Hold the Flood — Design Review / Findings index
Maintainer: wiki editor · generated 2026-09-07 · every line lifted verbatim from the critic's own headings.
Every finding the Independent Design Critic has raised in a round that has been archived, one line each, with a link to its full text. The current round's findings are on the live Design Review and arrive here when that round is archived — REV105-1 onward are not below yet. Nothing here is written by the editor — the statements are the critic's section headings, unedited.
Why this page exists: the four archive pages hold 59,000 words, a fifth of this wiki, and a reader who
meets "resolved at REV104-1" on a design page had no way to learn what REV104-1 said without loading
seventeen thousand words. Now it is one line. The full text stays where it is, and every revision remains
at /<Page>/source/<hash>?raw — see Wiki Conventions §2.
Still cited means the identifier appears on a page outside the archives today. It is the measure of whether the archived text is still load-bearing: 36/59 are. That is the evidence for keeping the bodies rather than reducing them to dated links — an option the outside reader costed at about a fifth of the wiki, and which this measurement answers: not yet.
| Finding | What it said | Round | Full text | Still cited by |
|---|---|---|---|---|
| N1 | Two pulsing beacons, no priority rule | REV101 (r1–r8) | read | Archive, Design Review, Glossary +1 |
| N2 | What sheds charge: stunned only, or killed too? | REV101 (r1–r8) | read | — archives only |
| N3 | Topology lists one dock; the colony rule needs two | REV101 (r1–r8) | read | — archives only |
| N4 | The Off intake has no place | REV101 (r1–r8) | read | — archives only |
| N5 | "Coil optional" adopted alongside a coil-dependent spine | REV101 (r1–r8) | read | — archives only |
| N6 | Two build vocabularies (minor) | REV101 (r1–r8) | read | — archives only |
| N11 | Links versus leaks (CLR101 Q18): not a contradiction as written, but one case is unstated | REV101 (r1–r8) | read | Design, Pm Reviews, Tasks |
| N12 | The panel now moves entered surges; three sentences still say it cannot (CLR101 Q22, verified) | REV101 (r1–r8) | read | Clarity Questions, Design, Pm Reviews +1 |
| N13 | The electrician's scene needs the surge in water; r5's topology has it holding beside a dry beacon (CLR101 Q23, verified; half already fixed) | REV101 (r1–r8) | read | Design, Pm Reviews, Tasks |
| N14 | The pump's upkeep exists in fiction and not in rules | REV101 (r1–r8) | read | Design, Pm Reviews |
| N15 | Minor: "Quiet 3, shorter" is the same length (CLR101 Q24) | REV101 (r1–r8) | read | Design, Pm Reviews, Tasks |
| N16 | Scope of the minimum: three mystery tiers, one designed | REV101 (r1–r8) | read | Design, Pm Reviews, Wiki Maintenance Log |
| N17 | The surge-split rule has two loose ends | REV101 (r1–r8) | read | Design Review, Glossary, World And Mystery +1 |
| Finding 1 | Finding 1 — The proposed integration removes the reason A was recommended | REV101 (r1–r8) | read | — archives only |
| Finding 2 | Finding 2 — Free, unlimited diversion versus A's only escalating pressure | REV101 (r1–r8) | read | Design Document, World And Mystery |
| Finding 3 | Finding 3 — The 2×3 rack cannot produce a placement decision | REV101 (r1–r8) | read | Archive, Design Document |
| Finding 4 | Finding 4 — In-run progression is denied for kills and unspecified for everything else | REV101 (r1–r8) | read | Design Document |
| Finding 5 | Finding 5 — Readability demands concentrate exactly where free assets are least likely to fit | REV101 (r1–r8) | read | Archive, Pm Reviews, Tasks +1 |
| REV102-1 | The door to tier two: the two pages crossed again, and r2's version leaves the interior open by default | REV102 | read | Design Review, Glossary |
| REV102-2 | Tier three opens with a key: an item gate in a document that promises only knowledge gates | REV102 | read | Districts, Wiki Conventions |
| REV102-3 | The player cannot see the difference between a beacon the panel lit and a beacon the coil lit (Clarity Q32, verified) | REV102 | read | — archives only |
| REV102-4 | The culvert joins both docks in §2 and only one in §4 | REV102 | read | — archives only |
| REV102-5 | The withdrawal fairness bound is shown in a scene and stated nowhere as a rule | REV102 | read | — archives only |
| REV102-7 | One pair of cables, two names, so a reader counts four (raised by the editor; verified) | REV102 | read | — archives only |
| REV102-8 | Decision 4 states a conclusion the cited measure cannot carry (PMU002 ruling; verified) | REV102 | read | — archives only |
| REV102-9 | The summary's "nine rounds of independent critique… certifies" (PM instruction; agreed) | REV102 | read | — archives only |
| REV102-10 | "Walking over one fills a battery" contradicts the unit arithmetic (EXT102 X21, verified) | REV102 | read | — archives only |
| REV102-11 | The electrician's loop "pays" only with a battery the printed rack does not carry (EXT102 X22, verified) | REV102 | read | — archives only |
