected oxygen accounting, retained deferred upgrades and made the major reward compatible with valid defensive play |
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
21
0ee579 Anonymous 2026-09-15 12:22:46
Resume story and survival review alongside combat design; forecast F2.3
22
The chosen expedition and growth rules are aligned in Combat Rules and ten supporting articles. The new Ricochet and Gravity mechanisms are still proposed replacements for parts of the old detailed build rules; numerical reconciliation has not been declared complete.
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
23
799925 Anonymous 2026-09-15 11:53:48
Align resumed design work and confirmed expedition choices
24
## Current work
6487d5 Anonymous 2026-09-10 15:14:39
Record owner-requested token pause; suspend active forecasts
25
8b36e4 Anonymous 2026-09-15 12:53:25
Record completed combat package and next expedition case; forecast F2.5
26
**The next package has 2 outcomes in progress.** The completed route uses open enemy sources. We are now resolving what the next expedition is like after the player permanently seals all four sources on that route. The player should keep the benefit of that work and still find a worthwhile horde, growth and a discovery.
474440 Anonymous 2026-09-09 13:05:20
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
27
799925 Anonymous 2026-09-15 11:53:48
Align resumed design work and confirmed expedition choices
28
| Outcome | Who | State | Next delivery, Jerusalem time |
29
|---|---|---|---|
8b36e4 Anonymous 2026-09-15 12:53:25
Record completed combat package and next expedition case; forecast F2.5
30
| 64 — Fresh combat after every source is sealed | Systems Designer, then PM | Working; receiving activity verified at 12:51 | Draft 13:30; range 13:10–14:00 |
31
| 65 — Independent review of that later expedition | Temporary reviewer | Criteria saved; awaiting the draft | Critique 14:00; range 13:30–14:30. Reviewed package 15:00; range 14:00–16:00 |
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
32
8b36e4 Anonymous 2026-09-15 12:53:25
Record completed combat package and next expedition case; forecast F2.5
33
This work can continue while the owner reacts to the three build directions. The previous package is integrated into the room, encounter and survival references for its named route configuration. The additional case must explain visible fresh enemies without silently undoing seals, closing the shortcut or refilling a cleared area during the same expedition.
1f816c Anonymous 2026-09-10 10:55:46
Record completed discovery/home correction and active combat/build batch
34
0ee579 Anonymous 2026-09-15 12:22:46
Resume story and survival review alongside combat design; forecast F2.3
35
The original Claude Design Lead and Reviewer were absent from the last native session-directory check earlier today. No assignment has been sent to another Claude session. PM, Systems and temporary GPT review support can complete this batch; no additional permanent agent is needed today.
1f816c Anonymous 2026-09-10 10:55:46
Record completed discovery/home correction and active combat/build batch
36
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
37
The outside [Open Decisions](/Hold%20The%20Flood/Open%20Decisions) review has been read and its fourteen groups triaged. Most room, character, language, interface and consistency work belongs to the team. The reported 49-page cleanup has not yet been independently verified by PM; current pages are checked as their topics are revised.
1f816c Anonymous 2026-09-10 10:55:46
Record completed discovery/home correction and active combat/build batch
38
799925 Anonymous 2026-09-15 11:53:48
Align resumed design work and confirmed expedition choices
39
## Delivery forecast
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
40
8b36e4 Anonymous 2026-09-15 12:53:25
Record completed combat package and next expedition case; forecast F2.5
41
Updated 15 September, forecast F2.5. Estimates assume work continues today and about five further active working days for the first full pass. The dates will change when actual delivery or remaining decisions change the work.
9c9651 Anonymous 2026-09-09 19:15:21
Record the corrected proposal ready for owner reaction and remaining wiki work
42
799925 Anonymous 2026-09-15 11:53:48
Align resumed design work and confirmed expedition choices
43
| Milestone | Target | Plausible range | What will be ready |
c8ab81 Anonymous 2026-09-10 10:25:09
Continue independent wiki correction and report actual role availability
44
|---|---|---|---|
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
45
| First reviewed build/expedition packet | **Completed today 12:08** | Earlier than revised 13:00 target | Both proposals, critique, responses and PM checks |
700227 Anonymous 2026-09-15 12:34:36
Record completed story and survival packet and combat author correction
46
| Growth and renewed-route draft | **Submitted today 12:22** | Earlier than 13:00 target | A concrete rhythm and an example using the actual station plan; critique completed 12:27 |
47
| Reviewed story/survival proposals | **Completed today 12:32** | Earlier than 14:00 target | Current proposals, one focused critique, one response and PM disposition |
8b36e4 Anonymous 2026-09-15 12:53:25
Record completed combat package and next expedition case; forecast F2.5
48
| Reviewed growth/route packet | **Completed today 12:45** | Earlier than 14:30 target | Proposal, critique, response and checked integration into supporting pages |
49
| Reviewed expedition after all four source seals | Today 15:00 | Today 14:00–16:00 | A concrete later expedition that preserves permanent work, with critique, response and integration |
799925 Anonymous 2026-09-15 11:53:48
Align resumed design work and confirmed expedition choices
50
| Coherent revised design wiki | 23 September | 21–28 September | Readable core articles and supporting rules aligned with selected directions; consequential open choices explicit |
51
| Full detailed campaign design | 24 November | 3 November–22 December | Proposed progression, content, mysteries, ending paths and production scope developed across the campaign |
49369b Anonymous 2026-09-08 16:27:44
PM forecast F1.2: actual outline completion and next scoped deliveries
52
799925 Anonymous 2026-09-15 11:53:48
Align resumed design work and confirmed expedition choices
53
The near-term forecast has moderate confidence. The full-wiki estimate has low confidence; the detailed-campaign date has very low confidence and is a planning allowance pending a fresh content estimate. Neither means the game is built, tested, balanced or proven to last the desired number of hours. Development and playtests await separate authorization.
