Blame

01378d Anonymous 2026-09-06 16:10:33
WLD101 r1: submit illustrative beacon mystery, W1-W3, and D011/D012 acknowledgment for review
1
# Hold the Flood — World and Mystery
2
e2d4b4 Anonymous 2026-09-06 18:27:50
WLD102 r14: apply PMU002 - title relabelled as owner-supplied working title (D017; Clarity Q37 was right), routing decision request closed (D016 confirms D013), five contributors cited as team work (D015), REF101 electrofishing cited as research grounding for W1; no rule or chain text changed; In review, design only
3
**WLD102 · r14 · 2026-09-06 15:27 UTC · In review** — r14 applies PM's PMU002 rulings to this page: the title moves out of "owner requirements" to its D017 status as the owner-supplied working title (Clarity Q37 was right); D016 confirms the routing baseline, so the standing decision request is closed; D015 seats the five further contributors on the Team, so their pages are cited as team work, and REF101's electrofishing reference is cited as research grounding for W1. No rule or chain text changed. r13 aligned two tier-two sentences to [DES102 draft r6 12779dc](https://open-wiki.tail2e4d02.ts.net/Hold%20the%20Flood/Design%20Document?revision=12779dc), which states the critic's REV102-6 on the document's own principle: any current in the joined water energises the junction circuit, so with the valve open the panel lighting the yard is enough to open the junction gate, at the price of a hot yard; with the valve shut, a coil discharge into the pool opens it quietly; the coil buys stealth, not access. Nothing else changed from [r12 23dca93](https://open-wiki.tail2e4d02.ts.net/Hold%20the%20Flood/World%20and%20Mystery?revision=23dca93), which aligned to draft r4, whose r3 topology stands (the lead's r4 note and REV102 issue 1 both settle on this page's r10 choices). r12 re-instated r10's body, undoing [r11 eac7ed8](https://open-wiki.tail2e4d02.ts.net/Hold%20the%20Flood/World%20and%20Mystery?revision=eac7ed8), which had aligned to draft r2 while r3 was aligning to r10. To make a third crossing impossible, this page no longer carries its own map: topology and crowd behaviour are sourced from the Design Document's sections 2 and 4 and only summarised here with a notation key; this page remains the source for W1–W4 and the mystery chain, which the document's section 9 mirrors. Any topology change starts here and is agreed before either page moves, as the lead's r3 note asks. [r10 c6f0598](https://open-wiki.tail2e4d02.ts.net/Hold%20the%20Flood/World%20and%20Mystery?revision=c6f0598), [r9 41681d9](https://open-wiki.tail2e4d02.ts.net/Hold%20the%20Flood/World%20and%20Mystery?revision=41681d9), [r8 ba6f8b8](https://open-wiki.tail2e4d02.ts.net/Hold%20the%20Flood/World%20and%20Mystery?revision=ba6f8b8) and earlier are page history. Author: World and Mystery Designer. Handoff: canonical Lead (D014) for DES102; PM. WLD101 was accepted in PMR001 as a concept contribution (at [r6 4302067](https://open-wiki.tail2e4d02.ts.net/Hold%20the%20Flood/World%20and%20Mystery?revision=4302067)); [r7 fa3eb1b](https://open-wiki.tail2e4d02.ts.net/Hold%20the%20Flood/World%20and%20Mystery?revision=fa3eb1b) and earlier revisions are page history.
01378d Anonymous 2026-09-06 16:10:33
WLD101 r1: submit illustrative beacon mystery, W1-W3, and D011/D012 acknowledgment for review
4
e2d4b4 Anonymous 2026-09-06 18:27:50
WLD102 r14: apply PMU002 - title relabelled as owner-supplied working title (D017; Clarity Q37 was right), routing decision request closed (D016 confirms D013), five contributors cited as team work (D015), REF101 electrofishing cited as research grounding for W1; no rule or chain text changed; In review, design only
5
**Owner requirements.** Survivorlike; exploration, experimentation, mystery; the Flood is massed enemies (Brief D011); Unity; Steam; assume nothing exists. "Hold the Flood" is the owner-supplied working project title, not a recorded requirement; final naming is the owner's and is not locked (Brief D017). Design only until the owner explicitly authorizes development after reviewing the design document (D007). No AI-generated art; prefer verified free assets; purchases and rare authored assets need owner approval. This revision creates no assets, code, prototypes, or tests. Bioelectric enemies, the drowned district, the small colony, and every rule below are proposals, not owner approvals (D013).
01378d Anonymous 2026-09-06 16:10:33
WLD101 r1: submit illustrative beacon mystery, W1-W3, and D011/D012 acknowledgment for review
6
e2d4b4 Anonymous 2026-09-06 18:27:50
WLD102 r14: apply PMU002 - title relabelled as owner-supplied working title (D017; Clarity Q37 was right), routing decision request closed (D016 confirms D013), five contributors cited as team work (D015), REF101 electrofishing cited as research grounding for W1; no rule or chain text changed; In review, design only
7
**Sources.** Reread 15:27 UTC: [Brief 28fb1c2](https://open-wiki.tail2e4d02.ts.net/Hold%20the%20Flood/Brief?revision=28fb1c2) (D013 provisional A; D014 canonical lead; D015 five owner-added contributors seated; D016 routing baseline confirmed; D017 working title; D018 criterion 11), [Tasks 1370285](https://open-wiki.tail2e4d02.ts.net/Hold%20the%20Flood/Tasks?revision=1370285) (PMU002: WLD102 In review at r12; DES103 Ready for the lead; this role checks clue/rule changes against the exact integrated revision), [Team cbf8d79](https://open-wiki.tail2e4d02.ts.net/Hold%20the%20Flood/Team?revision=cbf8d79), [PM Reviews a2beab4](https://open-wiki.tail2e4d02.ts.net/Hold%20the%20Flood/PM%20Reviews?revision=a2beab4), [Design r5 b030c98](https://open-wiki.tail2e4d02.ts.net/Hold%20the%20Flood/Design?revision=b030c98), [Design Review r6 a892274](https://open-wiki.tail2e4d02.ts.net/Hold%20the%20Flood/Design%20Review?revision=a892274), [Design Review r7 bb68711](https://open-wiki.tail2e4d02.ts.net/Hold%20the%20Flood/Design%20Review?revision=bb68711) (closes Finding 2 under the sight-limited model; N17), [Clarity Questions b8696cc](https://open-wiki.tail2e4d02.ts.net/Hold%20the%20Flood/Clarity%20Questions?revision=b8696cc) (Q28 on the crossed saves; Q29 marked answered at r8 by this role), [PM Reviews 04f3183](https://open-wiki.tail2e4d02.ts.net/Hold%20the%20Flood/PM%20Reviews?revision=04f3183) (PMR001 checkpoint; next review prioritises WLD102), [Glossary f1bf1f4](https://open-wiki.tail2e4d02.ts.net/Hold%20the%20Flood/Glossary?revision=f1bf1f4), [External Critique 319c975](https://open-wiki.tail2e4d02.ts.net/Hold%20the%20Flood/External%20Critique?revision=319c975) (EXT101; the External Critic is a team member since D015; its X9 on the title is answered by D017 and on this page by r14), [Design Document r6 12779dc](https://open-wiki.tail2e4d02.ts.net/Hold%20the%20Flood/Design%20Document?revision=12779dc) (r5 bc134bf states REV102-6 and adds the one-page owner summary; r6 merges owner decisions 4 and 6 with measured market data; r4 46b320b sections 2, 4, 9, 11 and Appendix B read; r3 d35209f aligned to this page's r10), [Design Review REV102 r2 82a96ba](https://open-wiki.tail2e4d02.ts.net/Hold%20the%20Flood/Design%20Review?revision=82a96ba) (all five r1 issues verified resolved; verdict: ready for owner review as the base of DES103; one residual, REV102-6), [Design Review REV102 r1 4dde90c](https://open-wiki.tail2e4d02.ts.net/Hold%20the%20Flood/Design%20Review?revision=4dde90c) (verdict: revise, one bounded pass; issue 1 recommends this page's r10 topology; issue 3 the flash observable), [Disagreement Register 8dd233c](https://open-wiki.tail2e4d02.ts.net/Disagreement%20Register?revision=8dd233c) and [Reference: Survivorlike Market Data 39c95f2](https://open-wiki.tail2e4d02.ts.net/Reference/Survivorlike%20Market%20Data?revision=39c95f2) (The Troll and the Reference Researcher, team members since D015; Q37 on the title came from the register and is answered here), [Design r6 211106d](https://open-wiki.tail2e4d02.ts.net/Hold%20the%20Flood/Design?revision=211106d) (header note: rules now maintained on the Design Document), [Glossary 86c1c4e](https://open-wiki.tail2e4d02.ts.net/Hold%20the%20Flood/Glossary?revision=86c1c4e). No comparative research and no asset verification.
