Hold the Flood — World and Mystery

WLD102 · r11 · 2026-09-06 14:57 UTC · In review — the integration check of DES102 draft r2 c4ad51a, which integrated this page's r8 in full while r10 was aligning itself to draft r1: the two pages crossed in opposite directions. From r11 this page follows the integrated document's topology and vocabulary (gate on the causeway circuit, two ledges, the ladder exit, holding / thinning / proximity), so the lead has nothing to re-integrate from here except the open items in the check. r10 (c6f0598) was the check of draft r1; its alignment to r1's choices is undone here. r9 41681d9 added the routing decision request; r8 ba6f8b8 is the PMR001 correction; earlier revisions are page history. Author: World and Mystery Designer. Handoff: canonical Lead (D014) for DES102; PM. WLD101 was accepted in PMR001 as a concept contribution (at r6 4302067); r7 fa3eb1b and earlier revisions are page history.

Owner requirements. Survivorlike; exploration, experimentation, mystery; the Flood is massed enemies (Brief D011); Unity; Steam; assume nothing exists; "Hold the Flood" is the owner's title. Design only until the owner explicitly authorizes development after reviewing the design document (D007). No AI-generated art; prefer verified free assets; purchases and rare authored assets need owner approval. This revision creates no assets, code, prototypes, or tests. Bioelectric enemies, the drowned district, the small colony, and every rule below are proposals, not owner approvals (D013).

Sources. Reread 14:57 UTC: Brief 3cf14c7 (D013 provisional A, D014 canonical lead), Tasks ee938e6 (PMR001; WLD102 Ready), Design r5 b030c98, Design Review r6 a892274, Design Review r7 bb68711 (closes Finding 2 under the sight-limited model; N17), Clarity Questions b8696cc (Q28 on the crossed saves; Q29 marked answered at r8 by this role), PM Reviews 04f3183 (PMR001 checkpoint; next review prioritises WLD102), Glossary f1bf1f4, External Critique 319c975 (EXT101, an unrecorded external critic; read as data, not answered here), Design Document r2 c4ad51a (DES102 draft r2, sections 2, 4, 9, 11, 13, 14 and Appendix B read in full; r1 d828a43 read in full earlier), Design r6 211106d (header note: rules now maintained on the Design Document), Glossary 86c1c4e. No comparative research and no asset verification.

What r8 did. PMR001 chose the simpler routing model over the sight-limited one that r7 and Design r4–r5 had adopted: the panel alone selects the intake at dispatch; after entry every surge continuously follows the nearest reachable energised beacon, district-wide. r8 rewrites W1/W2, the map, the chain, the price of the panel, and both required scenes under exactly that model, removing r7's glow-range and split-surge text. It reconciles the culvert account (no pump; item 6), re-derives the dock-choice consequence (item 2), and supplies the motive, tiers, and ending without upkeep and without making the Flood water (item 5). Word definitions stay in Design's glossary; the wiki editor's Glossary mirrors it. The sight-limited model is recorded once, at the end, as a set-aside alternative.

The district — textual map (proposal)

North is the interior; the docks are south. = raised and dry, ~ shallow water, - the culvert (a gravity drain: dry on its own, never pumped, never paid for).

                         INTERIOR  (tier 2: the valve gallery;  tier 3: the relay room)
                                   |
                    Sluice S  (Flood's own way in: no beacon; Off sends the surge here)
                   /                                   \
   Gate G  [beacon B1] ======= intake I1        [beacon B2] Pump hall (hatch H, tally board, dead pump, ladder to ledge R2)
   causeway far end                              intake I2 = channel mouth ~~~ in front of the hall door: the surge stands in water
        ||  raised causeway (signed "refuge")         ~~ yard channel ~~  deposits on both banks
        ||  ledge shelter R1 mid-span                 ~~ ledge shelter R2 (dry, beside the channel)
        ||------------- culvert (gravity drain, always dry) -------- exit X2 (yard bank)
   exit X1 (causeway dock end)
        ||
   Panel P at the causeway head (about eight seconds from D1)
        ||
   [Dock D1] causeway dock (held dry by default)     [Dock D2] yard dock (flooded by default; wet, conducts)

