2026-09-09 12:16:19
Anonymous:
Record readiness submissions555/557 and verified ONE critique558
hold the flood/design coverage.md ..
@@ 1,6 1,6 @@
# Hold The Horde — Design Coverage
-
**PM coverage assessment,9 September2026; current status through553.**15 usable first-pass domains/0 partial remains the classification depth; it is not M2/M3 completion.38 now numbers the previously planned final coherence/readiness work, with no game-scope increment.
+
**PM coverage assessment,9 September2026; current status through558.**15 usable first-pass domains/0 partial remains the classification depth; it is not M2/M3 completion.38 now numbers the previously planned final coherence/readiness work, with no game-scope increment.
Across fifteen major areas, **all fifteen now have usable first-pass contracts; zero remain partial at this classification depth**. This is not complete wiki v1, weighted progress or a percentage of the game.37 is preparation-closed550; whole-v1 coherence/readiness38 remains. “Written” does not mean owner-approved, implemented or validated.
@@ 42,7 42,7 @@
|Prepared information/options34|[Player Information And Options34](/Hold%20The%20Flood/Player%20Information%20And%20Options): main cue/action inventory, journal/manifest, equivalent channels and default interactions, closed509 at61e0be4a|One critique/response plus PM508 integration complete; no second review. Actual-ID/global/mechanical consumers still need alignment; full presentation variants remain M4|
|Prepared campaign evidence/state crosswalk36|[Campaign Evidence And State Crosswalk36](/Hold%20The%20Flood/Campaign%20Evidence%20And%20State%20Crosswalk):8 existing chains/15 scenes/26 evidence INDEX entries,7 host variants/5 personal variants and2 actual Regional25 orders|Closed545 at11:49:32, final70e004e9. PM owns36 STOPPED; Lead’s36 writing is stopped. Optional parent tags declined; no transfer needed. Use the prepared mapping in whole-v1 coherence;26 entries are not26 new objects|
|Prepared scope and development handoff37|[Production Scope](/Hold%20The%20Flood/Production%20Scope)68db46ea and [Development And Validation Handoff](/Hold%20The%20Flood/Development%20And%20Validation%20Handoff)59945901;21,243/27,529 bytes|Closed550 at12:05:47 after ONE critique/response and verification. Both Systems STOPPED.10–18 coherence hours remains forward; accepted dated14–26 response allowance is not charged again|
-
|Whole-v1 coherence/readiness38|[V1 Readiness38](/Hold%20The%20Flood/V1%20Readiness):15-domain matrix, evidence-backed bounded repairs, decision register and separate M2/M3 recommendations|Lead551 and Systems552 factual support WORKING; Reviewer553 criteria WORKING; all receiving/full contracts verified. Draft13:30 (12:45–14:30), reviewed16:00 (14:30–18). No repeated broad review or new content|
+
|Whole-v1 coherence/readiness38|[V1 Readiness38](/Hold%20The%20Flood/V1%20Readiness):15-domain matrix, evidence-backed bounded repairs, decision register and separate M2/M3 recommendations|Lead557/Systems555 STOPPED after submissions; Reviewer558 WORKING, receiving/full contract verified. Draft13:30 (12:45–14:30), reviewed16:00 (14:30–18). No repeated broad review or new content|
Full scripts, all string/glyph occurrences, exhaustive state/layout permutations and implementation are outside these M3 clusters. They remain visible M4/later work. A missing major mechanical rule cannot be replaced by a UI label or a list of unanswered questions.
