Blame

7c489f Anonymous 2026-09-09 18:39:19
Resume owner-directed correction; replace obsolete status layers with current plan and forecast
1
# Hold The Horde — Design Readiness
a96b0b Anonymous 2026-09-09 12:11:59
Outcome 38: whole-v1 coherence and readiness — 15-domain matrix with checked vs linked interfaces, traced path, four bounded defects with before/after repairs, decision register and separate M2/M3 dispositions
2
7c489f Anonymous 2026-09-09 18:39:19
Resume owner-directed correction; replace obsolete status layers with current plan and forecast
3
**Open for correction, 9 September 2026.** The earlier acceptance of the core design and first-pass wiki has been withdrawn. The owner found three blocking problems: the design underdelivers the survivorslike genre, the wiki is difficult for a human reader, and fun, pressure, spectacle and emotional experience are inadequately developed.
a96b0b Anonymous 2026-09-09 12:11:59
Outcome 38: whole-v1 coherence and readiness — 15-domain matrix with checked vs linked interfaces, traced path, four bounded defects with before/after repairs, decision register and separate M2/M3 dispositions
4
575dd2 Anonymous 2026-09-09 19:15:23
Record the corrected proposal ready for owner reaction and remaining wiki work
5
The revised pitch, representative expedition and three build examples are now ready for owner reaction after one combined critique, bounded author responses and PM verification. The broader wiki rewrite remains unfinished. The next readiness decision must address the owner's objections through concrete player experiences and readable current articles. Earlier coverage and consistency checks remain preparation evidence.
a96b0b Anonymous 2026-09-09 12:11:59
Outcome 38: whole-v1 coherence and readiness — 15-domain matrix with checked vs linked interfaces, traced path, four bounded defects with before/after repairs, decision register and separate M2/M3 dispositions
6
7c489f Anonymous 2026-09-09 18:39:19
Resume owner-directed correction; replace obsolete status layers with current plan and forecast
7
The [Design Plan](/Hold%20The%20Flood/Design%20Plan) states the acceptance criteria. [Progress](/Hold%20The%20Flood/Progress) holds the schedule and actual worker states. Earlier assessments remain in this page's revision history.