Blame

7ad187 Anonymous 2026-09-06 16:27:42
REV101 r1: acknowledge role and design-only gate; review DES101 r1 (c340f6/4343a2) and WLD101 r1 (01378d); verdict revise before OWN101 with five findings
1
# Hold the Flood — Design Review
2
285925 Anonymous 2026-09-06 18:57:35
REV103 r1: present-tense review of DES103 r3 (Design Document r9, fb6b6d) on per-beat ledgers rebuilt from the rules; PMR002 1, 2, 4 met on the page, 3 met on World r16 but not yet lifted; verdict revise, one short pass: REV103-1 %A712 leftover sentence and two ledger cells, -2 collection rule disobeyed by both scenes, -3 %A711 Fix ending contradicts World r16 and %A74's two-cable model, -4 three stale sentences; REV102-13 resolved; REV102 r6 moved to Archive/REV102
3
**REV103 · r1 · 2026-09-06 16:05 UTC · Independent Design Critic · In review** — independent review of **DES103 r3, the Design Document at revision r9**, the revision written against PMR002 findings 1–4 and criteria 1–11. Present-tense, revision-specific, built on per-beat ledgers this role derived from the document's own rules before trusting its prose, as REV102 r6 committed to. REV102 is closed; its r6–r1 are on the [REV102 archive](/Hold%20The%20Flood/Design%20Review/Archive/REV102), REV101 r8–r1 on the [REV101 archive](/Hold%20The%20Flood/Design%20Review/Archive); every revision is in [page history](/Hold%20The%20Flood/Design%20Review/history) (REV102 r6 538724 · r5 e2db8b · r4 041852 · r3 382607 · r2 82a96b · r1 4dde90 · REV101 r8 11bd4d … r1 7ad187).
a89227 Anonymous 2026-09-06 17:26:22
REV101 r6: re-review Design r3 (0b4039) and WLD101 r5/r6 (430206); N10, N11, extraction trace, readability resolved; Q22 verified as load-bearing contradiction (N12: W2/cost(3)/does-not-turn-back vs continuous path; Finding 2 conditionally re-opened); Q23 verified (N13); N14 pump upkeep fiction vs rules; N15, N16; verdict unchanged; r5-r1 retained
4
285925 Anonymous 2026-09-06 18:57:35
REV103 r1: present-tense review of DES103 r3 (Design Document r9, fb6b6d) on per-beat ledgers rebuilt from the rules; PMR002 1, 2, 4 met on the page, 3 met on World r16 but not yet lifted; verdict revise, one short pass: REV103-1 %A712 leftover sentence and two ledger cells, -2 collection rule disobeyed by both scenes, -3 %A711 Fix ending contradicts World r16 and %A74's two-cable model, -4 three stale sentences; REV102-13 resolved; REV102 r6 moved to Archive/REV102
5
## What was reviewed
a89227 Anonymous 2026-09-06 17:26:22
REV101 r6: re-review Design r3 (0b4039) and WLD101 r5/r6 (430206); N10, N11, extraction trace, readability resolved; Q22 verified as load-bearing contradiction (N12: W2/cost(3)/does-not-turn-back vs continuous path; Finding 2 conditionally re-opened); Q23 verified (N13); N14 pump upkeep fiction vs rules; N15, N16; verdict unchanged; r5-r1 retained
6
11bd4d Anonymous 2026-09-06 17:48:35
REV101 r8: post-acceptance note - REV101 accepted (PMR001), REV102 assigned blocked on DES102; live verdict restated; Finding 2 closed under both routing models (r7 sight-limited, r8 district-wide), recommend confirming D013 with r8's relay/lamp separation; N16/N17 updates; EXT101 treated as data, X2/X3/X4/X6 document parts carried into REV102, X8 answered; r7 moved to Archive
7
| Artifact | Revision | UTC | Note |
8
| --- | --- | --- | --- |
285925 Anonymous 2026-09-06 18:57:35
REV103 r1: present-tense review of DES103 r3 (Design Document r9, fb6b6d) on per-beat ledgers rebuilt from the rules; PMR002 1, 2, 4 met on the page, 3 met on World r16 but not yet lifted; verdict revise, one short pass: REV103-1 %A712 leftover sentence and two ledger cells, -2 collection rule disobeyed by both scenes, -3 %A711 Fix ending contradicts World r16 and %A74's two-cable model, -4 three stale sentences; REV102-13 resolved; REV102 r6 moved to Archive/REV102
9
| **Design Document — DES103 r3 (document r9)** | fb6b6d (r8 d37cbf) | 15:47 | Diffed against r8; §1, §4–§6, §8–§9, §11–§17 and both appendices read in full; §12 and §13 re-tallied from the rules |
10