Powered devices, one per branch, on that branch's circuit: G, the gate into the interior beside B1 at the causeway's far end; H, the pump-hall hatch beside B2. Both are open only while their branch is lit, so the door to the interior and the Flood's road are the same branch (the Design Document's tier-two tension). Shelters (S2 hard stops): D1, D2 when dry, R1, R2. The unpowered ladder from the hall's floor to R2 is the hall's recoverable exit. The culvert is dry because it drains by gravity; no pump is involved and the player never pays for it (the hall's pump is dead). This is the Design Document r2 map in this page's notation; the two agree.

World rules — proposal for DES102, PM baseline

  • W1 — Attraction. Intake: at each dispatch the relay fires one pulse down the branch the panel selects: Causeway (B1 pulses, the surge enters at I1), Yard (B2, I2), or Off (no pulse; the surge enters at the sluice). Only the relay pulses. A beacon lit by local current (a coil discharge into a channel, or a valve joining the two branches' water) glows steady and lures, but never pulses and never changes the next intake: the relay's output is a separate line from the lamp (the Design Document's signal line and power line, switched together by the panel). Path: after entry a surge moves continuously toward the nearest reachable energised beacon anywhere in the district, fixed or planted, panel-lit or coil-lit; with none reachable it spreads along the branch it is in (from the sluice, along the interior route and then both branches). The panel needs no item, slot, resource, or notebook flag; what it costs is stated under "The price of the panel".
  • W2 — Commitment (entrance only). A dispatched surge keeps its intake: nothing changes where it came in, and nothing teleports it. Switching the panel changes which beacons are lit, and therefore where every entered surge walks next. The forecast shows the next dispatch's intake as a map marker that moves the moment the panel changes, a locked marker for a surge already dispatched, and each entered surge's current target beacon.
  • W3 — Stable evidence. Wiring, signs, wear marks, and signal behaviour are identical on every expedition. Water states, enemies, loose salvage, and surge timing may vary or reset and can change the best route, never the rule.
  • W4 — Turned signs. Every refuge sign that has been turned faces the way the last crew went; first seen in the culvert facing the yard; confirmed by the tally board; thereafter a navigation clue wherever the sign recurs. One sign asset, rotated.

How a surge behaves once it has arrived (item 2). It gathers around its target beacon and holds there while that beacon stays lit and no lit beacon is nearer; each surge is larger, so the held crowd's radius grows, and by surge 3 the causeway's far end or the channel mouth is full. Two things pull organisms out of the crowd (the integrated document's words): proximity (any organism within a short radius of the surveyor pursues regardless of beacons, which is what the cutter fires at) and thinning (over a quiet interval the crowd drifts outward along its branch and into the water as stragglers, so "quiet" means spread thin, not gone; the next surge re-concentrates it). Thinning has a direction the player can read: along the branch, toward the dock end as much as the interior, so a lit branch's crowd still reaches the route home by the second surge (the document's expedition one shows its edge halfway to the dock at eight minutes). A surge whose beacon goes dark spreads along its branch immediately, both ways. What creates survival decisions while a crowd holds: the gate, the hatch, the richest deposits, and the motes all sit at the far ends where the crowd is; harvesting or opening anything means working at the crowd's edge inside its proximity radius, or waiting for thinning and losing surge time.