01378d Anonymous 2026-09-06 16:10:33
WLD101 r1: submit illustrative beacon mystery, W1-W3, and D011/D012 acknowledgment for review
8
c6f059 Anonymous 2026-09-06 17:49:39
WLD102 r10: integration check of DES102 draft r1 (d828a4) - 8 items, 6 need a draft change (culvert pump breaks clause 2; yard-bypass wording; withdrawal claim needs a press-rate bound; forecast shows each surge's target; W4 unstated; tier-3 key is an item gate; lift chain verbatim); page aligned to integrated topology (junction gate, crank, press/pursuit, shelters); In review, design only
9
**What r8 did.** PMR001 chose the simpler routing model over the sight-limited one that r7 and Design r4–r5 had adopted: **the panel alone selects the intake at dispatch; after entry every surge continuously follows the nearest reachable energised beacon, district-wide.** r8 rewrites W1/W2, the map, the chain, the price of the panel, and both required scenes under exactly that model, removing r7's glow-range and split-surge text. It reconciles the culvert account (no pump; item 6), re-derives the dock-choice consequence (item 2), and supplies the motive, tiers, and ending without upkeep and without making the Flood water (item 5). Word definitions stay in [Design's glossary](https://open-wiki.tail2e4d02.ts.net/Hold%20the%20Flood/Design#words-used-below); the wiki editor's Glossary mirrors it. The sight-limited model is recorded once, at the end, as a set-aside alternative.
01378d Anonymous 2026-09-06 16:10:33
WLD101 r1: submit illustrative beacon mystery, W1-W3, and D011/D012 acknowledgment for review
10
ba6f8b Anonymous 2026-09-06 17:38:58
WLD102 r8: PMR001 items 1, 2, 5 under PM baseline D013 (panel selects intake; entered surges follow nearest energised beacon district-wide; no glow/split); textual map; crowd holding/thinning/proximity; five-part price of the panel incl. mid-surge switch; dock-choice consequence re-derived; two required scenes; hatch closure + ladder exit; culvert = gravity drain; motive without upkeep; title kept; three tiers and ending; sight-limited model set aside; In review, design only
11
## The district — textual map (proposal)
01378d Anonymous 2026-09-06 16:10:33
WLD101 r1: submit illustrative beacon mystery, W1-W3, and D011/D012 acknowledgment for review
12
ba6f8b Anonymous 2026-09-06 17:38:58
WLD102 r8: PMR001 items 1, 2, 5 under PM baseline D013 (panel selects intake; entered surges follow nearest energised beacon district-wide; no glow/split); textual map; crowd holding/thinning/proximity; five-part price of the panel incl. mid-surge switch; dock-choice consequence re-derived; two required scenes; hatch closure + ladder exit; culvert = gravity drain; motive without upkeep; title kept; three tiers and ending; sight-limited model set aside; In review, design only
13
North is the interior; the docks are south. `=` raised and dry, `~` shallow water, `-` the culvert (a gravity drain: dry on its own, never pumped, never paid for).
01378d Anonymous 2026-09-06 16:10:33
WLD101 r1: submit illustrative beacon mystery, W1-W3, and D011/D012 acknowledgment for review
14
a8a3f4 Anonymous 2026-09-06 18:15:58
WLD102 r13: align tier-two door to Design Document r6 / REV102-6 (any current in the joined water energises the junction circuit: panel + open valve is enough; coil into the pool with valve shut is the quiet way; coil buys stealth, not access); two sentences; sources updated; nothing else changed from r12; In review, design only
15
The map is drawn once, in the [Design Document, section 2](https://open-wiki.tail2e4d02.ts.net/Hold%20the%20Flood/Design%20Document#2-the-district) (draft r4, from this page's r10, and not re-drawn on either page again). This page uses short labels for it: **D1** causeway dock (held dry by default) · **D2** yard dock (flooded by default; wet, conducts) · **P** the panel at the causeway head · **B1** causeway beacon at the causeway's far end · **I1** causeway intake beside it · **B2** yard beacon at the pump-hall door · **I2** yard intake, the channel mouth at the door, in water · **H** the pump-hall hatch, on the yard circuit with B2, hand crank inside · **X1, X2** the culvert's exits at the two dock ends (a gravity drain, always dry, never paid for) · **J** the junction platform, a shelter · **GJ** the junction gate into the interior, on the junction's own circuit, which the panel never reaches by wire; any current in the junction pool energises it: with valve **V** open the pool is joined to the yard channel, so a lit yard is enough, and with V shut a coil discharge into the pool opens it quietly · **S** the sluice beside the junction, the Flood's own way in. Shelters (S2 hard stops): D1, D2 when dry, J. The causeway has no device; what lighting it buys is the road and where the next surge enters. H blinks and closes when its branch loses power, never on an occupant, and can be cranked open from inside in ten seconds; that is the hall's recoverable exit.
