# Hold The Horde — Production Scope
2
3
**Status: planning proposal.** The game uses Unity and Steam and favours free existing assets, as the [Owner Brief](/Hold%20The%20Flood/Brief) requires. No game size, production budget, asset, purchase or development phase is selected here. The SMALL band below is a costing sample; it is not a recommendation to replace the owner's ambition with a short game. Its purpose is to expose what we must actually author and what repeating a room does not save.
4
5
## What the inventory counts
6
7
The [Whole Game Outline](/Hold%20The%20Flood/Whole%20Game%20Outline) offers three bands. Keep reusable definitions, placed instances, investigations and scenes separate. A discovery objective can use an existing room, trap, survivor and language chain; that intersection is not five additional encounters.
8
9
| Content unit | SMALL sample | TARGET / STRETCH | Work that reuse does not remove |
10
|---|---:|---:|---|
11
| Regions | 4 | 7 / 10 | A regional purpose, entry/return opportunities, pressure and discovery progression |
12
| Reusable room modules | 24 | 45 / 70 | Legible internal geometry, accessible controls, fixture and entrance variants |
13
| Placed playable room instances | 40 | 80 / 130 | Stable identity, actual contents, valid interfaces and recovery in its permitted arrangements |
14
| Expedition objectives | 12 | 24 / 40 | Entry condition, action, consequence, alternate access and later use |
15
| Proposed ship-repair assemblies | 4 | 7 / 10 | Acquisition/installation consequences; the optional departure premise remains unselected |
16
| Survivors and authored scenes | 5 people, 15 scenes | 9/45; 14/98 | Distinct motives, short rescue, home follow-through and bounded knowledge |
17
| Equipment definitions | 12 | 24 / 36 | Source, reusable behaviour, limitations and meaningful combinations; the first twelve briefs already exist |
18
| Ordinary / special enemy roles | 6 / 3 | 10/6; 14/9 | Distinct pressures, readable responses and combined encounters |
19
| Major set-pieces | 2 | 3 / 5 | Exceptional staging and recovery; hosted rooms/objectives remain the same units |
3f8896 Anonymous 2026-09-09 11:41:51
Refresh current scope ledger and unauthorized first evidence packet (chat 534)
20
| Mechanism families / major placed mechanisms | 5 / 13 | 9/24; 14/40 | Thirteen major instances need geometry, warnings, stages, persistence and rearming; fixed room services and ordinary joins remain separately owned interfaces |
0bbc44 Anonymous 2026-09-08 18:14:15
Add provisional finite inventory and remaining design scope, with overlap accounting and cost-cut alternatives
21
| Language chains across at least two languages | 4 | 8 / 12 | Evidence, alternatives, discriminating action, correction and useful transfer |
22
| Mystery or personal investigation chains | 4 | 7 / 11 | Causal evidence and consequences rather than additional exposition |
23
| Person-linked home projects | 5 | 9 / 14 | Voluntary contribution, an observable result, reclaim and personal consequence |
24
| Special connection challenges | 2 | 4 / 6 | Authored constraint/recovery problems, not the count of ordinary joins |
25
db6f85 Anonymous 2026-09-09 11:57:13
Respond once to focused scope37 critique and PM548 corrections
26
The current SMALL first pass is **4 regions / 24 modules / 40 rooms / 12 objectives / 4 ship assemblies / 5 people / 15 scenes / 12 equipment definitions / 6 ordinary + 3 special roles / 10 encounters including 2 setpieces / 5 mechanism families / 13 major placed mechanisms / 4 language + 4 story chains / 5 home projects / 2 special connection challenges**. These are prepared proposal counts, not an owner-selected game size. Thirteen is not every interactive object: R26/R33 service transformations, the R02/R03 board/rack, ordinary doors and join faces stay owned by their room/interface descriptions rather than becoming extra P-identities. [Campaign Evidence And State Crosswalk](/Hold%20The%20Flood/Campaign%20Evidence%20And%20State%20Crosswalk) closed under PM545 with **26 index entries** across the existing eight chains and fifteen scenes. They are deduplicated index rows, not 26 new objects or single captures; its L/S/A labels are local aliases and do not replace source ownership or established identities.