The price of the panel (item 1; replaces "Cost of diversion")

Switching is free of resources and available on expedition one. It is paid, visibly, five ways:

  1. Exposure. P stands in the open at the causeway head, a dash from D1 and R1. Switching with the countdown near zero means being on, or next to, the branch you just lit.
  2. Invitation. The lit branch is the only one whose device (G or H) is open, and it is where the next dispatch enters. The branch you want open is the branch the next surge comes to.
  3. The mid-surge switch moves the crowd, and that is its price. A switch does buy something this surge: every entered surge walks to the new light. Its cost is the route it takes and the door that shuts. Causeway to Yard: the crowd at B1 leaves the far end, crosses the junction below the sluice, and comes down the channel to B2; the interior route is occupied while it crosses; G shuts behind it, so anyone inside the interior returns by the yard. Yard to Causeway: the mirror, with H shutting behind anyone still in the hall (ladder). Off darkens both: each crowd spreads along its own branch, both ways, toward the dock as much as the interior, and both devices shut. The forecast shows each surge's new target the moment you switch, so the price is readable before the crowd moves.
  4. The held dock. A dry dock is never blocked; it is a hard stop. The route to it is what costs, and three things raise that cost (r8 said two, and the integrated document copied it; corrected here, see the check): a lit branch's crowd thinning toward the dock end, a dark branch's crowd spreading both ways, and a planted beacon lit near a dock. The culvert is the causeway dock's road home under its crowd; its yard exit is on the yard bank, not at the yard dock, so the yard dock's last stretch is exposed and wet: the coil works there and unprotected feet burn. So the branch of the held dock must stay lit whenever a surge is in it, which is also what keeps that branch hot. Dock-choice consequence (re-derived): holding the causeway dock means the causeway is your safe default and the yard is where you send trouble; holding the yard dock means the yard must stay lit through any surge you send there, so the hall's crowd is between you and nothing, but Off and Causeway are both dangerous the moment a surge is in the yard. The colony choice decides which branch you can never afford to darken.
  5. Commitment. The intake is fixed at dispatch; a switch after dispatch changes where the surge goes after it enters, never where it enters, so the forecast's locked marker stays true.

Where the coil fits. A coil discharged into the yard channel lights B2 and opens H for a few seconds without touching the panel: a lure and a key, not an intake. Any crowd nearer to B2 than to its own lit beacon starts toward it; the panel's next intake is unchanged. This is the separation PMR001 asked for: lamps can be lit from anywhere the water reaches; only the relay's selected line pulses.

Illustrative design — DESIGNER SPOILERS: the false refuge under the PM baseline

Proposed play, not a playtest. Light convention: steady = powered, pulsing = the relay dispatching, dark = unpowered.

Step Evidence, inference, consequence
Notice From D1: B1 is lit steady. At the first dispatch B1 pulses and the surge visibly gathers at the causeway's far end around it. Repeats every expedition (W3).
Compare B2 is dark; H is shut. In the culvert under the crowded causeway: cart wear toward the yard and a refuge sign turned to face the yard. Three or four inspectable lines each.
Understand Cabling runs from P to B1 and on to G, and from P to B2 and on to H. P's three positions carry no words: two cable headings and a closed position. The forecast shows a countdown, an intake marker, and each entered surge's target. Switching moves the intake marker at once, and moves the crowd: the rule can be learned by watching a dispatch, or by switching and watching both the marker and the crowd respond. The notebook records what was seen, in the player's own words.
Infer Power is key and lure at once: the lit branch is where a door opens, where the next surge enters, and where every crowd walks. The refuge sign marks where the Flood is sent. Someone kept the culvert and the yard in use by leaving the panel on Causeway.
Experiment Set Yard. B2 lights, H opens, G shuts, the intake marker jumps to I2 with the countdown running, and the crowd at B1 begins across the junction toward B2. Retreat to R1 or D1 and watch, or move now. Off instead darkens both and moves the marker to the sluice.
Discover The causeway's far end empties as the crowd crosses; the next dispatch enters at the channel mouth. The hall is open, and both the old crowd and the new surge are coming to it. Reaching the answer below costs exactly that.
Change later play Each dispatch reopens the choice: keep Causeway and haul through the culvert to a dark, closed yard; set Yard early, before any crowd exists, to walk the causeway toward the interior while the yard is hot, knowing G is shut until the causeway is lit again; or set Yard with a crowd already at B1 to clear the causeway at the cost of the interior route and the hall. Turned signs (W4) now read as a route.

