Hold The Horde — Progress

Updated 15 September. The owner has chosen fresh hordes each expedition and regular growth through fighting, with larger transformations. Permanent changes and carried property remain; temporary combat power resets whenever you return home.

Ready to read

Twelve proposal or editorial packages have been completed today. The latest finished at 15:44 Jerusalem time: five readable survivor portraits and their fifteen scenes, with a rescue-retry inconsistency corrected. The separate short-rescue choice remains open.

Start with The Game, continue through three expeditions into the observation ward, then Coming Home and Discovery in a Changing Station. For combat, follow Hordes and Builds into Three Ways to Break a Horde.

Completed package Actual time today What changed
59–61 — Builds and three expeditions 12:08 Different movement and payoff proposals; successive trips pursue different discoveries
56–58 — Hospital story and survival 12:32 Two possible core mysteries; comparable loadouts with a visible cost for the heavier kit
62–63 — Regular growth and renewed combat 12:45 An ordinary improvement before a major breakthrough, with crowds and discovery quiet placed along an existing route
64–65 — Combat after permanent seals 13:26 A second route state retains the seals and shortcut while enemies arrive from a distant open source; room and encounter references agree
66–67 — Six main reading pages 13:26 Player scenes lead; unfamiliar terms are explained; onward links work; obsolete clearing and growth claims are removed
68 — Moving scan and bridge 14:01 A rising fight through Cable Junction leads to a local optical discovery and usable bridge; living returns preserve the shortcut, while changed alignments have a visible rescan route
69 — Short rescue and death comparison 14:20 A person’s records, a short horde crossing and a homecoming; two unselected failure approaches with explicit protection and retry costs
70 — Completing the station 14:36 The final join secures the last piece of a dependable home; an alternative adds optional departure with the whole station, with its production and story costs explicit
71 — Campaign scope comparison 14:56 A 40-room reference versus 36 denser rooms, with named losses and retained work; current mechanism counts aligned and old hour allowances clearly qualified
72 — Language journal 15:06 Capture, compare and test a reading, with both language examples and the value of old records explained in place
73 — Whole campaign 15:26 The campaign from docking to deepest discoveries, with the horde/build/bridge climax, human consequences and open endings explained
74 — People and short rescues 15:44 Five people and their fifteen scenes, with their wishes, disagreements and later changes of belief explained before the shared rules

Each package received one focused critique, one response and PM checks. These are completed design proposals, not tested gameplay. The new Ricochet and Gravity controls remain proposed alternatives to the current detailed equipment rules. The two renewed-route examples do not yet cover every shifted layout or combination of permanent seals.

Working now

Outcome Owner and current state Next delivery, Jerusalem time
75 — Equipment reference Draft submitted at 15:48; independent review is working through the twelve parts, combinations and rules Draft delivered 15:48; reviewed page 16:30, range 16:00–17:00
38 — Full-design readiness, still reopened Outside-edit preservation audit completed; eleven factual/reference corrections published. Supporting readability and broader experience coverage remain Readiness reassessment with the coherent wiki pass, target 23 September, range 21–28 September

Read the scene in Hordes and Builds, with placement in Moving Scan Expedition. Its added rail, viewing bay, bridge and receiver make a fourteenth proposed major mechanism; physical fit and fun remain untested. The current proposals tackle two experience risks: making a short rescue feel like helping a person, and making the final station connection produce a lasting, perceptible payoff.

The tracker contains 75 outcomes: 71 preparation outcomes closed, 1 current design outcome, 1 readiness assessment reopened and 2 parked. The completed preservation audit and its corrections belong within outcome 38; they do not close overall readiness. These counts are not a percentage of the finished game. Outcomes 39–40 remain parked and unaccepted pending the core corrections.

The original Claude Reviewer received the earlier assignment automatically but stopped at a monthly spend limit at 13:03. Temporary GPT support completed that review. The Lead was absent from the same directory check; availability will be checked again before a future handoff. No new permanent agent or manual message forwarding is needed for the current assignments.

Delivery forecast

Forecast F2.20, updated 15 September. Dates assume work continues today and about five further active working days for the first full pass.