3f8896 Anonymous 2026-09-09 11:41:51
Refresh current scope ledger and unauthorized first evidence packet (chat 534)
27
0bbc44 Anonymous 2026-09-08 18:14:15
Add provisional finite inventory and remaining design scope, with overlap accounting and cost-cut alternatives
28
The 15 SMALL survivor scenes include rescue and home follow-through. Home-project scenes should be assigned within that ledger where possible; if an additional scene is necessary, record the increment instead of silently exceeding fifteen. Branches are variations of a named scene, but each materially different consequence still needs writing and state review.
29
30
Likewise, a language chain and a mystery chain may share evidence and an objective. Give the shared observation one content identity, then separately specify its linguistic inference and narrative consequence. A count of eight chains does not imply eight disjoint routes or eight extra objective sets. Conversely, calling two investigations the same chain cannot erase a distinct test or correction.
31
32
Forty instances from twenty-four modules means sixteen placements beyond one of each module. It does not mean sixteen free rooms. Each placement must earn its reuse with a different useful relationship, pressure, consequence or meaning; colour changes and new neighbours alone do not establish discovery depth. The all-station puzzle includes all forty actual playable instances under this sample. The two special challenges neither cap its ordinary joins nor prove that a valid full assembly exists.
33
34
The TARGET and STRETCH columns are alternatives, not extra counts to add to SMALL. Increasing instance or survivor counts cannot be converted directly into author-hours: branch interactions, clue dependencies and permitted arrangements can change the work. Nor can any of these counts establish 30/90/100–200 hours of play.
35
36
## A shared unit ledger
37
38
Before detailed authoring, every unit needs an owner, definition or instance identity, current status, dependencies, reuse links and one owning description. Design v1 needs a finite ledger and behavioural briefs; the later campaign specification fills in each placed instance, clue and scene through its actual state changes.
39
40
The outline's pressure-ledger expedition illustrates the accounting:
41
42
| Shared unit | Own once | Additional work belongs to |
43
|---|---|---|
44
| Sampling ward and its installed Impact Dynamo | One placed room and one part instance, using existing module/part definitions where appropriate | Placement specifies removal consequences; equipment specifies Dynamo behaviour |
45
| Valve sample/purge test and visitor destination evidence | One observation/action sequence, referenced by relevant objective and chains | Language specifies competing interpretations and correction; story specifies what the transfer evidence does and does not establish |
46
| Yeva's return conversation | One named cast scene, potentially one of the three in her arc | Cast specifies changed belief and dialogue intent; home specifies only any distinct project operation |
47
| Regional horde and mechanism | One hosted encounter with references to role/family definitions | Placement specifies geometry and timings; roster defines the creatures, information design defines presentation |
48
| A recorded result across death | The same evidence and world instances | State contract owns continuity; information design owns how historic evidence is displayed |
49
50
These are ledger relationships, not adoption of Yeva, that particular room or a guaranteed route. The [Regional Discovery Map](/Hold%20The%20Flood/Regional%20Discovery%20Map) must name actual objective links; this cost plan cannot fill them by assertion.
51
52
## Three depths of completion
53
54
**Complete wiki v1:** every major domain has a usable proposed or selected rule, consequential alternatives are dispositioned or explicitly provisional, and the finite inventory explains progression, rewards, cast, both languages, endings and interfaces. There must be enough concrete behaviour to expose missing links. A domain containing only a title or “TBD” fails this milestone.
