Blame

0b1275 Anonymous 2026-09-07 17:26:34
PM restart setup: define first design milestone and acceptance criteria
1
# Hold The Horde — Design Plan
2
a6ea6d Anonymous 2026-09-15 11:53:49
Align resumed design work and confirmed expedition choices
3
You leave home with a modest rig, fight through a growing horde, discover a powerful interaction between your equipment and the station, and return with something that changes the next expedition. The design must make that sequence exciting on the third trip as well as the first.
126e8a Anonymous 2026-09-09 13:05:21
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
4
a6ea6d Anonymous 2026-09-15 11:53:49
Align resumed design work and confirmed expedition choices
5
## The current correction
126e8a Anonymous 2026-09-09 13:05:21
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
6
a6ea6d Anonymous 2026-09-15 11:53:49
Align resumed design work and confirmed expedition choices
7
The owner chose fresh hordes each expedition and regular combat growth with larger transformations. Permanent changes and physically carried property remain, while temporary power resets on returning home. The [Owner Brief](/Hold%20The%20Flood/Brief) records the complete requirements.
126e8a Anonymous 2026-09-09 13:05:21
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
8
2782f4 Anonymous 2026-09-15 12:10:33
Continue from reviewed proposals into concrete growth and route design
9
The first reviewed packet contains two connected proposals:
126e8a Anonymous 2026-09-09 13:05:21
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
10
a6ea6d Anonymous 2026-09-15 11:53:49
Align resumed design work and confirmed expedition choices
11
- [Build Comparison](/Hold%20The%20Flood/Build%20Comparison): three builds with different ordinary play, growth, manual specials, physical costs and discoveries using their parts in the station.
12
- [Expedition Proposal](/Hold%20The%20Flood/Expedition%20Proposal): three successive outings with fresh growth, meaningful hordes, changing objectives and permanent progress.
126e8a Anonymous 2026-09-09 13:05:21
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
13
008a57 Anonymous 2026-09-15 12:53:25
Record completed combat package and next expedition case; forecast F2.5
14
Both proposals completed an independent critique, one response per author and PM checks. They are ready for owner reaction; the new build exceptions still need detailed reconciliation. The [combat growth and renewed route](/Hold%20The%20Flood/Combat%20Rules) also completed review and integration into the room, encounter and survival references. The next concrete case is fresh combat after all four enemy sources on that route are permanently sealed: the player must keep the benefit of the seals and the open shortcut. In parallel, the [hospital-story](/Hold%20The%20Flood/Hospital%20Story%20Directions) and [survival/loadout](/Hold%20The%20Flood/Survival%20And%20Loadout) proposals completed their review and response. They are ready for owner reaction; the alternative story explanations remain revisable. Combat design and its supporting pages continue while the owner chooses which build direction to deepen first. Actual task states and delivery estimates are on [Progress](/Hold%20The%20Flood/Progress).
126e8a Anonymous 2026-09-09 13:05:21
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
15
a6ea6d Anonymous 2026-09-15 11:53:49
Align resumed design work and confirmed expedition choices
16
## What makes a proposal ready
126e8a Anonymous 2026-09-09 13:05:21
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
17
a6ea6d Anonymous 2026-09-15 11:53:49
Align resumed design work and confirmed expedition choices
18
The reader must be able to picture ordinary play: the player's immediate goal, movement, decisions, growing pressure, breakthrough and relief. Hordes and ridiculous builds must be meaningful throughout the expedition. Discovery must change an understanding or a later action, with at least one payoff larger than routine maintenance.
126e8a Anonymous 2026-09-09 13:05:21
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
19
a6ea6d Anonymous 2026-09-15 11:53:49
Align resumed design work and confirmed expedition choices
20
The builds must differ in behavior and attention, not just appearance or damage. Their strongest results should feel constructed and discovered. Costs must create interesting decisions rather than automatically suppressing powerful combinations. A proposal should identify one plausible way its intended pleasure could fail.
5f2ffe Anonymous 2026-09-10 10:55:47
Record completed discovery/home correction and active combat/build batch
21
a6ea6d Anonymous 2026-09-15 11:53:49
Align resumed design work and confirmed expedition choices
22
Readable prose leads with the player and explains necessary terms in context. Each rule has one owning article; detailed references support the explanation. Review history and execution records stay outside game descriptions. Written consistency is useful but cannot establish fun, balance or campaign duration.
e17a00 Anonymous 2026-09-10 12:08:00
Record completed combat/build proposals and active room/information work with revised forecasts
23
a6ea6d Anonymous 2026-09-15 11:53:49
Align resumed design work and confirmed expedition choices
24
## After the core proposal
a0f39d Anonymous 2026-09-10 12:54:09
Close room and information batch and schedule horde-scale builds and successive expeditions
25
008a57 Anonymous 2026-09-15 12:53:25
Record completed combat package and next expedition case; forecast F2.5
26
The selected renewal and regular-growth rules are aligned in the main combat, persistence, equipment and encounter references. One real route now shows that growth with open sources. Next, resolve the fully sealed version and reconcile the selected build directions with their detailed mechanics. Develop the hospital and alien setting, characters, short rescues, language discoveries and story consequences through concrete scenes alongside that combat work. Present the owner with consequential creative alternatives; handle routine consistency and readability within the team.
8c10c2 Anonymous 2026-09-10 12:39:39
Record completed room and information review and earlier correction forecast
27
a6ea6d Anonymous 2026-09-15 11:53:49
Align resumed design work and confirmed expedition choices
28
Use [Open Decisions](/Hold%20The%20Flood/Open%20Decisions) as the issue index. Its recommendations remain proposals, and its categories overlap. The team should not wait for fourteen separate owner answers or assume that every criticized rule needs wholesale replacement.
01555d Anonymous 2026-09-10 13:59:59
Close build/expedition batch and forecast story/survival work
29
a6ea6d Anonymous 2026-09-15 11:53:49
Align resumed design work and confirmed expedition choices
30
The full reading path runs from [The Game](/Hold%20The%20Flood/The%20Game) through an expedition and builds, into the changing station and its discoveries, then home, people and story. Supporting articles will be revised from their current live text, preserving the outside review's useful cleanup.
126e8a Anonymous 2026-09-09 13:05:21
Owner570 feedback pause; preserve completed first-pass564 and stopped drafts
31
a6ea6d Anonymous 2026-09-15 11:53:49
Align resumed design work and confirmed expedition choices
32
## Open questions
0b1275 Anonymous 2026-09-07 17:26:34
PM restart setup: define first design milestone and acceptance criteria
33
008a57 Anonymous 2026-09-15 12:53:25
Record completed combat package and next expedition case; forecast F2.5
34
- The current regular-growth rhythm and milestone conditions are a reversible proposal. How well will they sustain excitement across other expeditions?
35
- After all four enemy sources on the sample route are permanently sealed, where does a worthwhile fresh horde fit, and what advantage does the player retain?
a6ea6d Anonymous 2026-09-15 11:53:49
Align resumed design work and confirmed expedition choices
36
- Which story and rescue consequences should be offered to the owner next?
37
- What does completing the station connection do, and what content scope can support the intended journey?
38
- The rules and numbers are proposals; practical testing awaits the owner's development-phase authorization.