@@ 50,7 50,7 @@
| Window, Jerusalem dates | Planned result | Staffing/dependency |
|---|---|---|
-
|9 Sep|35 closed11:35:17;36 closed11:49:32;37 closed12:05:47.38 draft13:30 (12:45–14:30), support13:00 (12:30–14), criteria12:45; reviewed16:00 (14:30–18)|Lead/Systems WORKING38; Reviewer criteria WORKING; all receiving/full contracts verified. All game parents STOPPED.38 targets low confidence; F1.14 dates unchanged pending actual readiness findings|
+
|9 Sep|35 closed11:35:17;36 closed11:49:32;37 closed12:05:47.38 draft13:30 (12:45–14:30), support13:00 (12:30–14), criteria12:45; reviewed16:00 (14:30–18)|Lead557/Systems555 STOPPED after submissions; Reviewer558 WORKING, receiving/full contract verified. All game parents STOPPED.38 targets low confidence; F1.14 dates unchanged pending actual readiness findings|
|9–11 Sep; core buffer to14Sep|Owning-parent, mechanical/information/state/reference integration; finite scope/handoff|PM, Systems and restored original Lead/Reviewer; no extra agent prerequisite. Technical/production candidate10Sep only if a concrete independent gap remains|
|**M3 target14 Sep; range11–18 Sep**|Complete first-pass wiki with integrated interfaces, finite inventories and usable proposed development handoff|**Adopted F1.14, low confidence.** Scope audit and accepted25–33 justify revision; first-pass scope/continuity/capacity changes can move it|
|Historical forecast|Prior published M3 target22 Sep (18–29); older absent-two-specialists scenario25 Sep (22 Sep–2 Oct)|Preserved planning history, superseded as the current schedule; yesterday’s conditional14Sep F1.14 draft was unpublished|
@@ 66,4 66,4 @@
Track deliverable and depth separately: first-pass rule set, finite content inventory, and later implementation. Count a shared survivor scene/colony project/clue/region objective once, then estimate only its distinct additional work. Keep package review/response, PM cross-page integration and whole-game coherence review separate without double counting. Production24's dated response assigned24module/40room/12mechanism v1 brief minimums to one20–34author-hour package, beyond objective allocation. Accepted32 now prepares the room/module briefs and honestly counts a thirteenth independent mechanism.33 retains ten encounters/thirteen mechanisms; this is scope reconciliation, not a newly calculated labor increment. Detailed campaign authoring extends these briefs; do not charge both full depths. See [Production Scope](/Hold%20The%20Flood/Production%20Scope) for the proposed revised144–247role-hour v1 allowance and separate review/response/integration; it is the dated8Sep planning estimate, not logged labor or an automatically current remaining balance; subtract accepted scope before recomputing the remainder.
-
This map is based on the current owner brief, Whole Game Outline revised through narrow alignment432 at2d6de3c0, the linked owning articles and a source-by-source PM coverage audit. The catalogue was subsequently read at submission396, received one focused review/response397/399 and was preparation-closed400 at revision737b3cfd. Outcome21 trap/encounter and22 handoff first passes were closed410;23 save/content-state closed417 at18:09:56 Jerusalem, final438cdf35. Production24 closed423 after scoped response421/422; Regional Discovery Map25 closed426 after response425 at3acda018. Its objective map initially left the domain partial pending24module/40room briefs, now prepared32. Acquisition26 closed434 at18:57:01, finalf5f6d768, after actual429, one focused critique431, the verified author response and PM’s paragraph-only maintenance433. Late notice436 records pre-maintenancef7ede725 rather than a rollback. PM now classifies equipment/acquisition as a usable first-pass contract, with source-fixture detail and exceptions still required. Combat And Enemy Roster27 closed443 at19:34, finalf1fe0d9a, after one focused critique and the442 response. PM now classifies the existing enemy/encounter/trap category as usable first-pass; the already usable combat category is not counted again. Room32 subsequently supplied24module/40room briefs;33 carries the ten-encounter/thirteen-mechanism successor. Home And Colony Loop28 closed450 