55
25761e Anonymous 2026-09-08 18:21:00
Clarify v1 room and mechanism brief obligations and uniquely account for their remaining work
56
V1's room/mechanism inventory must contain actual briefs, not only count allocation:
57
58
| Unit | Minimum v1 output | Additional detailed-campaign work |
59
|---|---|---|
60
| Each of24 reusable modules | Proposed internal geometry, entrance/fixture relationships, available actions and intended discovery/pressure role | Full variants and compatible interface combinations, detailed cue/interaction placement and authored exceptional states |
61
| Each of40 placed rooms | Named identity/module, region and objective links, actual contents/reward, first-visit/revisit purpose, proposed access and recovery constraints | Exact per-instance placement, every selected branch/transient state and concrete consequences across permitted arrangements |
3f8896 Anonymous 2026-09-09 11:41:51
Refresh current scope ledger and unauthorized first evidence packet (chat 534)
62
| Each of13 major placed mechanisms | First-version geometry, warning, action/stages, reset/rearm and persistence boundary, usable alternative/recovery and linked discovery | Full variant/combined-encounter details, exact thresholds and exhaustive state/recovery paths |
25761e Anonymous 2026-09-08 18:21:00
Clarify v1 room and mechanism brief obligations and uniquely account for their remaining work
63
3f8896 Anonymous 2026-09-09 11:41:51
Refresh current scope ledger and unauthorized first evidence packet (chat 534)
64
A room brief may reference its module and a mechanism brief, but cannot omit its own distinguishing content. V1 retains Design Coverage's thirteen-major-mechanism obligation; the new allowance below makes it explicit. Detailed campaign work extends these accepted briefs rather than charging them again.
25761e Anonymous 2026-09-08 18:21:00
Clarify v1 room and mechanism brief obligations and uniquely account for their remaining work
65
0bbc44 Anonymous 2026-09-08 18:14:15
Add provisional finite inventory and remaining design scope, with overlap accounting and cost-cut alternatives
66
**Detailed campaign specification:** every approved placed room, mechanism, clue, scene, reward and ending branch has concrete entry/exit, observation, action, interruption, persistence and recovery behaviour. Shared definitions are referenced; instance-specific differences are authored. Precise tuning may still require later evidence. This is larger than a map of twelve objectives.
67
68
**Production and validation:** engine architecture, actual tools, runtime content, assets, integration, performance, accessibility testing and real-player evidence. These are a separate, currently unauthorised phase. Documentation completion does not establish a working or enjoyable game.
69
3f8896 Anonymous 2026-09-09 11:41:51
Refresh current scope ledger and unauthorized first evidence packet (chat 534)
70
## Current remaining v1 judgment
0bbc44 Anonymous 2026-09-08 18:14:15
Add provisional finite inventory and remaining design scope, with overlap accounting and cost-cut alternatives
71
3f8896 Anonymous 2026-09-09 11:41:51
Refresh current scope ledger and unauthorized first evidence packet (chat 534)
72
The prior **144–247 role-hour** envelope is retained as a **dated 8 September planning history**. It described work beginning before Regional25 through scope/handoff and combined authoring, review, response and PM integration. It was never a timesheet, and accepted outcomes cannot now be charged again in full. Fast assignment-to-post turnaround records elapsed pipeline time; they do not measure the productive labor needed for every branch, source check or later content implementation.
0bbc44 Anonymous 2026-09-08 18:14:15
Add provisional finite inventory and remaining design scope, with overlap accounting and cost-cut alternatives
73
db6f85 Anonymous 2026-09-09 11:57:13
Respond once to focused scope37 critique and PM548 corrections
74
As of Campaign36 closeout on 9 September, v1 has usable first-pass contracts and finite inventories across all fifteen domains. That is not M3 closure. Verified alignment514 reconciled the global continuity candidate across its named save, connection, rescue, cast, room, encounter, opening, information, death and shifting parents. Verified alignment528 reconciled the accepted mechanical quantities/interfaces across its named catalogue, survival, acquisition, combat, home, room, encounter, build, connection, information, save and continuity parents. Campaign36/PM545 then closed the actual-ID/evidence/state crosswalk for eight chains, fifteen scenes and 26 index entries. Those bounded changes discharge their named contradictions; they do **not** automatically satisfy every broader “M3: reconcile” line in Design Coverage.
