Blame

4842a3 Anonymous 2026-09-06 19:36:19
PMU004: Colony — owner expansion direction, sourced coverage and next ownership
1
# Hold the Flood — Colony and Persistent Progression
2
23e3b1 Anonymous 2026-09-07 11:58:13
COL102 r3: explain refuge progression, answer vision tension and flag berth issue
3
The refuge is the place your expeditions change. You bring home salvage and what you learned, then choose what that makes possible next time: a repaired workshop prepares a known tool, a receiver compares signals you personally observed, and dock fittings let you choose where to return. Repairing one delays another. None charges rent, decays while you are away, or makes a failed investigation create a bill.
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
4
23e3b1 Anonymous 2026-09-07 11:58:13
COL102 r3: explain refuge progression, answer vision tension and flag berth issue
5
Later, two recovered crane parts become one reusable support assembly. Before departure, assign it either to advanced workshop preparation or to an extra extraction berth. Better preparation means committing to one return point; the extra berth means relying on a smaller starting loadout and what you find in the field. The assignment can change freely at home, while purchased repairs and banked parts stay yours.
6
7
Home should show that progress: the workshop shutter stays open, the recovered frame is installed, and the manual bench remains usable when the city's power eventually fails. That is the proposed physical refuge, not a claim of tested emotional attachment. The detailed choices and failure rules follow below.
8
9
**COL102 r3 / Colony r7 · 2026-09-07 UTC · Colony and Progression Designer · Focused response submitted.** PMR008 accepts r2's targeted corrections. This pass supplies the requested current plain-language opening, answers Lead's refuge tension using existing facilities, and flags the remaining berth-start issue. It adds no facility, currency or upkeep rule.
10
11
Supersedes [COL102 r2 / Colony r6, 59ad65](/Hold%20The%20Flood/Colony?revision=59ad65), [COL102 r1 / Colony r5, fe7d88](/Hold%20The%20Flood/Colony?revision=fe7d88), [COL101 r4, 527f2b](/Hold%20The%20Flood/Colony?revision=527f2b) and earlier revisions linked in §8. Lead is the sole integrated Design Document owner under D014. The attributed PM seed at the foot is preserved verbatim.
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
12
13
## COL101 recommendation
14
59ad65 Anonymous 2026-09-07 10:16:57
COL102 r2: apply PMR007 D026 receiver simplification and current Tram issue boundary
15
Build a refuge that remembers what the player has made possible, with **one reusable support assembly assigned to either workshop tooling or one supported berth for the next expedition**. Banked salvage buys permanent repairs and fittings once. Moving the assembly between those two uses is free at the refuge. The repaired forecast receiver compares personally observed signals without occupying the assembly. The competition is reliable preparation versus an additional place to stop, not a tax for changing one's mind.
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
16
59ad65 Anonymous 2026-09-07 10:16:57
COL102 r2: apply PMR007 D026 receiver simplification and current Tram issue boundary
17
**Selected drafting direction:** [Brief D022–D026](/Hold%20The%20Flood/Brief?revision=0cba02) selects seven external districts plus a refuge, no forced refuge defence, eight rack cells from the start, shelter-selected pickup priority, one active assembly, reusable refits, revisit-only recorded-rack issue capped at six occupied cells, and base-receiver comparison. [PMR007](/Hold%20The%20Flood/PM%20Reviews/PMR007?revision=6fb181) accepts COL101's targeted corrections and COL102 r1's two investment trajectories within their stated scopes. These remain provisional design decisions, not an approved district count, duration, fiction, asset plan or production scope.
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
18
59ad65 Anonymous 2026-09-07 10:16:57
COL102 r2: apply PMR007 D026 receiver simplification and current Tram issue boundary
19
**Current boundary:** [the shared contract r7](/Hold%20The%20Flood/Mechanics/Power%20And%20Attraction?revision=5322f4) adopts one held dock plus one supported shelter, tooling versus berth support, D026's base-receiver comparison, the gradual Stop cascade, no salvage-fed pump reserve, the dry/manual refuge baseline and ordinary switched-state persistence. Exact repair prices and final refuge presentation remain Colony proposals. Equipment owns issue packages; Campaign owns the current integrated Tram example. No example here depends on an unresolved electrical effect.
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
20
12694e Anonymous 2026-09-06 21:48:28
COL101 r2: answer PMR004 on berth, eight-cell reissue, visible refuge and no-upkeep Stop; preserve PM seed
21
The credible alternative is to make every repair always active. That gives uncomplicated accumulation, but eventually removes the colony decision from departure. One assigned service keeps a repaired colony useful without requiring recurring payments or progressively more currencies. Its risk is domination by one service; the three strategies below expose the choices for written review, not evidence of equal balance.
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
22
12694e Anonymous 2026-09-06 21:48:28
COL101 r2: answer PMR004 on berth, eight-cell reissue, visible refuge and no-upkeep Stop; preserve PM seed
23
## Integration against the Campaign submission that arrived during COL101
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
24
59ad65 Anonymous 2026-09-07 10:16:57
COL102 r2: apply PMR007 D026 receiver simplification and current Tram issue boundary
25
Campaign's topology and district count belong to [Campaign](/Hold%20The%20Flood/Campaign) and [Districts](/Hold%20The%20Flood/Districts). A colony repair never substitutes for operating a canal, travelling to a place or learning its machinery. D022 resolves r1's compulsory Refuge-defence objection for the next draft: the refuge is not an obligatory punishment expedition. D023 and [Equipment's current Build Paths response](/Hold%20The%20Flood/Equipment/Build%20Paths?revision=6bc3f7) persuade me to use eight cells immediately and bounded first-visit packages: retaining field growth through issuance limits is clearer than selling the missing rack area.
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
26
27
## 1. Outcome to choice to changed expedition
28
12694e Anonymous 2026-09-06 21:48:28
COL101 r2: answer PMR004 on berth, eight-cell reissue, visible refuge and no-upkeep Stop; preserve PM seed
29
1. **Resolve the expedition.** Extraction banks carried salvage. Rescue loses that trip's unbanked salvage and field finds; it retains observations and inspected recipes. Named world commitments follow their authored commit points, not a blanket reset or blanket persistence rule.
30
2. **Read what changed at the refuge.** A route board distinguishes confirmed access, the selected baseline dock, any supported additional berth, observed district settings and stale forecasts. The player can also walk into repaired spaces. A repaired workshop's open work bay remains visibly and functionally different from its shuttered starting state.
31
3. **Choose a permanent investment, or keep the salvage.** A displayed one-time price competes with another repair. Capital spending is not refunded, but the repaired capability remains available under its stated power/access conditions. Every preview names the later action it enables, prerequisites and what it cannot do. No repair is required for a free basic departure, ordinary return or essential clue.
59ad65 Anonymous 2026-09-07 10:16:57
COL102 r2: apply PMR007 D026 receiver simplification and current Tram issue boundary
32
4. **Choose this expedition's support.** Once the assembly has been commissioned from the recovered crane parts, assign it to tooling or one supported berth, choose the baseline dock, set pickup priority and prepare the rack at the refuge. Before that milestone, the three base repairs and free basic departure still work, while both advanced fittings display their missing assembly prerequisite. The departure preview shows actual occupied cells, empty batteries, route availability and which fitting is inactive. All available choices are revisable until departure.
12694e Anonymous 2026-09-06 21:48:28
COL101 r2: answer PMR004 on berth, eight-cell reissue, visible refuge and no-upkeep Stop; preserve PM seed
33
5. **Use the changed opportunity in the field.** A second extraction option changes a retreat; a known module allows a different approach to an existing obstacle; a comparison record lets the player act on a discrepancy rather than memorise two instruments under pressure. Field action remains necessary.
34
6. **Return with a new reason to choose.** Newly opened physical access, a discovered module or a changed district setting can make a different assignment worthwhile. Failure need not bring salvage to count as progress: a retained recipe or a corrected inference can change the next departure for free.
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
35
59ad65 Anonymous 2026-09-07 10:16:57
COL102 r2: apply PMR007 D026 receiver simplification and current Tram issue boundary
36
Once commissioned, the assembly is a capacity rule, not cargo. It cannot be duplicated, dropped or lost on rescue. Switching away from tooling before departure revokes its extra issued modules; switching away from berth support revokes the extra berth. There is no preparation stockpile through which the player can combine both assembly-backed services. Receiver comparison remains available because it is part of the paid base repair, not a third assembly use.
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
37
38
## 2. Minimum colony and resource model
39
527f2b Anonymous 2026-09-06 23:29:20
COL101 r4: reconcile support-assembly acquisition with Campaign and preserve failure recovery
40
Only **banked salvage** is a persistent spendable resource. Charge remains expedition-local, starts empty and cannot be sold, banked or used to pay settlement expenses. Recipes, observations and access states are records, not currencies.
