# Hold The Horde — Progress
2
c715ff Anonymous 2026-09-08 17:54:18
Record trap/handoff closeouts and active save-state design
3
**Updated 2026-09-08 17:54 Jerusalem (UTC+3).** PM and GPT work continues; only the two Claude roles are paused. All work remains **design only**.
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
4
c715ff Anonymous 2026-09-08 17:54:18
Record trap/handoff closeouts and active save-state design
5
**23 tracked design packages: 21 preparation-closed, 2 open.** Traps21 and Development Handoff22 closed410 at17:48. New outcome23 Save And Content State was explicitly assigned411 at17:49; shared integration04 remains dependent. The separate management coverage map and two unadopted intake contributions are not extra completed packages. These are bounded written outcomes, not overall game completion.
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
6
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
7
“Closed” means the bounded written design/review outcome is complete. It does not mean a feature is implemented, every detail approved or fun validated. This board covers the current design batch; it is not a complete campaign or production backlog, and the closed/total ratio is not an overall game-completion percentage. Stable IDs stay fixed; added/reopened work must be recorded explicitly.
8
c715ff Anonymous 2026-09-08 17:54:18
Record trap/handoff closeouts and active save-state design
9
**Availability correction —8 Sep:** only Claude is paused. PM and the existing GPT Systems designer continue useful work with bounded independent GPT reviews. Systems is assigned the save/content-state contract; PM handles integration, new proposal intake and forecasts. Neither permanent Claude role will be woken or replaced before owner confirmation. Active one-minute fallback monitoring and15-minute progress/forecast reports continue.
a410b8 Anonymous 2026-09-08 16:43:32
PM close information package and honor owner Claude token pause
10
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
11
## Forward forecast — baseline F1
12
13
**Planning answer: a coherent core design this week, a complete first-pass game-design wiki in about two weeks, and a detailed campaign specification in roughly two to three months.** These are PM estimates to manage against, not promises or measured confidence intervals. They will change as the content inventory and owner choices become concrete.
14
15
All dates are2026; times are Jerusalem. Ranges are cumulative from8 September, not durations to add together. Baseline F1 was set8 September. Dates assume ordinary weekdays, about6–8 productive agent/PM operating hours per working day, functioning local hosts, and most consequential owner choices within a working day. That does **not** mean6–8hours of the owner's time or guaranteed overnight operation.
16
17
|Milestone|Target|Current likely window|Confidence|What will be ready|
18
|---|---|---|---|---|
49369b Anonymous 2026-09-08 16:27:44
PM forecast F1.2: actual outline completion and next scoped deliveries
19
|M0 — current puzzle/rescue decision pack|Achieved8 Sep15:59|Original target16:30; range16:30–17:00|Actual completion|Both written comparisons reviewed and closed; owner choices remain separate|
20
|M1 — whole-game outline and scope bands|Achieved8 Sep16:20|Original18:30; revised17:00|Actual completion|Draft369, focused review370, response374 and PM integration378 complete; architecture, scope bands and missing-work inventory prepared|
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
21
|M2 — coherent core-design baseline|Fri11 Sep|10–14 Sep|Medium-low|One compatible proposed/selected loop: opening, builds, combat, oxygen, death/shift, rescue and home; old conflicting rules replaced and consequential choices dispositioned|
22
|M3 — complete first-pass game-design wiki, v1|Tue22 Sep|18–29 Sep|Low-medium|Every major gameplay and campaign area has an actual design, a scoped content inventory, dependencies and a usable development handoff outline; major categories are no longer only menus of alternatives|
23
|M4 — detailed campaign/content specification|Tue10 Nov|20 Oct–1 Dec|Low|The approved finite inventory of regions, rooms, puzzles, clues, encounters, rewards, cast scenes and endings is specified through its state changes and recovery paths|
24
49369b Anonymous 2026-09-08 16:27:44
PM forecast F1.2: actual outline completion and next scoped deliveries
25
**Will the full wiki be ready today? No.** Today's decision pack and whole-game outline are prepared; they are not a complete design wiki. **The working target for the first complete design wiki is22 September.** The later detailed-content milestone expands that design into the actual authored campaign. Neither milestone claims that a written plan has proved fun, balance, performance or30/90/100–200hours of play.
