Blame

6057e0 Anonymous 2026-09-08 11:37:22
Add home project material, information, and departure contract
1
# Hold The Horde — Home Projects
2
b6f61a Anonymous 2026-09-08 13:26:00
Integrate owner carry-return and accepted directions (PM 249)
3
**Status:** working systems contract for the cooperative return in [Coming Home](/Hold%20The%20Flood/Coming%20Home). The owner tentatively accepted this equipment-loan direction (“keep. I think.”), not a complete colony economy or a requirement that every scene consume scarce material. Human effect and production cost remain unvalidated.
6057e0 Anonymous 2026-09-08 11:37:22
Add home project material, information, and departure contract
4
b67303 Anonymous 2026-09-08 11:47:39
Align cooperative loan, sensor path, reactions, and departure manifest
5
## Arrival and relay states
6057e0 Anonymous 2026-09-08 11:37:22
Add home project material, information, and departure contract
6
b6f61a Anonymous 2026-09-08 13:26:00
Integrate owner carry-return and accepted directions (PM 249)
7
One ordinary relay-family part returns from the station. While carried it occupies shared capacity. A live return brings it aboard; death also brings it and every other still-carried item aboard with the astronaut under the owner’s rule. It remains in the rig if installed there, otherwise in ship storage. A relay deliberately left in station infrastructure was not carried and stays installed. Dorn and Yeva show their incomplete work, but neither silently takes or reserves it.
6057e0 Anonymous 2026-09-08 11:37:22
Add home project material, information, and departure contract
8
b67303 Anonymous 2026-09-08 11:47:39
Align cooperative loan, sensor path, reactions, and departure manifest
9
The player may seat or remove the relay at either project, carry it on departure, or postpone with it stored. The relay is reusable equipment under [Build Rules](/Hold%20The%20Flood/Build%20Rules): removal returns the same part and stops the powered device. No timer, degradation, upkeep demand or relationship penalty advances while either project waits.
6057e0 Anonymous 2026-09-08 11:37:22
Add home project material, information, and departure contract
10
b67303 Anonymous 2026-09-08 11:47:39
Align cooperative loan, sensor path, reactions, and departure manifest
11
| State | Relay location | What operates | What survives removal |
6057e0 Anonymous 2026-09-08 11:37:22
Add home project material, information, and departure contract
12
|---|---|---|---|
b6f61a Anonymous 2026-09-08 13:26:00
Integrate owner carry-return and accepted directions (PM 249)
13
| Carried in station | Astronaut rig or pack | Neither project | Existing records; death brings the carried relay aboard |
b67303 Anonymous 2026-09-08 11:47:39
Align cooperative loan, sensor path, reactions, and departure manifest
14
| Stored / postponed | Ship storage | Neither project | Incomplete room states and conversations |
15
| Listening | Dorn's receiver seat | One addressed interlock sensor can be read | Dorn's attributed observation, once made |
16
| Packing | Bench service seat | Improved canister preparation | Charge in canisters already prepared |
17
| Reclaimed | Storage or astronaut rig | Both projects dark | Communicated knowledge and prepared canisters |
6057e0 Anonymous 2026-09-08 11:37:22
Add home project material, information, and departure contract
18
b67303 Anonymous 2026-09-08 11:47:39
Align cooperative loan, sensor path, reactions, and departure manifest
19
The single relay never powers both devices, or stays aboard while also carried.
6057e0 Anonymous 2026-09-08 11:37:22
Add home project material, information, and departure contract
20
b67303 Anonymous 2026-09-08 11:47:39
Align cooperative loan, sensor path, reactions, and departure manifest
21
## Dorn's receiver and its physical channel
6057e0 Anonymous 2026-09-08 11:37:22
Add home project material, information, and departure contract
22
b67303 Anonymous 2026-09-08 11:47:39
Align cooperative loan, sensor path, reactions, and departure manifest
23
The station docking collar carries a low-rate monitoring bus among its service lines. Dorn's shipboard tap addresses one channel on that bus: the pressure sensor at a single interlock panel. He knows its address and crew location because he serviced that panel. This proposed physical channel does not depend on answered hails and does not invent an earlier player-placed sensor.
6057e0 Anonymous 2026-09-08 11:37:22
Add home project material, information, and departure contract
24
b1221d Anonymous 2026-09-08 11:59:02
Clarify known panel versus sampled volume and qualify the remote pressure inference
25
When powered, the receiver gives one pressure value at that point and whether it is steady. Dorn observes a drift and return that differs from what he expected under its last known conditions. He also states that a failing sensor looks identical from aboard. The reading therefore establishes neither motion, cause, direction, which volume the pressure line currently samples, whole-section condition nor safety. Removing the relay ends monitoring, but Dorn retains what he observed.
6057e0 Anonymous 2026-09-08 11:37:22
Add home project material, information, and departure contract
26
b1221d Anonymous 2026-09-08 11:59:02
Clarify known panel versus sampled volume and qualify the remote pressure inference
27
Knowledge sharing is an action. Dorn tells the astronaut; the astronaut may then tell Yeva. She asks which side of the seal the panel's pressure line currently samples. Dorn knows the panel's location; the receiver channel alone does not establish that plumbing connection. The bounded next goal is to inspect the known panel, trace the sampled volume and check the sensor, not open the section. The remote signal alone does not establish whether the pressure itself changed.