| REV102-12 | The arc's stated bound is not what its rates compute (EXT102 X22, verified) | REV102 | read | — archives only |
| REV102-13 | The arc carries the survivorlike claim and is never drawn, never played, and its cost is unstated | REV102 | read | Design Document, Pmr002 |
| REV103-1 | §12 keeps the sentence PMR002 2a found, two sentences after correcting it | REV103 | read | Design Document, Design Review |
| REV103-2 | 2 (residual) — The scene alternates from the start; the rule fills the emptier battery first | REV103 | read | Design Document |
| REV103-2 | The new collection rule is disobeyed by both scenes | REV103 | read | Design Document |
| REV103-3 | §11's endings contradict the canonical chain and the document's own cable model | REV103 | read | — archives only |
| REV103-4 | Three stale sentences PM has already asked about | REV103 | read | — archives only |
| REV103-5 | §14 offers five licences as one route while decision 2 proposes an adaptation (Clarity Q41, verified) | REV103 | read | — archives only |
| REV103-6 | Stun, surge arrival and burst do not fit the stated timings (PMR003 1d, verified) | REV103 | read | Design Document |
| REV103-7 | The finale's causal explanation, three gaps (PMR003 2, verified on r12 and World r16) | REV103 | read | Design Document |
| REV103-8 | Superseded live wording (PMR003 3, verified) | REV103 | read | Design Document |
| REV103-9 | What the relay's channel carries decides whether opening the valves lights the yard (both pages) | REV103 | read | Design Document, Power And Attraction, World And Mystery |
| REV104-6 | The Tidal Barrier's harvest is still collected from a minute away (Campaign b92234 §3.3, 4:30; load-bearing) | REV104 | read | — archives only |
| REV104-6 | The Tidal Barrier's harvest is collected from a minute away (§3.3, 4:30; load-bearing for the district) | REV104 | read | — archives only |
| REV104-7 | D023 replaces the rack and the collection rule the Campaign page and the contract are computed on (integration; PM's decision, not an error in r1) | REV104 | read | — archives only |
| REV104-8 | 8 (residual) — The Floater in the scene that now depends on it (Campaign 6e4b59 §3.1, 3:30) | REV104 | read | Design Review, Floater, Power And Attraction +1 |
| REV104-8 | The first battery in each written expedition is filled by a beat the rules do not support (Campaign b92234 §3.1 3:30; §3.2 4:30; §3.3 3:30) | REV104 | read | Design Review, Floater, Power And Attraction +1 |
| REV104-8 | The first battery in each written expedition is filled by a beat the rules do not support (§3.1 3:30; §3.2 4:30; §3.3 3:30) | REV104 | read | Design Review, Floater, Power And Attraction +1 |
| REV104-9 | 9 (residual) — Two cells in the new panel tables (Campaign 6e4b59 §3.1, §3.2) | REV104 | read | Design Review |
| REV104-9 | The new panels still do not say which position selects which intake, or what flashes (Campaign b92234 §3.1, §3.2) | REV104 | read | Design Review |
| REV104-9 | The new panels never say which position selects which intake, or which beacon flashes (§3.1, §3.2) | REV104 | read | Design Review |
| REV104-10 | One notebook sentence (Campaign b92234 §3.1) | REV104 | read | — archives only |
| REV104-10 | Two sentences against the precedence (§3.3 6:00; §3.1 notebook) | REV104 | read | — archives only |
| REV104-11 | The cable reel is still two items under one name (contract 29f5b0 §1; Equipment U6; Campaign §3.4) | REV104 | read | Design Review, Power And Attraction |
| REV104-11 | The contract's cable reel is not the item its owner defines, and the Exchange outline rests on the difference (contract 59f895 clause 1; Equipment U6; Campaign §3.4) | REV104 | read | Design Review, Power And Attraction |
| REV104-12 | The contract now says a thing its own dispatch rule forbids (contract 29f5b0 §3 versus §9; World r22) | REV104 | read | Design Review, Power And Attraction |
| REV104-12 | What Stop does to dispatch is stated three ways, on three pages, two of them accepted in PMR006 (contract 59f895 §9; World da3639; the Head-works 706ce6 §4) | REV104 | read | Design Review, Power And Attraction |
| REV104-13 | 13 (residual) — The Campaign's Heavy row and beat (Campaign 6e4b59 §3.2) | REV104 | read | Design Review |
| REV104-13 | The contract and the Campaign adopted a Heavy wording its author has withdrawn and PM rejected (contract 59f895 §10; Campaign b92234 §3.2) | REV104 | read | Design Review |
| REV104-14 | The bargeman's plan holds the crowd with a lure that the contract drains in a hundred seconds (Campaign 6e4b59 §3.1; contract 29f5b0 §5; U3) | REV104 | read | Design Review |
| REV104-15 | The Spark row has crossed: the contract now holds Combat's rule and Combat now holds the contract's (contract 29f5b0 §4; Combat 80835f §0.5; Spark 730ee8) | REV104 | read | Campaign, Design Review, Enemies +4 |
Regenerated by the editor when the critic archives a round. If a finding is missing, its heading did not match the pattern — tell the editor rather than adding it by hand, so the generator gets fixed.