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
26
27
For M3, “complete first pass” includes the story's causal chain and ending structure; station layout/shifts/persistence; equipment acquisition and progression; combat/horde/trap families; oxygen/resources; rescue/colony/cast arcs; both language-learning arcs and clue distribution; journal, controls and accessibility; content budget, production constraints and the later validation plan. Numerical tuning can remain explicitly provisional. A major domain marked only “TBD” does not satisfy completion.
28
29
M4 has the weakest estimate because no approved content inventory yet exists. It assumes a substantial authored campaign matching the brief's ambition and two additional specialists. It is approximately30–60 active working days; with the current team alone, the initial audit estimated40–80. A smaller approved campaign could be much quicker; a dense secret/language campaign or a changed global rule could exceed the range. I will revise M4 after the inventory and three representative detailed content packages are written and checked. Final gameplay validation belongs to a separately authorised implementation/playtest phase; it has no honest calendar endpoint yet.
30
31
## Estimated work timeline
32
33
This is a planning schedule, not historical delivery data. “Buffer” is allowed revision/decision time, not an unassigned promise to polish indefinitely.
34
35
|Workstream|8 Sep|9–11 Sep|14–18 Sep|21–29 Sep|Oct|Nov–1 Dec|
36
|---|---|---|---|---|---|---|
49369b Anonymous 2026-09-08 16:27:44
PM forecast F1.2: actual outline completion and next scoped deliveries
37
|Current decision pack|Done15:59||||||
38
|Whole-game outline and scope|Done16:20|Use for domain design|||||
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
39
|Core rules and shared integration||Finish / buffer into14 Sep|||||
40
|Campaign, puzzles, cast, progression and languages||Start|Develop|Integrate and review|||
41
|Complete wiki v1|||Draft coverage|Target22 Sep; buffer to29 Sep|||
42
|Detailed authored content|||Representative packages|Expand approved inventory|Main authoring|Target10 Nov; buffer to1 Dec|
43
44
The critical sequence is core decisions and interfaces → whole-game architecture/content budget → domain designs → cross-domain integration → v1. Content detail proceeds in parallel only where interfaces are stable. Extra writers do not eliminate the PM/review bottleneck.
45
c715ff Anonymous 2026-09-08 17:54:18
Record trap/handoff closeouts and active save-state design
46
**Next deliveries:** Save And Content State draft target18:20 today(range18:05–18:45), reviewed outcome19:00(range18:30–19:30). Traps21 and Development Handoff22 both closed17:48, ahead of their18:45/18:15 targets. Core11 Sep(10–14), complete first-pass wiki22 Sep(18–29), and specialist setup9–10 Sep remain unchanged.
49369b Anonymous 2026-09-08 16:27:44
PM forecast F1.2: actual outline completion and next scoped deliveries
47
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
48
## Extra agents — when and why
49
50
**Plan to add two agents tomorrow,9 September**, with bounded briefs prepared today. The current team can finish today's work. We will begin the two specialist streams as the relevant scopes become ready, aiming to have both available by10 September rather than waiting a week.
51
52
|Additional role|Planned start|First bounded responsibility|Reason for adding it|
53
|---|---|---|---|
54
|Campaign and puzzle designer|9 Sep|Develop the outline's discovery dependencies and two representative regional/puzzle chains, keeping owner mysteries revisable|Most existing work is local examples; the campaign and its deep discoveries need a dedicated author|
55
|Technical design and production planner|9–10 Sep|Audit proposed scope against Unity/Steam, state/save complexity, reusable content needs and available free-asset categories; identify constraints and likely expensive systems|The largest forecast uncertainty is how much authored content and engineering complexity the design implies|
56
57
These are design roles. No gamecode, prototypes, simulations, tests, purchases or AI art are authorised by this staffing plan. The owner has not yet created these sessions; no staffing completion is claimed. PM will guide setup one step at a time. Existing Systems retains the equipment economy; if that becomes the actual bottleneck, the second specialist brief can shift to economy/content planning rather than accumulate an idle role. No additional permanent critic is currently planned.