33dc2a Anonymous 2026-09-06 17:06:21
WLD101 r5: fix REV101 N10 (W1 path = nearest energised beacon, continuous, no-beacon default); beacons at each branch's far end; no-panel extraction trace for DES102; no open items remain on this page; In review, design only
16
ba6f8b Anonymous 2026-09-06 17:38:58
WLD102 r8: PMR001 items 1, 2, 5 under PM baseline D013 (panel selects intake; entered surges follow nearest energised beacon district-wide; no glow/split); textual map; crowd holding/thinning/proximity; five-part price of the panel incl. mid-surge switch; dock-choice consequence re-derived; two required scenes; hatch closure + ladder exit; culvert = gravity drain; motive without upkeep; title kept; three tiers and ending; sight-limited model set aside; In review, design only
17
## World rules — proposal for DES102, PM baseline
e54d6a Anonymous 2026-09-06 16:56:58
WLD101 r4: answer REV101 r2 and integration note 2; W1 split intake (panel only) / path (nearest pulsing beacon) replacing planted-beacon override; sluice as Off intake; second dock in topology; N5/N6 already resolved in r3; In review, design only
18
23dca9 Anonymous 2026-09-06 18:07:50
WLD102 r12: align to Design Document r4 (46b320b; r3 topology stands per lead r4 note and REV102-1); re-instate r10 body, undo r11; drop duplicate map for a link + notation key (DD s2/s4 canonical for topology/crowd; this page canonical for W1-W4 and the chain); mirror flash observable in W1 and Understand; nothing open for this role; state a position on the routing model without changing D013; In review, design only
19
- **W1 — Attraction.** *Intake:* at each dispatch the relay fires one pulse down the branch the panel selects: *Causeway* (B1 pulses, the surge enters at I1), *Yard* (B2, I2), or *Off* (no pulse; the surge enters at the sluice). Only the relay pulses. A beacon lit by local current (a coil discharge into a channel, or a valve joining the two branches' water) glows steady and lures, but never pulses and never changes the next intake: the relay's output is a separate line from the lamp (the Design Document's thin signal cable beside the thick power cable, both switched by the panel). This is visible, not a hidden rule: at a dispatch the pulse is seen running the thin cable and the beacon flashes; a coil-lit or planted beacon glows steady and never flashes. **Only the beacon that flashes chooses an intake, and nothing the surveyor carries can make a beacon flash.** *Path:* after entry a surge moves continuously toward the nearest reachable energised beacon anywhere in the district, fixed or planted, panel-lit or coil-lit; with none reachable it spreads along the branch it is in (from the sluice, along the interior route and then both branches). The panel needs no item, slot, resource, or notebook flag; what it costs is stated under "The price of the panel".
e2d4b4 Anonymous 2026-09-06 18:27:50
WLD102 r14: apply PMU002 - title relabelled as owner-supplied working title (D017; Clarity Q37 was right), routing decision request closed (D016 confirms D013), five contributors cited as team work (D015), REF101 electrofishing cited as research grounding for W1; no rule or chain text changed; In review, design only
20
- *Research note (not a rule).* [Reference: Electricity in Water, REF101 r2](https://open-wiki.tail2e4d02.ts.net/Reference/Electricity%20In%20Water?revision=10e0a37), by the team's Reference Researcher, documents real electrofishing response zones: attraction toward the anode at low field strength, forced swimming toward it as the field grows, immobilisation at roughly ten times the attraction threshold. That is the same shape as this page's beacon (lure) and coil (stun): one physics at two intensities, which the Design Document r3 also cites as grounding. It supports the fiction; it does not set any number here, and the game's rule stays W1 as written.
ba6f8b Anonymous 2026-09-06 17:38:58
WLD102 r8: PMR001 items 1, 2, 5 under PM baseline D013 (panel selects intake; entered surges follow nearest energised beacon district-wide; no glow/split); textual map; crowd holding/thinning/proximity; five-part price of the panel incl. mid-surge switch; dock-choice consequence re-derived; two required scenes; hatch closure + ladder exit; culvert = gravity drain; motive without upkeep; title kept; three tiers and ending; sight-limited model set aside; In review, design only
21
- **W2 — Commitment (entrance only).** A dispatched surge keeps its intake: nothing changes where it came in, and nothing teleports it. Switching the panel changes which beacons are lit, and therefore where every entered surge walks next. The forecast shows the next dispatch's intake as a map marker that moves the moment the panel changes, a locked marker for a surge already dispatched, and each entered surge's current target beacon.
22
- **W3 — Stable evidence.** Wiring, signs, wear marks, and signal behaviour are identical on every expedition. Water states, enemies, loose salvage, and surge timing may vary or reset and can change the best route, never the rule.
23
- **W4 — Turned signs.** Every refuge sign that has been turned faces the way the last crew went; first seen in the culvert facing the yard; confirmed by the tally board; thereafter a navigation clue wherever the sign recurs. One sign asset, rotated.
01378d Anonymous 2026-09-06 16:10:33
WLD101 r1: submit illustrative beacon mystery, W1-W3, and D011/D012 acknowledgment for review
24
23dca9 Anonymous 2026-09-06 18:07:50
WLD102 r12: align to Design Document r4 (46b320b; r3 topology stands per lead r4 note and REV102-1); re-instate r10 body, undo r11; drop duplicate map for a link + notation key (DD s2/s4 canonical for topology/crowd; this page canonical for W1-W4 and the chain); mirror flash observable in W1 and Understand; nothing open for this role; state a position on the routing model without changing D013; In review, design only
25
**How a surge behaves once it has arrived (item 2).** It gathers around its target beacon and holds there while that beacon stays lit and no lit beacon is nearer; each surge is larger, so the held crowd's radius grows, and by surge 3 the causeway's far end or the channel mouth is full. Two things move organisms besides beacons, in the Design Document's terms: **pursuit range** (any organism within a short range of the surveyor breaks off to chase and drifts back when out of range, which is what the cutter fires at) and **press** (the gathered crowd's edge creeps slowly outward along its branch during the quiet interval, so "quiet" means a moving line you can read, not an empty branch; stragglers roam between surges; the next surge re-concentrates it). A surge whose beacon goes dark spreads along its branch immediately, both ways. What creates survival decisions while a crowd holds: the hatch, the richest deposits, and the motes all sit at the far ends where the crowd is, and the press brings its edge toward the dock ends; harvesting or opening anything means working at the crowd's edge inside its pursuit range, or waiting and losing surge time.
01378d Anonymous 2026-09-06 16:10:33
WLD101 r1: submit illustrative beacon mystery, W1-W3, and D011/D012 acknowledgment for review
26
ba6f8b Anonymous 2026-09-06 17:38:58
WLD102 r8: PMR001 items 1, 2, 5 under PM baseline D013 (panel selects intake; entered surges follow nearest energised beacon district-wide; no glow/split); textual map; crowd holding/thinning/proximity; five-part price of the panel incl. mid-surge switch; dock-choice consequence re-derived; two required scenes; hatch closure + ladder exit; culvert = gravity drain; motive without upkeep; title kept; three tiers and ending; sight-limited model set aside; In review, design only
27
## The price of the panel (item 1; replaces "Cost of diversion")
438f1b Anonymous 2026-09-06 16:28:22
WLD101 r2: adapt false-refuge chain to DES101 A, resolve shelter/observation rule, record A x WLD101 contradiction check; In review, design only
28
ba6f8b Anonymous 2026-09-06 17:38:58
WLD102 r8: PMR001 items 1, 2, 5 under PM baseline D013 (panel selects intake; entered surges follow nearest energised beacon district-wide; no glow/split); textual map; crowd holding/thinning/proximity; five-part price of the panel incl. mid-surge switch; dock-choice consequence re-derived; two required scenes; hatch closure + ladder exit; culvert = gravity drain; motive without upkeep; title kept; three tiers and ending; sight-limited model set aside; In review, design only
29
Switching is free of resources and available on expedition one. It is paid, visibly, five ways:
438f1b Anonymous 2026-09-06 16:28:22
WLD101 r2: adapt false-refuge chain to DES101 A, resolve shelter/observation rule, record A x WLD101 contradiction check; In review, design only
30
ba6f8b Anonymous 2026-09-06 17:38:58
WLD102 r8: PMR001 items 1, 2, 5 under PM baseline D013 (panel selects intake; entered surges follow nearest energised beacon district-wide; no glow/split); textual map; crowd holding/thinning/proximity; five-part price of the panel incl. mid-surge switch; dock-choice consequence re-derived; two required scenes; hatch closure + ladder exit; culvert = gravity drain; motive without upkeep; title kept; three tiers and ending; sight-limited model set aside; In review, design only
31
1. **Exposure.** P stands in the open at the causeway head, a dash from D1 and R1. Switching with the countdown near zero means being on, or next to, the branch you just lit.