Milestone Target Plausible range Completion means
Reviewed sealed-source expedition Completed today 13:26 Earlier than 15:00 target Proposal, critique, response and integration into its owning references
Clear six-page reading path Completed today 13:26 Earlier than 16:00 target Main journey and combat branch revised and checked against current rules
Moving-scan proposal Delivered 13:39 Earlier than 14:15 target Concrete location, rising fight, build climax, discovery and next trip
Reviewed moving-scan proposal Completed 14:01 Earlier than 15:30 target One critique, one response and verified integration across six articles
Outside-edit preservation audit Completed 13:47; follow-up corrections 13:52 Earlier than 14:15 report target All 58 captured changes inspected with provenance; identified factual/preservation defects corrected
Short-rescue proposal Delivered 14:03 Earlier than 14:30 target One personal rescue scene and two comparable failure approaches
Reviewed short-rescue proposal Completed 14:20 Earlier than 15:15 target One critique and response; owner comparison published, shared rules await selection
Station-completion comparison Completed 14:36 Earlier than 16:00 target Two reviewed consequences of the last connection, with the next home visit and expedition
Costed campaign comparison Completed 14:56 Earlier than 17:00 target Named retained, moved and removed experiences; current counts and historical allowance distinguished
Readable language journal Completed 15:06 Earlier than 16:15 target Existing journal explanation leads with player use and discovery, with current rules preserved through review
Readable campaign overview Completed 15:26 Earlier than 16:00 target Opening through deeper and optional play shows horde growth, discoveries and people, with current proposals distinguished
Readable cast and rescue map Completed 15:44 Earlier than 17:00 target Five people and fifteen scenes lead with their choices and changing relationships; current waiting places and unresolved rescue choices remain clear
Readable equipment reference Today 16:30 16:00–17:00 A reader can picture the twelve parts and their combinations, find actual costs and distinguish current mechanisms from proposed alternatives
Coherent revised design wiki 23 September 21–28 September Readable core and supporting rules aligned; consequential choices explicit
Full detailed campaign design 24 November 3 November–22 December Proposed progression, content, mysteries, ending paths and production scope developed across the campaign

Near-term estimates have moderate confidence. The full-wiki estimate has low confidence. The campaign date has very low confidence and remains a planning allowance pending a fresh content estimate. None promises development, validated fun or the desired number of playable hours; those require a separately authorized phase.

The pre-pause targets were 15 September for the readable wiki and 17 November for detailed campaign design. Five paused calendar days and the outside review's core-loop findings moved those dates. Today's first packet finished at 12:08 against a revised 13:00 target; subsequent packages finished at 12:32, 12:45 and 13:26. F2.20 records the campaign overview completed at 15:26 and the cast page at 15:44. The equipment draft arrived at 15:48, ahead of its 16:30 target. Review is working; with the draft available early, the reviewed-page target moves from 17:30 to 16:30. The critique and single author response still need completion. The cast review found that death before a rescue retry must preserve the current shelter, and the relevant pages now agree. The home-loop page also now correctly says that either return brings fresh hordes next expedition. The journal finished at 15:06. The reviewed scope comparison and factual reference alignment finished at 14:56. The station-completion comparison finished at 14:36. The rescue comparison was completed at 14:20. The moving scan and preservation audit are complete. The overall dates remain unchanged because supporting design and creative choices still need work. Earlier estimates remain in revision history and the forecast checkpoint.

What still needs work

  • Broader expeditions must sustain fresh combat, meaningful growth and different discoveries around persistent changes.
  • Build combinations need distinct decisions and room for surprising interactions. The new alternatives still need selection and detailed integration.
  • Rooms, people, languages and story consequences need concrete scenes with emotional and discovery payoffs.
  • Supporting pages need the same clarity as the entry path. The captured outside-edit bundle has been audited and its identified factual defects corrected; that preservation check does not establish that every page is easy for a human to read.
  • Full readiness requires a coherent player journey and honest scope, beyond internally consistent tables.

Owner choices

The two immediate combat questions are answered in the Owner Brief. The current concrete choice is in Rescue Under Pressure: if the astronaut dies after Yeva starts crossing the prepared short route, does she finish and reach the ship, or take shelter and require a new attempt after the shift? PM recommends finishing; the stronger failure/retry case and both safety exceptions are explained. The owner has been asked directly; no answer is inferred. The first survivor and wider survivor mortality remain open.

The earlier build-priority question also remains: which direction to deepen first. It does not discard the others or approve every proposed rule.

Completing The Station is ready to compare: finish securing a dependable home, or add an optional departure carrying the entire place. This is prepared for a subsequent owner choice; the rescue question above remains the current question. The campaign scope comparison is reviewed and ready for subsequent reaction; neither size is selected, and existing story alternatives remain available for reaction. Open Decisions is the wider issue index; its recommendations remain proposals. Its fourteen categories are not fourteen answers needed before work can continue.

0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9