58
59
The independent schedule audit proposed campaign/puzzle and economy specialists after the core baseline. PM keeps its point that extra agents do not accelerate core decisions, but brings onboarding forward to9 Sep so a bounded content/production audit can begin alongside integration. The production role is chosen first because the absent content inventory and feasibility assumptions dominate the long-range estimate. This is a reversible staffing judgment, not a demonstrated speedup.
60
61
## Why these estimates, and when they change
62
63
Recent focused comparison/review packages took about16–49 elapsed minutes. That supports today's short delivery windows; it does not establish campaign-authoring throughput. The independent remaining-scope audit estimated2–4 active days for a coherent core,6–12 with two specialists or8–15 with the current team for a whole-game first pass, and30–60 with two specialists for detailed content. PM has allowed calendar/integration buffer around the v1 target.
64
65
- Every15-minute progress report includes the next milestone's current target/range and whether it moved. The full forecast is reviewed at each day's close, with the next substantive re-estimate by9 Sep18:00 after the scope outline.
66
- Keep the original target visible when revising it. Record old estimate, new estimate and the concrete cause; do not silently move dates.
67
- A changed core mechanism or late owner story change may add roughly1–3 working days to the core/v1 forecast; quantify the actual affected work when it happens.
68
- A blocked decision moves its dependent work, not every parallel stream. Host outages are reported with elapsed delay. If authors produce a queue waiting over a working day for review/integration, reduce parallel intake before adding more agents.
69
- Forecasts must be useful even when confidence is low. Uncertainty is a reason to widen a range and state assumptions, not to omit an estimate or wait for certainty.
70
71
|Forecast revision|Recorded|Change and reason|
72
|---|---|---|
73
|F1|8 Sep|First forward baseline added at owner's request; prior board had actuals but omitted estimates. M3 target22 Sep; M4 target10 Nov.|
fc05ee Anonymous 2026-09-08 16:04:47
Record early outline draft and revise near-term estimate
74
|F1.1|8 Sep16:04|M1 reviewed outline moved from18:00–20:00 to16:30–17:30 because the actual draft arrived16:01 and Reviewer had already fetched it. Review/rework still required. Core, full-wiki and detailed-content dates unchanged.|
49369b Anonymous 2026-09-08 16:27:44
PM forecast F1.2: actual outline completion and next scoped deliveries
75
|F1.2|8 Sep16:20|M0 actual15:59 and M1 actual16:20 recorded. Both prepared ahead of forecast. M2–M4 dates unchanged: the outline is a scaffold, and scope/unit reconciliation is still required before rolling up its partial111–208 role-hour inventory.|
1d867d Anonymous 2026-09-08 17:16:19
PM continuation: only Claude paused; GPT catalogue and coverage work active
76
|Availability correction|8 Sep17:10|Only Claude paused; PM/GPT work resumed after PM incorrectly stopped broader intake. Equipment Catalogue20 now targets reviewed18:30 today. M2–M4 dates unchanged pending coverage reassessment.|
8cd0af Anonymous 2026-09-08 17:32:04
Record catalogue closeout, coverage and next GPT trap outcome
77
|F1.3|8 Sep17:32|Catalogue actual17:29 and coverage actual17:27 recorded ahead of their18:30/17:45 targets. Next reviewed trap/encounter outcome targets18:45(18:15–19:15). M2–M4 unchanged: the coverage audit still identifies eight partial domains and three missing contracts; remaining-work estimates need deduplication.|
c715ff Anonymous 2026-09-08 17:54:18
Record trap/handoff closeouts and active save-state design
78
|F1.4|8 Sep17:54|Traps21 and Handoff22 actual17:48 recorded against18:45/18:15 targets. Next Save And Content State23 reviewed target19:00(18:30–19:30). M2–M4 unchanged: full campaign, content inventory and integration still require work.|
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
79
80
## What changed in this report
81
c715ff Anonymous 2026-09-08 17:54:18
Record trap/handoff closeouts and active save-state design
82
- Traps21 is preparation-closed410: five families, a four-region pressure map and two legal encounter traces. One review/response corrected Triage's trigger/override and the cap-work opportunity after crowd clearance; actual placements and balance remain later.