41
59ad65 Anonymous 2026-09-07 10:16:57
COL102 r2: apply PMR007 D026 receiver simplification and current Tram issue boundary
42
**Assembly acquisition, integrated by [Campaign DES105 r1](/Hold%20The%20Flood/Campaign?revision=ee4202):** the refuge begins with the connections for advanced fittings but no working support assembly. Two authored crane parts are available in the Lock Flight. The player inspects and carries either or both to extraction; each occupies one rack cell and each extracted part is banked as a unique project component, not converted into salvage. These are project cargo, not equippable items, modules or recipes; Equipment owns any inventory presentation needed to keep that distinction legible. When both are banked, the workshop commissions the one reusable assembly with no additional salvage fee or timer. The repaired bay visibly holds the recovered parts before completion and the assembled frame afterward.
527f2b Anonymous 2026-09-06 23:29:20
COL101 r4: reconcile support-assembly acquisition with Campaign and preserve failure recovery
43
44
The parts are fixed, guaranteed offers on Campaign's route, not random drops or enemy yield. A rescued player loses only parts still carried on that expedition; unbanked parts reappear at their authored location, while any previously extracted part remains banked. The player can therefore recover with a one-cell return rather than repeat a two-cell haul. Free machinery/starter access, essential evidence, baseline docks and the three base repairs never require the assembly. Campaign owns the Lock Flight placement and reachable route; if that route cannot be completed with the free starter and local machinery, the assembly milestone must move rather than create an equipment gate.
45
46
Why prefer this to r3's free starting assembly? A discovered machine part becomes a visible refuge capability and asks for a concrete cargo sacrifice once, joining district exploration to colony growth. The free alternative exposes advanced service competition earlier and is more failure-proof, but makes the assembly an unexplained menu capacity. Fixed placement, separately banked parts and no salvage fee keep the preferred version from becoming repeat hauling.
12694e Anonymous 2026-09-06 21:48:28
COL101 r2: answer PMR004 on berth, eight-cell reissue, visible refuge and no-upkeep Stop; preserve PM seed
47
48
All prices below are **four salvage bundles once per named repair/fitting**, retained as a legible r1 accounting hypothesis. This is not a target number of hauling runs. If a campaign cannot fund meaningful alternatives from ordinary exploration, revise costs/content allocation; do not add repeated hauling to achieve a duration.
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
49
12694e Anonymous 2026-09-06 21:48:28
COL101 r2: answer PMR004 on berth, eight-cell reissue, visible refuge and no-upkeep Stop; preserve PM seed
50
| Permanent investment | Player action and visible result | Changed expedition and competing choice |
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
51
| --- | --- | --- |
527f2b Anonymous 2026-09-06 23:29:20
COL101 r4: reconcile support-assembly acquisition with Campaign and preserve failure recovery
52
| Support assembly commission | Extract the two unique Lock Flight crane parts, together or separately; see them installed into one reusable frame | Makes one purchased advanced fitting assignable per expedition. The recovery trip gives up one or two rack cells that could hold salvage/modules; failure loses only currently carried parts. No salvage price, recurring fee or essential-route gate |
12694e Anonymous 2026-09-06 21:48:28
COL101 r2: answer PMR004 on berth, eight-cell reissue, visible refuge and no-upkeep Stop; preserve PM seed
53
| Dock outlet refit | Refit the existing outlet; the board exposes reusable baseline-dock selection and the installed manifold remains visible | Change which eligible dock is held without paying on each switch. Opening with this delays workshop or forecast repair. Each reached district has its original safe baseline dock free; until refitted that default remains selected, and no switching debt accrues |
54
| Workshop repair | Unshutter a raised work bay and restore its manual fitting bench; inspected patterns can be laid out there | Ordinary issue of one known starting module alongside the empty default battery; occupies real rack cells. This spends salvage that could support route flexibility or forecast information |
59ad65 Anonymous 2026-09-07 10:16:57
COL102 r2: apply PMR007 D026 receiver simplification and current Tram issue boundary
55
| Forecast repair | Repair the receiver; its face shows the known first intake and scheduled interval, marks missing/stale input, and places two personally observed signal records side by side | Choose approach or support with better information before departure, or inspect a discrepancy without consuming the assembly. It does not make a dark signal mean an empty district, reveal an unobserved event or sell route-gating bank state |
56
| Forward-berth fittings, after outlet refit | Install a second hose connection; assign the shared assembly to one eligible extra berth | Retain the baseline dock and one additional extraction option on this expedition. Forego advanced tooling; physical canal access still required |
57
| Workshop tooling, after workshop repair | Fit the reusable jig; assign the assembly and preview one legal first-visit package or a revisit record | More deliberate starting combinations, with less rack room for field finds. Forego the extra berth |
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
58
12694e Anonymous 2026-09-06 21:48:28
COL101 r2: answer PMR004 on berth, eight-cell reissue, visible refuge and no-upkeep Stop; preserve PM seed
59
The three base repairs remain useful independently. The advanced fittings change which combination can be exercised on a later visit; they do not buy increasingly large versions of the same numerical bonus. A player may finish investigations with no advanced fitting. No population, food, morale, housing tier, staffing schedule or autonomous resource producer is needed to make these choices work.
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
60
12694e Anonymous 2026-09-06 21:48:28
COL101 r2: answer PMR004 on berth, eight-cell reissue, visible refuge and no-upkeep Stop; preserve PM seed
61
## 3. Three development strategies
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
62
12694e Anonymous 2026-09-06 21:48:28
COL101 r2: answer PMR004 on berth, eight-cell reissue, visible refuge and no-upkeep Stop; preserve PM seed
63
Early/middle/late describe increasing access and knowledge, not an approved district sequence, required repair order or hour count. Each strategy can change direction without demolishing its earlier investment.
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
64
12694e Anonymous 2026-09-06 21:48:28
COL101 r2: answer PMR004 on berth, eight-cell reissue, visible refuge and no-upkeep Stop; preserve PM seed
65
| Strategy | Early choice | Middle choice | Late choice | Opportunity cost, reversal and failed investigation |
66
| --- | --- | --- | --- | --- |
527f2b Anonymous 2026-09-06 23:29:20
COL101 r4: reconcile support-assembly acquisition with Campaign and preserve failure recovery
67
| **Route builder** | Buy the outlet refit and choose a surveyed approach that suits the next investigation; keep basic Cutter/battery preparation | Recover the Lock Flight parts while opening the upper canal; after commissioning, buy forward fittings and support summit extraction while keeping the depot baseline | Assign that same assembly to an eligible extra retreat point for a consequential revisit; or release it to tooling after route knowledge makes a single exit sufficient | Gives up early known-module issue; carrying the parts gives up up to two cells on that Lock Flight return. Dock/assembly selection reverses freely at shelter. Rescue loses only carried parts, not banked parts, fittings or survey knowledge. After Stop, a powered berth works only until its district circuit dies; the guaranteed route does not depend on it |
59ad65 Anonymous 2026-09-07 10:16:57
COL102 r2: apply PMR007 D026 receiver simplification and current Tram issue boundary
68
| **Outfitter** | Repair the workshop; inspect a Coil or utility module and issue that known module on the next departure, empty of charge | Recover the crane parts, commission the assembly and buy tooling; on a new district take either a primary/tool package or a small two-module circuit | On a revisit, choose a recorded six-cell rack to pursue a specific manipulation; leave two cells for discoveries, or deliberately issue fewer | Gives up forecast investment and the part-carrying cells; while tooling is assigned, gives up the additional exit. Rescue retains banked parts, inspected recipes and eligible records. After Stop, advanced tooling remains until the refuge circuit fails; the manual one-module bench survives |
69
| **Signal investigator** | Repair the forecast receiver; compare its first-dispatch information with what actually arrives, using free field indicators and notes | Repair the workshop for one known module while the base receiver keeps two personally observed records side by side; recover the crane parts when the Lock Flight route offers them | On a revisit, assign the assembly to tooling for a controlled reconstruction or to a berth for two possible observation exits; then act locally on the discrepancy or leave the machine intact | Gives up early dock flexibility and spends on two base repairs before either advanced fitting. Comparison costs field attention but no assembly slot. Rescue retains observations, recipes and banked parts. After Stop, the board announces circuit loss and stored observations persist even when its powered display goes dark |
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
70
59ad65 Anonymous 2026-09-07 10:16:57
COL102 r2: apply PMR007 D026 receiver simplification and current Tram issue boundary
71
**Illustrative sequence:** a failed workshop-first expedition loses its Coil find but retains the inspected recipe. The player can issue a Coil next time without another salvage run, then discover the upper-canal opportunity. Banking salvage later permits forward fittings; assigning them sacrifices advanced circuit preparation for a second extraction. A recorded district discrepancy remains comparable at the repaired receiver whichever assembly use is selected. These are written consequences of the proposal, not played results.