| World and Mystery — WLD102 r15, r16 | dca569 → 812fd6 | 15:47, 15:49 | r15: what counts as a beacon; retarget-before-spread; state table of the signature routes; complete tier-three chain and endings table. r16: merges the lead's r9 access chain with the page's relay chain; two reconciliations stated. Canonical for W1–W4 and the chain |
11
| Tasks; PMR002 (closing) | ab97dc; 4f18c7 | 15:49, 15:48 | REV103 listed Blocked on "the revision addressing PMR002"; r9 is that revision and postdates the closing pass by two minutes. REV102-13 accepted by PM; quantity checks placed in this role's remit |
12
| Brief 28fb1c, PM Reviews a2beab, Team cbf8d7 | unchanged | | |
a89227 Anonymous 2026-09-06 17:26:22
REV101 r6: re-review Design r3 (0b4039) and WLD101 r5/r6 (430206); N10, N11, extraction trace, readability resolved; Q22 verified as load-bearing contradiction (N12: W2/cost(3)/does-not-turn-back vs continuous path; Finding 2 conditionally re-opened); Q23 verified (N13); N14 pump upkeep fiction vs rules; N15, N16; verdict unchanged; r5-r1 retained
13
285925 Anonymous 2026-09-06 18:57:35
REV103 r1: present-tense review of DES103 r3 (Design Document r9, fb6b6d) on per-beat ledgers rebuilt from the rules; PMR002 1, 2, 4 met on the page, 3 met on World r16 but not yet lifted; verdict revise, one short pass: REV103-1 %A712 leftover sentence and two ledger cells, -2 collection rule disobeyed by both scenes, -3 %A711 Fix ending contradicts World r16 and %A74's two-cable model, -4 three stale sentences; REV102-13 resolved; REV102 r6 moved to Archive/REV102
14
## Verdict — **revise: one short pass, then it can be judged for the owner**
a89227 Anonymous 2026-09-06 17:26:22
REV101 r6: re-review Design r3 (0b4039) and WLD101 r5/r6 (430206); N10, N11, extraction trace, readability resolved; Q22 verified as load-bearing contradiction (N12: W2/cost(3)/does-not-turn-back vs continuous path; Finding 2 conditionally re-opened); Q23 verified (N13); N14 pump upkeep fiction vs rules; N15, N16; verdict unchanged; r5-r1 retained
15
285925 Anonymous 2026-09-06 18:57:35
REV103 r1: present-tense review of DES103 r3 (Design Document r9, fb6b6d) on per-beat ledgers rebuilt from the rules; PMR002 1, 2, 4 met on the page, 3 met on World r16 but not yet lifted; verdict revise, one short pass: REV103-1 %A712 leftover sentence and two ledger cells, -2 collection rule disobeyed by both scenes, -3 %A711 Fix ending contradicts World r16 and %A74's two-cable model, -4 three stale sentences; REV102-13 resolved; REV102 r6 moved to Archive/REV102
16
r9 does what PMR002 asked, and the ledgers below show it: the scenes now obey the routing rule, the racks are legal and drawn, every unit of charge is tracked and the tallies close, the arc is drawn twice and played once, the fuel policy is stated as rules, the hours arithmetic is honest, the hauler's cost is true, the ending costs no salvage. PMR002 findings 1 and 2 are met on the page.
a89227 Anonymous 2026-09-06 17:26:22
REV101 r6: re-review Design r3 (0b4039) and WLD101 r5/r6 (430206); N10, N11, extraction trace, readability resolved; Q22 verified as load-bearing contradiction (N12: W2/cost(3)/does-not-turn-back vs continuous path; Finding 2 conditionally re-opened); Q23 verified (N13); N14 pump upkeep fiction vs rules; N15, N16; verdict unchanged; r5-r1 retained
17
285925 Anonymous 2026-09-06 18:57:35
REV103 r1: present-tense review of DES103 r3 (Design Document r9, fb6b6d) on per-beat ledgers rebuilt from the rules; PMR002 1, 2, 4 met on the page, 3 met on World r16 but not yet lifted; verdict revise, one short pass: REV103-1 %A712 leftover sentence and two ledger cells, -2 collection rule disobeyed by both scenes, -3 %A711 Fix ending contradicts World r16 and %A74's two-cable model, -4 three stale sentences; REV102-13 resolved; REV102 r6 moved to Archive/REV102
18
What remains is small and specific: one leftover sentence in §12 that contradicts its own correction; one new rule that both scenes disobey; §11's endings, which the world designer has since reconciled on the canonical page and which the document still states in the version that contradicts its own cable model; and three stale sentences PM has already asked to be removed or added. None is a rule change. This role does not pre-approve r10; it names what r9 lacks, and will judge r10 when it exists.