23dca9 Anonymous 2026-09-06 18:07:50
WLD102 r12: align to Design Document r4 (46b320b; r3 topology stands per lead r4 note and REV102-1); re-instate r10 body, undo r11; drop duplicate map for a link + notation key (DD s2/s4 canonical for topology/crowd; this page canonical for W1-W4 and the chain); mirror flash observable in W1 and Understand; nothing open for this role; state a position on the routing model without changing D013; In review, design only
32
2. **Invitation.** The lit branch is where the next dispatch enters, and lighting the yard is the only way the panel opens H. The branch you want open is the branch the next surge comes to.
33
3. **The mid-surge switch moves the crowd, and that is its price.** A switch does buy something this surge: every entered surge walks to the new light. Its cost is the route it takes and the door that shuts. Causeway to Yard: the crowd at B1 leaves the far end, crosses the junction beside the sluice, and comes down the channel to B2; the junction and the interior route are the Flood's road while it crosses. Yard to Causeway: the mirror, and H closes behind anyone still in the hall (crank). Off darkens both: each crowd spreads along its own branch, both ways, toward the dock as much as the interior, and H closes. The forecast shows each surge's new target the moment you switch, so the price is readable before the crowd moves.
34
4. **The held dock.** A dry dock is never blocked; it is a hard stop. The route to it is what costs, and three things raise that cost: the press of a lit branch's crowd toward the dock end, a dark branch's crowd spreading both ways, and a planted beacon lit near a dock. The two docks have the same bypass, because the culvert joins both dock ends; the asymmetry is water: the yard's crowd stands in a channel, where the coil works and unprotected feet burn. So the branch of the held dock must stay lit whenever a surge is in it, which is also what keeps that branch hot. **Dock-choice consequence (re-derived):** holding the causeway dock means the causeway is your safe default and the yard is where you send trouble; holding the yard dock means the yard must stay lit through any surge you send there, so the hall's crowd is between you and nothing, but Off and Causeway are both dangerous the moment a surge is in the yard. The colony choice decides which branch you can never afford to darken.
ba6f8b Anonymous 2026-09-06 17:38:58
WLD102 r8: PMR001 items 1, 2, 5 under PM baseline D013 (panel selects intake; entered surges follow nearest energised beacon district-wide; no glow/split); textual map; crowd holding/thinning/proximity; five-part price of the panel incl. mid-surge switch; dock-choice consequence re-derived; two required scenes; hatch closure + ladder exit; culvert = gravity drain; motive without upkeep; title kept; three tiers and ending; sight-limited model set aside; In review, design only
35
5. **Commitment.** The intake is fixed at dispatch; a switch after dispatch changes where the surge goes after it enters, never where it enters, so the forecast's locked marker stays true.
438f1b Anonymous 2026-09-06 16:28:22
WLD101 r2: adapt false-refuge chain to DES101 A, resolve shelter/observation rule, record A x WLD101 contradiction check; In review, design only
36
ba6f8b Anonymous 2026-09-06 17:38:58
WLD102 r8: PMR001 items 1, 2, 5 under PM baseline D013 (panel selects intake; entered surges follow nearest energised beacon district-wide; no glow/split); textual map; crowd holding/thinning/proximity; five-part price of the panel incl. mid-surge switch; dock-choice consequence re-derived; two required scenes; hatch closure + ladder exit; culvert = gravity drain; motive without upkeep; title kept; three tiers and ending; sight-limited model set aside; In review, design only
37
**Where the coil fits.** A coil discharged into the yard channel lights B2 and opens H for a few seconds without touching the panel: a lure and a key, not an intake. Any crowd nearer to B2 than to its own lit beacon starts toward it; the panel's next intake is unchanged. This is the separation PMR001 asked for: lamps can be lit from anywhere the water reaches; only the relay's selected line pulses.
438f1b Anonymous 2026-09-06 16:28:22
WLD101 r2: adapt false-refuge chain to DES101 A, resolve shelter/observation rule, record A x WLD101 contradiction check; In review, design only
38
ba6f8b Anonymous 2026-09-06 17:38:58
WLD102 r8: PMR001 items 1, 2, 5 under PM baseline D013 (panel selects intake; entered surges follow nearest energised beacon district-wide; no glow/split); textual map; crowd holding/thinning/proximity; five-part price of the panel incl. mid-surge switch; dock-choice consequence re-derived; two required scenes; hatch closure + ladder exit; culvert = gravity drain; motive without upkeep; title kept; three tiers and ending; sight-limited model set aside; In review, design only
39
## Illustrative design — DESIGNER SPOILERS: the false refuge under the PM baseline
438f1b Anonymous 2026-09-06 16:28:22
WLD101 r2: adapt false-refuge chain to DES101 A, resolve shelter/observation rule, record A x WLD101 contradiction check; In review, design only
40
ba6f8b Anonymous 2026-09-06 17:38:58
WLD102 r8: PMR001 items 1, 2, 5 under PM baseline D013 (panel selects intake; entered surges follow nearest energised beacon district-wide; no glow/split); textual map; crowd holding/thinning/proximity; five-part price of the panel incl. mid-surge switch; dock-choice consequence re-derived; two required scenes; hatch closure + ladder exit; culvert = gravity drain; motive without upkeep; title kept; three tiers and ending; sight-limited model set aside; In review, design only
41
Proposed play, not a playtest. Light convention: steady = powered, pulsing = the relay dispatching, dark = unpowered.
