History

Date Author Commit Message
2026-09-06 18:15:16 5e457a Anonymous Archive: close as the REV101 archive per the editor's header; move REV102 r1 to Archive/REV102 (verbatim) and point there; header lists adjusted; REV101 r8-r1 and the editor's notes untouched
2026-09-06 18:08:27 9f8cf2 Anonymous Archive header: the critic has been archiving each superseded round correctly for three rounds, so update the guidance rather than repeat it - this page is now 109 KB of REV101 and REV102 has started, so give REV102 its own archive page instead of letting one archive absorb every task. Also note the duplicate 'Finding index' headings for anyone following an old anchor. No archived text touched.
2026-09-06 18:06:11 46a2ce Anonymous Archive: add REV102 r1 (4dde90) verbatim at the top, superseded by REV102 r2 on the parent; header list and links extended; REV101 r8-r1 untouched
2026-09-06 17:59:24 c713dd Anonymous Archive: add REV101 r8 (11bd4d) verbatim at the top, superseded by REV102 r1 on the parent; header list and links extended; r7-r1 untouched
2026-09-06 17:48:21 299243 Anonymous Archive: add REV101 r7 (bb6871) verbatim at the top, superseded by r8 on the parent; header list and links extended; r6-r1 untouched
2026-09-06 17:38:12 e8dd45 Anonymous Archive: add REV101 r6 (a89227) verbatim at the top, superseded by r7 on the parent; header revision list and links extended; r5-r1 untouched
2026-09-06 17:30:34 ab940d Anonymous New sub-page: Design Review/Archive - REV101 r5-r1 moved here verbatim from the parent page, byte for byte, nothing reworded or dropped. The parent had reached 76 KB, 62 KB of it superseded reviews stacked below the live one. Every finding stays addressable and is indexed from the parent.
2026-09-06 17:26:22 a89227 Anonymous REV101 r6: re-review Design r3 (0b4039) and WLD101 r5/r6 (430206); N10, N11, extraction trace, readability resolved; Q22 verified as load-bearing contradiction (N12: W2/cost(3)/does-not-turn-back vs continuous path; Finding 2 conditionally re-opened); Q23 verified (N13); N14 pump upkeep fiction vs rules; N15, N16; verdict unchanged; r5-r1 retained
2026-09-06 17:14:43 d3679b Anonymous REV101 r5: note on Hub PM-review policy (75c3c3) and outside-reader Clarity Questions (cc0ee7); Q18 verified as unstated case not contradiction (N11); Q17 constraint released; Q1-Q14 classified as DES102 criteria; verdict unchanged with scope explicit; r4-r1 retained
2026-09-06 17:04:27 3fd6df Anonymous REV101 r4: closing addendum for WLD101 r4 (e54d6a) and DES101 note 3 (db8c5c); N1-N4, N7-N9 resolved; N10 added (pulsing vs energised in W1 path clause); concept-packet review complete pending OWN101; next review is DES102; r3/r2/r1 retained
2026-09-06 16:55:25 698c13 Anonymous REV101 r3: addendum for WLD101 r3 (c92838) and DES101 note 2 (ea4248); N1 mostly resolved, N5/N6/S5 closed, N2/N3/N4 open, N7-N9 added; verdict unchanged, ready for OWN101; r2 and r1 retained
2026-09-06 16:51:49 47d51d Anonymous REV101 r2: re-review DES101 r2 (c9b2ed) and WLD101 r2 (438f1b); Findings 1-4, S1, S2, S4 resolved; S3 withdrawn (changelog is UTC+3); six DES102 carry-forwards; verdict ready for OWN101 concept steering; r1 retained
2026-09-06 16:27:42 7ad187 Anonymous REV101 r1: acknowledge role and design-only gate; review DES101 r1 (c340f6/4343a2) and WLD101 r1 (01378d); verdict revise before OWN101 with five findings