19
20
## The ledgers — expedition one (§12), rebuilt from the rules
21
22
Rules applied: six slots; battery 1, coil 2, bundle 1; a mote adds up to capacity ten; one unit a minute per bundle connected to a battery through touching bundles; modules go into empty slots wherever found; arranging and linking only in a shelter.
23
24
| Beat | Slots (my count) | Document's ledger | Charge (my count) | Agrees? |
25
| --- | --- | --- | --- | --- |
26
| 0:00 | battery = 1/6 | battery 1 | 0 | Yes |
27
| 1:30 | + 2 bundles + coil = 5/6 | coil 2, battery 1, bundles 2; one empty | 0 | Yes |
28
| ~4:00–5:00 | two stragglers → two motes; platform: `C C B / S - S`, link B→C; battery (1,3) touches coil and one bundle | arranged; one drip; stored 2 | 2, then −1/min | Yes — one drip is right for that drawing |
29
| 7:30 | third bundle into (2,2): `S S S` row, all connected to the battery = **6/6, three drips** | coil 2, battery 1, bundles 3; full; three drips; stored 0 | 0 | Yes — **but see REV103-1: the prose's next sentence says the opposite** |
30
| 9:00 | cutter kills two pursuers | not in the ledger | two motes dropped; collected or expired in seconds under three drips | **Ledger omits them** |
31
| 9:40 | 3 bundles + coil + battery = 6/6 | extracted with 3 bundles, coil, empty battery | 0 | Yes |
32
33
Timing note: with one drip from about 5:00, the two stored units are gone by about 7:00 on their own; the prose attributes their loss to the three drips at 7:30. Either the third bundle is added straight after arranging, or the ledger's 7:30 row starts from zero. One cell.
041852 Anonymous 2026-09-06 18:25:07
REV102 r4: PMU002 applied (D016 confirms baseline, D018 criterion 11 added to checklist, D015 contributors are teammates); Design Document r6 (12779d) assessed - rules unchanged; three items for DES103: REV102-7 cable pair named twice in Appendix A, REV102-8 decision 4's unsupported playtime inference per PMU002 X19 ruling, REV102-9 replace 'nine rounds certifies' per PM; r3 moved to Archive/REV102
34
285925 Anonymous 2026-09-06 18:57:35
REV103 r1: present-tense review of DES103 r3 (Design Document r9, fb6b6d) on per-beat ledgers rebuilt from the rules; PMR002 1, 2, 4 met on the page, 3 met on World r16 but not yet lifted; verdict revise, one short pass: REV103-1 %A712 leftover sentence and two ledger cells, -2 collection rule disobeyed by both scenes, -3 %A711 Fix ending contradicts World r16 and %A74's two-cable model, -4 three stale sentences; REV102-13 resolved; REV102 r6 moved to Archive/REV102
35
## The ledgers — expedition six (§13), rebuilt from the rules
041852 Anonymous 2026-09-06 18:25:07
REV102 r4: PMU002 applied (D016 confirms baseline, D018 criterion 11 added to checklist, D015 contributors are teammates); Design Document r6 (12779d) assessed - rules unchanged; three items for DES103: REV102-7 cable pair named twice in Appendix A, REV102-8 decision 4's unsupported playtime inference per PMU002 X19 ruling, REV102-9 replace 'nine rounds certifies' per PM; r3 moved to Archive/REV102
36
285925 Anonymous 2026-09-06 18:57:35
REV103 r1: present-tense review of DES103 r3 (Design Document r9, fb6b6d) on per-beat ledgers rebuilt from the rules; PMR002 1, 2, 4 met on the page, 3 met on World r16 but not yet lifted; verdict revise, one short pass: REV103-1 %A712 leftover sentence and two ledger cells, -2 collection rule disobeyed by both scenes, -3 %A711 Fix ending contradicts World r16 and %A74's two-cable model, -4 three stale sentences; REV102-13 resolved; REV102 r6 moved to Archive/REV102
37
Batteries: coil's (B1) and arc's (B2), capacity ten each; collection "to the linked battery with the most room" as §5 states.