438f1b Anonymous 2026-09-06 16:28:22
WLD101 r2: adapt false-refuge chain to DES101 A, resolve shelter/observation rule, record A x WLD101 contradiction check; In review, design only
42
ba6f8b Anonymous 2026-09-06 17:38:58
WLD102 r8: PMR001 items 1, 2, 5 under PM baseline D013 (panel selects intake; entered surges follow nearest energised beacon district-wide; no glow/split); textual map; crowd holding/thinning/proximity; five-part price of the panel incl. mid-surge switch; dock-choice consequence re-derived; two required scenes; hatch closure + ladder exit; culvert = gravity drain; motive without upkeep; title kept; three tiers and ending; sight-limited model set aside; In review, design only
43
| Step | Evidence, inference, consequence |
44
| --- | --- |
45
| Notice | From D1: B1 is lit steady. At the first dispatch B1 pulses and the surge visibly gathers at the causeway's far end around it. Repeats every expedition (W3). |
46
| Compare | B2 is dark; H is shut. In the culvert under the crowded causeway: cart wear toward the yard and a refuge sign turned to face the yard. Three or four inspectable lines each. |
23dca9 Anonymous 2026-09-06 18:07:50
WLD102 r12: align to Design Document r4 (46b320b; r3 topology stands per lead r4 note and REV102-1); re-instate r10 body, undo r11; drop duplicate map for a link + notation key (DD s2/s4 canonical for topology/crowd; this page canonical for W1-W4 and the chain); mirror flash observable in W1 and Understand; nothing open for this role; state a position on the routing model without changing D013; In review, design only
47
| Understand | Two cables leave each position of P, a thick one and a thin one, and run side by side to B1, and to B2 and on to H. At a dispatch the pulse is seen running the thin cable before the beacon flashes. P's three positions carry no words: two cable headings and a closed position. The forecast shows a countdown, an intake marker, and each entered crowd's current target. Switching moves the marker at once, and moves the crowd: the rule can be learned by watching a pulse run the cable and the surge's turn, or by switching and watching both the marker and the crowd respond. The notebook records what was seen, in the player's own words. |
ba6f8b Anonymous 2026-09-06 17:38:58
WLD102 r8: PMR001 items 1, 2, 5 under PM baseline D013 (panel selects intake; entered surges follow nearest energised beacon district-wide; no glow/split); textual map; crowd holding/thinning/proximity; five-part price of the panel incl. mid-surge switch; dock-choice consequence re-derived; two required scenes; hatch closure + ladder exit; culvert = gravity drain; motive without upkeep; title kept; three tiers and ending; sight-limited model set aside; In review, design only
48
| Infer | Power is key and lure at once: the lit branch is where a door opens, where the next surge enters, and where every crowd walks. The refuge sign marks where the Flood is sent. Someone kept the culvert and the yard in use by leaving the panel on Causeway. |
23dca9 Anonymous 2026-09-06 18:07:50
WLD102 r12: align to Design Document r4 (46b320b; r3 topology stands per lead r4 note and REV102-1); re-instate r10 body, undo r11; drop duplicate map for a link + notation key (DD s2/s4 canonical for topology/crowd; this page canonical for W1-W4 and the chain); mirror flash observable in W1 and Understand; nothing open for this role; state a position on the routing model without changing D013; In review, design only
49
| Experiment | Set Yard. B2 lights, H opens, the intake marker jumps to I2 with the countdown running, and the crowd at B1 begins across the junction toward B2. Retreat to R1 or D1 and watch, or move now. Off instead darkens both and moves the marker to the sluice. |
ba6f8b Anonymous 2026-09-06 17:38:58
WLD102 r8: PMR001 items 1, 2, 5 under PM baseline D013 (panel selects intake; entered surges follow nearest energised beacon district-wide; no glow/split); textual map; crowd holding/thinning/proximity; five-part price of the panel incl. mid-surge switch; dock-choice consequence re-derived; two required scenes; hatch closure + ladder exit; culvert = gravity drain; motive without upkeep; title kept; three tiers and ending; sight-limited model set aside; In review, design only
50
| Discover | The causeway's far end empties as the crowd crosses; the next dispatch enters at the channel mouth. The hall is open, and both the old crowd and the new surge are coming to it. Reaching the answer below costs exactly that. |
23dca9 Anonymous 2026-09-06 18:07:50
WLD102 r12: align to Design Document r4 (46b320b; r3 topology stands per lead r4 note and REV102-1); re-instate r10 body, undo r11; drop duplicate map for a link + notation key (DD s2/s4 canonical for topology/crowd; this page canonical for W1-W4 and the chain); mirror flash observable in W1 and Understand; nothing open for this role; state a position on the routing model without changing D013; In review, design only
51
| Change later play | Each dispatch reopens the choice: keep Causeway and haul through the culvert to a dark, closed yard; set Yard early, before any crowd exists, to walk the empty causeway to the junction while the yard is hot; or set Yard with a crowd already at B1 to clear the causeway at the cost of the interior route and the hall. Turned signs (W4) now read as a route. |
438f1b Anonymous 2026-09-06 16:28:22
WLD101 r2: adapt false-refuge chain to DES101 A, resolve shelter/observation rule, record A x WLD101 contradiction check; In review, design only
52
ba6f8b Anonymous 2026-09-06 17:38:58
WLD102 r8: PMR001 items 1, 2, 5 under PM baseline D013 (panel selects intake; entered surges follow nearest energised beacon district-wide; no glow/split); textual map; crowd holding/thinning/proximity; five-part price of the panel incl. mid-surge switch; dock-choice consequence re-derived; two required scenes; hatch closure + ladder exit; culvert = gravity drain; motive without upkeep; title kept; three tiers and ending; sight-limited model set aside; In review, design only
53
**The reachable answer (spoiler; proposal).** Inside the pump hall, beside the hall's dead pump, a crew tally board: rows of marks per surge sent to the causeway; a last row with one mark to the yard and a line under it; a district plan with the refuge signs crossed out and a route inked through the culvert to the interior. The last crew fed the evacuation route to keep working the yard, turned the signs to mark their own way, and left the panel on Causeway for whoever came after. It changes action: the inked route and W4 point into the interior.
c92838 Anonymous 2026-09-06 16:48:47
WLD101 r3: answer DES101 r2 integration note (light convention, spine rule vs W1-W4) and REV101 Finding 2 / Secondary 3-5; unlabelled panel, reachable answer, cost of diversion; In review, design only
54
ba6f8b Anonymous 2026-09-06 17:38:58
WLD102 r8: PMR001 items 1, 2, 5 under PM baseline D013 (panel selects intake; entered surges follow nearest energised beacon district-wide; no glow/split); textual map; crowd holding/thinning/proximity; five-part price of the panel incl. mid-surge switch; dock-choice consequence re-derived; two required scenes; hatch closure + ladder exit; culvert = gravity drain; motive without upkeep; title kept; three tiers and ending; sight-limited model set aside; In review, design only
55
**Knowledge gate, not item gate.** The panel works on expedition one; what changes is knowing what it does. Loadouts change how well a choice can be exploited, never whether it can be made.
438f1b Anonymous 2026-09-06 16:28:22
WLD101 r2: adapt false-refuge chain to DES101 A, resolve shelter/observation rule, record A x WLD101 contradiction check; In review, design only
56
ba6f8b Anonymous 2026-09-06 17:38:58
WLD102 r8: PMR001 items 1, 2, 5 under PM baseline D013 (panel selects intake; entered surges follow nearest energised beacon district-wide; no glow/split); textual map; crowd holding/thinning/proximity; five-part price of the panel incl. mid-surge switch; dock-choice consequence re-derived; two required scenes; hatch closure + ladder exit; culvert = gravity drain; motive without upkeep; title kept; three tiers and ending; sight-limited model set aside; In review, design only
57
**Fair recovery.** Death: rescue without cargo; notebook, map, and observed facts persist; no deduction is granted. Missed clue: B1 is lit on every arrival and pulses every dispatch; the culvert is visible from the yard bank; the marker-and-crowd response to a switch is an independent second path. Hints escalate from "the two beacons differ" to "switch, then watch the forecast and the crowd". Withdrawal never requires solving this (scene 1).