at20:01:12, final5bff3436, after one focused critique and449response. Home/colony was thereby classified usable first-pass; exact fixture/control details remain unfinished, and Cast31 now supplies its separate first-pass cast/scene allocation. Two Language Discovery Map29 closed459 at20:23:52, finaldf0f48f5, after one focused critique and458response. Language/discovery was thereby classified usable first-pass. Story And Ending Map30 closed466 at20:42:22, final03c9cb8e, after one focused critique and465response. Story/ending was thereby classified usable first-pass. Cast And Short Rescue Map31 closed473 at21:12:44, final6456406b, after one focused critique and472response; the cast/rescue category thereby advanced to13usable/2partial at that closeout. Five cast briefs/fifteen unique primary scene briefs are prepared; full scripts, state/geometry variants and placements remain. Station Room And Module Inventory32 closed481 at21:44:18 after one review/response479/480, finald4ef2497(61009bytes), with24module/40room first-pass briefs and an honest13major-mechanism ledger. Regional coverage is now usable, bringing the current total to14usable/1partial. Encounter And Mechanism Placement Inventory33 was submitted484, received ONE critique486/response488, and preparation-closed493 on9Sep10:32:09 after narrow PM integration492, final5c1a9ad6(57934bytes). Ten encounters INCLUDING two setpieces and13major mechanism briefs are prepared. Owner resumed all roles490;34 main information/options assigned491 and global04 continuity assigned494, with two original-Reviewer critiques preauthorized495. Information34 subsequently closed509 at10:53:59, final61e0be4a, after one critique/response and PM508 integration. Global04 candidate577236e7 was accepted512 at10:56:53; all eleven parent alignments were subsequently verified and04 closed518 at11:07:24. PM519 explicitly promotes the existing continuity category, bringing current coverage to15usable/0partial without claiming M3 completion. Mechanical35 later closed533 at11:35:17, final2e604fc2, after one critique/response, twelve verified parent alignments and two532 fixes. Campaign36 subsequently closed545 at11:49:32, final70e004e9, after one critique/response and PM integration;8 chains/15 scenes/26 evidence INDEX entries,7 host variants/5 personal variants/2 Regional25 orders. No parent transfer is needed. Scope/handoff37 closed550 at12:05:47 after ONE critique547/response549 and exact verification, final68db46ea/59945901. The previously planned coherence work is now38 under551–553. Current38tracked/37closed/1open38; Lead assessment and Systems local factual support are WORKING; Reviewer criteria WORKING; all receiving/full contracts verified. All game parents remain STOPPED.15usable/0partial does not close M3.13is not every interactive object, and the scope increment is not owner approval. Global04 is now usable at first-pass contract depth; remaining interfaces and whole-v1 coherence are open, while full scripts/exhaustive variants are M4. The credits/continue-before-departure choice and three earlier questions remain unanswered. New485 asks protected alive/unsent retreat before one shift versus dangerous injury/loss options, bringing the current total to five; no survivor rule was selected in485; new candidate-only ownership was explicitly assigned494. Narrow legacy04 Discovery114e9267/Expedition836ab2ae integration was verified443; broader global04 preparation closed518. Historical scope allowances are planning assumptions, not validated labor or adopted content counts.37 accepted14–26 role-hours as the dated response549 allowance; its4–8 response/disposition share is now closed, leaving only10–18 coherence hours forward. M4 350–590 and future-packet289–490/5–8 weeks remain low-confidence conditional estimating proposals, not measured productivity or phase authorization. F1.14 dates remain unchanged pending38. The separately found Rescue Shift Proposal and Station Assembly Example remain unadopted intake407, not completed shared integration. The management checkpoint retains the exact inspected source revisions. No page count, model agreement or desk review establishes fun, balance, usability, performance or campaign duration.