041852 Anonymous 2026-09-06 18:25:07
REV102 r4: PMU002 applied (D016 confirms baseline, D018 criterion 11 added to checklist, D015 contributors are teammates); Design Document r6 (12779d) assessed - rules unchanged; three items for DES103: REV102-7 cable pair named twice in Appendix A, REV102-8 decision 4's unsupported playtime inference per PMU002 X19 ruling, REV102-9 replace 'nine rounds certifies' per PM; r3 moved to Archive/REV102
38
285925 Anonymous 2026-09-06 18:57:35
REV103 r1: present-tense review of DES103 r3 (Design Document r9, fb6b6d) on per-beat ledgers rebuilt from the rules; PMR002 1, 2, 4 met on the page, 3 met on World r16 but not yet lifted; verdict revise, one short pass: REV103-1 %A712 leftover sentence and two ledger cells, -2 collection rule disobeyed by both scenes, -3 %A711 Fix ending contradicts World r16 and %A74's two-cable model, -4 three stale sentences; REV102-13 resolved; REV102 r6 moved to Archive/REV102
39
| Beat | Slots (my count) | B1 / B2 (my count) | Document | Agrees? |
40
| --- | --- | --- | --- | --- |
41
| 0:00 | coil + battery = 3/6 | 0 / — | 0 / none | Yes |
42
| 1:30 | + insulation + battery = 5/6 | 0 / 0 | 0 / 0 | Yes |
43
| 3:00 | two motes | **no link has been drawn yet** (the first arrangement is at 5:00), so under §5's sentence no battery is "linked" and the motes should expire | 2 / 0 | **Rule and scene disagree — REV103-2** |
44
| 4:00 | panel to yard; causeway crowd's beacon dark, yard the only lit beacon → retargets | — | same | Yes — precedence obeyed |
45
| 5:00 | + arc = 6/6; harvester `C C B / A B I`; B1→C, B2→A; B1 at (1,3) touches C and I; B2 at (2,2) touches C, A, I — no bundle, no leak | 2 / 0 | 2 / 0 | Yes |
46
| 6:00–7:30 | eleven kills → eleven motes; by "most room" B2 (room 10) fills before B1 (room 8) until they equalise, so about 6 / 5 | — | 10 / 3 (B1 first, to full) | **Scene fills the fuller battery first — REV103-2** |
47
| 7:50 | discharge B1 → 0; 29 stunned → two large motes = 10; B1 has the most room | 10 / 3 | 10 / 3; spent 10 | Yes |
48
| 8:00 | discharge B1 → 0 into ~60 fresh in water → six motes = 30; B1 takes 10, B2 takes 7 (3→10), 13 expire | 10 / 10; expired 13 | same | Yes |
49
| 8:20 | burst: B2 10 → 0 over ten seconds; targets have shed → no motes | 10 / 0 | same | Yes |
50
| 8:30–11:30 | causeway empty (both crowds at the yard); junction gate shut; valve opened → pool lamp (indicator) lights, gate opens; player does not enter | 10 / 0 | same | Yes — consistent with §2, §4, §11 |
51
| 12:00 | causeway home; no cargo; B1's ten lost at the dock | — | same | Yes |
52
53
Both scenes now close to the unit. The two disagreements are between the scenes and one new sentence in §5, not within the scenes.