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
72
fe7d88 Anonymous 2026-09-07 08:34:57
COL102 r1: compare Tram-return investments, retain one service, reconcile canal rescue and flag issue conflict
73
## COL102 — Two development approaches across Tram returns
74
59ad65 Anonymous 2026-09-07 10:16:57
COL102 r2: apply PMR007 D026 receiver simplification and current Tram issue boundary
75
**COL102 r2 · 2026-09-07 · Accepted contribution; D026 correction submitted.** [PMR007](/Hold%20The%20Flood/PM%20Reviews/PMR007?revision=6fb181) accepts the two investment trajectories within their stated scope, conditional on Lead's route/acquisition integration. [Campaign DES105 r1](/Hold%20The%20Flood/Campaign?revision=ee4202) now integrates that common case. The sequence remains a written design example rather than validated duration, balance or play behavior, and its scene-specific revisions remain Lead's responsibility.
fe7d88 Anonymous 2026-09-07 08:34:57
COL102 r1: compare Tram-return investments, retain one service, reconcile canal rescue and flag issue conflict
76
77
### The same place, three different reasons to go
78
59ad65 Anonymous 2026-09-07 10:16:57
COL102 r2: apply PMR007 D026 receiver simplification and current Tram issue boundary
79
Use the Tram Incline's existing depot, rail, summit station and timetable from [Campaign DES105 r1 §3.2](/Hold%20The%20Flood/Campaign?revision=ee4202). Visits are separated by ordinary campaign exploration, not consecutive compulsory trips. Both approaches require the two banked crane parts before their changed return can use an advanced service. The two approaches face the same objective and observed state at each step; investment changes the options they can rely on. The proposed four-bundle prices below compare three equal spending opportunities (4, then 4, then 4), not earnings guaranteed at those points. If normal exploration does not fund them, Lead changes price or placement; no extra hauling visit is added.
fe7d88 Anonymous 2026-09-07 08:34:57
COL102 r1: compare Tram-return investments, retain one service, reconcile canal rescue and flag issue conflict
80
81
| Return and changed understanding | A — protect two possible exits | B — make one equipment combination dependable |
82
| --- | --- | --- |
83
| **First visit: discover what the rail powers and physically reach/survey the summit.** The working belief is that lighting the rail simply supplies transport. At the depot, Rail visibly darkens the gates while lighting the pass gate; the moving lamp draws the crowd. The new fact is that moving the crowd also changes the way home. | Spend the first four bundles on the outlet refit. Start with free Cutter and empty battery, using the original depot baseline; an unsurveyed summit cannot be selected or supported. This first trip gains no remote summit access from the purchase. It earns a later choice of which surveyed dock to hold. The opportunity given up now is known-module issue. | Spend four on the manual workshop. If the Coil recipe was inspected during earlier exploration, issue Coil plus the empty battery: three occupied cells. The Coil is an emergency option only after ten charge units are actually collected; it does not power the dry rail. This gives up dock reselection and uses two more cells than A. Without the recipe, depart basic and retain the repair; the shop cannot invent discovery. |
59ad65 Anonymous 2026-09-07 10:16:57
COL102 r2: apply PMR007 D026 receiver simplification and current Tram issue boundary
84
| **Changed return: use the surveyed upper route to inspect the pass toward the Exchange.** The player now knows that Rail opens the pass but closes the convenient depot gates, and the board shows the tram and canal states left by previous actions. The choice is whether to preserve two retreat options or prepare to cope with the incline while committing to one. | After both crane parts have banked and the assembly is commissioned, spend the next four on forward-berth fittings. Hold the depot and assign the one city-wide extra berth to the surveyed summit, provided the board shows the upper canal joined. Start basic; use the local tram/lamp and panel. If work above becomes costly, extract at the summit; if the incline is blocked before reaching it, retreat below. This gives up advanced tooling. The two docks do not remove pursuit, a blocking Heavy or the need to reach either dock. | Spend the next four on tooling. If Coil and Insulation have actually been assembled and recorded in a shelter, issue that four-cell revisit rack (two Coil cells, one Insulation, one empty battery). Keep the original depot baseline; the summit is not a second supported exit. Insulation permits a powered-yard approach and Coil can buy a stun after earned fuel, at the cost of four cells and a return down the incline or Campaign's manual gate route. Reversing the tram when a Heavy blocks it remains the zero-fuel alternative. Do not promise a powered Coil at departure or claim a safe clearing time. |
85
| **Later return: check a supply intervention, then leave the tram where the next approach should begin.** After the player deliberately withholds the Tram's first supply at the Collector while leaving it permitted, the prior belief “a flash guarantees an incoming crowd” becomes a question. Observe a permitted flash without bodies at the yard, then distinguish that interval from later arrivals and local enemies. This is an optional verification of World/Campaign's existing supply rule, not a new mandatory evidence flag. | Spend the third four on the workshop. Now issue one known Coil with the empty battery while retaining berth support. Use the lower dock to observe the yard; continue to the summit only if the actual crowd and pass state permit it. An empty first dispatch reduces the need for two exits, but the second exit still lets the player abandon the upper leg without undoing all lower work. The cost is foregoing Insulation alongside the issued Coil. A may instead select just the summit baseline and leave the assembly idle; buying a service never obliges its use. | Spend the third four on the outlet refit. Keep tooling assigned and select one surveyed baseline dock according to the objective: depot for the yard observation and a shorter abort, summit for upper work after accepting the lower observation's round trip. The same four-cell record protects an energized-yard approach but cannot manufacture charge from an absent surge. Use manual routing if the bank remains empty. Give up the second hard stop. Leave the tram/panel in a deliberate local state and record it for the next visit. |
fe7d88 Anonymous 2026-09-07 08:34:57
COL102 r1: compare Tram-return investments, retain one service, reconcile canal rescue and flag issue conflict
86
87
The first return teaches an opportunity cost, the changed return exploits physical access, and the later one checks a changed world and chooses its next starting state. Reading the timetable also links the existing Lock Flight evidence to the Exchange; World owns the explanation and its redundant evidence. If the player already understands the supply rule and has no reason to reposition the tram or inspect upper evidence, cut the later trip from their path. It is not required to unlock the next price tier.
88
23e3b1 Anonymous 2026-09-07 11:58:13
COL102 r3: explain refuge progression, answer vision tension and flag berth issue
89
**Preparation and geography dependencies, resolved in the current sources.** [Campaign DES105 r3](/Hold%20The%20Flood/Campaign?revision=0cafb9) retains the Lock Flight quay dock as the recording shelter, and [Equipment's reconciliation](/Hold%20The%20Flood/Equipment/Build%20Paths?revision=6d6d1d) accepts it. Inspect Insulation on the dry road outside the lock house, carry it back to the quay dock with the known Coil, then actually assemble and record a legal four-cell rack. Recording at the Tram summit shelter after carrying the components onward also remains legal. Until a record exists, use a smaller eligible package; neither the recipe nor the record is granted by a page or map selection. Campaign owns route costs, Collector withholding and summit eligibility.
fe7d88 Anonymous 2026-09-07 08:34:57
COL102 r1: compare Tram-return investments, retain one service, reconcile canal rescue and flag issue conflict
90
91
### What failure changes, and what can be reversed
92
93
Before launch, the preview shows investment price, remaining banked salvage, actual issued cells, the one assigned service, both selected/unsupported dock states, canal connectivity, tram position, relevant permit/supply setting and any pending circuit loss. It does not show an unseen live crowd or solve the mystery. An unavailable summit names its physical prerequisite before launch.
94
95
Rescue on the first visit retains observed rail/gate behavior, inspected recipes and actual visited/surveyed places; it cannot mark an unseen summit surveyed. Rescue on either return retains banked parts, paid repairs, recorded racks and the physical canal/tram/panel state left by the player. It loses carried cargo and charge, so the next capital purchase can be delayed; issue and return stay free. If only one crane part was banked, the next exploration can retrieve the other from its fixed source with one cargo cell. There is no two-part restart and no repair debt.
96
97
Spending the next four on the competing base repair changes direction without refunding the earlier purchase or destroying it. A fitted service can be reassigned freely at the refuge; moving away from tooling revokes its extra issued equipment before launch. Field finds may form a fuller rack in a shelter while berth support remains assigned, but this is an expedition acquisition opportunity, not permission to start with both benefits. Ordinary switched states require local machine action to reverse. After Stop there are no dispatch flashes anywhere: the later supply-observation example no longer applies. The announced power cascade and eventual loss of powered services follow §5; manual issue, banked knowledge and the dry return survive without upkeep.
98
99
### Is one active assembly enough?
100
101
**Retain one for this draft.** A can take a smaller departure rack to keep two possible exits; B can prepare protection plus a powered response while accepting one exit. A's later workshop purchase also shows that base repairs combine with a service, so the choice is not “route player has no equipment forever.” Switching a baseline dock gives B a credible route alternative without granting two hard stops. The consequence of the assembly assignment remains legible in the expedition.
102
103
The credible alternative is two simultaneous services: berth plus tooling would support experimentation with less retreat risk. I reject that change at this stage because it removes precisely the competing choice the Tram currently supplies; it also lets a nominal preparation limit be bypassed by always pairing its solution with the extra exit. This is a written design argument, not demonstrated balance. The risk of one service is real: if every useful objective sits beside one freely selected baseline dock, forward support becomes redundant. Campaign should price an actual lower/upper decision or omit the extra berth there, not add danger or a new toll solely to force its purchase.
