# Hold The Horde — Progress
2
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
3
Updated **15 September**. The owner has chosen **fresh hordes each expedition** and **regular growth through fighting, with larger transformations**. Permanent changes and carried property remain; temporary combat power resets whenever you return home.
6487d5 Anonymous 2026-09-10 15:14:39
Record owner-requested token pause; suspend active forecasts
4
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
5
## Ready to read
6487d5 Anonymous 2026-09-10 15:14:39
Record owner-requested token pause; suspend active forecasts
6
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
7
**Five proposal packages have been completed today.** The latest two finished at **13:26 Jerusalem time**: renewed combat after permanent source seals, and the six main reading pages.
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
8
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
9
Start with [The Game](/Hold%20The%20Flood/The%20Game), continue through [three expeditions into the observation ward](/Hold%20The%20Flood/Expedition%20Proposal), then [Coming Home](/Hold%20The%20Flood/Coming%20Home) and [Discovery in a Changing Station](/Hold%20The%20Flood/Connecting%20The%20Station). For combat, follow [Hordes and Builds](/Hold%20The%20Flood/Hordes%20and%20Builds) into [Three Ways to Break a Horde](/Hold%20The%20Flood/Build%20Comparison).
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
10
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
11
| Completed package | Actual time today | What changed |
12
|---|---|---|
13
| 59–61 — Builds and three expeditions | 12:08 | Different movement and payoff proposals; successive trips pursue different discoveries |
14
| 56–58 — Hospital story and survival | 12:32 | Two possible core mysteries; comparable loadouts with a visible cost for the heavier kit |
15
| 62–63 — Regular growth and renewed combat | 12:45 | An ordinary improvement before a major breakthrough, with crowds and discovery quiet placed along an existing route |
16
| 64–65 — Combat after permanent seals | 13:26 | A second route state retains the seals and shortcut while enemies arrive from a distant open source; room and encounter references agree |
17
| 66–67 — Six main reading pages | 13:26 | Player scenes lead; unfamiliar terms are explained; onward links work; obsolete clearing and growth claims are removed |
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
18
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
19
Each package received one focused critique, one response and PM checks. These are completed design proposals, not tested gameplay. The new Ricochet and Gravity controls remain proposed alternatives to the current detailed equipment rules. The two renewed-route examples do not yet cover every shifted layout or combination of permanent seals.
6487d5 Anonymous 2026-09-10 15:14:39
Record owner-requested token pause; suspend active forecasts
20
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
21
## Working now
474440 Anonymous 2026-09-09 13:05:20
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
22
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
23
| Outcome | Owner and current state | Next delivery, Jerusalem time |
24
|---|---|---|
25
| 68 — Place the moving-lamp expedition | Systems Designer received the assignment and began work; review preparation is separate | Proposal **14:15**, range **14:00–14:45**; reviewed proposal **15:30**, range **14:45–16:30** |
26
| 38 — Full-design readiness, still reopened | PM and a temporary helper are checking the outside-edit bundle for lost meaning and current inconsistencies | Preservation report **14:15**, range **13:45–14:45**; readiness depends on the remaining design work |
f12e0d Anonymous 2026-09-15 12:10:33
Record completed first correction packet and active cadence/route batch
27
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
28
The moving lamp is one of the stronger experience ideas: fight alongside a scan, grow powerful enough to break its final horde, then discover that an apparent constellation points to a bridge you can use. Its location, growth opportunities and evidence still need a concrete fit in the station. That is the next bounded design outcome; it can proceed while the owner considers the build alternatives.
1f816c Anonymous 2026-09-10 10:55:46
Record completed discovery/home correction and active combat/build batch
29
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
30
The tracker contains **68 outcomes: 64 preparation outcomes closed, 1 current design outcome, 1 readiness assessment reopened and 2 parked**. The readiness audit is active work within outcome 38. These counts are not a percentage of the finished game. Outcomes 39–40 remain parked and unaccepted pending the core corrections.
1f816c Anonymous 2026-09-10 10:55:46
Record completed discovery/home correction and active combat/build batch
31
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
32
The original Claude Reviewer received the earlier assignment automatically but stopped at a monthly spend limit at 13:03. Temporary GPT support completed that review. The Lead was absent from the same directory check; availability will be checked again before a future handoff. No new permanent agent or manual message forwarding is needed for the current assignments.