54
55
## PMR002 findings 1–4 against r9
56
57
| Finding | Where in r9 | Status |
538724 Anonymous 2026-09-06 18:46:18
REV102 r6: closing correction - PMR002 declined the r2/r3 ready verdicts and is right; findings 1a-1d, 2a-2c, 3 verified against Design Document r8 in the present tense (%A71 yard-stays-dark vs shared circuit, %A78 nearest-beacon, %A712 seven slots, %A713 third bundle, hours arithmetic); ready verdicts withdrawn; r8 fixes REV102-10..12 verified, -13 open; REV103 acknowledged blocked; per-beat ledger method for REV103; r5 moved to Archive/REV102
58
| --- | --- | --- |
285925 Anonymous 2026-09-06 18:57:35
REV103 r1: present-tense review of DES103 r3 (Design Document r9, fb6b6d) on per-beat ledgers rebuilt from the rules; PMR002 1, 2, 4 met on the page, 3 met on World r16 but not yet lifted; verdict revise, one short pass: REV103-1 %A712 leftover sentence and two ledger cells, -2 collection rule disobeyed by both scenes, -3 %A711 Fix ending contradicts World r16 and %A74's two-cable model, -4 three stale sentences; REV102-13 resolved; REV102 r6 moved to Archive/REV102
59
| **1** — signature experiment vs the routing rule | §1 coil route: "The yard's beacon, on the same circuit, glows steady for those seconds… but it never flashes"; §1 state table (three routes: panel, coil, switch-then-coil, each with panel, circuit, lit beacons, crowd position→target, hatch); §4: "Precedence, stated once: a crowd retargets to the nearest lit beacon it can reach whenever one exists, and spreads… only when none does; a crowd already holding at a lit beacon never leaves it for a farther light. Only beacons pull; other lamps, including the junction pool's indicator, are not beacons"; §8 rewritten so the failure needs a crowd with nowhere to go (panel off, surge from the sluice spreading) — and says why the old version could not happen. World r15's state table reaches the same rows | **Met.** I checked each state-table row against clause 3 and the precedence; all four follow |
60
| **2** — space and charge | Legal drawn racks in §5 (three loadouts, the failed arrangement, two arc loadouts with adjacency stated and no leaks — I checked each battery's neighbours); charge's five states; collection, overflow, planting and retrieval rules; the arc's fuel policy (one battery per burst; no charging while drawing; no motes from shed organisms); early/middle/late; §12 and §13 ledgers | **Met, with REV103-1 and -2** |
61
| **3** — final mystery and endings | §11 tier three: a complete clue → inference → action → consequence chain on the existing rule; each ending's dispatch, forecast, retreat and door consequences; the ending costs no salvage; hours restated honestly; early-stop answer without achievement figures. World r16 merges this chain with the page's relay chain and reconciles two points | **Met on the world page; the document lags it — REV103-3** |
62
| **4** — market evidence | §11 and §17: measures named with limits; no minimum-length or refund conclusions; the "minority who finish" forecast removed; the intended player named once; price uncommitted | **Met** (REF103's own corrections are the researcher's) |
63
64
## The findings
65
66
### REV103-1 — §12 keeps the sentence PMR002 2a found, two sentences after correcting it
67
68
- **Where:** §12, 3:30–7:30. The new text: the platform arrangement `C C B / S - S` with one drip; then "the player finds a third deposit… drops the bundle into the empty slot. Now the three bundles touch each other in a row, the row touches the battery, and three drips show; the two units are gone in under a minute." Then, unchanged from r8: "**Rack now: coil, battery, three bundles, one slot empty, and one drip, because a bundle touches the battery.** The player does not yet know what a drip means."
69
- **Why it fails:** six of six slots are full and three drips show, by the paragraph's own previous sentence and by the ledger's 7:30 row. The stale sentence asserts a seventh slot and one drip — the exact defect PMR002 2a named, now contradicted by its own fix.
70
- **Also in the ledger:** the two pursuers killed at 9:00 drop two motes the ledger does not record; and with one drip from 5:00 the two stored units are gone by about 7:00, before the three-drip moment the prose blames.
71
- **Category:** contradiction (leftover text); ledger completeness.
72
- **Minimal change:** delete the stale sentence and its duplicate "does not yet know" clause; add "dropped 2; expired 2" at 9:00; either place the third bundle immediately after arranging or start the 7:30 row from zero.
73
74
### REV103-2 — The new collection rule is disobeyed by both scenes
75
76
- **Where:** §5: "A collected mote goes to **the linked battery with the most room**." §12 ~4:00: the battery collects two motes before the first arrangement at the platform — it is not yet linked. §13 3:00: the first battery collects two motes; links are drawn at 5:00. §13 6:00–7:30: eleven motes go "eight to the coil's battery, which is now full, and three to the arc's" — the battery with *less* room fills first.
77
- **Why it fails:** the sentence was added in r9 to answer PMR002 2 and it is contradicted by both scenes that were rewritten in the same revision. Either unlinked batteries collect (the scenes) or they do not (the rule), and either allocation is by room (the rule) or by the player's choice or by the coil's battery first (the scene).
78
- **Consequence:** small in play, but it is a rule about the arc's fuel, which the recommendation rests on; PMR002 asked for the fuel policy as rules and this is the one rule in it the examples break.
79
- **Category:** contradiction (rule versus its own examples).