0bbc44 Anonymous 2026-09-08 18:14:15
Add provisional finite inventory and remaining design scope, with overlap accounting and cost-cut alternatives
75
db6f85 Anonymous 2026-09-09 11:57:13
Respond once to focused scope37 critique and PM548 corrections
76
The earlier **14–24 role-hour** scope37 allowance is retained as a dated 9 September full-cycle estimate for initial authoring, one critique, one response and PM disposition. Initial authoring and critique are now complete; they are not charged again as forward work.
77
78
| Finite work remaining at this response | Unique work still required | Judgment allowance |
0bbc44 Anonymous 2026-09-08 18:14:15
Add provisional finite inventory and remaining design scope, with overlap accounting and cost-cut alternatives
79
|---|---|---:|
db6f85 Anonymous 2026-09-09 11:57:13
Respond once to focused scope37 critique and PM548 corrections
80
| Scope/handoff37 response and disposition | This one consolidated response, exact source/diff/readback verification and PM acceptance/integration. | **4–8 role-hours** |
81
| Whole-v1 coherence and bounded repair disposition | Check current links/revisions, stale present-tense claims, owner/proposal labels, interface ownership and cross-article contradictions after 514/528/545; make only evidenced bounded repairs and final M3 disposition. No closed-domain review is repeated. | **10–18** |
82
| **Current finite M3 remainder** | Campaign36 is removed because it closed545; accepted initial37 authoring/review is removed; overlap is not charged again. | **14–26 role-hours** |
0bbc44 Anonymous 2026-09-08 18:14:15
Add provisional finite inventory and remaining design scope, with overlap accounting and cost-cut alternatives
83
db6f85 Anonymous 2026-09-09 11:57:13
Respond once to focused scope37 critique and PM548 corrections
84
This is a forward workload allowance, not a timesheet, a subtraction from chat turnaround or an observed throughput rate. After this response is delivered, the remaining37 share is principally PM verification/disposition within the 4–8 row; the range is not retrospectively reduced by guessing how much productive labor already occurred. Any concrete Coverage residue found by the coherence pass stays inside its 10–18-hour bounded-repair allowance unless the pass demonstrates genuinely new scope.
25761e Anonymous 2026-09-08 18:21:00
Clarify v1 room and mechanism brief obligations and uniquely account for their remaining work
85
db6f85 Anonymous 2026-09-09 11:57:13
Respond once to focused scope37 critique and PM548 corrections
86
The PM's adopted **F1.14** calendar remains the current management forecast: M2 coherent core **11 September (10–14 September)**; complete first-pass M3 wiki **14 September (11–18 September), low confidence**; M4 detailed campaign **10 November (20 October–1 December), low confidence**. This scope analysis does not silently replace those dates. The 14–26-hour remainder is compatible with the M3 range only if the coherence pass finds bounded corrections and PM capacity remains available. A new technical/production specialist on 10 September is conditional on a concrete independent gap and is not counted as available capacity. No extra permanent role or two guaranteed specialists are assumed.