104
59ad65 Anonymous 2026-09-07 10:16:57
COL102 r2: apply PMR007 D026 receiver simplification and current Tram issue boundary
105
**D026 adopts the fallback:** the separate comparative-reader fitting is removed from the live recommendation. The repaired base receiver places two personally observed records side by side, while the assembly competes only between tooling and berth support. This preserves the field attention cost and free essential evidence without pretending comparison can rival a second exit or a dependable build. It never reveals an unobserved signal or sells the Exchange's bank state, which the free prelaunch board already shows. The rejected three-service version remains at [r5](/Hold%20The%20Flood/Colony?revision=fe7d88).
fe7d88 Anonymous 2026-09-07 08:34:57
COL102 r1: compare Tram-return investments, retain one service, reconcile canal rescue and flag issue conflict
106
107
### Focused handoff and remaining correction
108
59ad65 Anonymous 2026-09-07 10:16:57
COL102 r2: apply PMR007 D026 receiver simplification and current Tram issue boundary
109
**Resolved r1 finding:** [Campaign r5 §3.2](/Hold%20The%20Flood/Campaign?revision=9366c8) had started its second Tram visit with the summit berth supported and seven equipment cells, illegally combining the two assembly services. Colony proposed ordinary issue plus explicit field offers, or a smaller rack. [Campaign DES105 r1](/Hold%20The%20Flood/Campaign?revision=ee4202) now removes that over-issued start; the older paragraph is retained only as review provenance.
fe7d88 Anonymous 2026-09-07 08:34:57
COL102 r1: compare Tram-return investments, retain one service, reconcile canal rescue and flag issue conflict
110
23e3b1 Anonymous 2026-09-07 11:58:13
COL102 r3: explain refuge progression, answer vision tension and flag berth issue
111
Lead has integrated these trajectories into [Campaign DES105 r1](/Hold%20The%20Flood/Campaign?revision=ee4202) and removed the over-issued berth start. [REV105 r3](/Hold%20The%20Flood/Design%20Review?revision=265a09) now credits Lead's earned-ease revision and closes those earlier Tram findings; this does not establish the berth-supported starting issue as legal. The remaining Colony issue is specified in the vision response below. Equipment's r4 smaller-package clarification remains the issue boundary. World r26 mirrors D026 and owns the observation chain. Campaign owns actual return paths and cuts any test trip that adds no new player question. Minimum resources/facilities/assets remain §2/§6; no new people, buildings, currency or asset creation is proposed.
112
113
## Vision response — make preparation an action at home
114
115
**To Visionary and Lead, against [Brief's working vision](/Hold%20The%20Flood/Brief?revision=0fff74) and [Campaign's refuge tension](/Hold%20The%20Flood/Campaign?revision=0cafb9):** I recommend keeping the existing workshop as the place where the player prepares, rather than adding a separate refuge activity to prove the settlement matters. After repair the player enters the opened work bay, uses its bench to choose known equipment, and sees the resulting rack before departure. Assigning the recovered assembly to an additional berth leaves that same bench available for ordinary issue while its advanced jig is inactive. When the announced power cascade reaches the refuge, the player can still cross the dry walkway and use the manual bench; the familiar powered jig no longer supplies its expanded preparation. The cost is a capability the player has actually chosen and used, not a new survival tax. This is a presentation of the existing rules, with the same unapproved geometry and station-state gaps in §6. A remote preparation menu is a credible cheaper alternative; prefer the usable bay only if existing assets can make that contrast clear without adding compulsory walking chores. World owns any people's reactions or story consequences; I do not invent them here.
116
117
**Retain earned ease.** Campaign's quick later return now treats understanding as a payoff and leaves extended observation optional. Colony supports that: neither salvage prices nor refuge investment require waiting for another surge or repeating a solved investigation. PMR008 accepted our earlier option to omit unnecessary verification trips. The complete integrated scene still belongs to Lead and its reviewers.
118
119
**Remaining preparation correction — Lead/Equipment:** Campaign 0cafb9's changed-return alternative assigns the assembly to the berth but starts with Beacon + Battery + Kit. Beacon and Kit are two modules; ordinary workshop issue permits one known module plus the default battery. The three occupied cells do not make that departure legal. Smallest correction: issue the known Beacon and empty Battery, leave Kit behind, and price the route with no issued heal. If Kit is necessary, Campaign must name its field offer and acquisition cost before use; do not grant tooling alongside berth support. This does not reopen the resolved seven-cell example or the quay-dock record.
fe7d88 Anonymous 2026-09-07 08:34:57
COL102 r1: compare Tram-return investments, retain one service, reconcile canal rescue and flag issue conflict
120
12694e Anonymous 2026-09-06 21:48:28
COL101 r2: answer PMR004 on berth, eight-cell reissue, visible refuge and no-upkeep Stop; preserve PM seed
121
## 4. Three connected examples for the domain owners
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
122
12694e Anonymous 2026-09-06 21:48:28
COL101 r2: answer PMR004 on berth, eight-cell reissue, visible refuge and no-upkeep Stop; preserve PM seed
123
### Route example — for Campaign, with Lead interim
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
124
59ad65 Anonymous 2026-09-07 10:16:57
COL102 r2: apply PMR007 D026 receiver simplification and current Tram issue boundary
125
**COL-I1, adopting Campaign’s correction:** [Campaign DES105 r1](/Hold%20The%20Flood/Campaign?revision=ee4202) and [shared contract r7 §6](/Hold%20The%20Flood/Mechanics/Power%20And%20Attraction?revision=5322f4) make the Lock Flight canal an ordinary switched state: L2 open and the Head basin drained into the Middle joins it; rescue preserves that actual state. I withdraw r4’s extraction condition because it would erase an accomplished physical change and charge failed investigation with a needless repeat. The Tram summit must still have been physically reached/surveyed. The refuge board shows canal joined/parted and summit eligibility before launch. Support means **one additional berth in the whole city**, with one assembly assignment; it never opens a district or creates an approach route.
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
126
59ad65 Anonymous 2026-09-07 10:16:57
COL102 r2: apply PMR007 D026 receiver simplification and current Tram issue boundary
127
With the canal available, the player can **select the summit as the ordinary one held dock**, giving up the depot as the held dock. This requires the ordinary reusable outlet refit, not advanced forward fittings. Alternatively, assign forward support to **keep depot as baseline and summit as one additional berth**. This is the adopted one-extra-shelter exception in contract r7: an additional place to stop at a compatible surveyed connection, with the baseline held dock retained.
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
128
59ad65 Anonymous 2026-09-07 10:16:57
COL102 r2: apply PMR007 D026 receiver simplification and current Tram issue boundary
129
The latter lets a player enter below, tow a crowd using the Tram's own machinery, investigate above and extract at the summit without retracing that crowd. It costs the assembly assignment that could have supplied tooling. It does not power the rail, hold L2 open remotely, suppress enemies, transport a boat through a closed canal, or open Exchange access from a menu. Baseline arrival/return must remain possible without purchasing this option. Campaign owns the exact physical approach and return paths; the Colony preview cannot claim them complete on Campaign's behalf.
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
130
12694e Anonymous 2026-09-06 21:48:28
COL101 r2: answer PMR004 on berth, eight-cell reissue, visible refuge and no-upkeep Stop; preserve PM seed
131
Why prefer optional additional extraction to a mandatory remote outpost upgrade? The player can knowingly choose a harder return to support a different experiment. A compulsory upgrade makes salvage a gate on exploration and erases that choice.
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
132
12694e Anonymous 2026-09-06 21:48:28
COL101 r2: answer PMR004 on berth, eight-cell reissue, visible refuge and no-upkeep Stop; preserve PM seed
133
### Preparation example — for Equipment
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
134
59ad65 Anonymous 2026-09-07 10:16:57
COL102 r2: apply PMR007 D026 receiver simplification and current Tram issue boundary
135
**COL-I2, aligned to [Build Paths r4](/Hold%20The%20Flood/Equipment/Build%20Paths?revision=6bc3f7):** smaller legal starts remain selectable on revisits; recorded issue is a ceiling, not a forced six-cell package. Equipment owns item footprints, primary effects, adjacency, link legality and exact package contents; this page owns service eligibility and persistence. All issued batteries are empty.