dc0998 Anonymous 2026-09-09 19:06:07
Record completed critique, focused response and earlier owner delivery estimate
54
8b36e4 Anonymous 2026-09-15 12:53:25
Record completed combat package and next expedition case; forecast F2.5
55
The first packet was initially forecast for 14:15 today, advanced to 13:00 as drafts arrived, and completed at 12:08. The pre-pause estimates were 15 September for the readable wiki and 17 November for detailed campaign design. Five paused calendar days and the outside review's unresolved core-loop findings require new dates. F2.3 resumed the story/survival review in parallel after reconciling current sources. F2.4 recorded the story package at 12:32. F2.5 records the combat package at 12:45, ahead of its 14:30 estimate, and adds the next concrete case after all four sources are sealed. The full-wiki and campaign dates are unchanged. Earlier estimates and actual deliveries remain in this page's revision history.
e3dd63 Anonymous 2026-09-10 12:07:59
Record completed combat/build proposals and active room/information work with revised forecasts
56
799925 Anonymous 2026-09-15 11:53:48
Align resumed design work and confirmed expedition choices
57
## What must improve
95a115 Anonymous 2026-09-10 13:59:59
Close build/expedition batch and forecast story/survival work
58
799925 Anonymous 2026-09-15 11:53:48
Align resumed design work and confirmed expedition choices
59
- Each expedition provides fresh combat and a rise in power before its major challenge, while permanent discoveries and changes keep their value.
60
- Builds differ in movement, attention, cost and payoff, and permit useful combinations the player can discover.
61
- Hordes create urgency and spectacular releases; earned quiet gives discoveries room to land.
62
- Articles explain what the player wants, notices and does, and why the experience could be exciting. Consistent numbers and completed documents alone do not satisfy this standard.
95a115 Anonymous 2026-09-10 13:59:59
Close build/expedition batch and forecast story/survival work
63
799925 Anonymous 2026-09-15 11:53:48
Align resumed design work and confirmed expedition choices
64
## Held work and earlier outcomes
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
65
8b36e4 Anonymous 2026-09-15 12:53:25
Record completed combat package and next expedition case; forecast F2.5
66
The full tracker contains **65 outcomes: 60 preparation outcomes closed, 2 current, 0 held, 1 readiness assessment reopened and 2 parked**. Earlier closure records document preparation and integration, not proof the game meets the brief.
284b2f Anonymous 2026-09-10 11:47:03
Record submitted combat response and explain pending growth-rhythm choice
67
799925 Anonymous 2026-09-15 11:53:48
Align resumed design work and confirmed expedition choices
68
| Outcome | State | Reason |
69
|---|---|---|
70
| 38 — Full design readiness | Reopened | The player's experience and cross-page consistency still need work |
71
| 39–40 — Earlier detailed samples | Parked, unaccepted | Reassess after core corrections |
284b2f Anonymous 2026-09-10 11:47:03
Record submitted combat response and explain pending growth-rhythm choice
72
799925 Anonymous 2026-09-15 11:53:48
Align resumed design work and confirmed expedition choices
73
Previous completed work includes the discovery/home, combat, room/information, and build/expedition drafting batches. The latest owner answers supersede their permanent encounter-clearing and stage-only growth assumptions. Their useful content remains input to the correction.
284b2f Anonymous 2026-09-10 11:47:03
Record submitted combat response and explain pending growth-rhythm choice
74
799925 Anonymous 2026-09-15 11:53:48
Align resumed design work and confirmed expedition choices
75
## Next owner decisions
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
76
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
77
The two immediate combat choices are answered. The owner is now being asked which of the three build directions to deepen first; this sets a priority without discarding the others. Next, PM will bring concrete story and rescue alternatives, then the effect of completing the station connection and a costed scope proposal. The fourteen review categories are not fourteen questions the owner must answer before work continues.