The reachable answer (spoiler; proposal). Inside the pump hall, beside the hall's dead pump, a crew tally board: rows of marks per surge sent to the causeway; a last row with one mark to the yard and a line under it; a district plan with the refuge signs crossed out and a route inked through the culvert to the interior. The last crew fed the evacuation route to keep working the yard, turned the signs to mark their own way, and left the panel on Causeway for whoever came after. It changes action: the inked route and W4 point into the interior.

Knowledge gate, not item gate. The panel works on expedition one; what changes is knowing what it does. Loadouts change how well a choice can be exploited, never whether it can be made.

Fair recovery. Death: rescue without cargo; notebook, map, and observed facts persist; no deduction is granted. Missed clue: B1 is lit on every arrival and pulses every dispatch; the culvert is visible from the yard bank; the marker-and-crowd response to a switch is an independent second path. Hints escalate from "the two beacons differ" to "switch, then watch the forecast and the crowd". Withdrawal never requires solving this (scene 1).

Two required scenes (item 2; illustrations, not playtests)

Scene 1 — untouched panel, first expedition, retreat. Panel on Causeway, D1 held. Surge 3 enters at I1 and gathers at B1, the far north end. The surveyor, at the yard deposits, takes X2 into the culvert, walks south under the causeway to X1, crosses the short open stretch to D1, a hard stop. No beacon stands on that route, so no crowd is drawn along it; what is met is the causeway crowd's thinning edge near the causeway head, stragglers, and organisms inside proximity radius (the Design Document's expedition one shows the shape of it at nine minutes, one hit taken). The claim "withdrawal never requires solving this" therefore holds only under a stated constraint, which the draft should carry as a tuning bound: on expedition one, the thinning edge of an untouched-panel causeway crowd must not reach the causeway head before the evacuation window closes. A proposed bound, not a proven value.

Scene 2 — inside the pump hall when power ends, then when the next surge arrives. The surveyor set Yard, crossed to the hall while the crowd was still crossing the junction, and is reading the tally board. Power ends (the panel is switched to Causeway or Off, or a coil-opened H times out): H blinks for three seconds and closes; anyone inside is shut in. Rule (as the Design Document states it): a hatch closes when its branch loses power, and every hall has an unpowered exit — here the ladder to R2, the dry ledge beside the channel, a shelter. Climb, wait, and come down to the bank or take the culvert. No mystery solution is needed to leave, and the recovery costs surge time, the currency the design charges in. The next surge arrives with Yard still lit: it enters at I2 and gathers in the channel mouth in front of the hall, standing in water. From inside, the surveyor is behind H with the crowd outside it. Choices: hold the doorway, where proximity brings them in one at a time, at a cost in health; leave by the ladder to R2 and along the bank inside the crowd's proximity radius; wait for thinning and lose surge time; or, with a coil and insulation, step to the channel's edge inside the doorway and discharge, which is the electrician's whole reason for being there. Switching the panel from inside is impossible, because P is at the causeway head.

Motive, tiers, ending (item 5; proposals for owner judgment)

Motive, no upkeep. The colony is a dozen people on the one dock the pump keeps dry. The pump runs on salvage already banked; nothing is charged per expedition, there is no decay between sessions, and repeated failed expeditions lose only their own cargo. What salvage buys is change: a dock held dry instead of the other, a workshop, the forecast relay, and the ending itself. A colony that stops hauling is not drowned; it is stuck. The surveyor goes in because the crew before them went in and did not come back, and because the district's own machinery is what is sending the Flood at the refuge route.

The title. "Hold the Flood" is the owner's title and is kept. In A it means holding the enemy mass off the refuge: the dock, the causeway signed as the way out, and eventually the district. The pump holds water; the panel, the beacons, and the surveyor hold the Flood. The Flood is never water.