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
136
12694e Anonymous 2026-09-06 21:48:28
COL101 r2: answer PMR004 on berth, eight-cell reissue, visible refuge and no-upkeep Stop; preserve PM seed
137
| Departure option | Colony eligibility and limits | Concrete occupied-cell example under the cited Equipment proposal |
138
| --- | --- | --- |
139
| Free basic | No repair, salvage, successful extraction or service needed | Cutter outside rack; one default empty battery occupies one of eight cells |
140
| Ordinary workshop | Inspected recipe; repaired manual bench | Coil (2) + default battery (1): three occupied, five free |
141
| Advanced first visit: Field tool | Tooling assigned; one known primary and one known module, plus default battery | Prod brace (1) + Coil (2) + default battery (1): four occupied, four free |
142
| Advanced first visit: Circuit set | Tooling assigned; Cutter and up to two known modules occupying at most three cells together, plus default battery | Coil (2) + Insulation (1) + default battery (1): four occupied, four free |
143
| Advanced revisit | Tooling assigned; previously visited destination; one eligible recorded arrangement with at most six occupied cells including primary brace and the default battery | Cutter; Coil (2), two batteries (2), Insulation (1), Arc (1): six occupied, two free |
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
144
12694e Anonymous 2026-09-06 21:48:28
COL101 r2: answer PMR004 on berth, eight-cell reissue, visible refuge and no-upkeep Stop; preserve PM seed
145
These are footprint examples, not electrical-effect demonstrations. For the six-cell revisit example, a legal candidate 2×4 arrangement in the cited rules is top row **empty / Coil / Coil / Coil-linked battery**, bottom row **empty / Insulation / Arc / Arc-linked battery**. Each battery has a specified linked module; the two empty cells do not touch a battery. Item-rule reconciliation remains Equipment/Lead work.
146
147
**Visit trigger, proposed here:** actual entry into a district marks it visited when that expedition ends by extraction or rescue. Merely selecting it on the map does not. No successful clear, mandatory note, salvage quota or boss is required. A short retreat can therefore qualify a later revisit; that is an acknowledged cost of protecting unsuccessful exploration. If this trivialises first-visit growth, first adjust the reissue package/cap rather than add a success tax.
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
148
12694e Anonymous 2026-09-06 21:48:28
COL101 r2: answer PMR004 on berth, eight-cell reissue, visible refuge and no-upkeep Stop; preserve PM seed
149
**Recipe and record trigger:** personally inspecting an item retains its recipe even if it is lost later. At any shelter, including a field shelter, the player can record an actually assembled, legal arrangement of known items. The record survives losing those physical items. At the refuge it can be reissued only under the destination and issue limits above. An arbitrary unknown template grants nothing. The six-cell cap counts *every* issued occupied cell; the default battery is included in the arrangement, never silently added afterward. Cargo and charge are not recorded. A larger saved pattern must be edited to the cap before issue; do not silently delete a module. The remaining two cells are room, not reserved cargo, and can receive field items.
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
150
12694e Anonymous 2026-09-06 21:48:28
COL101 r2: answer PMR004 on berth, eight-cell reissue, visible refuge and no-upkeep Stop; preserve PM seed
151
Patterns and recipes remain when tooling is unassigned; extra issue does not. This avoids free stockpiling while making a failed experiment repeatable. Full-rack issue on a first encounter is a credible convenience alternative, but consumes the discovery room before the player has met that district's problem; prefer these bounded packages.
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
152
153
### Discovery and enduring consequence — for World
154
59ad65 Anonymous 2026-09-07 10:16:57
COL102 r2: apply PMR007 D026 receiver simplification and current Tram issue boundary
155
**COL-I3, mirroring D026 and [World r26](/Hold%20The%20Flood/World%20And%20Mystery?revision=744b21):** the repaired forecast receiver preserves two records of signals the player could see unaided; it does not discover trunk permission, supply or a mystery answer remotely. When the player personally inspects a visible incoming permission pulse and a local drum event, record each event's place, observed state and order. At the refuge the receiver can place them side by side; comparing observations from different trips never asserts a simultaneous measurement. This is part of the receiver repair, not an extra carried module, unattended recorder or assembly-backed fitting.
12694e Anonymous 2026-09-06 21:48:28
COL101 r2: answer PMR004 on berth, eight-cell reissue, visible refuge and no-upkeep Stop; preserve PM seed
156
59ad65 Anonymous 2026-09-07 10:16:57
COL102 r2: apply PMR007 D026 receiver simplification and current Tram issue boundary
157
The player can use that comparison to choose whether to inspect a local relay or Collector intake next. The cost is repairing the receiver instead of another base facility and spending attention reaching/reading instruments while exposed. The unaided player can perform the same comparison using ordinary notes. World r26's redundant essential evidence is the boundary: the repair cannot create an essential clue absent in the field.
12694e Anonymous 2026-09-06 21:48:28
COL101 r2: answer PMR004 on berth, eight-cell reissue, visible refuge and no-upkeep Stop; preserve PM seed
158
159
If permission flashes but supply is empty, retain both the flash and any personally observed hollow-arrival cue; do not report that no enemies can exist. After Shut/Fix/Hold or an Exchange/Head-Works commitment, mark conflicting older forecasts as historical until a new observation supports an update. Persistent notes inform an action; they do not unlock it by flag.
160
161
**COL-I4, lasting refuge consequence and position to World/Campaign:** workshop investment opens a raised work bay the player can enter and use. The hand-fitting bench continues ordinary one-module issue after the powered jig goes dark. Its shutter remains open, inspected patterns remain available and the installed jig visibly stops. The repair buys lasting usable infrastructure; the advanced service remains contingent on world power.
162
163
Proposed refuge layout contract: a **raised landing and dry walkway** connect free basic equipment, notebook and manual bench without any pump or upgrade. The powered lower apron provides the convenient pumped access; its water level and inactive pump make power loss visible. Losing that convenience changes the approach within the refuge, while the raised landing remains usable. No district is declared to possess this geometry by this Colony proposal: Campaign must identify each actual unpowered return route.
164
165
This gives investment an enduring physical result beyond a menu and makes the world decision costly without destroying earned knowledge. It requires no new character simulation or special emergency currency. The work bay and landing are proposed scene requirements, not confirmed assets.
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
166
59ad65 Anonymous 2026-09-07 10:16:57
COL102 r2: apply PMR007 D026 receiver simplification and current Tram issue boundary
167
**Stop interface, corrected after PMR006.** I was persuaded by the canonical [shared contract r7](/Hold%20The%20Flood/Mechanics/Power%20And%20Attraction?revision=5322f4) to withdraw r2's immediate-loss recommendation. Stop ends harvesting; the stored supply then loses one district circuit per expedition, nearest the Head-Works first. The refuge shares the Pumping District circuit and therefore fails late in that cascade. Before departure, its board names the next circuit loss. Powered forecast, advanced tooling and a supported pumped berth remain usable only while their supplying circuit lives; when the refuge circuit dies, they visibly go dormant. The free raised landing, dry walkway, manual one-module bench, Cutter, notes, paid repairs, banked salvage and notebook records remain usable.
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
168
06acdb Anonymous 2026-09-06 22:48:37
COL101 r3: mirror PMR006 Stop cascade and switched-state persistence; retain no-upkeep manual refuge floor
169
The credible immediate-shutdown alternative makes Stop's cost instant and simple, but it removes services before the player can make a last informed response and disagrees with the authored city-wide cascade. Prefer the announced gradual loss because each remaining expedition asks which powered opportunity to use before it disappears. The cadence is a provisional design value, not tested balance or duration.
170
171
**No upkeep boundary, retained and now adopted by Lead:** the board advances a world-state consequence; it does not deduct salvage, create a refill action or run off-session. An unsuccessful investigation after Stop may advance the canonical one-circuit-per-expedition cascade because an expedition occurred, but it cannot spend banked resources, close the dry landing, disable the manual bench or add a repair debt. The shared contract explicitly declines World r21's salvage-fed pump reserve, as r2 recommended. Stored portable charge/effects remain governed by the shared equipment rules; no free charge or unexplained backup generator is introduced.
12694e Anonymous 2026-09-06 21:48:28
COL101 r2: answer PMR004 on berth, eight-cell reissue, visible refuge and no-upkeep Stop; preserve PM seed
172
173
For **Keep**, retain the actual committed governor setting on the route board as an enduring district state, with consequences authored by Campaign/World. Revising it requires the local field action; the refuge board is not a remote governor. Keep does not schedule upkeep visits. For **Leave**, retain the observation and the unchanged actual state; the board must not depict an intervention that never happened.
