Blame

0b1275 Anonymous 2026-09-07 17:26:34
PM restart setup: define first design milestone and acceptance criteria
1
# Hold The Horde — Design Plan
2
8743b3 Anonymous 2026-09-09 18:39:18
Resume owner-directed correction; replace obsolete status layers with current plan and forecast
3
We are correcting the design so that ordinary play delivers a discovery-focused survivorslike: massed enemies, expressive builds, urgency, surprising discoveries and a growing home. The owner resumed work on 9 September after finding that the earlier design was too small and deliberate, difficult to read, and weak on the player's experience.
126e8a Anonymous 2026-09-09 13:05:21
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
4
8743b3 Anonymous 2026-09-09 18:39:18
Resume owner-directed correction; replace obsolete status layers with current plan and forecast
5
## The next delivery
126e8a Anonymous 2026-09-09 13:05:21
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
6
8743b3 Anonymous 2026-09-09 18:39:18
Resume owner-directed correction; replace obsolete status layers with current plan and forecast
7
The owner will receive a short revised pitch, one representative expedition and three contrasting build examples. The expedition must let a reader picture preparation, crowd pressure, a build breakthrough, a consequential discovery, a climax and relief. The builds must show visible behavior, player choices, growth and an earned payoff.
126e8a Anonymous 2026-09-09 13:05:21
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
8
8743b3 Anonymous 2026-09-09 18:39:18
Resume owner-directed correction; replace obsolete status layers with current plan and forecast
9
Systems writes the horde and build proposal. The Design Lead writes the pitch and expedition independently. The Reviewer saves criteria before reading either draft, then gives one combined critique. PM reads the actual proposals, resolves material conflicts through one bounded author response, and brings the resulting direction to the owner. Dates and actual worker states are on [Progress](/Hold%20The%20Flood/Progress).
126e8a Anonymous 2026-09-09 13:05:21
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
10
8743b3 Anonymous 2026-09-09 18:39:18
Resume owner-directed correction; replace obsolete status layers with current plan and forecast
11
## What makes the proposal ready for reaction
126e8a Anonymous 2026-09-09 13:05:21
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
12
8743b3 Anonymous 2026-09-09 18:39:18
Resume owner-directed correction; replace obsolete status layers with current plan and forecast
13
- The ordinary expedition, not just an exceptional scene, is recognizably a survivorslike with massed enemies and consequential movement.
14
- Three builds create substantially different visible results and choices. Their power is understandable as something the player constructed and developed.
15
- Discovery changes what the player understands or can attempt. At least one substantial payoff goes beyond completing maintenance.
16
- The explanation connects events and mechanics to intended fun, challenge, pressure, release and emotion, and names credible ways those experiences could fall flat.
17
- A first-time reader can follow the proposal without chat history, unexplained codes or a tour through technical reference pages.
18
- The proposal respects the [Owner Brief](/Hold%20The%20Flood/Brief) and labels new choices as proposals. Agreement between agents and coverage counts do not establish readiness.
126e8a Anonymous 2026-09-09 13:05:21
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
19
8743b3 Anonymous 2026-09-09 18:39:18
Resume owner-directed correction; replace obsolete status layers with current plan and forecast
20
## Rewrite the wiki around the game
126e8a Anonymous 2026-09-09 13:05:21
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
21
8743b3 Anonymous 2026-09-09 18:39:18
Resume owner-directed correction; replace obsolete status layers with current plan and forecast
22
The reading path will run from the promise and an expedition to combat/builds, discovery and the changing station, people/home/story, and finally detailed reference. Main articles begin with player actions and examples. Each rule has one owning location; useful dependencies are linked and unfamiliar terms defined where introduced. Older debates and versions stay in revision history. Source hashes, review exchanges and delivery records stay in project administration or chat.
126e8a Anonymous 2026-09-09 13:05:21
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
23
8743b3 Anonymous 2026-09-09 18:39:18
Resume owner-directed correction; replace obsolete status layers with current plan and forecast
24
PM is preparing navigation and removing obsolete management layers now. Broader game-page rewrites follow the selected direction so that cleaner prose also describes a better game. Existing detailed samples are preserved for possible reuse; they do not constrain the correction.
126e8a Anonymous 2026-09-09 13:05:21
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
25
8743b3 Anonymous 2026-09-09 18:39:18
Resume owner-directed correction; replace obsolete status layers with current plan and forecast
26
## Scope and next decision
0b1275 Anonymous 2026-09-07 17:26:34
PM restart setup: define first design milestone and acceptance criteria
27
8743b3 Anonymous 2026-09-09 18:39:18
Resume owner-directed correction; replace obsolete status layers with current plan and forecast
28
This is design work. The selected engine is Unity and intended platform is Steam. Implementation, simulations, playtests and game assets await their relevant owner authorization. The hospital/godhood story remains a revisable leading proposal. The five earlier owner questions remain open; silence settles none of them.
a6ddd7 Anonymous 2026-09-08 13:07:35
Prioritise owner decisions and record recovered reviewer handoff
29
8743b3 Anonymous 2026-09-09 18:39:18
Resume owner-directed correction; replace obsolete status layers with current plan and forecast
30
After the owner reacts to the corrected proposal, PM will assign the main-article rewrites and update the detailed-campaign estimate. Additional permanent agents will be proposed only for a concrete independent workload. The earlier readiness declaration is withdrawn; the [readiness page](/Hold%20The%20Flood/V1%20Readiness) records the current decision.