1f816c Anonymous 2026-09-10 10:55:46
Record completed discovery/home correction and active combat/build batch
33
799925 Anonymous 2026-09-15 11:53:48
Align resumed design work and confirmed expedition choices
34
## Delivery forecast
3f5678 Anonymous 2026-09-08 15:56:59
Add milestone forecast F1, target dates, staffing and uncertainty
35
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
36
Forecast **F2.7**, updated 15 September. Dates assume work continues today and about five further active working days for the first full pass.
9c9651 Anonymous 2026-09-09 19:15:21
Record the corrected proposal ready for owner reaction and remaining wiki work
37
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
38
| Milestone | Target | Plausible range | Completion means |
c8ab81 Anonymous 2026-09-10 10:25:09
Continue independent wiki correction and report actual role availability
39
|---|---|---|---|
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
40
| Reviewed sealed-source expedition | **Completed today 13:26** | Earlier than 15:00 target | Proposal, critique, response and integration into its owning references |
41
| Clear six-page reading path | **Completed today 13:26** | Earlier than 16:00 target | Main journey and combat branch revised and checked against current rules |
42
| Moving-scan proposal | Today **14:15** | **14:00–14:45** | One location, rising fight, earned build climax, credible discovery and next trip |
43
| Reviewed moving-scan proposal | Today **15:30** | **14:45–16:30** | One critique, one response and PM disposition with explicit placement costs |
44
| Outside-edit preservation report | Today **14:15** | **13:45–14:45** | Captured changes inspected, completed checks distinguished from any remaining work |
45
| Coherent revised design wiki | **23 September** | **21–28 September** | Readable core and supporting rules aligned; consequential choices explicit |
46
| Full detailed campaign design | **24 November** | **3 November–22 December** | Proposed progression, content, mysteries, ending paths and production scope developed across the campaign |
49369b Anonymous 2026-09-08 16:27:44
PM forecast F1.2: actual outline completion and next scoped deliveries
47
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
48
Near-term estimates have moderate confidence. The full-wiki estimate has low confidence. The campaign date has very low confidence and remains a planning allowance pending a fresh content estimate. None promises development, validated fun or the desired number of playable hours; those require a separately authorized phase.
dc0998 Anonymous 2026-09-09 19:06:07
Record completed critique, focused response and earlier owner delivery estimate
49
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
50
The pre-pause targets were 15 September for the readable wiki and 17 November for detailed campaign design. Five paused calendar days and the outside review's core-loop findings moved those dates. Today's first packet finished at 12:08 against a revised 13:00 target; subsequent packages finished at 12:32, 12:45 and 13:26. F2.7 records the early combat and reading-path deliveries and adds the moving-scan placement. The overall dates remain unchanged because supporting design and creative choices still need work. Earlier estimates remain in revision history and the forecast checkpoint.
e3dd63 Anonymous 2026-09-10 12:07:59
Record completed combat/build proposals and active room/information work with revised forecasts
51
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
52
## What still needs work
95a115 Anonymous 2026-09-10 13:59:59
Close build/expedition batch and forecast story/survival work
53
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
54
- Broader expeditions must sustain fresh combat, meaningful growth and different discoveries around persistent changes.
55
- Build combinations need distinct decisions and room for surprising interactions. The new alternatives still need selection and detailed integration.
56
- Rooms, people, languages and story consequences need concrete scenes with emotional and discovery payoffs.
57
- Supporting pages need the same clarity as the entry path. PM has not yet verified the outside review's entire reported 49-page cleanup.
58
- Full readiness requires a coherent player journey and honest scope, beyond internally consistent tables.
284b2f Anonymous 2026-09-10 11:47:03
Record submitted combat response and explain pending growth-rhythm choice
59
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
60
## Owner choices
284b2f Anonymous 2026-09-10 11:47:03
Record submitted combat response and explain pending growth-rhythm choice
61
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
62
The two immediate combat questions are answered in the [Owner Brief](/Hold%20The%20Flood/Brief). One priority question remains: which build direction to deepen first. It does not discard the others or approve every proposed rule.
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
63
431dc8 Anonymous 2026-09-15 13:30:19
Record completed combat and reading path; forecast moving-scan design
64
PM will next bring concrete story and rescue alternatives, the effect of completing the station connection, and a costed scope proposal. [Open Decisions](/Hold%20The%20Flood/Open%20Decisions) is the wider issue index; its recommendations remain proposals. Its fourteen categories are not fourteen answers needed before work can continue.