80
- **Minimal change:** one sentence, either way. Simplest, matching the scenes: "A collected mote goes to the battery with the most room, linked or not; a full battery takes nothing; a battery the arc is drawing takes nothing until the burst ends" — and make the 6:00 split follow it (about six and five), or state that the player picks the battery when both have room.
81
82
### REV103-3 — §11's endings contradict the canonical chain and the document's own cable model
83
84
- **Where:** §11 tier three, "Fix it": "the panel is welded to one branch; that branch's beacon flashes at every dispatch for good… and **the welded branch's door is open forever while the other's is shut forever**." World and Mystery r16 (canonical for the chain, by the two pages' own division of sources) merges the lead's chain and reconciles this: "**Fix** clamps the signal cable only, so the intake is fixed and power still switches, and the lead's 'welded branch's door open forever, the other's shut forever' is dropped, because under the two-cable rule a clamp on the lever cannot fix the power line."
85
- **Why it fails:** §4 makes power and signal two cables switched separately; a clamp on the lever fixes what the lever does. The document's Fix ending has the clamp fix both, which §4 forbids; the world page's version does not. The document also lacks the relay chain's inside steps (drum, lever, clamp, drain valve) that give the three endings their observable cause. The lead offered the chain "for the world designer to correct and own"; the correction now exists and has not flowed back.
86
- **Consequence:** the finale — the thing PMR002 3 asked to be complete — is stated two ways on the two pages, and the document's way breaks the document's own rule.
87
- **Category:** contradiction (cross-page, and with §4).
88
- **Minimal change:** lift World r16's "Reaching the room", "Inside the room" and the endings table into §11 verbatim, as §9 does for tier one; keep Shut's fifteen-minute window and hard-stop docks (r16 already adopts the lead's version of that).
89
90
### REV103-4 — Three stale sentences PM has already asked about
91
92
- Owner page: "An independent critic has reviewed this document and found it consistent, honest about its unknowns, and readable cold" — that was true of r5 and misrepresents the current state; PMR002 5 asks for "reviewed; revisions remain open". Say that.
93
- §16: "A critic outside the recorded team has posted a market and originality audit; PM has not yet ruled on its standing" — the External Critic is a team member since D015, and the paragraph's substance is now in §17. Remove or date it.
94
- Appendix A has no **battery** entry, the one Q39 asked for and PMR002 assigned; the word is used in every section.
95
96
**Category:** housekeeping; criterion 10.
97
98
## What works in r9, and why
99
100
- **The scenes are now state sequences**, and they obey the rule they quote. §1's table is the first place the document lets a reader *check* the signature interaction rather than believe it; §8's rewritten failure is a better failure than the old one, because it needs the player to have made a crowd with nowhere to go.
101
- **The ledgers close.** Expedition six tallies to the unit through two discharges, an overflow of thirteen, and a burst that returns nothing because its targets have shed — the fuel policy demonstrated, not asserted. That is what PMR002 2 and REV102-13 asked for.
102
- **The arc costs what the link rule says it costs**: six slots and no cargo for the harvester, or three bundles and a slow burst for the arc hauler; both drawn, both leak-free by adjacency I checked.
103
- **The tier-three chain uses only what the player already knows** — the junction valve's lesson, one pool further — and the world page's relay chain gives each ending an observable cause in the same vocabulary. Once §11 lifts it, criterion 5 holds at the finale as it does at tier one.
104
- **The market text now says what the measures are**, and the length is two figures with their assumptions labelled.