6057e0 Anonymous 2026-09-08 11:37:22
Add home project material, information, and departure contract
28
b67303 Anonymous 2026-09-08 11:47:39
Align cooperative loan, sensor path, reactions, and departure manifest
29
## Yeva and Dorn's packing bench
6057e0 Anonymous 2026-09-08 11:37:22
Add home project material, information, and departure contract
30
b67303 Anonymous 2026-09-08 11:47:39
Align cooperative loan, sensor path, reactions, and departure manifest
31
Yeva installed the compressor head and routed the ship supply. Dorn's completed pressure-hardware service is why it can run, and he operates it in this scene. The prerequisites are that completed setup, the ship's unlimited oxygen supply and the relay seated while packing. This creates no maintenance schedule: the bench does not degrade when Dorn is absent, and wider staffing or survivor-loss rules remain open.
6057e0 Anonymous 2026-09-08 11:37:22
Add home project material, information, and departure contract
32
b67303 Anonymous 2026-09-08 11:47:39
Align cooperative loan, sensor path, reactions, and departure manifest
33
Before power, ship oxygen receives the ordinary proposed fill. While powered, the bench prepares canisters with more usable charge, the existing proposal in [Rescue and Home](/Hold%20The%20Flood/Rescue%20and%20Home). Earlier canisters were not secretly degraded. Removing the relay stops further improved preparation, but charge already placed in a canister remains embodied there; it is not continued operation by a dark bench.
6057e0 Anonymous 2026-09-08 11:37:22
Add home project material, information, and departure contract
34
b67303 Anonymous 2026-09-08 11:47:39
Align cooperative loan, sensor path, reactions, and departure manifest
35
Prepared canisters still occupy their normal carrying capacity. They may support more reach for a chosen carried pattern or similar planned reach with more capacity for equipment or salvage. No exact charge, slot allocation or preparation duration is asserted.
6057e0 Anonymous 2026-09-08 11:37:22
Add home project material, information, and departure contract
36
b67303 Anonymous 2026-09-08 11:47:39
Align cooperative loan, sensor path, reactions, and departure manifest
37
## Intended sequence and departure
6057e0 Anonymous 2026-09-08 11:37:22
Add home project material, information, and departure contract
38
b67303 Anonymous 2026-09-08 11:47:39
Align cooperative loan, sensor path, reactions, and departure manifest
39
This scene is a cooperative loan and preparation sequence:
6057e0 Anonymous 2026-09-08 11:37:22
Add home project material, information, and departure contract
40
fa4dc4 Anonymous 2026-09-08 11:48:11
Match the receiver observation to the addressed sensor reading
41
1. Seat the relay in Dorn's receiver, observe one pressure value drift and return, and reclaim it.
b67303 Anonymous 2026-09-08 11:47:39
Align cooperative loan, sensor path, reactions, and departure manifest
42
2. Seat it in the bench, prepare the departure canisters, and reclaim it.
43
3. Leave carrying the single relay, those canisters and Dorn's limited account.
6057e0 Anonymous 2026-09-08 11:37:22
Add home project material, information, and departure contract
44
b67303 Anonymous 2026-09-08 11:47:39
Align cooperative loan, sensor path, reactions, and departure manifest
45
Both ship projects are dark on departure. Nothing is duplicated: prepared charge and communicated knowledge persist because they are produced results, not operating benefits. Leaving the relay in the bench remains permitted but gives no additional established benefit for this departure. Darkness during the expedition and unspecified ship time are not invented costs.
6057e0 Anonymous 2026-09-08 11:37:22
Add home project material, information, and departure contract
46
b67303 Anonymous 2026-09-08 11:47:39
Align cooperative loan, sensor path, reactions, and departure manifest
47
Other participation choices remain honest. Leaving the bench powered leaves the relay aboard and offers no additional established benefit to that departure. Postponing sends the relay out in the rig with ordinary canisters and no reading. Selective listening or packing is also possible. These are choices about which human activities and information the player engages with, not exclusive material expenditures.
6057e0 Anonymous 2026-09-08 11:37:22
Add home project material, information, and departure contract
48
b67303 Anonymous 2026-09-08 11:47:39
Align cooperative loan, sensor path, reactions, and departure manifest
49
## Visible human responses and content states
6057e0 Anonymous 2026-09-08 11:37:22
Add home project material, information, and departure contract
50
b1221d Anonymous 2026-09-08 11:59:02
Clarify known panel versus sampled volume and qualify the remote pressure inference
51
After listening, Dorn unseats and returns the relay himself, thanking the player specifically for a loan. At the bench, Yeva says the canisters are his work as much as hers and returns the relay beside them. On postponement, Yeva says she would rather hear no than have Dorn keep asking through her; Dorn says the panel will still be there. Neither withdraws anything. When told the reading, Yeva asks which side of the seal the pressure line currently samples, giving the player a specific connection to trace at the known panel.
6057e0 Anonymous 2026-09-08 11:37:22
Add home project material, information, and departure contract
52
b67303 Anonymous 2026-09-08 11:47:39
Align cooperative loan, sensor path, reactions, and departure manifest
53
The crossed-out-name disagreement remains an ordinary later conversation, not payment or punishment. Neither memory is made station history.
6057e0 Anonymous 2026-09-08 11:37:22
Add home project material, information, and departure contract
54
b67303 Anonymous 2026-09-08 11:47:39
Align cooperative loan, sensor path, reactions, and departure manifest
55
Necessary room states are both devices incomplete/dark, receiver powered, bench powered and both dark after reclamation. Dialogue variants cover inspect, listen, share, pack, remove, postpone and return after checking the panel. The sequence's strength is visible cooperation without manufactured loss. Its risk is becoming an automatic pre-departure checklist rather than time among people. Irreversible commitment remains credible for another project whose material and experience justify it. Reopen this choice if the interaction becomes compulsory repetition or a concrete permanent project supports a stronger human decision without hidden degradation, delays or loss rules.