+
This map is based on the current owner brief, Whole Game Outline revised through narrow alignment432 at2d6de3c0, the linked owning articles and a source-by-source PM coverage audit. The catalogue was subsequently read at submission396, received one focused review/response397/399 and was preparation-closed400 at revision737b3cfd. Outcome21 trap/encounter and22 handoff first passes were closed410;23 save/content-state closed417 at18:09:56 Jerusalem, final438cdf35. Production24 closed423 after scoped response421/422; Regional Discovery Map25 closed426 after response425 at3acda018. Its objective map initially left the domain partial pending24module/40room briefs, now prepared32. Acquisition26 closed434 at18:57:01, finalf5f6d768, after actual429, one focused critique431, the verified author response and PM’s paragraph-only maintenance433. Late notice436 records pre-maintenancef7ede725 rather than a rollback. PM now classifies equipment/acquisition as a usable first-pass contract, with source-fixture detail and exceptions still required. Combat And Enemy Roster27 closed443 at19:34, finalf1fe0d9a, after one focused critique and the442 response. PM now classifies the existing enemy/encounter/trap category as usable first-pass; the already usable combat category is not counted again. Room32 subsequently supplied24module/40room briefs;33 carries the ten-encounter/thirteen-mechanism successor. Home And Colony Loop28 closed450 at20:01:12, final5bff3436, after one focused critique and449response. Home/colony was thereby classified usable first-pass; exact fixture/control details remain unfinished, and Cast31 now supplies its separate first-pass cast/scene allocation. Two Language Discovery Map29 closed459 at20:23:52, finaldf0f48f5, after one focused critique and458response. Language/discovery was thereby classified usable first-pass. Story And Ending Map30 closed466 at20:42:22, final03c9cb8e, after one focused critique and465response. Story/ending was thereby classified usable first-pass. Cast And Short Rescue Map31 closed473 at21:12:44, final6456406b, after one focused critique and472response; the cast/rescue category thereby advanced to13usable/2partial at that closeout. Five cast briefs/fifteen unique primary scene briefs are prepared; full scripts, state/geometry variants and placements remain. Station Room And Module Inventory32 closed481 at21:44:18 after one review/response479/480, finald4ef2497(61009bytes), with24module/40room first-pass briefs and an honest13major-mechanism ledger. Regional coverage is now usable, bringing the current total to14usable/1partial. Encounter And Mechanism Placement Inventory33 was submitted484, received ONE critique486/response488, and preparation-closed493 on9Sep10:32:09 after narrow PM integration492, final5c1a9ad6(57934bytes). Ten encounters INCLUDING two setpieces and13major mechanism briefs are prepared. Owner resumed all roles490;34 main information/options assigned491 and global04 continuity assigned494, with two original-Reviewer critiques preauthorized495. Information34 subsequently closed509 at10:53:59, final61e0be4a, after one critique/response and PM508 integration. Global04 candidate577236e7 was accepted512 at10:56:53; all eleven parent alignments were subsequently verified and04 closed518 at11:07:24. PM519 explicitly promotes the existing continuity category, bringing current coverage to15usable/0partial without claiming M3 completion. Mechanical35 later closed533 at11:35:17, final2e604fc2, after one critique/response, twelve verified parent alignments and two532 fixes. Campaign36 subsequently closed545 at11:49:32, final70e004e9, after one critique/response and PM integration;8 chains/15 scenes/26 evidence INDEX entries,7 host variants/5 personal variants/2 Regional25 orders. No parent transfer is needed. Scope/handoff37 closed550 at12:05:47 after ONE critique547/response549 and exact verification, final68db46ea/59945901. The previously planned coherence work is now38 under551–553. Current38tracked/37closed/1open38; Lead557 assessment and Systems555 local factual support are submitted/STOPPED; Reviewer558 is WORKING, receiving/full contract verified. All game parents remain STOPPED.15usable/0partial does not close M3.13is not every interactive object, and the scope increment is not owner approval. Global04 is now usable at first-pass contract depth; remaining interfaces and whole-v1 coherence are open, while full scripts/exhaustive variants are M4. The credits/continue-before-departure choice and three earlier questions remain unanswered. New485 asks protected alive/unsent retreat before one shift versus dangerous injury/loss options, bringing the current total to five; no survivor rule was selected in485; new candidate-only ownership was explicitly assigned494. Narrow legacy04 Discovery114e9267/Expedition836ab2ae integration was verified443; broader global04 preparation closed518. Historical scope allowances are planning assumptions, not validated labor or adopted content counts.37 accepted14–26 role-hours as the dated response549 allowance; its4–8 response/disposition share is now closed, leaving only10–18 coherence hours forward. M4 350–590 and future-packet289–490/5–8 weeks remain low-confidence conditional estimating proposals, not measured productivity or phase authorization. F1.14 dates remain unchanged pending38. The separately found Rescue Shift Proposal and Station Assembly Example remain unadopted intake407, not completed shared integration. The management checkpoint retains the exact inspected source revisions. No page count, model agreement or desk review establishes fun, balance, usability, performance or campaign duration.