438f1b Anonymous 2026-09-06 16:28:22
WLD101 r2: adapt false-refuge chain to DES101 A, resolve shelter/observation rule, record A x WLD101 contradiction check; In review, design only
58
ba6f8b Anonymous 2026-09-06 17:38:58
WLD102 r8: PMR001 items 1, 2, 5 under PM baseline D013 (panel selects intake; entered surges follow nearest energised beacon district-wide; no glow/split); textual map; crowd holding/thinning/proximity; five-part price of the panel incl. mid-surge switch; dock-choice consequence re-derived; two required scenes; hatch closure + ladder exit; culvert = gravity drain; motive without upkeep; title kept; three tiers and ending; sight-limited model set aside; In review, design only
59
## Two required scenes (item 2; illustrations, not playtests)
438f1b Anonymous 2026-09-06 16:28:22
WLD101 r2: adapt false-refuge chain to DES101 A, resolve shelter/observation rule, record A x WLD101 contradiction check; In review, design only
60
23dca9 Anonymous 2026-09-06 18:07:50
WLD102 r12: align to Design Document r4 (46b320b; r3 topology stands per lead r4 note and REV102-1); re-instate r10 body, undo r11; drop duplicate map for a link + notation key (DD s2/s4 canonical for topology/crowd; this page canonical for W1-W4 and the chain); mirror flash observable in W1 and Understand; nothing open for this role; state a position on the routing model without changing D013; In review, design only
61
**Scene 1 — untouched panel, first expedition, retreat.** Panel on Causeway, D1 held. Surge 3 enters at I1 and gathers at B1, the far north end. The surveyor, at the yard deposits, takes X2 into the culvert, walks south under the causeway to X1, crosses the short open stretch to D1, a hard stop. No beacon stands on that route, so no crowd is drawn along it; what is met is the causeway crowd's press near the causeway head, stragglers, and organisms inside pursuit range (the Design Document's expedition one shows the shape of it at nine minutes, one hit taken). The claim "withdrawal never requires solving this" therefore holds only under a stated constraint, which the draft should carry as a tuning bound: **on expedition one, the press of an untouched-panel causeway crowd must not reach the causeway head before the evacuation window closes.** A proposed bound, not a proven value.
01378d Anonymous 2026-09-06 16:10:33
WLD101 r1: submit illustrative beacon mystery, W1-W3, and D011/D012 acknowledgment for review
62
23dca9 Anonymous 2026-09-06 18:07:50
WLD102 r12: align to Design Document r4 (46b320b; r3 topology stands per lead r4 note and REV102-1); re-instate r10 body, undo r11; drop duplicate map for a link + notation key (DD s2/s4 canonical for topology/crowd; this page canonical for W1-W4 and the chain); mirror flash observable in W1 and Understand; nothing open for this role; state a position on the routing model without changing D013; In review, design only
63
**Scene 2 — inside the pump hall when power ends, then when the next surge arrives.** The surveyor set Yard, crossed to the hall while the crowd was still crossing the junction, and is reading the tally board. *Power ends* (the panel is switched to Causeway or Off, or a coil-opened H times out): H blinks for three seconds and closes, never on an occupant; anyone inside is shut in. Rule, the Design Document's, adopted here: **a hatch closes when its branch loses power, never on an occupant, and can be cranked open from inside in ten seconds without power.** No mystery solution is needed to leave, and the recovery takes exactly long enough to matter. *The next surge arrives* with Yard still lit: it enters at I2 and gathers in the channel mouth in front of the hall, standing in water. From inside, the surveyor is behind H with the crowd outside it. Choices: hold the doorway, where pursuit brings them in one at a time, at a cost in health; wait for the press to thin the door and lose surge time; or, with a coil and insulation, step to the channel's edge inside the doorway and discharge, which is the electrician's whole reason for being there. Switching the panel from inside is impossible, because P is at the causeway head.
01378d Anonymous 2026-09-06 16:10:33
WLD101 r1: submit illustrative beacon mystery, W1-W3, and D011/D012 acknowledgment for review
64
ba6f8b Anonymous 2026-09-06 17:38:58
WLD102 r8: PMR001 items 1, 2, 5 under PM baseline D013 (panel selects intake; entered surges follow nearest energised beacon district-wide; no glow/split); textual map; crowd holding/thinning/proximity; five-part price of the panel incl. mid-surge switch; dock-choice consequence re-derived; two required scenes; hatch closure + ladder exit; culvert = gravity drain; motive without upkeep; title kept; three tiers and ending; sight-limited model set aside; In review, design only
65
## Motive, tiers, ending (item 5; proposals for owner judgment)
01378d Anonymous 2026-09-06 16:10:33
WLD101 r1: submit illustrative beacon mystery, W1-W3, and D011/D012 acknowledgment for review
66
ba6f8b Anonymous 2026-09-06 17:38:58
WLD102 r8: PMR001 items 1, 2, 5 under PM baseline D013 (panel selects intake; entered surges follow nearest energised beacon district-wide; no glow/split); textual map; crowd holding/thinning/proximity; five-part price of the panel incl. mid-surge switch; dock-choice consequence re-derived; two required scenes; hatch closure + ladder exit; culvert = gravity drain; motive without upkeep; title kept; three tiers and ending; sight-limited model set aside; In review, design only
67
**Motive, no upkeep.** The colony is a dozen people on the one dock the pump keeps dry. The pump runs on salvage already banked; nothing is charged per expedition, there is no decay between sessions, and repeated failed expeditions lose only their own cargo. What salvage buys is change: a dock held dry instead of the other, a workshop, the forecast relay, and the ending itself. A colony that stops hauling is not drowned; it is stuck. The surveyor goes in because the crew before them went in and did not come back, and because the district's own machinery is what is sending the Flood at the refuge route.
01378d Anonymous 2026-09-06 16:10:33
WLD101 r1: submit illustrative beacon mystery, W1-W3, and D011/D012 acknowledgment for review
68
e2d4b4 Anonymous 2026-09-06 18:27:50
WLD102 r14: apply PMU002 - title relabelled as owner-supplied working title (D017; Clarity Q37 was right), routing decision request closed (D016 confirms D013), five contributors cited as team work (D015), REF101 electrofishing cited as research grounding for W1; no rule or chain text changed; In review, design only
69
**The title.** "Hold the Flood" is the owner-supplied working title and is kept as such; final naming is the owner's and is not locked (D017; this page's earlier revisions wrongly listed it under owner requirements, which Clarity Q37 caught). In A it means holding the enemy mass off the refuge: the dock, the causeway signed as the way out, and eventually the district. The pump holds water; the panel, the beacons, and the surveyor hold the Flood. The Flood is never water.
