2026-09-06 19:32:16 ec1b6c Anonymous DES103 r8 (Design Document r14): REV103-2/X27 residual fixed under the collection rule as written (17 kills; 1/1 at 3:00, 10/9 before the discharge, arc's takes one, nineteen expire; ledger closes to the unit); second discharge at 8:22 so 'about sixty' matches arrival over half a minute; World r17 mirrored in section 11 (V/V2/V3, weir clause, drain R, junction gate keeps working, workshop stays useful); REV103-9 stated with the lead's hydraulic proposal for World to rule on first; REV103-8 PM report rewritten; Q45 front matter names Appendix C and gives both readings
2026-09-06 19:13:23 50046f Anonymous DES103 r7 (Design Document r13) against PMR003 and REV103 r2: expedition six arrival/stun/burst sequence made consistent (discharge at 8:20 with sixty in the water, eight-second stun, burst on the recovering crowd); 'can reach'; stale handoffs replaced; valve table, relay-versus-door supply and coil-route crowd qualification stated as lead proposals for the world designer; state table and both ledgers moved to Appendix C; nothing else moved
2026-09-06 19:05:09 50840d Anonymous DES103 r6 (Design Document r12): decision 3 and section 4 now state the team's split on the routing model (world designer prefers the sight-limited alternative, critic the written one, PM chose the written one for drafting), so the owner sees the dissent (Clarity Q42); nothing else moved
2026-09-06 19:03:34 6fe6ca Anonymous DES103 r5 (Design Document r11) against REV103 r1: stale seventh-slot sentence deleted and expedition one's timing and ledger fixed (REV103-1, EXT X25); collection rule restated (most room, linked or not, tie to the earlier battery) and expedition six re-tallied so the coil's battery is full before each discharge (REV103-2); plain licence clauses and the asset-licences page cited (Clarity Q41); nothing else moved
2026-09-06 18:54:36 8afa59 Anonymous DES103 r4 (Design Document r10) against PMR002 closing review: finale mirrors World and Mystery r16's merged chain and endings (fix clamps signal only); PM's audience wording; owner page says reviewed with revisions open; stale awaits-PM lines fixed; two-battery electrician drawn leak-free with one-link-per-module rule; burst nominal equals actual; PM's vertical-coil one-drip rack; world designer's alternative failure recorded; Appendix A module roster and battery entry (Q39); Q40 already met
2026-09-06 18:47:35 fb6b6d Anonymous DES103 r3 (Design Document r9) against PMR002: scenes rewritten as state sequences obeying the routing rule with retarget-or-spread precedence; junction lamp is an indicator; legal racks and charge ledgers for both expeditions; hauler cost stated truthfully; pickup, overflow, planting rules; arc fuel policy and two drawn arc loadouts with a played burst (REV102-13); tier-three chain proposed for the world designer; endings' rules; no ending salvage cost; length in hours as assumptions; early-stop answer without achievement data; free zombie pack as a design lever; price uncommitted
2026-09-06 18:33:26 d37cbf Anonymous DES103 r2 (Design Document r8): fix EXT102 X21 (a mote adds charge up to capacity) and X22 (electrician loop break-even with one battery, profitable with two; arc bounded by the surge, drain above cutter yield); one cable vocabulary (REV102-7); owner page recommendation rewritten in plain words with no term before its definition (Clarity Q38); nothing else moved
2026-09-06 18:25:16 44984c Anonymous DES103 r1 (Design Document r7) under PMU002 criteria 1-11: owner page leads with one recommendation; section 17 proposes one experience with departures priced; arc module moved into the minimum scope so the design meets the survivorlike requirement; unsupported commercial claims withdrawn per PMU002; D016 and D017 recorded; review-count line replaced; Q36 answered; duplicate cable entry merged
2026-09-06 18:13:03 12779d Anonymous DES102 draft r6 (DES103 base): merge owner decisions 4 and 6 into one shelf decision with the measured price bands, playtime medians with the reviewer-bias caveat, refund terms and honest options (Clarity Q35, EXT101 X20); renumber to nine; note World and Mystery r12 alignment; nothing else moved
2026-09-06 18:08:29 bc134b Anonymous DES102 draft r5, offered as DES103 base: state REV102-6 (panel through the open valve opens the junction gate, coil buys stealth not access); add a one-page owner summary on top as the pitch layer; bookkeeping; nothing else moved
2026-09-06 18:04:54 46b320 Anonymous DES102 draft r4: complete REV102 r1 issues 3 and 5 (flash observable in the failed-experiment lesson; press-rate bound in section 15) and the minor items; Clarity Q33 (survivorlike question in the owner's word, decision 6 reframed) and Q34 (refund window explained and sourced from Steam; measured price bands cited with caveat); Noita named; conductivity extension; r3 topology stands per REV102-1, world designer asked to align
2026-09-06 17:59:52 d35209 Anonymous DES102 draft r3: align to World and Mystery r10 verbatim (junction platform, junction gate on its own circuit with valve and pool, crank, press and pursuit range, r10 map); apply integration items 1-7; visible signal cable answers Clarity Q32; expedition twenty-one, owned length and working-title wording answer EXT101 X9/X13/X14; cite REF101; routing baseline unchanged pending PM
2026-09-06 17:51:43 c4ad51 Anonymous DES102 draft r2: integrate WLD102 r8 (map with gate and ledges, ladder exit, gravity culvert, crowd holding/proximity/thinning, five-part price, shut/fix/hold ending); answer External Critique on design points (differentiator, rack scope, optional arc module, renewable, length vs refund window); three new owner decisions; routing baseline unchanged pending PM ruling
2026-09-06 17:42:52 d828a4 Anonymous DES102 draft r1: integrated design document under Brief D013 and Tasks PMR001; one routing model priced, district map, rack loadouts, finite charge, no-upkeep colony, three-tier ending, expedition one and expedition six, readable-state table with checked sources; In review