Blame

0b1275 Anonymous 2026-09-07 17:26:34
PM restart setup: define first design milestone and acceptance criteria
1
# Hold The Horde — Design Plan
2
a431be Anonymous 2026-09-15 13:30:20
Record completed combat and reading path; forecast moving-scan design
3
You leave home with a modest rig, fight through a growing horde, discover a powerful interaction between your equipment and the station, and return with something that changes the next expedition. That sequence must be exciting on the third trip as well as the first.
126e8a Anonymous 2026-09-09 13:05:21
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
4
a431be Anonymous 2026-09-15 13:30:20
Record completed combat and reading path; forecast moving-scan design
5
## The current design
126e8a Anonymous 2026-09-09 13:05:21
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
6
a431be Anonymous 2026-09-15 13:30:20
Record completed combat and reading path; forecast moving-scan design
7
The owner chose fresh hordes each expedition and regular combat growth with larger transformations. Permanent changes and physically carried property remain, while temporary power resets on returning home. The [Owner Brief](/Hold%20The%20Flood/Brief) records the requirements.
126e8a Anonymous 2026-09-09 13:05:21
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
8
a431be Anonymous 2026-09-15 13:30:20
Record completed combat and reading path; forecast moving-scan design
9
The main reading path now begins with [The Game](/Hold%20The%20Flood/The%20Game), follows [three expeditions](/Hold%20The%20Flood/Expedition%20Proposal), returns to [the people aboard](/Hold%20The%20Flood/Coming%20Home), and opens into [discovery in the changing station](/Hold%20The%20Flood/Connecting%20The%20Station). [Hordes and Builds](/Hold%20The%20Flood/Hordes%20and%20Builds) explains the current examples; [Build Comparison](/Hold%20The%20Flood/Build%20Comparison) presents alternative controls and payoffs for owner reaction.
126e8a Anonymous 2026-09-09 13:05:21
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
10
a431be Anonymous 2026-09-15 13:30:20
Record completed combat and reading path; forecast moving-scan design
11
Five proposal packages completed review and response today: builds/expeditions, hospital story/survival, regular growth on a renewed route, a second route state after permanent source seals, and the six-page reading path. [Combat Rules](/Hold%20The%20Flood/Combat%20Rules) and the room/encounter references describe the two concrete route states. They preserve completed work while giving fresh opposition a physical route. Other seal combinations and shifted layouts remain design work.
126e8a Anonymous 2026-09-09 13:05:21
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
12
a431be Anonymous 2026-09-15 13:30:20
Record completed combat and reading path; forecast moving-scan design
13
The new Ricochet and Gravity mechanisms remain proposed replacements for parts of the detailed build rules. The [hospital-story alternatives](/Hold%20The%20Flood/Hospital%20Story%20Directions) remain revisable. Completed review does not select them for the owner or establish fun, balance or duration.
126e8a Anonymous 2026-09-09 13:05:21
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
14
a431be Anonymous 2026-09-15 13:30:20
Record completed combat and reading path; forecast moving-scan design
15
## Next: make the moving scan concrete
126e8a Anonymous 2026-09-09 13:05:21
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
16
a431be Anonymous 2026-09-15 13:30:20
Record completed combat and reading path; forecast moving-scan design
17
The moving lamp promises a strong sequence: pursue an apparent constellation, fight alongside its carriage, earn a spectacular build release, and discover a bridge that changes the next trip. Systems is placing that sequence in the actual station, with one proposed location, visible sources, growth before the climax, a usable withdrawal and evidence that supports the discovery. Added geometry and content costs must be explicit.
126e8a Anonymous 2026-09-09 13:05:21
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
18
a431be Anonymous 2026-09-15 13:30:20
Record completed combat and reading path; forecast moving-scan design
19
One focused critique and one author response belong to this bounded outcome. The current reader pages remain stable while the separate proposal is prepared. PM is also checking the outside-edit bundle for lost meaning; this preservation work does not reopen every accepted design debate. States and estimates are on [Progress](/Hold%20The%20Flood/Progress).
5f2ffe Anonymous 2026-09-10 10:55:47
Record completed discovery/home correction and active combat/build batch
20
a431be Anonymous 2026-09-15 13:30:20
Record completed combat and reading path; forecast moving-scan design
21
## What makes a proposal useful
e17a00 Anonymous 2026-09-10 12:08:00
Record completed combat/build proposals and active room/information work with revised forecasts
22
a431be Anonymous 2026-09-15 13:30:20
Record completed combat and reading path; forecast moving-scan design
23
The reader can picture what the player wants, sees and does. Pressure develops through meaningful horde combat. A growth choice changes the next movement decision; a build breakthrough creates a visible payoff; quiet lets a discovery change an understanding or future action.
a0f39d Anonymous 2026-09-10 12:54:09
Close room and information batch and schedule horde-scale builds and successive expeditions
24
a431be Anonymous 2026-09-15 13:30:20
Record completed combat and reading path; forecast moving-scan design
25
Builds differ in behavior, attention and cost. Their strongest results should feel constructed and discovered. Practical limits should support interesting choices without automatically suppressing powerful combinations. Each substantial scene identifies a plausible way its intended pleasure could fail.
8c10c2 Anonymous 2026-09-10 12:39:39
Record completed room and information review and earlier correction forecast
26
a431be Anonymous 2026-09-15 13:30:20
Record completed combat and reading path; forecast moving-scan design
27
Readable prose leads with an example and explains necessary terms where they arise. Detailed references support the explanation. Discussion history and execution records stay outside game descriptions. Written consistency helps us design; later evidence is still needed to establish the experience.
01555d Anonymous 2026-09-10 13:59:59
Close build/expedition batch and forecast story/survival work
28
a431be Anonymous 2026-09-15 13:30:20
Record completed combat and reading path; forecast moving-scan design
29
## Remaining design work
126e8a Anonymous 2026-09-09 13:05:21
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
30
a431be Anonymous 2026-09-15 13:30:20
Record completed combat and reading path; forecast moving-scan design
31
- Extend renewal and regular growth across worthwhile expeditions with different goals and crowd patterns.
32
- Reconcile selected build directions with their detailed mechanics while retaining expressive combinations.
33
- Develop the hospital, alien setting, people, short rescues, languages and story consequences through concrete scenes.
34
- Decide what completing the station connection changes and cost a content model that can support the intended journey.
35
- Continue the readability pass through supporting articles, preserving useful outside edits and resolving actual contradictions.
0b1275 Anonymous 2026-09-07 17:26:34
PM restart setup: define first design milestone and acceptance criteria
36
a431be Anonymous 2026-09-15 13:30:20
Record completed combat and reading path; forecast moving-scan design
37
Use [Open Decisions](/Hold%20The%20Flood/Open%20Decisions) as an overlapping issue index. Its recommendations remain proposals; the team handles routine consistency and brings consequential creative alternatives to the owner. Development, simulations, playtests and game assets await separate authorization.