PMR007 — first repeat-expedition contributions and integration review

2026-09-07 · PM · Written design review only. Compared live sources and immutable revisions with PMR006; PMU007 was a coordination update, not an intervening acceptance. Read current Hub, Brief, Tasks, Team and index/log/feed. Findings below distinguish delivered domain work from acceptance of the integrated game. No game implementation, simulation, playtest or asset creation was authorized or performed.

Verdict

The repeated-expedition proposition now has concrete contributions, but the integrated design still needs changes. Equipment offers three genuinely different preparations for one Tram objective and a discovery that turns bankable salvage into a brief return-route lure. Colony compares route flexibility with dependable equipment across the same place. World connects changing explanations to interventions rather than only to the ending. These are useful additions beyond catalogue size or district counts; they are not yet a coherent DES105 sequence or evidence of enjoyment.

The main electrical decisions are settled: two seconds of Coil power versus eight of stun; fixed-powered water remains hazardous; Spark death supplies power without stun; the bounded Arc does not power water. Colony now mirrors persistent switches and the gradual refuge shutdown. Campaign and Head-Works use Stop / Keep / Leave, with no flashes after Stop. Do not reopen these as unresolved design choices. Some live copies still contradict them, as item 3 identifies.

Accepted contributions and their limits

  • EQP101: accept Equipment's effect countersign at dc3aa2 and Arc fc64bb as the delivered interface contribution, supported by current Coil 80da75 and Inventory 9cebc1. Equipment r4 arrived during this review and was diffed: it retains the effects, incorporates EQP102 and retires its pending Cable/Spark requests; no redo is assigned. Utility r3 also corrects Hand Pump persistence: the deployment resets, while a completed basin-level change follows the shared hydraulic rules. Cable Reel's terminal-only scope is already adopted in contract 8644ea; no further ruling is needed. This is not acceptance of every catalogue value, old example or asset requirement.
  • EQP102: accept the Equipment contribution at Build Paths 6bc3f7, with placement and shared-scene integration outstanding. Ride-and-cut sacrifices charge collection; wet-yard breach pays for control; a dark tram with a planted lure changes the crowd's destination. The later Siphon choice spends a bundle and the converter for three charge / at most thirty lit seconds, not a free full bank. The written ledger and opportunity cost support that distinction. Combat has not yet countersigned these approaches. Proposed apron geometry, manual return, cache locations and short crossing are not established facts about the map.
  • COL101: accept the targeted persistence/Stop/assembly-acquisition corrections at Colony fe7d88. Banked crane parts are safe; carried parts still require extraction; canal state persists through rescue; one extra berth exists city-wide. COL102: accept its two investment trajectories as a delivered contribution, conditional on DES105's route/acquisition integration. Equal spending opportunities are illustrative, not proven campaign income.
  • REV104: accept ce94e4 as a substantive independent review of the expanded package, not a whole-game approval. Its Exchange findings are supported by the actual page. Qualify its blanket closure of crossed copies: Combat §6 and World's persistence table still need the corrections below. REV105 remains a separate review of the not-yet-integrated depth pass.
  • WLD104: e99445 is In review — targeted changes required, not just awaiting receipt. The new explanation-to-action chain is useful; its order and service proposal currently disagree with the campaign/contract.

Specific corrections and the smallest useful next work

1. Exchange: retain the district's idea; make its visit possible

At Exchange 5bc625 §§2/4/7, batteries start empty but the 0:30 lure is already charged; one full bank cannot hold it from before 4:30 to after 9:30; a reachable lit portable lure prevents the ordinary crowd from spreading as claimed; the Coil spend and final two-bundle retrieval are unfunded/unfitted. The rack is drawn five cells over three, not two rows of four. The panel also flashes a beacon distant from the only intake, breaking the learned flash-location convention.

CAM102 / Lead: implement the written corrections REV104-16/17 request: intake-local dispatch marker, a legal 2×4 rack, earned charge, actual lure expiry and retargeting, explicit collection/spend/loss, and two free cells if retrieving beacon plus bank. Show Carrier distance as well as charge; its acquisition is bounded. Correct the reel's wet-point text and the Grounder's placement. A new rule or longer battery is not needed to rescue this scene.

REV104-18 is a campaign dependency, not a local footnote. Two permitted districts cannot explain the already-announced Pumping, Lock Flight and Tram visits before the player reaches the bank; the Exchange's own illustrated dispatch also occurs while it is unpermitted. Lead and Campaign must give one initial bank state and follow it through that route. The critic's seized-on Pumping clutch is a candidate, not adopted here: it removes the previously proposed ability to darken Pumping from the Exchange. Choose explicitly and update the affected revisit, rather than preserve incompatible benefits. Reconcile Exchange's ten-minute duration allowance with a scene reaching minute twelve before relying on the baseline estimate.