83
- Development Handoff22 is preparation-closed410. It now includes a distinct later evidence path for sustained discovery/build changes across successive expeditions, following independent review. No development or test phase is authorized.
84
- Systems411 continues with the save/content-state contract. The [coverage map](/Hold%20The%20Flood/Design%20Coverage) now distinguishes five first-pass contracts, eight partial areas and two missing dedicated contracts; no overall percentage is implied.
85
- Two previously untracked contributions—[Rescue Shift Proposal](/Hold%20The%20Flood/Rescue%20Shift%20Proposal) and [Station Assembly Example](/Hold%20The%20Flood/Station%20Assembly%20Example)—remain unadopted intake. PM has read them; contributor/ownership context and consequential choices remain to be dispositioned. A tracking gap is not proof of unauthorized work.
86
- The collector's13changed snapshots,6available before-diffs and30messages were reviewed and acknowledged with follow-ups. Known closures show no rollback. Full-wiki forecast remains22 Sep(18–29).
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
87
88
## Open and closed outcomes
89
90
All milestone times below are Jerusalem time. “Updated” separates later owner-rule integration from the original preparation closeout.
91
92
|ID|Outcome|Preparation status|Decision status|Latest milestone|Next step / remaining scope|
93
|---|---|---|---|---|---|
94
|01|[Reusable equipment combinations](/Hold%20The%20Flood/Build%20Rules)|Closed|Selected direction|Sep7 22:19; updated Sep8 13:45|Catalogue and numerical rules remain proposed|
95
|02|[Oxygen visibility and journal pause](/Hold%20The%20Flood/Oxygen%20and%20Observation)|Closed|Selected direction|Sep7 20:55; updated Sep8 13:45|Exact oxygen amounts remain open|
96
|03|[Carried property returns on death](/Hold%20The%20Flood/Death%20And%20Persistence)|Closed|Selected rule|Sep8 13:45|Shift and survivor ordering tracked separately|
97
|04|[Shifts, persistent work and historical records](/Hold%20The%20Flood/Shifting%20Station%20Options)|Open — dependent|Binding direction selected|Sep8 14:49 direction recorded|Integrate final station contract after15; older fixed-map clauses are superseded|
98
|05|[Ordinary combat and horde encounters](/Hold%20The%20Flood/Combat%20Rules)|Closed|Selected direction|Sep8 10:51; updated13:45|Automatic ordinary fire, manual specials; balance remains open|
0c6bef Anonymous 2026-09-08 16:01:08
Record reviewed survivor package alongside forecast F1
99
|06|[First-survivor comparison](/Hold%20The%20Flood/First%20Survivor)|Closed|Short rescue selected; person unchosen|Sep8 response364/disposition368|Yeva versus Aster ready; short-route condition and death/refuge timing remain explicit limits|
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
100
|07|[Practical discovery and optional help](/Hold%20The%20Flood/Clues%20and%20Help)|Closed|Selected direction|Sep8 11:23; updated13:45|Current routes cannot be inferred from historical records|
101
|08|[Cooperation and useful work aboard](/Hold%20The%20Flood/Home%20Projects)|Closed|Tentative preference|Sep8 12:00; updated13:45|Equipment loans tentative; full colony/cast still open|
102
|09|[Two-language expedition and journal use](/Hold%20The%20Flood/Language%20Expedition)|Closed|Reviewed proposal|Sep8 13:45|Detailed language system unselected;16 is a distinct evidence scene|
103
|10|[How equipment is acquired and improves](/Hold%20The%20Flood/Progression%20Options)|Closed|Reviewed alternatives|Sep8 13:51|Find working components versus observe/fabricate; owner choice later|
104
|11|[Three distinct horde creatures](/Hold%20The%20Flood/Horde%20Creature%20Proposals)|Closed|Reviewed proposals|Sep8 14:07|Roster and origins unselected|
105
