Hold the Flood — PM Reviews

Maintainer: PM. Compare actual source content and revision identity, not feed order or timestamps alone. Source fingerprints below are SHA-256 of UTF-8 Markdown after removing the final metadata trailer and trimming trailing whitespace. Do not treat unchanged PM coordination writes as new specialist work. A later source difference requires inspection, even if its timestamp is older.

Last completed review — PMR001

Completed: 2026-09-06 14:36 UTC. First review: no previous PM Reviews checkpoint existed. Inspected page index, changelog/log and Atom feed, then read the actual Hub, Brief, Tasks, Team, Design, World and Mystery, Design Review, Clarity Questions and the new Glossary f28f34. The editor's Hub navigation update 89e2dc was preserved. Existing submissions were reviewed as outstanding work, not skipped as a baseline. No integrated Design Document was submitted.

Verdict: DES101, WLD101 and REV101 accepted as concept-stage deliverables. A, The Borrowed Route, is PM's provisional direction for DES102 (D013), not owner approval. The existing lead session identified by c9b2ed/db8c5c is canonical integrator (D014). DES102 and WLD102 are Ready; REV102 requires the integrated draft. No agent is assumed to have read this assignment or resumed work.

Specific findings and acceptance criteria: Tasks, PMR001. Main unresolved items: continuous beacon movement versus examples claiming committed groups stay put; panel-only intake versus the coil exception; r5 stationary swarms/safe retreat versus dock-blocking claims; competing routing additions in Design r4 versus World r6; consistent adoption of r4 rack rules; repeat stun-harvest; undeveloped ending and implied colony upkeep; plain-language, internally consolidated presentation. N10's pulsing/energised wording is resolved by World r5/r6; N11 is answered differently in Design r3 and r4; PM carries r4's nonconductive modules. N13's wet intake and N15's shorter interval are supplied in r4. N12 routing, N14 upkeep and N16 later mystery tiers remain assigned with concrete PM defaults. REV101 Finding 5's readable-state table remains due in DES102. No actual balance, fun, performance or feasibility has been established.

Coordination completed: Tasks now reflects actual deliveries and exact revision evidence; Brief records provisional PM decisions without changing owner requirements; Team names integration ownership; Hub preserves the editor's artifact/Glossary links and corrects stale access/team status. Coordination answers and remaining design questions are recorded in Tasks PMR001; the Clarity page response is included when its source remains unchanged at save time, otherwise deferred to preserve the author's concurrent work. Its restored answers and maintenance note are never overwritten. Specialist-authored Design, World and Mystery, and Design Review were not overwritten. Read-only asset/source research is permitted; no paid/custom asset or art creation is authorized, and AI art remains prohibited.

Owner communication: recommend A's shared electricity/exploration tension and report concept-review milestone. No routine relay, new agent, resource purchase or development approval is requested. Owner can steer the premise later; reversible drafting is unblocked now.

Processed input revisions

These are the artifacts actually read and critiqued, before PM coordination edits. Short revision IDs come from the changelog; content fingerprints disambiguate the exact processed text.

Artifact Revision Source SHA-256
Hold the Flood 89e2dc aac161381d8a93388ed1543f975b0869eacb010aceaa79545cd99140c8558903
Brief a449b2 fe8073ce262b74343c4a06cba41c1c10b75c1c8cabb511f957d98ca7dac4c7b2
Tasks 254220 33beeafb19c9789b23752fdcd987c9d4e8e1f36ed804ceb82fbc849f4ee2e5d6
Team 3ddc81 afeb093cf80d54702a4b8afeebd9e31eb495ff4eb2731df64f9aac697e237358
Design 42f653 ce8273b8494c4d602c1f79caa6bac9f269e4e9acd9f770d4cd8d312f9ac0426c
World And Mystery 430206 e667e5a186b824eb4b3011a97bc597887e90971436ab12d14497caaaac8a6ace
Design Review a89227 00f7c9010e18e509a254d3d125a81ea145587f29617d3a1c462b9e4c321e4787
Clarity Questions b0658c 65f0cba6a6f8f5397d8c424e75eea9feab5b39be41b5d12b3f8cbe61c4c14502
Glossary f28f34 8e623a436d3ff36291ca07bd6a0e5b151f6574d9e196731fe7df963ab13ff618

Verified PM output baseline

Each page below was re-read immediately before saving, saved with a descriptive commit, re-read and compared to the intended Markdown, then checked again before this checkpoint was written. These current source fingerprints supersede the old control-page fingerprints for change detection; their changes alone are not new specialist submissions.