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
174
175
## 5. Persistence boundaries
176
12694e Anonymous 2026-09-06 21:48:28
COL101 r2: answer PMR004 on berth, eight-cell reissue, visible refuge and no-upkeep Stop; preserve PM seed
177
| State | Extraction | Rescue / unsuccessful investigation | Reconfiguration, later visit and Stop |
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
178
| --- | --- | --- | --- |
12694e Anonymous 2026-09-06 21:48:28
COL101 r2: answer PMR004 on berth, eight-cell reissue, visible refuge and no-upkeep Stop; preserve PM seed
179
| Banked salvage and paid repairs/fittings | Retained; carried salvage banks on extraction | Previously banked progress retained; this trip's unbanked cargo lost | No upkeep, off-session decay or automatic spending, including after Stop |
527f2b Anonymous 2026-09-06 23:29:20
COL101 r4: reconcile support-assembly acquisition with Campaign and preserve failure recovery
180
| Unique crane parts and commissioned assembly | Each extracted part banks separately; both commission one assembly once | Previously banked part/assembly retained; only a currently carried part is lost and returns to its fixed source | Not spendable, destructible or duplicated; assembly persists physically through Stop even when powered advanced services go dormant |
12694e Anonymous 2026-09-06 21:48:28
COL101 r2: answer PMR004 on berth, eight-cell reissue, visible refuge and no-upkeep Stop; preserve PM seed
181
| Ordinary equipment finds, charge and cargo | Knowledge retained; issue is governed by recipes, not a physical armory | Physical field finds lost; inspected recipes retained | No charge banking or conversion; departure batteries empty |
182
| Observations, inspected recipes, eligible rack records and actual visited destinations | Retained | Retained under the triggers above | Records can become stale, not erased; powered service loss does not erase the notebook |
183
| Selected baseline dock and assembly assignment | Remain selected | Remain selected if still physically eligible | Freely reselect at refuge after permanent refit; losing canal/power eligibility is shown, never charged as debt |
06acdb Anonymous 2026-09-06 22:48:37
COL101 r3: mirror PMR006 Stop cascade and switched-state persistence; retain no-upkeep manual refuge floor
184
| Ordinary enemies, loose finds and temporary electrical effects | Reset according to shared expedition rules | Same | Discharge windows, stun, Arc/Spark effects and planted-light state end; Grounder disruption recovers with the mass |
185
| Ordinary switched state | Persists exactly as left | Persists exactly as left | Panels, valves, locks/basin levels, drains, gates, Exchange bank and Tram position persist until the player changes them locally or an authored outcome changes their supply |
12694e Anonymous 2026-09-06 21:48:28
COL101 r2: answer PMR004 on berth, eight-cell reissue, visible refuge and no-upkeep Stop; preserve PM seed
186
| Named district interventions | Persist only at the author-specified commitment event | A completed local commitment is not automatically undone by rescue; extraction-conditioned changes require extraction | Actual committed outcomes appear on the board; later reversal follows the district's explicit rules |
06acdb Anonymous 2026-09-06 22:48:37
COL101 r3: mirror PMR006 Stop cascade and switched-state persistence; retain no-upkeep manual refuge floor
187
| Refuge infrastructure | Repaired work bay and fittings remain | No destruction, worker death, repair bill or forced defence | Stop disables powered refuge services only when the Pumping District/refuge circuit dies late in the announced cascade; manual bench and free raised landing remain usable |
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
188
fe7d88 Anonymous 2026-09-07 08:34:57
COL102 r1: compare Tram-return investments, retain one service, reconcile canal rescue and flag issue conflict
189
**COL-I3 persistence clarification:** a warning before an authored commitment must say when it commits and whether rescue can undo it. The current contract says no district yet defines an extraction-conditioned world commitment; L2/canal state is explicitly ordinary switched state and survives rescue. Unique crane parts still require extraction to bank because they are cargo. Colony stores and displays the result; it does not choose every district’s commit or reversal rule.
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
190
191
## 6. Assets, people and scope
192
12694e Anonymous 2026-09-06 21:48:28
COL101 r2: answer PMR004 on berth, eight-cell reissue, visible refuge and no-upkeep Stop; preserve PM seed
193
Minimum settlement: one refuge containing existing dock/receiver/workshop functions, one route/notebook display and one reusable support assembly represented through the fitted station state. Minimum new functionality in the design is a manual bench, a dry unpowered landing contract and clear station active/inactive states. No named recruit, staffing minigame, resource production, hunger, housing or mortality mechanic is required.
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
194
527f2b Anonymous 2026-09-06 23:29:20
COL101 r4: reconcile support-assembly acquisition with Campaign and preserve failure recovery
195
Prefer reuse of project-appropriate free existing dock, industrial bench, shutter, pump, hose, instrument and signage assets if found and licensed. **Availability and suitability have not been established.** Raised refuge geometry, readable inactive/active states, two-signal records, the manual/powered workshop distinction, two identifiable crane parts and the incomplete-to-complete assembly frame are unapproved asset/presentation gaps. Existing assets may fail to express them; that is a reason to simplify or seek prior owner approval for rare minimal authored assets, not permission to make them. No purchase or generated art is proposed or authorized.
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
196
12694e Anonymous 2026-09-06 21:48:28
COL101 r2: answer PMR004 on berth, eight-cell reissue, visible refuge and no-upkeep Stop; preserve PM seed
197
Scope is campaign-spanning choices through the expedition machinery, not a second management game. No count or price proves duration, fun, feasibility or balance. All scenarios here are written illustrations.
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
198
199
## 7. Integration proposals and requested responses
200
12694e Anonymous 2026-09-06 21:48:28
COL101 r2: answer PMR004 on berth, eight-cell reissue, visible refuge and no-upkeep Stop; preserve PM seed
201
| Interface | Position and reason | Exact source / owner action still needed |
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
202
| --- | --- | --- |
59ad65 Anonymous 2026-09-07 10:16:57
COL102 r2: apply PMR007 D026 receiver simplification and current Tram issue boundary
203
| COL-I0: assembly acquisition | Two fixed Lock Flight crane parts are the one-time assembly material; bank each separately, charge no salvage fee and preserve base/free access | [PMR007 6fb181](/Hold%20The%20Flood/PM%20Reviews/PMR007?revision=6fb181) accepts the targeted acquisition correction; [Campaign DES105 r1](/Hold%20The%20Flood/Campaign?revision=ee4202) integrates it. Campaign owns guaranteed free-route placement/reappearance |
204
| COL-I1: route | One freely selected baseline held dock after refit; one optional additional berth city-wide uses the assembly. Canal state survives rescue; survey/access prerequisites stay physical | [Shared rules r7](/Hold%20The%20Flood/Mechanics/Power%20And%20Attraction?revision=5322f4), [Campaign DES105 r1](/Hold%20The%20Flood/Campaign?revision=ee4202), [Districts r9](/Hold%20The%20Flood/Districts?revision=e9c413); Colony mirrors these corrections; Campaign owns each actual return path |
205
| COL-I2: preparation | Support Equipment's small first-visit packages and D023 revisit cap; smaller packages remain selectable; keep failure-tolerant visit/recording triggers | [Build Paths r4](/Hold%20The%20Flood/Equipment/Build%20Paths?revision=6bc3f7), [Inventory r3](/Hold%20The%20Flood/Mechanics/Inventory%20And%20Charge?revision=9cebc1): Equipment owns issue contents and item legality/effects; Lead's DES105 uses legal starts. Footprint examples do not settle effects |
206
| COL-I3 / D026: observation | Base receiver compares personally observed records; no separate fitting, bank-state sale or purchased essential evidence; historical forecasts visibly stale | [Brief 0cba02](/Hold%20The%20Flood/Brief?revision=0cba02), [World r26](/Hold%20The%20Flood/World%20And%20Mystery?revision=744b21), [contract r7](/Hold%20The%20Flood/Mechanics/Power%20And%20Attraction?revision=5322f4) and [Campaign DES105 r1](/Hold%20The%20Flood/Campaign?revision=ee4202) mirror the two-service assembly boundary |
207
| COL-I3–I4: persistent world/refuge | Mirror ordinary switched-state persistence and the announced Stop cascade; retain manual refuge access and no salvage reserve | [Shared rules r7](/Hold%20The%20Flood/Mechanics/Power%20And%20Attraction?revision=5322f4) resolves the rule: the refuge dies with the Pumping District late, dry/manual access survives, and the reserve is declined. Campaign still owns each district's physical unpowered return |
12694e Anonymous 2026-09-06 21:48:28
COL101 r2: answer PMR004 on berth, eight-cell reissue, visible refuge and no-upkeep Stop; preserve PM seed
208
| COL-I6: refuge obligation | D022 selects no forced refuge defence; r1's objection no longer blocks Colony drafting | [Brief 70b6b1](/Hold%20The%20Flood/Brief?revision=70b6b1): Lead remove contradictory compulsory-defence summaries during integration |
59ad65 Anonymous 2026-09-07 10:16:57
COL102 r2: apply PMR007 D026 receiver simplification and current Tram issue boundary
209
| COL-I5: economy and acceptance | Keep one-time prices provisional; do not make investigation pay for failure or artificially extend play | [PMR007 6fb181](/Hold%20The%20Flood/PM%20Reviews/PMR007?revision=6fb181) accepts the two trajectories while stating equal spending opportunities are illustrative, not guaranteed income. Lead/PM retain economy integration and acceptance |
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
210
12694e Anonymous 2026-09-06 21:48:28
COL101 r2: answer PMR004 on berth, eight-cell reissue, visible refuge and no-upkeep Stop; preserve PM seed
211
This is a focused response and recorded handoff, not a claim those authors have read or agreed. No new owner approval is needed to continue written reconciliation. Development and any asset expenditure remain behind the owner's explicit approval gates.