2. Tram: integrate the new alternatives, not the illegal starting rack

Campaign 9366c8 §3.2 starts its second visit with berth support and seven equipment cells. Ordinary workshop issue cannot supply this, and even tooling's recorded-rack limit is six; berth support also occupies the assembly. DES105 / CAM103: use the new small legal starts, or place actual field acquisition and shelter fitting before the fuller rack is used. Keep the competing retreat/equipment choice intact. Name the dry apron, free manual depot return and recipe offers on the actual geography. The thirty-second Siphon crossing must include arming/withdrawal, crowd press and pursuit; reject that location if the written route cannot fit. Do not certify its timing or survivability from a hypothetical allowance.

Coordination choice: use Tram as the common DES105 case proposed independently by Colony and Equipment. Lead owns one integrated first/changed/later return; Campaign supplies geography with attribution. Do not write competing district versions. Cut a supply-observation trip if the player already knows its answer and has no new objective or useful state to change.

3. Crossed copies remain despite correct headers

At Combat 6129ea, the paragraph after §0.2 still calls fixed-powered water unresolved and recommends the opposite rule. §6's Stunned row still admits a Spark death; its charge paragraph still uses most-room collection, and its R3 paragraph still calls C2 open. These are live interface text, not clearly isolated archives. CMB101: replace those exact obsolete clauses with current contract/E3 pointers; the correct §0.2 table need not be redesigned. Remove the competing old presentation accounting when consolidating. REV104: verify these specific closures, not just the header.

World e99445's six-state table still says grounded runs persist. Contract §6 says the Grounder leaves with the mass and the run recovers between expeditions. World: change that row; it changes whether a returning player finds a previously disabled route powered.

4. Mystery: order the evidence on the route the player can actually take

WLD104 places Collector evidence before the Lock Flight/Tram explanation and explicitly says this depends on visiting Collector first. Districts e1136a has Lock Flight and Tram before the Exchange and Collector. Saying the explanations can swap does not yet show the resulting decisions. WLD104 / CAM103: re-order this one chain on the existing accessible route, including the Tram returns, or propose a reachable branch with its cost. Show the player's earlier interpretation and revised action at each actual visit. The refuge's basin-level display alone is not equivalent to a meter identifying harvested charge: name the second observable that supports that inference without adding a compulsory evidence flag. Do not map Stop/Keep/Leave to player sophistication; show the genuine reasons an informed player might choose each.

D026, provisional next-draft simplification: adopt Colony's fallback and World's agreement to fold side-by-side records of personally observed signals into the base forecast receiver. Retain one assembly competing between tooling and berth support; the comparative reader no longer needs a separate advanced fitting. Do not adopt World's replacement upgrade that sells pre-launch bank-permission information: contract §6 already requires route-gating bank state on the free departure board. No new facility, mandatory clue purchase or asset is approved. Lead/Colony/World mirror this and retain the rejected three-service alternative in history.

5. Collector: two seconds of power cannot run a five-second winch

Collector 75c09e §4 still claims one discharge completes a five-second powered lift. CAM102: specify retained mechanical progress and any remaining manual work, with clear release and interruption states, or another legal use of current sources. Equipment's two-powered-plus-three-manual ratchet is a candidate mechanical design, not an established conversion rate. Preserve the approximately forty-second free manual alternative; do not add a second-bank gate merely to repair prose.

6. Scope and assets: separate evidence from accounting labels

Districts now attributes 35 expeditions / 8.4 hours of baseline beats, plus two optional expedition hours, and labels overhead unmeasured. Accept that clearer accounting as a contribution, not sufficient length or a production commitment. Several visits divide observations into separate expeditions without yet demonstrating why combining them is impossible or undesirable. CAM103 should merge or justify those visits before the next scope recommendation. No required duration is inferred from reference-game counts.

D025 / Lead and Reference: accept REF110 fa674c as a bounded source/licence report, not suitability verification. Replace “covered” with source/licence-candidate status where suitability is unknown; separate missing source, unassessed pose/animation, adaptation and presentation work. Reusing an as-yet-unselected baseline asset is not evidence it exists in usable form, and engine-drawn cues are not zero authoring. Campaign §10's “none located free” is stale against its own §7's audit summary. No purchase or custom request is ready. PM did not reverify external licences or candidate quality in this review.

EXT X33 / TRL: credit the corrected owner paragraph and explicit deferral of commercial positioning; criterion 11's evidence remains deferred, not passed in substance. X32: within-district choice depth is the right challenge. EQP102 now engages it in an actual same-objective comparison; citation counts alone cannot establish that a designer ignored a source or that the game has enough variety. Lead/Combat should state the design implication, not add token citations. REF107 is not a launch-content quota, and its external figures were not reverified here.

Next acceptance gate

One concise DES105 sequence on Campaign, with linked domain detail, legal preparation, actual accessible clue order, three alternatives for a common objective, and a useful changed return. CMB102 must review the Equipment proposals; REV105 then critiques that integrated revision. Existing agents cover this work. No owner relay, new agent, creative approval, asset approval or development permission is currently needed.

Processed snapshots and review scope

The following immutable sources matched the inspected raw Markdown exactly after stripping only the final metadata trailer. “Processed” means the stated sections were reviewed, not that every inherited passage passed. Unchanged historical concept/GDD sections were used as provenance only. Other reference and maintenance pages were discovered but are not newly accepted; this review makes no empirical claims about enjoyment, balance, readability or performance.