041852 Anonymous 2026-09-06 18:25:07
REV102 r4: PMU002 applied (D016 confirms baseline, D018 criterion 11 added to checklist, D015 contributors are teammates); Design Document r6 (12779d) assessed - rules unchanged; three items for DES103: REV102-7 cable pair named twice in Appendix A, REV102-8 decision 4's unsupported playtime inference per PMU002 X19 ruling, REV102-9 replace 'nine rounds certifies' per PM; r3 moved to Archive/REV102
105
285925 Anonymous 2026-09-06 18:57:35
REV103 r1: present-tense review of DES103 r3 (Design Document r9, fb6b6d) on per-beat ledgers rebuilt from the rules; PMR002 1, 2, 4 met on the page, 3 met on World r16 but not yet lifted; verdict revise, one short pass: REV103-1 %A712 leftover sentence and two ledger cells, -2 collection rule disobeyed by both scenes, -3 %A711 Fix ending contradicts World r16 and %A74's two-cable model, -4 three stale sentences; REV102-13 resolved; REV102 r6 moved to Archive/REV102
106
## Recorded for later empirical validation — not defects
041852 Anonymous 2026-09-06 18:25:07
REV102 r4: PMU002 applied (D016 confirms baseline, D018 criterion 11 added to checklist, D015 contributors are teammates); Design Document r6 (12779d) assessed - rules unchanged; three items for DES103: REV102-7 cable pair named twice in Appendix A, REV102-8 decision 4's unsupported playtime inference per PMU002 X19 ruling, REV102-9 replace 'nine rounds certifies' per PM; r3 moved to Archive/REV102
107
285925 Anonymous 2026-09-06 18:57:35
REV103 r1: present-tense review of DES103 r3 (Design Document r9, fb6b6d) on per-beat ledgers rebuilt from the rules; PMR002 1, 2, 4 met on the page, 3 met on World r16 but not yet lifted; verdict revise, one short pass: REV103-1 %A712 leftover sentence and two ledger cells, -2 collection rule disobeyed by both scenes, -3 %A711 Fix ending contradicts World r16 and %A74's two-cable model, -4 three stale sentences; REV102-13 resolved; REV102 r6 moved to Archive/REV102
108
§16's list, unchanged; the arc's actual duration with pickups (§6 states the nominal); the press-rate bound.
a89227 Anonymous 2026-09-06 17:26:22
REV101 r6: re-review Design r3 (0b4039) and WLD101 r5/r6 (430206); N10, N11, extraction trace, readability resolved; Q22 verified as load-bearing contradiction (N12: W2/cost(3)/does-not-turn-back vs continuous path; Finding 2 conditionally re-opened); Q23 verified (N13); N14 pump upkeep fiction vs rules; N15, N16; verdict unchanged; r5-r1 retained
109
bb6871 Anonymous 2026-09-06 17:38:01
REV101 r7: re-review Design r4/r5 (42f653, b030c9) and WLD101 r7 (fa3eb1); N12-N15 resolved (beacon-sight rule, both pages), Finding 2 closed again, N11 reading reversed and re-checked; N17 added (surge-split rule: stale coil sentence, unplaced valve); editor split verified byte for byte and current+archive convention adopted; r6 moved to Archive; index updated
110
## Finding index — where every finding lives
a89227 Anonymous 2026-09-06 17:26:22
REV101 r6: re-review Design r3 (0b4039) and WLD101 r5/r6 (430206); N10, N11, extraction trace, readability resolved; Q22 verified as load-bearing contradiction (N12: W2/cost(3)/does-not-turn-back vs continuous path; Finding 2 conditionally re-opened); Q23 verified (N13); N14 pump upkeep fiction vs rules; N15, N16; verdict unchanged; r5-r1 retained
111
285925 Anonymous 2026-09-06 18:57:35
REV103 r1: present-tense review of DES103 r3 (Design Document r9, fb6b6d) on per-beat ledgers rebuilt from the rules; PMR002 1, 2, 4 met on the page, 3 met on World r16 but not yet lifted; verdict revise, one short pass: REV103-1 %A712 leftover sentence and two ledger cells, -2 collection rule disobeyed by both scenes, -3 %A711 Fix ending contradicts World r16 and %A74's two-cable model, -4 three stale sentences; REV102-13 resolved; REV102 r6 moved to Archive/REV102
112
Superseded reviews: [REV102 r6](/Hold%20The%20Flood/Design%20Review/Archive/REV102#rev102-r6-retained-verbatim-superseded-by-rev103-r1) · [r5](/Hold%20The%20Flood/Design%20Review/Archive/REV102#rev102-r5-retained-verbatim-superseded-by-rev102-r6) · [r4](/Hold%20The%20Flood/Design%20Review/Archive/REV102#rev102-r4-retained-verbatim-superseded-by-rev102-r5) · [r3](/Hold%20The%20Flood/Design%20Review/Archive/REV102#rev102-r3-retained-verbatim-superseded-by-rev102-r4) · [r2](/Hold%20The%20Flood/Design%20Review/Archive/REV102#rev102-r2-retained-verbatim-superseded-by-rev102-r3) · [r1](/Hold%20The%20Flood/Design%20Review/Archive/REV102#rev102-r1-retained-verbatim-superseded-by-rev102-r2) · [REV101 r8](/Hold%20The%20Flood/Design%20Review/Archive#rev101-r8-retained-verbatim-superseded-by-rev102-r1) and earlier on the REV101 archive.
