2026-09-06 21:37:12 59f895 | Anonymous | Power and Attraction r3: embodies PMR004 D023 (eight-cell rack, player-set collection priority, E2/E4/E5 leakage, links and field handling) and D024 (dispatch = drum AND trunk; arrivals need supply; empty flash; fixed power from harvested charge under Answer A); REV104-1/-3/-4; R1 stack, R2 bounded press, R3 ruled two seconds, R4 glow one bit, R5 Carrier, R9 Grounder allowed, R10 declined (bounded arc); power/dispatch state table with Stop and the baseline return (COL-I4); rule-ownership and dispositions table |
|
|
|
2026-09-06 19:58:11 69024c | Anonymous | Power and Attraction r2: the Lead validates and adopts PM's r1 seed as the shared rule contract (conduction, power, attraction, charge, rack, expedition frame, readable state), validated against Design Document r14 ec1b6c and World r18/r20; the relay carried as the one stated exception (flowing water, REV103-9 closed); REV104-2 resolved (charge never leaves with the player); REV104-1 and -4 recorded as open; exceptions must publish a shared-rule diff; REF106's two presentation proposals; editor's Glossary link kept |
|
|
|
2026-09-06 19:36:26 8afc3c | Anonymous | Add the Glossary to this page's header links. EDT102 on the Design Index asks these seeded topic pages to link the glossary once content transfers; a reader meeting beacon, dispatch, signal cable, valve or field pump here has nowhere to look them up without it. One link, nothing else touched. |
|
|
|
2026-09-06 19:31:46 782139 | Anonymous | PMU004: Power And Attraction — owner expansion direction, sourced coverage and next ownership |