Blame

aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
1
# Hold The Horde — Progress
2
799925 Anonymous 2026-09-15 11:53:48
Align resumed design work and confirmed expedition choices
3
Work resumed on **15 September**. The immediate goal is a game proposal that delivers fresh horde combat, an exciting rise in power, surprising discoveries and builds that play differently on successive expeditions.
6487d5 Anonymous 2026-09-10 15:14:39
Record owner-requested token pause; suspend active forecasts
4
799925 Anonymous 2026-09-15 11:53:48
Align resumed design work and confirmed expedition choices
5
The owner has now chosen **fresh hordes each expedition** and **regular growth through fighting, with larger transformations**. Permanent changes and carried property remain; temporary combat power resets whenever you return home. The answers are recorded in the [Owner Brief](/Hold%20The%20Flood/Brief).
6487d5 Anonymous 2026-09-10 15:14:39
Record owner-requested token pause; suspend active forecasts
6
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
7
## Latest result
8
700227 Anonymous 2026-09-15 12:34:36
Record completed story and survival packet and combat author correction
9
**Two proposal packets are now complete: builds/expeditions at 12:08 and story/survival at 12:32 on 15 September, three outcomes in each.** Each contains two proposals, one independent critique and one response from each author. These are proposals ready for your reaction, with detailed mechanics and practical validation still ahead.
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
10
11
| Completed outcome | Result |
12
|---|---|
13
| 59 — Three different build experiences | [Three ways to break a horde](/Hold%20The%20Flood/Build%20Comparison): stored electrical chains, timed ricochet fragments and movement-driven heat |
14
| 60 — Three worthwhile expeditions | [The observation ward](/Hold%20The%20Flood/Expedition%20Proposal): repair, test an apparent window as an alien instrument, then reach a hidden refuge |
15
| 61 — Independent review and response | Corrected unearned puzzle inference, mismatched rig abilities, growth order and unexplained cost notation |
700227 Anonymous 2026-09-15 12:34:36
Record completed story and survival packet and combat author correction
16
| 56 — Hospital story directions | [Two core mysteries](/Hold%20The%20Flood/Hospital%20Story%20Directions), with observable evidence, affected treatment and reversible consequences distinguished |
17
| 57 — Survival and loadout | [Packing for spectacle and discovery](/Hold%20The%20Flood/Survival%20And%20Loadout): compare both kits at the same progression; both retain ordinary disc spectacle |
18
| 58 — Story/survival review and response | Clarified causal scope, evidence preservation and the real cost of the heavier kit |
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
19
0ee579 Anonymous 2026-09-15 12:22:46
Resume story and survival review alongside combat design; forecast F2.3
20
The chosen expedition and growth rules are aligned in Combat Rules and ten supporting articles. The new Ricochet and Gravity mechanisms are still proposed replacements for parts of the old detailed build rules; numerical reconciliation has not been declared complete.
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
21
799925 Anonymous 2026-09-15 11:53:48
Align resumed design work and confirmed expedition choices
22
## Current work
6487d5 Anonymous 2026-09-10 15:14:39
Record owner-requested token pause; suspend active forecasts
23
700227 Anonymous 2026-09-15 12:34:36
Record completed story and survival packet and combat author correction
24
**Combat batch: 1 of 2 outcomes complete. Its independent review is finished; the author correction and PM integration remain.**
474440 Anonymous 2026-09-09 13:05:20
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
25
799925 Anonymous 2026-09-15 11:53:48
Align resumed design work and confirmed expedition choices
26
| Outcome | Who | State | Next delivery, Jerusalem time |
27
|---|---|---|---|
700227 Anonymous 2026-09-15 12:34:36
Record completed story and survival packet and combat author correction
28
| 62 — Growth rhythm and a renewed route | Systems Designer, then PM | Draft delivered 12:22; one author correction now working after review 63 | Correction target 12:55; range 12:40–13:15. Reviewed package 14:30; range 13:30–15:30 |
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
29
30
This batch can continue while the owner reacts to the three build directions. It will show how regular growth feels during fighting, when a transformation lands, where fresh enemies fit around permanent closures, and how oxygen and quiet leave room for discovery.
1f816c Anonymous 2026-09-10 10:55:46
Record completed discovery/home correction and active combat/build batch
31
0ee579 Anonymous 2026-09-15 12:22:46
Resume story and survival review alongside combat design; forecast F2.3
32
The original Claude Design Lead and Reviewer were absent from the last native session-directory check earlier today. No assignment has been sent to another Claude session. PM, Systems and temporary GPT review support can complete this batch; no additional permanent agent is needed today.
1f816c Anonymous 2026-09-10 10:55:46
Record completed discovery/home correction and active combat/build batch
33
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
34
The outside [Open Decisions](/Hold%20The%20Flood/Open%20Decisions) review has been read and its fourteen groups triaged. Most room, character, language, interface and consistency work belongs to the team. The reported 49-page cleanup has not yet been independently verified by PM; current pages are checked as their topics are revised.
1f816c Anonymous 2026-09-10 10:55:46
Record completed discovery/home correction and active combat/build batch
35
799925 Anonymous 2026-09-15 11:53:48
Align resumed design work and confirmed expedition choices
36
## Delivery forecast
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
37
700227 Anonymous 2026-09-15 12:34:36
Record completed story and survival packet and combat author correction
38
Updated 15 September, forecast F2.4. Estimates assume work continues today and about five further active working days for the first full pass. The dates will change when actual delivery or remaining decisions change the work.