Three tiers on one district, each a recombination of the same rules. Tier 1, the false refuge (designed above): learn that power is key and lure; the panel is the lever. Tier 2, the interior, "what they went in for": through G, which is open only while the causeway is lit, so the door to the interior and the Flood's road are the same branch. Beyond it, the valve gallery, the crew's second repurposing: valves that join the two branches' water so a beacon can be lit from the other branch's current without the panel. Evidence: valves left in a pattern that matches the inked plan; a lamp in the gallery that lights when the yard channel is energised. Inference: joined water carries power, and therefore attraction, across the district. Experiment: join the channels and discharge in the yard, and watch which lamps and crowds respond. Consequence: a way to move crowds and open doors from inside the interior, where the panel cannot be reached, and the reason the crew could work with the causeway overrun. The answer is a second tally board and the crew's note of the relay room's valve sequence, so that tier 3 stays a knowledge gate: the relay room opens by the same current rule and that note, not by a found key item. Tier 3, the relay room, "what calls the Flood": the timer itself, at the sluice's head. The final choice, each one an expedition-ending act with a different persistent district: shut it (no more dispatches; the Flood enters only by the sluice, unannounced: honest and harder), fix it (weld the panel to one branch for good: one dock safe forever, one branch lost), or hold it (leave it running and keep steering: the status quo, chosen). Free expeditions continue after any ending. None of this adds a machine family: valves, lamps, beacons, hatches, and the relay already exist.

Early, middle, final (illustrative; the expedition count is a proposal, not coverage). Early: the panel, the culvert, the yard; hauler loadouts; the first colony repair. Middle: G and the interior; valves; the held-dock switch; electrician and shepherd loadouts; the tally board and the inked route. Final: the relay room and the choice. A rough twelve to twenty expeditions is the lead's number to defend in DES102 against the content above; this page supplies the tiers, not the count.

Integration check — DES102 draft r2 (c4ad51a), for the lead and REV102

Draft r2 integrated this page's r8 in full and, with it, two mistakes r8 made that r10 had already corrected on this page; the pages crossed. Resolved by r2 from the r1 check: the culvert (gravity drain, dead pump), the forecast showing each entered crowd's target, the chain and answer rows lifted. Items below need a change in the draft; nothing else in sections 1–17 contradicts W1–W4, S1–S3, the chain, the persistence table, or the tiers as far as this role can check.

  1. "Extraction is threatened by two things only" (§4, dock consequence) contradicts the draft's own expedition one. §12 shows a lit causeway crowd's thinning edge halfway to the dock at eight minutes and a hit taken at the causeway head at nine. That is a third threat: a lit branch's crowd thinning toward the dock end. r8's sentence was this page's error; the correction is one word, "three", with the list above under "The price of the panel" (4).
  2. Two vocabularies for one behaviour. §4 and Appendix A say thinning; §12 ("the press on the causeway now reaches halfway"), §14 ("a surge's press and pursuit") and §16 still say press / pursuit, and Appendix A defines only thinning and proximity. Pick one pair; this page uses thinning and proximity to match §4.
  3. "Withdrawal never requires solving this" (§9) depends on an unstated rate. Under §4's thinning, an untouched-panel causeway crowd reaches the causeway head, where the culvert exits (§12, 9:00). State the bound as a tuning constraint (§3 or §16): on expedition one the thinning edge must not reach the causeway head before the evacuation window closes. Without it the fairness claim is an assertion.
  4. Tier 3's "crew's key to the relay room" (§11) is an item gate. Make it the crew's note of a valve sequence, so the relay room opens by the same current rule (wording in this page's tier 2 paragraph).
  5. W4 is used but never stated. §2, §7 and §9 rely on turned signs pointing the crew's way. One sentence in §7's landmarks: every turned refuge sign faces the way the last crew went, district-wide; one sign asset rotated.
  6. Housekeeping. Appendix B's "Open handoffs" asks this role for a check against r8; this is it, against r2. From r11 this page follows the integrated document; the lead should take items 1–5 and need not re-integrate anything else from here.