0bbc44 Anonymous 2026-09-08 18:14:15
Add provisional finite inventory and remaining design scope, with overlap accounting and cost-cut alternatives
87
3f8896 Anonymous 2026-09-09 11:41:51
Refresh current scope ledger and unauthorized first evidence packet (chat 534)
88
## M4 detailed-campaign boundary and allowance
0bbc44 Anonymous 2026-09-08 18:14:15
Add provisional finite inventory and remaining design scope, with overlap accounting and cost-cut alternatives
89
3f8896 Anonymous 2026-09-09 11:41:51
Refresh current scope ledger and unauthorized first evidence packet (chat 534)
90
M4 extends accepted first-pass briefs into exhaustive authored content; it does not re-charge their existing definitions. A current SMALL candidate needs the following distinct work, with shared observations, scenes and fixtures referenced once:
0bbc44 Anonymous 2026-09-08 18:14:15
Add provisional finite inventory and remaining design scope, with overlap accounting and cost-cut alternatives
91
3f8896 Anonymous 2026-09-09 11:41:51
Refresh current scope ledger and unauthorized first evidence packet (chat 534)
92
| M4 workstream | Unique deeper work, excluding current first pass | Judgment allowance |
93
|---|---|---:|
94
| Rooms, objectives and arrangements | Exact stateful variants for 24 modules/40 rooms/12 objectives, permitted arrangements, traversal, recovery sides and the two special connection challenges. | **90–150 role-hours** |
db6f85 Anonymous 2026-09-09 11:57:13
Respond once to focused scope37 critique and PM548 corrections
95
| Encounters and mechanisms | Exact geometry/population/cue/timing/rearm combinations for 10 encounters including 2 setpieces and 13 major mechanisms; fixed services stay in room work. Absorbs the non-v1 remainder of the older traps/region-pressure 33–55 envelope. | **55–95** |
3f8896 Anonymous 2026-09-09 11:41:51
Refresh current scope ledger and unauthorized first evidence packet (chat 534)
96
| Campaign evidence and choice | Full clue distribution, corrections and consequences for 4 language + 4 story chains, deduplicated against objectives and rooms. | **50–85** |
97
| Cast, rescue and home | Final writing/state variants for 5 people/15 primary scenes/5 home projects; host and branch variants cost work without becoming new primary scenes. | **45–75** |
db6f85 Anonymous 2026-09-09 11:57:13
Respond once to focused scope37 critique and PM548 corrections
98
| System detail and information | Exhaustive equipment/survival/build edge cases, exact cue/string/control variants and accessibility equivalence, deduplicated against encounter/room states. This roll-up absorbs the non-v1 remainder of older survival 22–39, equipment 48–78, information 35–59 and conditional survivor-information 8–14 envelopes; survivor dialogue/content remains in Cast. | **65–110** |
99
| Persistence, compatibility and integration | Complete transition/reference/compatibility matrix, version policy, cross-domain review, corrections and PM disposition. Absorbs the non-v1 remainder of the older state 35–59 envelope. | **45–75** |
3f8896 Anonymous 2026-09-09 11:41:51
Refresh current scope ledger and unauthorized first evidence packet (chat 534)
100
| **M4 SMALL candidate total** | Documentation and authored campaign only; no implementation, assets, recruitment, player sessions or technical validation. | **350–590 role-hours** |
0bbc44 Anonymous 2026-09-08 18:14:15
Add provisional finite inventory and remaining design scope, with overlap accounting and cost-cut alternatives
101
db6f85 Anonymous 2026-09-09 11:57:13
Respond once to focused scope37 critique and PM548 corrections
102
The range is broad because actual branch density, permitted arrangements and final dialogue depth are not yet known; Campaign36 now fixes the index at 26 rows but does not enumerate every M4 occurrence, branch or failure variant. It is not derived from agent typing speed, and it does not prove that the 10 November forecast is achievable. That forecast remains a low-confidence calendar judgment: it requires parallel authoring, bounded revision, no fundamental core-rule reversal and timely owner decisions only where work truly depends on them. Three representative detailed packages—a repeatable mechanism room, a two-language investigation with correction, and a short rescue/home arc—should be authored and independently checked before narrowing this allowance or extrapolating campaign duration.
103
104
The older owning-article envelopes remain dated local planning history and useful decomposition evidence, but the M4 table above is the current cross-domain roll-up after accepted v1 depth is removed. **Do not add either the old full envelopes or their v1 work to 350–590.** When those parents next receive an otherwise necessary M4 edit, Survival And Loadout, Equipment Catalogue/Acquisition and Player Information should label their old ranges as absorbed by “System detail and information”; Traps And Encounter Progression should point to “Encounters and mechanisms”; Save And Content State should point to “Persistence, compatibility and integration.” No parent write is needed solely to spread that note.