9c9651 Anonymous 2026-09-09 19:15:21
Record the corrected proposal ready for owner reaction and remaining wiki work
39
799925 Anonymous 2026-09-15 11:53:48
Align resumed design work and confirmed expedition choices
40
| Milestone | Target | Plausible range | What will be ready |
c8ab81 Anonymous 2026-09-10 10:25:09
Continue independent wiki correction and report actual role availability
41
|---|---|---|---|
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
42
| First reviewed build/expedition packet | **Completed today 12:08** | Earlier than revised 13:00 target | Both proposals, critique, responses and PM checks |
700227 Anonymous 2026-09-15 12:34:36
Record completed story and survival packet and combat author correction
43
| Growth and renewed-route draft | **Submitted today 12:22** | Earlier than 13:00 target | A concrete rhythm and an example using the actual station plan; critique completed 12:27 |
44
| Reviewed story/survival proposals | **Completed today 12:32** | Earlier than 14:00 target | Current proposals, one focused critique, one response and PM disposition |
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
45
| Reviewed growth/route packet | Today 14:30 | Today 13:30–15:30 | Proposal, one critique, one response and PM disposition |
799925 Anonymous 2026-09-15 11:53:48
Align resumed design work and confirmed expedition choices
46
| Coherent revised design wiki | 23 September | 21–28 September | Readable core articles and supporting rules aligned with selected directions; consequential open choices explicit |
47
| Full detailed campaign design | 24 November | 3 November–22 December | Proposed progression, content, mysteries, ending paths and production scope developed across the campaign |
49369b Anonymous 2026-09-08 16:27:44
PM forecast F1.2: actual outline completion and next scoped deliveries
48
799925 Anonymous 2026-09-15 11:53:48
Align resumed design work and confirmed expedition choices
49
The near-term forecast has moderate confidence. The full-wiki estimate has low confidence; the detailed-campaign date has very low confidence and is a planning allowance pending a fresh content estimate. Neither means the game is built, tested, balanced or proven to last the desired number of hours. Development and playtests await separate authorization.
dc0998 Anonymous 2026-09-09 19:06:07
Record completed critique, focused response and earlier owner delivery estimate
50
700227 Anonymous 2026-09-15 12:34:36
Record completed story and survival packet and combat author correction
51
The first packet was initially forecast for 14:15 today, advanced to 13:00 as drafts arrived, and completed at 12:08. The pre-pause estimates were 15 September for the readable wiki and 17 November for detailed campaign design. Five paused calendar days and the outside review's unresolved core-loop findings require new dates. F2.3 resumed the story/survival review in parallel after reconciling current sources. F2.4 records its completion at 12:32 and the early combat draft/review; remaining delivery targets are unchanged pending the correction and integration. Earlier estimates and actual deliveries remain in this page's revision history.
e3dd63 Anonymous 2026-09-10 12:07:59
Record completed combat/build proposals and active room/information work with revised forecasts
52
799925 Anonymous 2026-09-15 11:53:48
Align resumed design work and confirmed expedition choices
53
## What must improve
95a115 Anonymous 2026-09-10 13:59:59
Close build/expedition batch and forecast story/survival work
54
799925 Anonymous 2026-09-15 11:53:48
Align resumed design work and confirmed expedition choices
55
- Each expedition provides fresh combat and a rise in power before its major challenge, while permanent discoveries and changes keep their value.
56
- Builds differ in movement, attention, cost and payoff, and permit useful combinations the player can discover.
57
- Hordes create urgency and spectacular releases; earned quiet gives discoveries room to land.
58
- Articles explain what the player wants, notices and does, and why the experience could be exciting. Consistent numbers and completed documents alone do not satisfy this standard.
95a115 Anonymous 2026-09-10 13:59:59
Close build/expedition batch and forecast story/survival work
59
799925 Anonymous 2026-09-15 11:53:48
Align resumed design work and confirmed expedition choices
60
## Held work and earlier outcomes
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
61
700227 Anonymous 2026-09-15 12:34:36
Record completed story and survival packet and combat author correction
62
The full tracker contains **63 outcomes: 59 preparation outcomes closed, 1 current, 0 held, 1 readiness assessment reopened and 2 parked**. Earlier closure records document preparation and integration, not proof the game meets the brief.
284b2f Anonymous 2026-09-10 11:47:03
Record submitted combat response and explain pending growth-rhythm choice
63
799925 Anonymous 2026-09-15 11:53:48
Align resumed design work and confirmed expedition choices
64
| Outcome | State | Reason |
65
|---|---|---|
66
| 38 — Full design readiness | Reopened | The player's experience and cross-page consistency still need work |
67
| 39–40 — Earlier detailed samples | Parked, unaccepted | Reassess after core corrections |
284b2f Anonymous 2026-09-10 11:47:03
Record submitted combat response and explain pending growth-rhythm choice
68
799925 Anonymous 2026-09-15 11:53:48
Align resumed design work and confirmed expedition choices
69
Previous completed work includes the discovery/home, combat, room/information, and build/expedition drafting batches. The latest owner answers supersede their permanent encounter-clearing and stage-only growth assumptions. Their useful content remains input to the correction.
284b2f Anonymous 2026-09-10 11:47:03
Record submitted combat response and explain pending growth-rhythm choice
70
799925 Anonymous 2026-09-15 11:53:48
Align resumed design work and confirmed expedition choices
71
## Next owner decisions
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
72
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
73
The two immediate combat choices are answered. The owner is now being asked which of the three build directions to deepen first; this sets a priority without discarding the others. Next, PM will bring concrete story and rescue alternatives, then the effect of completing the station connection and a costed scope proposal. The fourteen review categories are not fourteen questions the owner must answer before work continues.