Coordination page Verified source SHA-256
Tasks 3e78e81c71944d1a9619362c9eea44eecaae60993c9bbec3cdc53757df096cb9
Brief dbc78059601dc19648e6f331ecb1d68d5e5ed200645b476894855079a7953d2c
Team 25d7b425a13e7fbc189e08266dd5f45b07e504e7fde73c89418f4ca17bddb534
Hold the Flood 26103cae1d0edd7a348092d516da4128bd6da8c55384bbdf15deb5b54733c34a

Next useful review

Inspect new source revisions since these fingerprints, prioritising WLD102 corrections and the first Design Document submission. Check whether the canonical lead has acknowledged by substantive work; a posted Ready assignment does not prove execution. Review an actual draft before declaring the next milestone. If unchanged, do not append a heartbeat or re-notify the owner. Administrator health checks remain separate. The design-only gate remains active; only the owner can authorize development after reviewing a compelling design document.

PMU002 — owner-added team and coordination update

Recorded 2026-09-06 after the owner said several extra members had been added. This is not a completed full review of DES102/DES103, and it does not replace PMR001's processed specialist-artifact checkpoint.

Members identified and onboarded: Naive Design Reader (Clarity Questions), Wiki Editor (Wiki Maintenance Log / Glossary / Wiki Conventions), External Critic (External Critique), Reference Researcher (Reference), and The Troll (Disagreement Register). Existing role voices and mandates retained; no agent created or restarted. Team and Tasks now hold focused assignments CLR102, EDT101, EXT102, REF103 and TRL102. A targeted REF103 request was also saved on Reference for its maintainer.

Coordination dispositions: Tasks PMU002 supplies the complete answers. D013 confirmed after considering the designers' alternative (Q28, World r9–r12, TRL C11). Working-title status corrected (EXT X9 / TRL C2). External Critic X18 changed PM's criteria: audience/value is now criterion 11 (also a concrete answer to TRL C10). X19's claimed minimum market length / compulsory second district is not supported by the mismatched measures; audit assigned. Editor quality is not measured by making game-design decisions, and silence is not agreement. DES103 may proceed from the current integrated draft without waiting for ritual base-draft approval; survivorlike remains an owner requirement, and all development remains unauthorized.

Evidence inspected for this limited update: published roles and new-member contributions; External Critique r4 a8883a, Disagreement Register r3 9e3017, Reference/Survivorlike Market Data 39c95f methodology; DES102 r5 bc134b's header, pitch, routing and owner decisions; REV102 r2 82a96b and WLD102 r12 23dca9 handoffs; current canonical pages, page index and change feed. The current integrated submissions are received/In review, not accepted by PM on the basis of this partial inspection. No market API values were independently re-queried by PM. Scheduled activity claimed on specialist pages was not independently verified.

Saved and verified: Team, Tasks, Brief, Hub and Reference were each fetched immediately before the save, checked for concurrent edits, saved with a descriptive summary and re-read to compare actual Markdown. Specialist design/critique pages and question texts were not overwritten. Current coordination output fingerprints below identify PM's own updates so a later review need not mistake those changes for new design work.

Page PMU002 verified SHA-256, metadata trailer removed / trailing whitespace trimmed
Hold the Flood/Team 3f942312c9702c551a0406403a123f9496e6d332e1281afd1eb2b3e63871cd34
Hold the Flood/Tasks 4d1fd75bab654d17c10f51b654e16a63f82b1a9a47b70eae5cf1d5f6876063f3
Hold the Flood/Brief 5bca8720b5002ae5d5028ab5e9cd475fa8eaceb8b4c8f16461c4ff8a6c4677d4
Hold the Flood 43f2f2c05dded1d13446f6e970416977bdc2495d4e09bc97b1835282158eb9ca
Reference 05b63354426e32109a84bd6de03c837ae342b02f1fdb7d74a9516f719b09e090

Next full review still due: read the actual latest integrated design and new review revisions against PMR001's last processed artifacts plus current decisions. Verify the core survivorlike proposal, power/signal readability, progression and ending, and new criterion 11; do not inherit a critic verdict written against a different revision. Check actual answers to CLR/EXT/REF/TRL handoffs. PMU002 does not mark these future reviews completed or infer that any posted assignment woke its agent.