Source Scope SHA-256
Campaign 9366c8 Owner pitch, shared summary, Tram scene/ledger, Exchange interface, equipment/colony integration and scope/assets/ending; no full re-audit of Lock Flight or Barrier scenes f53e6d756f00a6e5eeb6c97ccc30b27fb4a5c785f31b1fbab00ab5c53ad363d8
Mechanics/Power And Attraction 8644ea Full current shared contract and dispositions 1e4b39a9893952cd29801fa14ebea903781ca77109400255cbfafe11adcfea72
Colony fe7d88 COL102 new section; COL101 acquisition, preparation, persistence and Stop interfaces; inherited seed not re-certified 442e94c4eab42c08b51aeb068522f1f74d7140af332d245d43f501b17fb649d2
World And Mystery e99445 WLD104 new section; six-state table, essential evidence, Stop and Holding Basin; legacy single-district material not re-certified 053a30ff1815aacda1d0370b4bc0a6e3ec89f980b7ccfcd455d9d8d2c8a88336
Design Review ce94e4 REV104 r6 findings, closure evidence and handoffs 79fa5bfb776dd3b55d6a8d9ae44dc48fb8713c0146bfbf44269f1200c5a8e249
Districts e1136a Order/access/berth rules, baseline beat table, optional/overhead separation and source-transfer status 96b702c6786d21d6fddaffdcc970b984465c567a2181eaf8615131ed9d520fc7
Districts/The Exchange 5bc625 Problem, geography/panel, racks, mystery/bank, written expedition and critic interfaces 9c775af776a9d19afad5bab27fb22ce0a92593ec6d2bd140e4669059e5f42147
Districts/The Collector 75c09e Unchanged §4 winch against current pulse; remaining content retains PMR006 scope 2b587b1502cf4722f42719a7e61918f92842e5851df80887bc9c0cb0692cafd4
Districts/The Head-Works 65403a Changed Stop/Keep/Leave and return/power interface 2473a03c70f7fb03c79abf56cddf525320fd1329e45a8403e81f363ae0e8c7fc
Mechanics/Combat 6129ea Effect table, C2 copies, §6 status/accounting and presentation interfaces; not full combat acceptance 9860b5a2d2cd335f21c169eea77a5aa1ae5275bab425b423afdb2c06c6e6a812
Enemies 31ac57 Revised fixed-water encounter, REF107 response and roster/composition interfaces; not full re-audit of both encounter ledgers 04303a2427d69c9136f0c23c94c066418c41d38a15fda8a5e26d734e0fc82311
Enemies/Spark 454133 Power-only death ruling and source mirror 367fb4daed45b9c957bca7da946899e1b3d3fb82fcaf8e02c480722eb2c9e884
Enemies/Floater 92603a Water-only movement boundary and source mirror 936e446c60464028700f473b26ed254a9fe4bc0d3ce93ea1552852d8ba8fb511
Equipment 59fcc5 Effect countersign, catalogue rationale, EQP102 addition and retired Cable/Spark requests; r4 diff read against dc3aa2 cca76f7536779dbef147f58a094993edc7ee686c98513f46f4bd627a6acbe9a5
Equipment/Arc fc64bb Full current Arc specification and counterexample a4ae0feff555325feeca3d63ca53994be3603d11e357a6a007720e14b2b14b3b
External Critique 5f950c X33 withdrawal, X32 narrowed; originality research not independently verified c562d9cd4ce91a27a28b07c2419750476ae69f3af7a4bc013ca28bb080e45a74
Disagreement Register 156264 Current X33/positioning argument and filter-error note; inherited r15 challenge not re-disposed 662820c7b1e4950ac1e8cde202755d319bbad064600b2133b34ed5d7f464cd9a
Reference/Asset Audit fa674c Audit method/category status and limitations only; no independent external source/licence/suitability verification 03798fb0013866d9667cb1d837e77165bbfaf9f02311ca2936f5698442eee0cc
Equipment/Build Paths 6bc3f7 New EQP102 same-objective comparison, acquisition/issue, Siphon return and handoffs; inherited families not fully re-audited 13dd85c5c42bd3d15898394655c1ba3c826050732ce7bb6191a6ea21da1468cd
Equipment/Coil 80da75 Current power/stun rule, footprint, restrictions, example and integration d41ea9c220a641edab88ca8a9b20ba4071780a1439754ed5eebd56c105645495
Equipment/Utility Modules 04a42d Insulation offer, Beacon, Siphon, terminal-only Reel, Hand Pump persistence correction and related route conditions bf6e41f4ac3e76f900ecdf79e6ac48f00aa8ffe9d1275219d99612b4c995bdb0
Mechanics/Inventory And Charge 9cebc1 Ownership/baseline distinction, project-cargo delta and current issue/priority interface 4b6d0aa0b5b0ef4ab0b2dea26f1d085c09caed438444a6c3a50b82adb325effd