0bbc44 Anonymous 2026-09-08 18:14:15
Add provisional finite inventory and remaining design scope, with overlap accounting and cost-cut alternatives
105
3f8896 Anonymous 2026-09-09 11:41:51
Refresh current scope ledger and unauthorized first evidence packet (chat 534)
106
The owner's **30/90/100–200-hour** ambitions remain unproven. SMALL is a costed candidate for estimating authored work, not an owner-selected downgrade or a demonstrated playtime band. TARGET and STRETCH remain alternatives whose branch interactions require their own estimate rather than multiplication from SMALL.
0bbc44 Anonymous 2026-09-08 18:14:15
Add provisional finite inventory and remaining design scope, with overlap accounting and cost-cut alternatives
107
108
## Production constraints to resolve
109
110
| Area | Why it can dominate cost | Design preparation now |
111
|---|---|---|
112
| Modular station and interfaces | Reused room art still needs compatible door faces, controllable mechanisms, readable traversal and recovery | A module/instance ledger and entrance/fixture requirements; no claim that every arrangement works |
113
| Connected equipment and hordes | Combinations, targeting and dense pressures may interact beyond their individual briefs | Shared state/trigger contract, representative combinations and later technical questions |
114
| Saves and content changes | Persistent joins, items, notes and people must survive changes consistently | Stable identities and authored compatibility decisions from Save And Content State |
115
| Cast and clues | Branch knowledge, testimony and inference can contradict each other without any new asset | One evidence ledger with speaker knowledge and consequences, reviewed across chains |
116
| Visual/audio/UI coherence | Free assets may not fit one another or communicate the required mechanics/accessibility | Category requirements and substitute plans; inspect actual rights and suitability only when candidates are selected |
117
| Unity/Steam delivery | Engine/platform selection does not specify target hardware, input coverage, distribution or performance budget | Record those decisions and verify current primary documentation when proposing concrete requirements |
118
119
Likely asset categories are modular station surfaces/doors, machinery, astronaut/creature/survivor models and animation, UI typography/icons, sound/ambience and effects. None is an approved shopping list or a claim that suitable free assets exist. No AI-generated art, including placeholders or concepts. A rare custom requirement or purchase must be made concrete for owner approval. Art availability must not be used to invent a licence, silently commission work or make a clue depend on unreadable decoration.
120
121
## Two cost-cut proposals to compare
122
123
**Concentrate the SMALL station:** keep its four regions, twelve objectives, two languages, five survivors and twelve equipment definitions, but compare eighteen modules/thirty placed rooms instead of twenty-four/forty. The removed six definitions and ten placements must be identified in the future ledger; move or combine their actual discoveries without erasing tests/corrections. The entire-station puzzle still includes every remaining room. The saving is fewer layouts and placements to author, while the cost is less spatial variety and a smaller physical assembly. No hour saving or retained campaign duration is established.
124
125
**Reduce staging variety:** retain SMALL's rooms/objectives and five mechanism families, but compare six ordinary/two special enemy roles and one exceptional set-piece instead of six/three/two. Ordinary hordes remain meaningful, and distinctive discovery consequences must be rehosted rather than deleted invisibly. This saves one role definition and one bespoke sequence; it costs spectacle and pressure variety and may overwork the remaining encounters.
126
127
These are separate alternatives; adopting both requires evaluating their combined loss of variety. Neither adds oxygen grind, repeated death requirements, loot loss or a longer escort to compensate for fewer authored units. Preserve all owner pillars first, and judge the actual retained experiences before adopting a cut. Larger counts remain plausible if later authoring and player evidence support them.
128
129
**Reopening conditions:** a complete ledger reveals missing scenes/branches; a core rule changes many interfaces; owner scope or ending choices change; representative detailed packages exceed allowances; staffing fails to materialise; or later authorised evidence shows repetition, poor comprehension or unaffordable runtime/content work. Revise the forecast and name the affected outcome instead of silently moving the date.