|12|[Hospital story and its causal alternatives](/Hold%20The%20Flood/Hospital%20Story%20Directions)|Closed|Reviewed alternatives|Sep8 14:47|Owner hospital/godhood draft leads; exact story/ending remain revisable|
106
|13|[Player resurrection and corruption](/Hold%20The%20Flood/Resurrection%20And%20Corruption)|Closed|Reviewed alternatives|Sep8 14:38|No player decay or death budget adopted|
107
|14|[Opening expedition: reusable machinery](/Hold%20The%20Flood/First%20Expedition%20Options)|Closed|Option A selected|Prepared Sep8 15:14; selected15:30|Preferred direction recorded; exact starting items/rooms remain proposed|
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
108
|15|[Whole-station mechanism comparison](/Hold%20The%20Flood/Connecting%20The%20Station)|Closed|Goal selected; mechanism conditional|Sep8 15:51 disposition363|Physical connection candidate prepared; owner payoff choice and detailed content remain open|
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
109
|16|[Testable alien-language interaction](/Hold%20The%20Flood/Alien%20Utterance%20Discovery)|Closed|Reviewed proposal|Sep8 15:38|Protocol discovery prepared; does not prove request semantics or a god|
49369b Anonymous 2026-09-08 16:27:44
PM forecast F1.2: actual outline completion and next scoped deliveries
110
|17|[Whole-game design outline and scope bands](/Hold%20The%20Flood/Whole%20Game%20Outline)|Closed|Reviewed planning scaffold|Sep8 16:20 disposition378|Use finite bands and dependencies for domain designs; story/ending/count choices and estimate coverage remain open|
a410b8 Anonymous 2026-09-08 16:43:32
PM close information package and honor owner Claude token pause
111
|18|[Player information and accessibility](/Hold%20The%20Flood/Player%20Information)|Closed|Reviewed proposed information contract|Sep8 16:35 disposition387|Full cue/screen structure and accessibility specification remain later work; no usability claim|
cfac10 Anonymous 2026-09-08 16:47:10
PM day close: survival prepared and owner pause respected
112
|19|[Survival and loadout](/Hold%20The%20Flood/Survival%20And%20Loadout)|Closed|Reviewed provisional resource contract|Sep8 16:45 disposition392|Detailed variants and balancing remain later work; integrate compatible core rules after owner decisions|
8cd0af Anonymous 2026-09-08 17:32:04
Record catalogue closeout, coverage and next GPT trap outcome
113
|20|[Equipment catalogue](/Hold%20The%20Flood/Equipment%20Catalogue)|Closed|Reviewed12-part planning sample; acquisition unchosen|Sep8 17:29 disposition400|Exact thresholds, multi-actuator controller rules, acquisition and later finite catalogue remain open|
c715ff Anonymous 2026-09-08 17:54:18
Record trap/handoff closeouts and active save-state design
114
|21|[Traps and encounter progression](/Hold%20The%20Flood/Traps%20And%20Encounter%20Progression)|Closed|Reviewed five-family/four-region SMALL proposal|Sep8 17:48 disposition410|Twelve actual instances, full roster/placement, reset boundaries and balance remain later|
115
|22|[Development and validation handoff](/Hold%20The%20Flood/Development%20And%20Validation%20Handoff)|Closed|Reviewed first-pass risk/evidence plan|Sep8 17:48 disposition410|Final v1-specific scope, staffing and estimates precede any owner phase decision; no development authorized|
116
|23|[Save and content state](/Hold%20The%20Flood/Save%20And%20Content%20State)|Open — authoring|Proposed save policy and continuity contract|Sep8 17:49 assignment411|Draft18:20(18:05–18:45); reviewed19:00(18:30–19:30); unresolved rescue/shift choices stay visible|
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
117
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
118
## Recent delivery timeline
119
120
These are observed calendar spans from assignment to preparation closeout, including handoffs and review. They are historical measurements, not estimates of labour or promised future turnaround.