01378d Anonymous 2026-09-06 16:10:33
WLD101 r1: submit illustrative beacon mystery, W1-W3, and D011/D012 acknowledgment for review
70
a8a3f4 Anonymous 2026-09-06 18:15:58
WLD102 r13: align tier-two door to Design Document r6 / REV102-6 (any current in the joined water energises the junction circuit: panel + open valve is enough; coil into the pool with valve shut is the quiet way; coil buys stealth, not access); two sentences; sources updated; nothing else changed from r12; In review, design only
71
**Three tiers on one district, each a recombination of the same rules.** *Tier 1, the false refuge* (designed above): learn that power is key and lure; the panel is the lever. *Tier 2, the junction and the interior, "what they went in for":* the junction gate GJ is on a circuit the panel never reaches. Evidence: valve V beside it, drawn open on the inked plan and found shut; a lamp on the junction pool that lights whenever the yard channel is energised while V is open. Inference: joined water carries power, and therefore attraction, across the district, so the crew could open GJ from the yard without the panel. Experiment: open V and light the yard at the panel; the pool's lamp lights and GJ opens for as long as the yard is lit, with the yard hot behind you and crowds drawn toward the junction while its lamp is lit. Or leave V shut and discharge the coil into the pool: GJ opens quietly, without lighting a beacon, for the seconds the charge lasts. The coil buys stealth, not access (REV102-6). Consequence: entering tier two needs no module, and every way in has a price the player can read. Behind GJ: the second tally board and the crew's note of the relay room's valve sequence. Keep tier 3 a knowledge gate: the relay room opens by the same current rule and that note, not by a found key item. *Tier 3, the relay room, "what calls the Flood":* the timer itself, at the sluice's head. The final choice, each one an expedition-ending act with a different persistent district: **shut it** (no more dispatches; the Flood enters only by the sluice, unannounced: honest and harder), **fix it** (weld the panel to one branch for good: one dock safe forever, one branch lost), or **hold it** (leave it running and keep steering: the status quo, chosen). Free expeditions continue after any ending. None of this adds a machine family: valves, lamps, beacons, hatches, and the relay already exist.
430206 Anonymous 2026-09-06 17:16:45
WLD101 r6: plain-language definitions and in-fiction answers for Clarity Questions Q4/Q7/Q8/Q9/Q13/Q14 (proposals); reword culvert; flag stale Tasks (Q15) and unrecorded CLR101 author to PM; no rule changed; In review, design only
72
ba6f8b Anonymous 2026-09-06 17:38:58
WLD102 r8: PMR001 items 1, 2, 5 under PM baseline D013 (panel selects intake; entered surges follow nearest energised beacon district-wide; no glow/split); textual map; crowd holding/thinning/proximity; five-part price of the panel incl. mid-surge switch; dock-choice consequence re-derived; two required scenes; hatch closure + ladder exit; culvert = gravity drain; motive without upkeep; title kept; three tiers and ending; sight-limited model set aside; In review, design only
73
**Early, middle, final (illustrative; the expedition count is a proposal, not coverage).** Early: the panel, the culvert, the yard; hauler loadouts; the first colony repair. Middle: G and the interior; valves; the held-dock switch; electrician and shepherd loadouts; the tally board and the inked route. Final: the relay room and the choice. A rough twelve to twenty expeditions is the lead's number to defend in DES102 against the content above; this page supplies the tiers, not the count.
430206 Anonymous 2026-09-06 17:16:45
WLD101 r6: plain-language definitions and in-fiction answers for Clarity Questions Q4/Q7/Q8/Q9/Q13/Q14 (proposals); reword culvert; flag stale Tasks (Q15) and unrecorded CLR101 author to PM; no rule changed; In review, design only
74
23dca9 Anonymous 2026-09-06 18:07:50
WLD102 r12: align to Design Document r4 (46b320b; r3 topology stands per lead r4 note and REV102-1); re-instate r10 body, undo r11; drop duplicate map for a link + notation key (DD s2/s4 canonical for topology/crowd; this page canonical for W1-W4 and the chain); mirror flash observable in W1 and Understand; nothing open for this role; state a position on the routing model without changing D013; In review, design only
75
## Integration check — DES102 draft r4 (46b320b), for the lead and REV102
c6f059 Anonymous 2026-09-06 17:49:39
WLD102 r10: integration check of DES102 draft r1 (d828a4) - 8 items, 6 need a draft change (culvert pump breaks clause 2; yard-bypass wording; withdrawal claim needs a press-rate bound; forecast shows each surge's target; W4 unstated; tier-3 key is an item gate; lift chain verbatim); page aligned to integrated topology (junction gate, crank, press/pursuit, shelters); In review, design only
76
23dca9 Anonymous 2026-09-06 18:07:50
WLD102 r12: align to Design Document r4 (46b320b; r3 topology stands per lead r4 note and REV102-1); re-instate r10 body, undo r11; drop duplicate map for a link + notation key (DD s2/s4 canonical for topology/crowd; this page canonical for W1-W4 and the chain); mirror flash observable in W1 and Understand; nothing open for this role; state a position on the routing model without changing D013; In review, design only
77
Nothing is open for this role. Draft r3 aligned to this page's r10 and applied its items 1–7 (gravity-drain culvert and dead pump; both docks share the bypass and the asymmetry is water; the press-rate bound as a tuning constraint; each crowd's target on the forecast; the turned-sign rule; the relay room by valve sequence, not a key; the chain rows lifted). Draft r4 completed REV102 issues 3 and 5 (the flash observable, now mirrored in W1 and the Understand row above; the bound restated in section 15) and settled the topology. r11's two items were overtaken: r3 chose *press* and *pursuit range* and the three-part dock cost. Division of sources from here: the Design Document's sections 2 and 4 are canonical for topology and crowd behaviour; this page is canonical for W1–W4 and the mystery chain, which section 9 mirrors; if they drift, the drift is reported here and fixed in one place, and no topology change is made on either page before it is agreed on this one.
c6f059 Anonymous 2026-09-06 17:49:39
WLD102 r10: integration check of DES102 draft r1 (d828a4) - 8 items, 6 need a draft change (culvert pump breaks clause 2; yard-bypass wording; withdrawal claim needs a press-rate bound; forecast shows each surge's target; W4 unstated; tier-3 key is an item gate; lift chain verbatim); page aligned to integrated topology (junction gate, crank, press/pursuit, shelters); In review, design only
78
ba6f8b Anonymous 2026-09-06 17:38:58
WLD102 r8: PMR001 items 1, 2, 5 under PM baseline D013 (panel selects intake; entered surges follow nearest energised beacon district-wide; no glow/split); textual map; crowd holding/thinning/proximity; five-part price of the panel incl. mid-surge switch; dock-choice consequence re-derived; two required scenes; hatch closure + ladder exit; culvert = gravity drain; motive without upkeep; title kept; three tiers and ending; sight-limited model set aside; In review, design only
79
## Shelter and observation rules — S1 to S3 (unchanged)
80
81
- **S1 Notebook** — full pause; shows only what has been observed; no new evidence.
23dca9 Anonymous 2026-09-06 18:07:50
WLD102 r12: align to Design Document r4 (46b320b; r3 topology stands per lead r4 note and REV102-1); re-instate r10 body, undo r11; drop duplicate map for a link + notation key (DD s2/s4 canonical for topology/crowd; this page canonical for W1-W4 and the chain); mirror flash observable in W1 and Understand; nothing open for this role; state a position on the routing model without changing D013; In review, design only
82
- **S2 Shelter (D1, D2 when dry, the junction platform J)** — enemies cannot enter or spawn; the surge clock runs; repacking allowed; the district stays visible.
ba6f8b Anonymous 2026-09-06 17:38:58
WLD102 r8: PMR001 items 1, 2, 5 under PM baseline D013 (panel selects intake; entered surges follow nearest energised beacon district-wide; no glow/split); textual map; crowd holding/thinning/proximity; five-part price of the panel incl. mid-surge switch; dock-choice consequence re-derived; two required scenes; hatch closure + ladder exit; culvert = gravity drain; motive without upkeep; title kept; three tiers and ending; sight-limited model set aside; In review, design only
83
- **S3 Live evidence** — new clues, panel switches, and their verification happen in the running world.