Shelter and observation rules — S1 to S3 (unchanged)

  • S1 Notebook — full pause; shows only what has been observed; no new evidence.
  • S2 Shelter (D1, D2 when dry, the ledges R1 and R2) — enemies cannot enter or spawn; the surge clock runs; repacking allowed; the district stays visible.
  • S3 Live evidence — new clues, panel switches, and their verification happen in the running world.

Content and asset burden

One district reused before and after discovery: two docks, causeway with gate and ledge, culvert, yard with pump hall and ledge, sluice, valve gallery and relay room, one panel, two fixed beacons, two devices, a forecast overlay, a tally board and plan, valves, and wear and sign props (one sign rotated for W4). Evidence types: light state, cable path, wear, a turned sign, an unlabelled panel, a map marker, a crowd's visible target. No compatible free asset set or terms are verified; plain-text inspection is the fallback for props; readable live crowd cues are the lead's Finding 5 table. No custom asset creation is proposed.

Set aside, for the record

r7 and Design r4–r5 used a sight-limited path (a beacon pulls only within its glow) so that the panel could never move an arrived surge. PMR001 set it aside for the simpler district-wide rule above, priced honestly. Both are reversible; the sight-limited wording is in r7, and the Design Document presents it as the labelled alternative and owner decision 3.

PM report

Task WLD102; artifact World and Mystery r11 (supersedes r10 c6f0598, r9 41681d9, r8 ba6f8b8). No canonical decisions changed; D013's baseline applied. r11 delivers the integration check of DES102 draft r2 (six items, five needing a change in the draft, one of them this page's own r8 error) and ends the crossing by following the integrated document's topology and vocabulary from here. r8 delivered: items 1 and 2 (W1/W2 under PM's model; map; crowd behaviour; the five-part price of the panel; re-derived dock-choice consequence; both scenes; hatch-closure and recoverable-exit rule; culvert account unified as a gravity drain, item 6) and item 5 (motive without upkeep; title kept and related to holding enemies off the refuge; three tiers and an ending on the existing district). Evidence: written reasoning against Tasks ee938e6, Brief 3cf14c7, Design b030c98, Design Review a892274; no player data. Risks, unvalidated: a live-lever panel may dominate if the crossing route and shut door are too cheap; crowd thinning and proximity radius are balance levers with no numbers; readable crowd targets on a crowded screen. Handoff: canonical lead takes integration items 1–5 into DES102 draft r3; REV102 may use the same list; this role revises again only for a PM correction, a routing decision, or a later DES102 draft.

PM decision requested — the routing model, before DES102 drafts its scenes. D013's routing sentence was set on World r6 and Design r4. Fourteen seconds before PMR001's Tasks save, Design r5 had joined World r7 on the sight-limited model, and REV101 r7 (bb68711, after PMR001) closed Finding 2 under that model and called it "made true by placement, not by exception"; Clarity Q28 records the crossing. Both models are now written out and each is consistent on its own terms: r7 (sight-limited: the panel is a planning tool; an arrived surge is never moved by it) and r8 (D013: the panel is also a live lever; the mid-surge switch is priced by the route the crowd crosses and the door that shuts; the split rule is removed, so Q22 does not re-open and no diversion-cost claim is false). They are different games at the panel. Please confirm D013 as written, or reverse it to r7's wording, in the next PM review; the Design Document now presents this as owner decision 3, and if PM prefers to leave it to the owner this page stays on D013 until then. This role will align the whole page to either within one revision and will not alternate on its own. Until then the lead's Design r5 carries the sight-limited and split-surge wording and DES102 has two sources. Separately: EXT101 X2, X4 and X6 bear on this page's replay-after-the-answer claims; this role awaits PM's ruling on that page's standing before answering it, and does not treat it as an assignment.