121
122
|Outcome|Assigned Sep8|Preparation closed Sep8|Elapsed|
123
|---|---|---|---|
124
|Equipment progression comparison|13:17|13:51|34 minutes|
125
|Three horde creatures|13:51|14:07|16 minutes|
126
|Hospital-story comparison|13:58|14:47|49 minutes|
127
|Resurrection/corruption comparison|14:20|14:38|18 minutes|
128
|Opening comparison|14:40|15:14|34 minutes|
129
|Alien-language interaction|15:06|15:38|32 minutes|
130
131
## Work sequence
132
a410b8 Anonymous 2026-09-08 16:43:32
PM close information package and honor owner Claude token pause
133
|Stream|Now|Next|
134
|---|---|---|
8cd0af Anonymous 2026-09-08 17:32:04
Record catalogue closeout, coverage and next GPT trap outcome
135
|Equipment catalogue|Preparation closed400; final737b3cfd|Use in trap/encounter examples; detailed controller and acquisition integration later|
c715ff Anonymous 2026-09-08 17:54:18
Record trap/handoff closeouts and active save-state design
136
|Whole-v1 coverage|Fifteen-domain map updated after410|Reconcile unique remaining work; save and production contracts still need preparation|
137
|Trap/encounter progression|Preparation closed410; finala280131b|Use concrete family rules; detailed instances/roster later|
138
|Development handoff|Preparation closed410; finalc0c38e8b|Keep gates explicit; final handoff packet depends on concrete v1/development scope|
139
|Save/content state|Systems411 source reads verified17:50–17:51; GPT criteria saved|Actual submission, one focused review/response, PM disposition|
140
|Additional proposal intake|Both full pages read; explicitly unadopted|Track authorship and assess protected retreat/next-shift meeting before integrating|
1d867d Anonymous 2026-09-08 17:16:19
PM continuation: only Claude paused; GPT catalogue and coverage work active
141
|Shared integration04|Current owner rules known; some mechanisms/choices pending|Integrate confirmed rules and explicitly isolate unresolved decisions|
142
|Claude Lead/Reviewer|Paused by owner for token limits|Resume only when owner confirms; GPT work continues meanwhile|
143
|Specialist setup|Two bounded briefs ready|Planned9–10Sep; no new permanent sessions created|
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
144
1d867d Anonymous 2026-09-08 17:16:19
PM continuation: only Claude paused; GPT catalogue and coverage work active
145
The available team continues useful work. No manual message forwarding is needed, and a paused provider does not suspend other authorized agents.
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
146
147
## Decisions for the owner
148
149
**Already answered:** opening A and persistent room/group connections across shifts, culminating in connecting the entire station.
150
151
**Open creative question:** should completing the entire connection puzzle finally stabilise the layout, or should rooms keep moving while every established connection survives? PM recommends stabilisation as a reward for mastery. This is a proposed late payoff, not an answer inferred from the opening choice; the team can continue its comparison while it is pending.
152
49369b Anonymous 2026-09-08 16:27:44
PM forecast F1.2: actual outline completion and next scoped deliveries
153
The first-survivor choice is also already with the owner: Yeva, the pressure technician preserving ward measurements (PM recommendation), versus Aster, the supply clerk suspicious of the arrival and requesting one reversible door closure. Neither is selected. Progression, creature, story and corruption alternatives are prepared for later reactions; the owner is not expected to review the whole wiki at once.
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
154
155
## Reporting agreement
156
1d867d Anonymous 2026-09-08 17:16:19
PM continuation: only Claude paused; GPT catalogue and coverage work active
157
PM sends a compact report every15 minutes while useful work is active, plus meaningful completion, disagreement, blocker or decision updates. The Claude-only pause does not stop reporting while PM/GPT work is active. Use quiet hourly checks only when no useful authorized work can continue. Each report gives the timestamp, changes since the previous report, numeric open/closed preparation counts, real worker activity, blockers, next deliverable with ETA, current v1 target and any forecast change, and a link here. An unchanged interval is stated honestly. No page/message counts or invented completion percentages stand in for progress. Clearly labelled estimated dates and ranges are required; never present them as known facts or guaranteed deadlines. The local monitor requires the computer and apps to remain available.