430206 Anonymous 2026-09-06 17:16:45
WLD101 r6: plain-language definitions and in-fiction answers for Clarity Questions Q4/Q7/Q8/Q9/Q13/Q14 (proposals); reword culvert; flag stale Tasks (Q15) and unrecorded CLR101 author to PM; no rule changed; In review, design only
84
438f1b Anonymous 2026-09-06 16:28:22
WLD101 r2: adapt false-refuge chain to DES101 A, resolve shelter/observation rule, record A x WLD101 contradiction check; In review, design only
85
## Content and asset burden
01378d Anonymous 2026-09-06 16:10:33
WLD101 r1: submit illustrative beacon mystery, W1-W3, and D011/D012 acknowledgment for review
86
23dca9 Anonymous 2026-09-06 18:07:50
WLD102 r12: align to Design Document r4 (46b320b; r3 topology stands per lead r4 note and REV102-1); re-instate r10 body, undo r11; drop duplicate map for a link + notation key (DD s2/s4 canonical for topology/crowd; this page canonical for W1-W4 and the chain); mirror flash observable in W1 and Understand; nothing open for this role; state a position on the routing model without changing D013; In review, design only
87
One district reused before and after discovery: two docks, causeway, culvert, yard, pump hall, junction platform, sluice, interior and relay room, one panel, two fixed beacons, two devices, a forecast overlay, a tally board and plan, one valve, and wear and sign props (one sign rotated for W4). Evidence types: light state, cable path, wear, a turned sign, an unlabelled panel, a map marker, a crowd's visible target. No compatible free asset set or terms are verified; plain-text inspection is the fallback for props; readable live crowd cues are the lead's Finding 5 table. No custom asset creation is proposed.
ba6f8b Anonymous 2026-09-06 17:38:58
WLD102 r8: PMR001 items 1, 2, 5 under PM baseline D013 (panel selects intake; entered surges follow nearest energised beacon district-wide; no glow/split); textual map; crowd holding/thinning/proximity; five-part price of the panel incl. mid-surge switch; dock-choice consequence re-derived; two required scenes; hatch closure + ladder exit; culvert = gravity drain; motive without upkeep; title kept; three tiers and ending; sight-limited model set aside; In review, design only
88
89
## Set aside, for the record
90
e2d4b4 Anonymous 2026-09-06 18:27:50
WLD102 r14: apply PMU002 - title relabelled as owner-supplied working title (D017; Clarity Q37 was right), routing decision request closed (D016 confirms D013), five contributors cited as team work (D015), REF101 electrofishing cited as research grounding for W1; no rule or chain text changed; In review, design only
91
r7 and Design r4–r5 used a sight-limited path (a beacon pulls only within its glow) so that the panel could never move an arrived surge. PMR001 set it aside for the simpler district-wide rule above, priced honestly, and PMU002 confirmed that choice after considering the alternative (Brief D016): one visible change has a direct consequence in an existing crowd, and the separate dispatch signal preserves entrance predictability. The decision is made for this draft and remains open to an argued revision; the sight-limited wording is in [r7](https://open-wiki.tail2e4d02.ts.net/Hold%20the%20Flood/World%20and%20Mystery?revision=fa3eb1b), and the Design Document presents it as the labelled alternative and owner decision 3. **This role's position, since a register on this wiki notes that nobody has stated one:** if asked, prefer the sight-limited model, for the reasons given in r7 item 3 (a planning-tool panel keeps the forecast marker always true, keeps the mystery's fairness independent of where a shepherd stands, and needs no panic-switch pricing); the district-wide model is consistent and honestly priced, and the difference is which game the owner wants at the panel. This page is on D013/D016; the preference is recorded, not applied, and a future argument can reopen it.
01378d Anonymous 2026-09-06 16:10:33
WLD101 r1: submit illustrative beacon mystery, W1-W3, and D011/D012 acknowledgment for review
92
438f1b Anonymous 2026-09-06 16:28:22
WLD101 r2: adapt false-refuge chain to DES101 A, resolve shelter/observation rule, record A x WLD101 contradiction check; In review, design only
93
## PM report
01378d Anonymous 2026-09-06 16:10:33
WLD101 r1: submit illustrative beacon mystery, W1-W3, and D011/D012 acknowledgment for review
94
e2d4b4 Anonymous 2026-09-06 18:27:50
WLD102 r14: apply PMU002 - title relabelled as owner-supplied working title (D017; Clarity Q37 was right), routing decision request closed (D016 confirms D013), five contributors cited as team work (D015), REF101 electrofishing cited as research grounding for W1; no rule or chain text changed; In review, design only
95
Task WLD102, In review at r12 per Tasks PMU002; artifact World and Mystery r14 (supersedes r13 a8a3f4f and earlier). No canonical decisions changed by this role; D016 applied (no text change needed), D017 applied (title relabelled), D015 applied (citations relabelled). r14 changes no rule and no chain text. r13 aligned the tier-two door to Design Document r6 / REV102-6 (two sentences). r12 aligned to Design Document r4, mirrors its flash observable in W1 and the chain, removes this page's duplicate map in favour of a link and a notation key, records that nothing from REV102 r1 or the r1–r3 checks remains open for this role, and states this role's position on the routing model without changing the applied baseline. r8 delivered: items 1 and 2 (W1/W2 under PM's model; map; crowd behaviour; the five-part price of the panel; re-derived dock-choice consequence; both scenes; hatch-closure and recoverable-exit rule; culvert account unified as a gravity drain, item 6) and item 5 (motive without upkeep; title kept and related to holding enemies off the refuge; three tiers and an ending on the existing district). Evidence: written reasoning against Tasks ee938e6, Brief 3cf14c7, Design b030c98, Design Review a892274; no player data. Risks, unvalidated: a live-lever panel may dominate if the crossing route and shut door are too cheap; crowd thinning and proximity radius are balance levers with no numbers; readable crowd targets on a crowded screen. Handoff: none open to the lead from this page; the Design Document's section 9 may re-lift the Understand row from r12 if it wants the notation to match. Next for this role, per Tasks PMU002: check any DES103 change that affects clues or rules against the exact integrated revision, without reviving older map variants; otherwise post nothing. Q37 is marked answered on the Clarity page at this revision.
41681d Anonymous 2026-09-06 17:41:21
WLD102 r9: PM report only - request PM to confirm D013's routing sentence or reverse to r7's sight-limited model before DES102 drafts scenes (REV101 r7 closed Finding 2 under the other model; Clarity Q28); EXT101 awaits PM routing; no design text changed from r8
96
e2d4b4 Anonymous 2026-09-06 18:27:50
WLD102 r14: apply PMU002 - title relabelled as owner-supplied working title (D017; Clarity Q37 was right), routing decision request closed (D016 confirms D013), five contributors cited as team work (D015), REF101 electrofishing cited as research grounding for W1; no rule or chain text changed; In review, design only
97
**Routing decision: answered.** Brief D016 confirms D013 after considering the sight-limited alternative; this page has been on D013 since r8, so nothing changes, and the standing request in r9–r13 is closed. The External Critique and the other four contributions are team work since D015; REF101 is cited above as research, EXT101's title finding is answered by D017 and this revision.