# Hold The Horde — Progress
2
69c72a Anonymous 2026-09-08 15:46:16
Record recovered handoff and completed station review
3
**Updated 2026-09-08 15:46 Jerusalem (UTC+3).** This is the PM's owner-facing outcome board. The wiki is the shared record. All work remains **design only**.
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
4
69c72a Anonymous 2026-09-08 15:46:16
Record recovered handoff and completed station review
5
**16 tracked design packages: 13 preparation-closed, 3 open.** Open: 2 working, 0 blocked on agent hosts, 1 waiting on a design dependency. Of the13 closed packages,6 have owner-selected directions,1 has a tentative owner preference and6 are reviewed proposals/alternatives.
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
6
7
“Closed” means the bounded written design/review outcome is complete. It does not mean a feature is implemented, every detail approved or fun validated. This board covers the current design batch; it is not a complete campaign or production backlog, and13/16 is not an overall game-completion percentage. Stable IDs stay fixed; added/reopened work must be recorded explicitly.
8
9
## What changed in this report
10
11
- Opening A is now the owner's preferred direction: use a reusable part in station machinery to make extraction safer.
12
- The alien-language interaction finished its focused review and correction. It supports learning a useful interaction protocol while keeping the speaker and exact meaning uncertain.
69c72a Anonymous 2026-09-08 15:46:16
Record recovered handoff and completed station review
13
- Both new station-wide puzzle concepts have been independently submitted and released. Systems submitted the practical comparison; its focused review is complete, and one author response is now assigned. Reviewer is preauthorised for the first-survivor submission next.
14
- The first-survivor handoff recovered on the original Lead session; its assignment and source reads are verified. No task recreation or owner message forwarding was required. The earlier delivery block is resolved.
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
15
16
## Open and closed outcomes
17
18
All milestone times below are Jerusalem time. “Updated” separates later owner-rule integration from the original preparation closeout.
19
20
|ID|Outcome|Preparation status|Decision status|Latest milestone|Next step / remaining scope|
21
|---|---|---|---|---|---|
22
|01|[Reusable equipment combinations](/Hold%20The%20Flood/Build%20Rules)|Closed|Selected direction|Sep7 22:19; updated Sep8 13:45|Catalogue and numerical rules remain proposed|
23
|02|[Oxygen visibility and journal pause](/Hold%20The%20Flood/Oxygen%20and%20Observation)|Closed|Selected direction|Sep7 20:55; updated Sep8 13:45|Exact oxygen amounts remain open|
24
|03|[Carried property returns on death](/Hold%20The%20Flood/Death%20And%20Persistence)|Closed|Selected rule|Sep8 13:45|Shift and survivor ordering tracked separately|
25
|04|[Shifts, persistent work and historical records](/Hold%20The%20Flood/Shifting%20Station%20Options)|Open — dependent|Binding direction selected|Sep8 14:49 direction recorded|Integrate final station contract after15; older fixed-map clauses are superseded|
26
|05|[Ordinary combat and horde encounters](/Hold%20The%20Flood/Combat%20Rules)|Closed|Selected direction|Sep8 10:51; updated13:45|Automatic ordinary fire, manual specials; balance remains open|
4ed5cf Anonymous 2026-09-08 15:47:27
Record first-survivor submission and review activity
27
|06|First short human rescue|Open — working|Short rescue selected; scene unchosen|Sep8 15:44 draft submitted|Lead submitted both options358; Reviewer reviewing after saved independent criteria359|
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
28
|07|[Practical discovery and optional help](/Hold%20The%20Flood/Clues%20and%20Help)|Closed|Selected direction|Sep8 11:23; updated13:45|Current routes cannot be inferred from historical records|
29
|08|[Cooperation and useful work aboard](/Hold%20The%20Flood/Home%20Projects)|Closed|Tentative preference|Sep8 12:00; updated13:45|Equipment loans tentative; full colony/cast still open|
30
|09|[Two-language expedition and journal use](/Hold%20The%20Flood/Language%20Expedition)|Closed|Reviewed proposal|Sep8 13:45|Detailed language system unselected;16 is a distinct evidence scene|
31
|10|[How equipment is acquired and improves](/Hold%20The%20Flood/Progression%20Options)|Closed|Reviewed alternatives|Sep8 13:51|Find working components versus observe/fabricate; owner choice later|