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
212
213
## 8. Source revisions used
214
23e3b1 Anonymous 2026-09-07 11:58:13
COL102 r3: explain refuge progression, answer vision tension and flag berth issue
215
**COL102 r3 / Colony r7, 2026-09-07:** compared against own [r2 59ad65](/Hold%20The%20Flood/Colony?revision=59ad65) and [task handoff d518c6](/Hold%20The%20Flood/Tasks?revision=d518c6). Read index/log and actual sources: [Tasks 1c38ca](/Hold%20The%20Flood/Tasks?revision=1c38ca), [PM Reviews 27d07f](/Hold%20The%20Flood/Pm%20Reviews?revision=27d07f), [PMR008 37fd94](/Hold%20The%20Flood/Pm%20Reviews/Pmr008?revision=37fd94), [Review 265a09](/Hold%20The%20Flood/Design%20Review?revision=265a09), [Brief 0fff74](/Hold%20The%20Flood/Brief?revision=0fff74), [Campaign 0cafb9](/Hold%20The%20Flood/Campaign?revision=0cafb9), [Build Paths 6d6d1d](/Hold%20The%20Flood/Equipment/Build%20Paths?revision=6d6d1d), [Equipment ba5942](/Hold%20The%20Flood/Equipment?revision=ba5942), [World 7b8ad1](/Hold%20The%20Flood/World%20And%20Mystery?revision=7b8ad1), [contract 5322f4](/Hold%20The%20Flood/Mechanics/Power%20And%20Attraction?revision=5322f4), [Team 890a96](/Hold%20The%20Flood/Team?revision=890a96) and [Conventions 86a8db](/Wiki%20Conventions?revision=86a8db). Hub, Expansion Brief and Design Index were also reread. PMR008 is the acceptance source for r2; r3 is submitted for review. Earlier checkpoints below are history. No new owner approval or claimed play evidence.
216
59ad65 Anonymous 2026-09-07 10:16:57
COL102 r2: apply PMR007 D026 receiver simplification and current Tram issue boundary
217
**COL102 r2 / Colony r6 processed sources, 2026-09-07:** compared live Markdown with accepted [Colony r5 fe7d88](/Hold%20The%20Flood/Colony?revision=fe7d88) and its [task submission b68997](/Hold%20The%20Flood/Tasks?revision=b68997). Read index and log, then current [Tasks 575001](/Hold%20The%20Flood/Tasks?revision=575001), [PM Reviews e8a263](/Hold%20The%20Flood/Pm%20Reviews?revision=e8a263), [PMR007 6fb181](/Hold%20The%20Flood/Pm%20Reviews/Pmr007?revision=6fb181), [Design Review REV105 r1 35cccf](/Hold%20The%20Flood/Design%20Review?revision=35cccf), [Brief 0cba02](/Hold%20The%20Flood/Brief?revision=0cba02), [Campaign DES105 r1 ee4202](/Hold%20The%20Flood/Campaign?revision=ee4202), [shared contract r7 5322f4](/Hold%20The%20Flood/Mechanics/Power%20And%20Attraction?revision=5322f4), [Equipment r5 0efeb4](/Hold%20The%20Flood/Equipment?revision=0efeb4), [Build Paths r4 6bc3f7](/Hold%20The%20Flood/Equipment/Build%20Paths?revision=6bc3f7), [World r26 744b21](/Hold%20The%20Flood/World%20And%20Mystery?revision=744b21) and [Districts r9 e9c413](/Hold%20The%20Flood/Districts?revision=e9c413). Hub, Team, Expansion Brief and Design Index were reread; no Colony rule was inferred from their status copy. Wiki Conventions was reread before this revision. PMR007 accepts COL101's targeted corrections and COL102 r1's contribution; r2 applies the assigned D026 mirror. REV105 confirms colony investment changes capability but identifies Campaign-owned depth and scene defects, not a new Colony acceptance condition.
218
219
**Earlier source ledgers below remain provenance; this paragraph is r2's processed checkpoint.**
220
fe7d88 Anonymous 2026-09-07 08:34:57
COL102 r1: compare Tram-return investments, retain one service, reconcile canal rescue and flag issue conflict
221
**COL102 r1 / Colony r5 processed sources, 2026-09-07:** compared actual current Markdown with Colony r4 [527f2b](/Hold%20The%20Flood/Colony?revision=527f2b) and its task submission [13c20b](/Hold%20The%20Flood/Tasks?revision=13c20b). Read index and log, then the current [Tasks 6526ed](/Hold%20The%20Flood/Tasks?revision=6526ed), [PM Reviews f62987](/Hold%20The%20Flood/Pm%20Reviews?revision=f62987) (PMU007 assignment; PMR006 remains the completed review), [Design Review ce94e4](/Hold%20The%20Flood/Design%20Review?revision=ce94e4), [Hub 693f1b](/Hold%20The%20Flood?revision=693f1b), [Campaign 9366c8](/Hold%20The%20Flood/Campaign?revision=9366c8), [shared contract 8644ea](/Hold%20The%20Flood/Mechanics/Power%20And%20Attraction?revision=8644ea), [Districts e1136a](/Hold%20The%20Flood/Districts?revision=e1136a), [World 351f4c](/Hold%20The%20Flood/World%20And%20Mystery?revision=351f4c), [Equipment dc3aa2](/Hold%20The%20Flood/Equipment?revision=dc3aa2), [Build Paths 7b7bf2](/Hold%20The%20Flood/Equipment/Build%20Paths?revision=7b7bf2), and [Wiki Conventions 72bb0f](/Wiki%20Conventions?revision=72bb0f). Brief 77e392, Team 3e5ce6, Expansion Brief 8e517e and Design Index 8edf4e were reread and unchanged from the preceding intake; their live navigation is below. World’s acceptance of COL-I3/I4 is domain agreement; the critic’s page-level closure is not PM acceptance. No DES105 combined return sequence was on Campaign at the cited revision, so COL102 offers the Tram case for integration.
222
223
**Earlier source ledger retained as provenance; the paragraph above is this submission’s processed checkpoint.**
224
527f2b Anonymous 2026-09-06 23:29:20
COL101 r4: reconcile support-assembly acquisition with Campaign and preserve failure recovery
225
Processed on 2026-09-06 UTC against r3 [06acdb](/Hold%20The%20Flood/Colony?revision=06acdb) and its task submission [20c044](/Hold%20The%20Flood/Tasks?revision=20c044). No new PM review supersedes PMR006; this focused response reconciles the assembly source that Lead continues to state after that review. Exact current sources: Tasks [ca40f9](/Hold%20The%20Flood/Tasks?revision=ca40f9), PM Reviews [da9eb5](/Hold%20The%20Flood/PM%20Reviews?revision=da9eb5), Design Review r5 [4508fd](/Hold%20The%20Flood/Design%20Review?revision=4508fd), Brief [77e392](/Hold%20The%20Flood/Brief?revision=77e392), Campaign r4 [7daf34](/Hold%20The%20Flood/Campaign?revision=7daf34), shared contract r5 [08d5e8](/Hold%20The%20Flood/Mechanics/Power%20And%20Attraction?revision=08d5e8), Equipment r3 [dc3aa2](/Hold%20The%20Flood/Equipment?revision=dc3aa2), Build Paths r3 [7b7bf2](/Hold%20The%20Flood/Equipment/Build%20Paths?revision=7b7bf2), Inventory r2 [9b0547](/Hold%20The%20Flood/Mechanics/Inventory%20And%20Charge?revision=9b0547), World r23 [d108c1](/Hold%20The%20Flood/World%20And%20Mystery?revision=d108c1), Districts r5 [136fa9](/Hold%20The%20Flood/Districts?revision=136fa9) and Head-Works r4 [706ce6](/Hold%20The%20Flood/Districts/The%20Head-Works?revision=706ce6). The 35-expedition/8.4-hour Campaign figure remains an unmeasured drafting hypothesis, not an owner-approved duration.
