2026-09-08 15:46:16
Anonymous:
Record recovered handoff and completed station review
hold the flood/progress.md ..
@@ 1,8 1,8 @@
# Hold The Horde — Progress
-
**Updated 2026-09-08 15:40 Jerusalem (UTC+3).** This is the PM's owner-facing outcome board. The wiki is the shared record. All work remains **design only**.
+
**Updated 2026-09-08 15:46 Jerusalem (UTC+3).** This is the PM's owner-facing outcome board. The wiki is the shared record. All work remains **design only**.
-
**16 tracked design packages: 13 preparation-closed, 3 open.** Open: 1 working, 1 blocked on an agent host, 1 waiting on a design dependency. Of the13 closed packages,6 have owner-selected directions,1 has a tentative owner preference and6 are reviewed proposals/alternatives.
+
**16 tracked design packages: 13 preparation-closed, 3 open.** Open: 2 working, 0 blocked on agent hosts, 1 waiting on a design dependency. Of the13 closed packages,6 have owner-selected directions,1 has a tentative owner preference and6 are reviewed proposals/alternatives.
“Closed” means the bounded written design/review outcome is complete. It does not mean a feature is implemented, every detail approved or fun validated. This board covers the current design batch; it is not a complete campaign or production backlog, and13/16 is not an overall game-completion percentage. Stable IDs stay fixed; added/reopened work must be recorded explicitly.
@@ 10,8 10,8 @@
- Opening A is now the owner's preferred direction: use a reusable part in station machinery to make extraction safer.
- The alien-language interaction finished its focused review and correction. It supports learning a useful interaction protocol while keeping the speaker and exact meaning uncertain.
-
- Both new station-wide puzzle concepts have been independently submitted and released. Systems is writing their practical comparison; Reviewer can review the actual submission without another PM handoff.
-
- The first-survivor comparison is assigned, but its automatic handoff was not sent because the original Lead session is absent from a fresh local listing. Owner availability question pending. Other work continues.
+
- Both new station-wide puzzle concepts have been independently submitted and released. Systems submitted the practical comparison; its focused review is complete, and one author response is now assigned. Reviewer is preauthorised for the first-survivor submission next.
+
- The first-survivor handoff recovered on the original Lead session; its assignment and source reads are verified. No task recreation or owner message forwarding was required. The earlier delivery block is resolved.
## Open and closed outcomes
@@ 24,7 24,7 @@
|03|[Carried property returns on death](/Hold%20The%20Flood/Death%20And%20Persistence)|Closed|Selected rule|Sep8 13:45|Shift and survivor ordering tracked separately|
|04|[Shifts, persistent work and historical records](/Hold%20The%20Flood/Shifting%20Station%20Options)|Open — dependent|Binding direction selected|Sep8 14:49 direction recorded|Integrate final station contract after15; older fixed-map clauses are superseded|
|06|First short human rescue|Open — blocked|Short rescue selected; scene unchosen|Sep8 15:34 assigned|Lead session unavailable for handoff; two encounter/homecoming options requested|
+
|06|First short human rescue|Open — working|Short rescue selected; scene unchosen|Sep8 15:42 work verified|Lead preparing two encounter/homecoming options; Reviewer preauthorised after submission|
|07|[Practical discovery and optional help](/Hold%20The%20Flood/Clues%20and%20Help)|Closed|Selected direction|Sep8 11:23; updated13:45|Current routes cannot be inferred from historical records|
|08|[Cooperation and useful work aboard](/Hold%20The%20Flood/Home%20Projects)|Closed|Tentative preference|Sep8 12:00; updated13:45|Equipment loans tentative; full colony/cast still open|
|09|[Two-language expedition and journal use](/Hold%20The%20Flood/Language%20Expedition)|Closed|Reviewed proposal|Sep8 13:45|Detailed language system unselected;16 is a distinct evidence scene|
@@ 33,7 33,7 @@
|12|[Hospital story and its causal alternatives](/Hold%20The%20Flood/Hospital%20Story%20Directions)|Closed|Reviewed alternatives|Sep8 14:47|Owner hospital/godhood draft leads; exact story/ending remain revisable|
|13|[Player resurrection and corruption](/Hold%20The%20Flood/Resurrection%20And%20Corruption)|Closed|Reviewed alternatives|Sep8 14:38|No player decay or death budget adopted|
|14|[Opening expedition: reusable machinery](/Hold%20The%20Flood/First%20Expedition%20Options)|Closed|Option A selected|Prepared Sep8 15:14; selected15:30|Preferred direction recorded; exact starting items/rooms remain proposed|
-
|15|[Deep puzzle connecting the entire station](/Hold%20The%20Flood/Connecting%20The%20Station)|Open — working|Goal selected; mechanism proposed|Sep8 15:35 work verified|Systems comparison349 → focused Reviewer review → one response/disposition|
+
|15|[Deep puzzle connecting the entire station](/Hold%20The%20Flood/Connecting%20The%20Station)|Open — working|Goal selected; mechanism proposed|Sep8 15:41 review submitted|Comparison355 and review356 done → Systems response357 → PM disposition|
|16|[Testable alien-language interaction](/Hold%20The%20Flood/Alien%20Utterance%20Discovery)|Closed|Reviewed proposal|Sep8 15:38|Protocol discovery prepared; does not prove request semantics or a god|
## Recent delivery timeline
@@ 53,11 53,11 @@
|Stream|Now|Next|After that|
|---|---|---|---|
-
|Whole-station puzzle|Systems writes comparison|Reviewer checks submitted revision|One response if needed; PM disposition and owner-facing proposal|
-
|First survivor|Lead handoff blocked on host|Two concrete short encounter/rescue/homecoming options|PM review and owner reaction|
+
|Whole-station puzzle|Systems makes one response to completed review|PM dispositions actual revision|Owner-facing mechanism proposal; shared-rule integration|
+
|First survivor|Lead prepares two short encounter/rescue/homecoming options|Reviewer checks actual submission|One response if needed; PM disposition and owner reaction|
|Shared consistency|Old fixed-map claims marked superseded|Use the new connection contract and owner payoff choice|Replace conflicting rules in owning articles|
-
The whole-station contract is the current dependency for shared integration. The first-survivor stream can run independently when its host is available. No completion deadline is promised before the current comparison is examined.
+
The whole-station contract is the current dependency for shared integration. The first-survivor stream is now running independently after its host recovered. No completion deadline is promised before the current comparison is examined.