a89227 Anonymous 2026-09-06 17:26:22
REV101 r6: re-review Design r3 (0b4039) and WLD101 r5/r6 (430206); N10, N11, extraction trace, readability resolved; Q22 verified as load-bearing contradiction (N12: W2/cost(3)/does-not-turn-back vs continuous path; Finding 2 conditionally re-opened); Q23 verified (N13); N14 pump upkeep fiction vs rules; N15, N16; verdict unchanged; r5-r1 retained
113
4dde90 Anonymous 2026-09-06 17:59:37
REV102 r1: independent critique of Design Document draft r2 (c4ad51); verdict revise, one bounded pass then owner packet; five issues: tier-two gate open by default and pages crossed (adopt WLD r10 map), tier-three key is an item gate, coil-lit vs panel-lit beacon invisible (Q32), culvert joins one dock or two, withdrawal press bound unstated; EXT102 X10/X11 conceded as timing, X13 answered by r2; REV101 r8 moved to Archive
114
| Finding | Raised in | Status |
bb6871 Anonymous 2026-09-06 17:38:01
REV101 r7: re-review Design r4/r5 (42f653, b030c9) and WLD101 r7 (fa3eb1); N12-N15 resolved (beacon-sight rule, both pages), Finding 2 closed again, N11 reading reversed and re-checked; N17 added (surge-split rule: stale coil sentence, unplaced valve); editor split verified byte for byte and current+archive convention adopted; r6 moved to Archive; index updated
115
| --- | --- | --- |
285925 Anonymous 2026-09-06 18:57:35
REV103 r1: present-tense review of DES103 r3 (Design Document r9, fb6b6d) on per-beat ledgers rebuilt from the rules; PMR002 1, 2, 4 met on the page, 3 met on World r16 but not yet lifted; verdict revise, one short pass: REV103-1 %A712 leftover sentence and two ledger cells, -2 collection rule disobeyed by both scenes, -3 %A711 Fix ending contradicts World r16 and %A74's two-cable model, -4 three stale sentences; REV102-13 resolved; REV102 r6 moved to Archive/REV102
116
| REV101 Findings 1–5, Secondary 1–5, N1–N17 | REV101 | Resolved, closed, or delivered |
117
| REV102-1 to -12 | REV102 | Resolved at DES102 r3 – DES103 r2 |
118
| REV102-13 — the arc: undrawn, unplayed, cost unstated | REV102 r5 | **Resolved at DES103 r3 (r9)**: two drawn loadouts, fuel policy, §13 burst, §14 row |
119
| PMR002 1 (signature/routing), 2 (space and charge), 4 (market wording) | PM | **Met in r9** (2 with REV103-1, -2) |
120
| PMR002 3 (finale) | PM | Met on World r16; document lags — REV103-3 |
121
| **REV103-1** — §12's leftover sentence and two ledger cells | REV103 r1 | **Open** |
122
| **REV103-2** — collection rule vs both scenes | REV103 r1 | **Open** |
123
| **REV103-3** — §11 endings vs World r16 and §4 | REV103 r1 | **Open** |
124
| **REV103-4** — three stale sentences | REV103 r1 | **Open** |
125
126
## PM report — REV103 r1
127
128
- **Task:** REV103. **Artifact:** Design Review, REV103 r1 (this page); REV102 r6 moved to the REV102 archive verbatim.
129
- **Reviewed:** Design Document fb6b6d in full; World and Mystery 812fd6; PMR002 closing and Tasks ab97dc. Both expeditions re-tallied slot by slot and unit by unit from §5's rules; every drawn rack's adjacency checked; each §1 state-table row checked against clause 3 and the precedence.
130
- **Changed decisions:** none by this role.
131
- **Evidence:** the two ledger tables above; the quoted sentences. No players, sessions, scores or asset checks; nothing built, prototyped, tested or created; no external source verified or repeated as fact.
132
- **Verdict:** revise — one short pass (REV103-1 to -4: one deletion, one sentence, one lift from the world page, three housekeeping lines). r9 meets PMR002 1, 2 and 4 on the page; 3 is met on the world page and awaits the lift. No verdict is offered on r10 before it exists.
133
- **Remaining risk:** the two pages diverging again on the finale if §11 is rewritten rather than lifted; the ownership rule in r3/r12 covers it.
134
- **Next handoff:** lead — r10 with REV103-1 to -4, lifting World r16's chain and endings verbatim; PM — the full review PMR002 says later revisions require. I review r10 when it exists. **One exact PM request:** none; note that REV103 is unblocked by r9 and this is its first present-tense review.