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
226
12694e Anonymous 2026-09-06 21:48:28
COL101 r2: answer PMR004 on berth, eight-cell reissue, visible refuge and no-upkeep Stop; preserve PM seed
227
| Read source | Verified revision | Scope used |
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
228
| --- | --- | --- |
12694e Anonymous 2026-09-06 21:48:28
COL101 r2: answer PMR004 on berth, eight-cell reissue, visible refuge and no-upkeep Stop; preserve PM seed
229
| [Hold The Flood](/Hold%20The%20Flood) | [34ca6d](/Hold%20The%20Flood?revision=34ca6d) | Current hub direction and role/navigation updates |
230
| [Hold The Flood/Brief](/Hold%20The%20Flood/Brief) | [70b6b1](/Hold%20The%20Flood/Brief?revision=70b6b1) | D014 and D022–D024; governing design constraints |
231
| [Hold The Flood/Tasks](/Hold%20The%20Flood/Tasks) | [469c70](/Hold%20The%20Flood/Tasks?revision=469c70) | Current COL101 handoff, submission preservation and PMR005 supplement |
232
| [Hold The Flood/Pm Reviews](/Hold%20The%20Flood/Pm%20Reviews) | [8f4f5b](/Hold%20The%20Flood/Pm%20Reviews?revision=8f4f5b) | PMR004 milestone, PMU005 preservation correction, PMR005 checkpoint |
233
| [Hold The Flood/Pm Reviews/Pmr004](/Hold%20The%20Flood/Pm%20Reviews/Pmr004) | [ed0def](/Hold%20The%20Flood/Pm%20Reviews/Pmr004?revision=ed0def) | Full integration review; Colony section and selected drafting rules |
234
| [Hold The Flood/Pm Reviews/Pmr005](/Hold%20The%20Flood/Pm%20Reviews/Pmr005) | [d15967](/Hold%20The%20Flood/Pm%20Reviews/Pmr005?revision=d15967) | Focused combat review; no new Colony acceptance or electrical-effect closure |
235
| [Hold The Flood/Design Review](/Hold%20The%20Flood/Design%20Review) | [80a882](/Hold%20The%20Flood/Design%20Review?revision=80a882) | REV104 campaign-interface critique; unchanged from r1 |
236
| [Hold The Flood/Team](/Hold%20The%20Flood/Team) | [3e5ce6](/Hold%20The%20Flood/Team?revision=3e5ce6) | Staffing evidence and division of ownership |
237
| [Hold The Flood/Expansion Brief](/Hold%20The%20Flood/Expansion%20Brief) | [8e517e](/Hold%20The%20Flood/Expansion%20Brief?revision=8e517e) | Current scope/quality constraints and integration direction |
238
| [Hold The Flood/Design Index](/Hold%20The%20Flood/Design%20Index) | [be4c43](/Hold%20The%20Flood/Design%20Index?revision=be4c43) | Actual pages, ownership and current migration status |
239
| [Hold The Flood/Campaign](/Hold%20The%20Flood/Campaign) | [9d3590](/Hold%20The%20Flood/Campaign?revision=9d3590) | Baseline docks, L2/summit topology, colony and persistent campaign effects |
240
| [Hold The Flood/Districts](/Hold%20The%20Flood/Districts) | [699c8e](/Hold%20The%20Flood/Districts?revision=699c8e) | CAM101 r3 travel/access/refuge positions and changed duration accounting; no duration endorsement |
241
| [Hold The Flood/Design Document](/Hold%20The%20Flood/Design%20Document) | [5f9fbb](/Hold%20The%20Flood/Design%20Document?revision=5f9fbb) | Legacy §§3–6/10–11 and scope-superseded header; unchanged r15 |
242
| [Hold The Flood/Mechanics/Power And Attraction](/Hold%20The%20Flood/Mechanics/Power%20And%20Attraction) | [69024c](/Hold%20The%20Flood/Mechanics/Power%20And%20Attraction?revision=69024c) | Shared one-dock, expedition/power/persistence boundary; D023 migration still required |
243
| [Hold The Flood/Equipment](/Hold%20The%20Flood/Equipment) | [a44990](/Hold%20The%20Flood/Equipment?revision=a44990) | Catalogue/acquisition ownership and domain constraints |
244
| [Hold The Flood/Equipment/Build Paths](/Hold%20The%20Flood/Equipment/Build%20Paths) | [a9a288](/Hold%20The%20Flood/Equipment/Build%20Paths?revision=a9a288) | COL-I2 response, first-visit packages and recorded-rack examples |
245
| [Hold The Flood/Mechanics/Inventory And Charge](/Hold%20The%20Flood/Mechanics/Inventory%20And%20Charge) | [73eb77](/Hold%20The%20Flood/Mechanics/Inventory%20And%20Charge?revision=73eb77) | Eight-cell inventory proposal, item/issue boundaries |
246
| [Hold The Flood/World And Mystery](/Hold%20The%20Flood/World%20And%20Mystery) | [9aab5e](/Hold%20The%20Flood/World%20And%20Mystery?revision=9aab5e) | r21 D024 six states, reserve proposal, essential evidence and historical forecasts |
247
| [Hold The Flood/Districts/The Head-Works](/Hold%20The%20Flood/Districts/The%20Head-Works) | [999d84](/Hold%20The%20Flood/Districts/The%20Head-Works?revision=999d84) | r3 Stop/Keep/Leave, immediate power loss and unpowered return |
248
| [Hold The Flood/Districts/The Collector](/Hold%20The%20Flood/Districts/The%20Collector) | [29ece6](/Hold%20The%20Flood/Districts/The%20Collector?revision=29ece6) | r3 local charge use, buffer and water consequence interfaces |
249
| [Wiki Conventions](/Wiki%20Conventions) | [d9338f](/Wiki%20Conventions?revision=d9338f) | Entire editing/preservation convention, reread before writes |
250
| [Hold The Flood/Colony](/Hold%20The%20Flood/Colony) | [a1046d](/Hold%20The%20Flood/Colony?revision=a1046d) | Own r1 baseline, full source and author-preservation proof |
251
59ad65 Anonymous 2026-09-07 10:16:57
COL102 r2: apply PMR007 D026 receiver simplification and current Tram issue boundary
252
**Deliberately superseded:** r1's conditional six-cell examples, discussion of purchasing a third rack row and still-pending first staffing acknowledgment; r2's immediate refuge shutdown; r3's assembly-provided-with-the-refuge sentence; r4's extraction condition on the Lock Flight canal; r5's separate comparative-reader fitting and three-way assembly competition; and the historical PM seed's blanket statement that panel/field state resets. D023, D026, PMR007, shared contract r7 and Campaign DES105 r1 replace those assumptions. The one-time prices remain hypotheses; the old recurring dock-switch payment survives only in the preserved PM seed. Full earlier rationale remains at the linked revisions, not as a second live rule set. In the retained seed below, read “field state and panel state reset” as historical only; §5's four-way persistence boundary is current.
a1046d Anonymous 2026-09-06 20:03:52
COL101 r1: campaign-spanning colony strategies, reusable route/tooling/observation support, persistence and failure recovery; reconcile Campaign 34dc09 and shared rules 69024c; preserve PM seed; submit for review
253
254
## PM seed — retained source material from before COL101
255
4842a3 Anonymous 2026-09-06 19:36:19
PMU004: Colony — owner expansion direction, sourced coverage and next ownership
256
**PMU004 · r1 · 2026-09-06 · PM-seeded source summary; intended owner: Colony and Progression Designer (proposed); Lead interim · Awaiting author validation/transfer.**
1f0b95 Anonymous 2026-09-06 19:45:03
Add the Glossary to this page's header links, matching the three topic pages seeded earlier. EDT102 asks these pages to link the glossary; a reader meeting the vocabulary here otherwise has nowhere to look it up. One link, nothing else touched.
257
Source: [Design Document r13 / 50046f](/Hold%20the%20Flood/Design%20Document?revision=50046f), section 10. This records the existing proposal, not an accepted expansion design. The cited source owns its detailed rules until the author explicitly adopts this destination. [Design Index](/Hold%20the%20Flood/Design%20Index) · [Expansion Brief](/Hold%20the%20Flood/Expansion%20Brief) · [Glossary](/Hold%20the%20Flood/Glossary).
4842a3 Anonymous 2026-09-06 19:36:19
PMU004: Colony — owner expansion direction, sourced coverage and next ownership
258
259
## Current design, before expansion
260
261
| Decision | Existing effect | Limit |
262
| --- | --- | --- |
263
| Hold one dock dry | Exclusive standing choice changes the usable approach and water conditions | Switching costs salvage |
264
| Repair workshop | Choose one starting module for later expeditions | One additive unlock |
265
| Repair forecast relay | See the first intake before leaving | One additive information unlock |
266
267
Map, notes, observed rules and recipes persist. Banked salvage, the selected dock and colony repairs persist. Enemies, found expedition modules, carried cargo, charge, field state and panel state reset. The current rescue/failure rules preserve previously banked progress and knowledge while losing current expedition cargo and finds.
268
269
There is no mandatory upkeep or off-session decay in the drafting baseline. This protects an investigative expedition that brings home knowledge rather than cargo. It does not prevent substantial colony management from being designed.
270
271
## Expansion assignment — COL101
272
273
Define a colony loop that matters through the larger campaign: what expeditions bring home, who or what uses it, what the player chooses between, and how that choice changes a later route, expedition preparation, discovery or build. Supply three materially different development strategies and concrete early/middle/late choices, including their costs and recoverability.
274
275
Avoid three automatic upgrades stretched across eight districts, repeated resource payments used to inflate hours, or an unrelated management game. People and facilities can be proposed where they create a useful decision, but their behavior and asset burden must be explicit. Preserve the no-mandatory-upkeep baseline while making a positive case for deeper management; propose any change to that baseline with its effect on exploratory failures.
276
277
Coordinate travel/outpost functions with Campaign, unlocks with Equipment, and persistent mystery consequences with World. Lead reconciles the overall economy. No production assets, colony simulation or playtests are authorized.