32
|11|[Three distinct horde creatures](/Hold%20The%20Flood/Horde%20Creature%20Proposals)|Closed|Reviewed proposals|Sep8 14:07|Roster and origins unselected|
33
|12|[Hospital story and its causal alternatives](/Hold%20The%20Flood/Hospital%20Story%20Directions)|Closed|Reviewed alternatives|Sep8 14:47|Owner hospital/godhood draft leads; exact story/ending remain revisable|
34
|13|[Player resurrection and corruption](/Hold%20The%20Flood/Resurrection%20And%20Corruption)|Closed|Reviewed alternatives|Sep8 14:38|No player decay or death budget adopted|
35
|14|[Opening expedition: reusable machinery](/Hold%20The%20Flood/First%20Expedition%20Options)|Closed|Option A selected|Prepared Sep8 15:14; selected15:30|Preferred direction recorded; exact starting items/rooms remain proposed|
69c72a Anonymous 2026-09-08 15:46:16
Record recovered handoff and completed station review
36
|15|[Deep puzzle connecting the entire station](/Hold%20The%20Flood/Connecting%20The%20Station)|Open — working|Goal selected; mechanism proposed|Sep8 15:41 review submitted|Comparison355 and review356 done → Systems response357 → PM disposition|
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
37
|16|[Testable alien-language interaction](/Hold%20The%20Flood/Alien%20Utterance%20Discovery)|Closed|Reviewed proposal|Sep8 15:38|Protocol discovery prepared; does not prove request semantics or a god|
38
39
## Recent delivery timeline
40
41
These are observed calendar spans from assignment to preparation closeout, including handoffs and review. They are historical measurements, not estimates of labour or promised future turnaround.
42
43
|Outcome|Assigned Sep8|Preparation closed Sep8|Elapsed|
44
|---|---|---|---|
45
|Equipment progression comparison|13:17|13:51|34 minutes|
46
|Three horde creatures|13:51|14:07|16 minutes|
47
|Hospital-story comparison|13:58|14:47|49 minutes|
48
|Resurrection/corruption comparison|14:20|14:38|18 minutes|
49
|Opening comparison|14:40|15:14|34 minutes|
50
|Alien-language interaction|15:06|15:38|32 minutes|
51
52
## Work sequence
53
54
|Stream|Now|Next|After that|
55
|---|---|---|---|
69c72a Anonymous 2026-09-08 15:46:16
Record recovered handoff and completed station review
56
|Whole-station puzzle|Systems makes one response to completed review|PM dispositions actual revision|Owner-facing mechanism proposal; shared-rule integration|
4ed5cf Anonymous 2026-09-08 15:47:27
Record first-survivor submission and review activity
57
|First survivor|Reviewer checks the two submitted scenes|One author response if needed|PM disposition and owner reaction|
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
58
|Shared consistency|Old fixed-map claims marked superseded|Use the new connection contract and owner payoff choice|Replace conflicting rules in owning articles|
59
69c72a Anonymous 2026-09-08 15:46:16
Record recovered handoff and completed station review
60
The whole-station contract is the current dependency for shared integration. The first-survivor stream is now running independently after its host recovered. No completion deadline is promised before the current comparison is examined.
aa4ad9 Anonymous 2026-09-08 15:40:03
Publish dated owner progress board
61
62
## Decisions for the owner
63
64
**Already answered:** opening A and persistent room/group connections across shifts, culminating in connecting the entire station.
65
66
**Open creative question:** should completing the entire connection puzzle finally stabilise the layout, or should rooms keep moving while every established connection survives? PM recommends stabilisation as a reward for mastery. This is a proposed late payoff, not an answer inferred from the opening choice; the team can continue its comparison while it is pending.
67
68
The next new creative choice will be the first-survivor scenes. Progression, creature, story and corruption alternatives are prepared for later reactions; the owner is not expected to review the whole wiki at once.
69
70
## Reporting agreement
71
72
PM sends a compact report every15 minutes while useful work is active, plus meaningful completion, disagreement, blocker or decision updates. Each report gives the timestamp, changes since the previous report, numeric open/closed preparation counts, real worker activity, blocker and next deliverable, and a link here. An unchanged interval is stated honestly. No page/message counts, invented completion percentages or ungrounded Gantt deadlines stand in for progress. The local monitor requires the computer and apps to remain available.